ML22136A069: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301                             Administrative Topics Outline                           Form ES-301-1 Facility:         Point Beach                                 Date of Examination:           7/15/2019 Examination Level: RO           SRO                         Operating Test Number:         2019 Administrative Topic (see Note)             Type           Describe activity to be performed Code*
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility:
D Respond to Quadrant Power Tilt in Excess Conduct of Operations                                    of Technical Specifications S
Point Beach Date of Examination:
2.1.7 (4.4/4.7)
7/15/2019 Examination Level: RO SRO Operating Test Number:
D Perform a Pressurizer Heater Group Input Conduct of Operations                                    Test Calculation R
2019 Administrative Topic (see Note)
2.1.25 (3.9/4.2)
Type Code*
S     Auxiliary Feedwater Lineup Equipment Control N      2.2.15, (3.9/4.3)
Describe activity to be performed Conduct of Operations D
Determine a Stay Time for a High D      Radiation Area Radiation Control                                  R      2.3.7 (3.5/3.6)
S Respond to Quadrant Power Tilt in Excess of Technical Specifications 2.1.7 (4.4/4.7)
P      2.3.12 (3.2/3.7) 2015 NRC Exam Emergency Plan                                   N/A     Not Applicable NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
Conduct of Operations D
* Type Codes and Criteria:         (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
R Perform a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)
Equipment Control S
N Auxiliary Feedwater Lineup 2.2.15, (3.9/4.3)
Radiation Control D
R P
Determine a Stay Time for a High Radiation Area 2.3.7 (3.5/3.6) 2.3.12 (3.2/3.7) 2015 NRC Exam Emergency Plan N/A Not Applicable NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
(P)revious 2 exams ( 1, randomly selected)  


ES-301                             Administrative Topics Outline                           Form ES-301-1 Facility:         Point Beach                               Date of Examination:           7/15/2019 Examination Level: RO           SRO                       Operating Test Number:         2019 Administrative Topic (see Note)             Type           Describe activity to be performed Code*
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
D Review Quadrant Power Tilt Manual Conduct of Operations                                    Calculation R
Point Beach Date of Examination:
2.1.37 (4.3/4.6)
7/15/2019 Examination Level: RO SRO Operating Test Number:
N Review a Pressurizer Heater Group Input Conduct of Operations                                    Test Calculation R
2019 Administrative Topic (see Note)
2.1.25 (3.9/4.2)
Type Code*
D     Review Tagout Equipment Control R      2.2.13, (4.1/4.3)
Describe activity to be performed Conduct of Operations D
M     Remove RMS Channel from Service Radiation Control R      2.3.13 (3.4/3.8)
R Review Quadrant Power Tilt Manual Calculation 2.1.37 (4.3/4.6)
D     Formulate Protective Action Emergency Plan                                    R      Recommendations S      2.4.44 (2.4/4.4)
Conduct of Operations N
R Review a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)
Equipment Control D
R Review Tagout 2.2.13, (4.1/4.3)
Radiation Control M
R Remove RMS Channel from Service 2.3.13 (3.4/3.8)
Emergency Plan D
R S
Formulate Protective Action Recommendations 2.4.44 (2.4/4.4)
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes and Criteria:         (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
* Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
(P)revious 2 exams ( 1, randomly selected)  


ES-301                             Administrative Topics Outline                           Form ES-301-1 Facility:         Point Beach - Added for Lohse-RO            Date of Examination:           7/15/2019 Examination Level: RO           SRO                         Operating Test Number:         2019 Administrative Topic (see Note)             Type             Describe activity to be performed Code*
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Conduct of Operations D
Point Beach Date of Examination:
Determination of Maximum Venting Time Conduct of Operations                                      per Attachment B of CSP-I.3 R
7/15/2019 Examination Level: RO SRO Operating Test Number:
2.1.25 (3.9/4.2)
2019 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations Conduct of Operations D
R Determination of Maximum Venting Time per Attachment B of CSP-I.3 2.1.25 (3.9/4.2)
Equipment Control Radiation Control Emergency Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
Equipment Control Radiation Control Emergency Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes and Criteria:         (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
* Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)}}
(P)revious 2 exams ( 1, randomly selected)
- Added for Lohse-RO}}

Latest revision as of 17:06, 27 November 2024

Form ES-301-1
ML22136A069
Person / Time
Site: Point Beach  
Issue date: 03/19/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
Baker R
Shared Package
ML17215A928 List:
References
Download: ML22136A069 (3)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Point Beach Date of Examination:

7/15/2019 Examination Level: RO SRO Operating Test Number:

2019 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations D

S Respond to Quadrant Power Tilt in Excess of Technical Specifications 2.1.7 (4.4/4.7)

Conduct of Operations D

R Perform a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)

Equipment Control S

N Auxiliary Feedwater Lineup 2.2.15, (3.9/4.3)

Radiation Control D

R P

Determine a Stay Time for a High Radiation Area 2.3.7 (3.5/3.6) 2.3.12 (3.2/3.7) 2015 NRC Exam Emergency Plan N/A Not Applicable NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Point Beach Date of Examination:

7/15/2019 Examination Level: RO SRO Operating Test Number:

2019 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations D

R Review Quadrant Power Tilt Manual Calculation 2.1.37 (4.3/4.6)

Conduct of Operations N

R Review a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)

Equipment Control D

R Review Tagout 2.2.13, (4.1/4.3)

Radiation Control M

R Remove RMS Channel from Service 2.3.13 (3.4/3.8)

Emergency Plan D

R S

Formulate Protective Action Recommendations 2.4.44 (2.4/4.4)

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Point Beach Date of Examination:

7/15/2019 Examination Level: RO SRO Operating Test Number:

2019 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations Conduct of Operations D

R Determination of Maximum Venting Time per Attachment B of CSP-I.3 2.1.25 (3.9/4.2)

Equipment Control Radiation Control Emergency Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)

- Added for Lohse-RO