ML23262B229: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML23262B229 | | number = ML23262B229 | ||
| issue date = 09/21/2023 | | issue date = 09/21/2023 | ||
| title = Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time ( | | title = Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | ||
| author name = Jardaneh M | | author name = Jardaneh M | ||
| author affiliation = NRC/NRR/DSS | | author affiliation = NRC/NRR/DSS | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:September 21, 2023 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 | {{#Wiki_filter:September 21, 2023 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 | ||
==SUBJECT:== | ==SUBJECT:== | ||
FINAL SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-591, REVISION 0, REVISE RISK-INFORMED COMPLETION TIME (RICT) PROGRAM (EPID L-2022-PMP-0003) | FINAL SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-591, REVISION 0, REVISE RISK-INFORMED COMPLETION TIME (RICT) PROGRAM (EPID L-2022-PMP-0003) | ||
==Dear Members of the Technical Specifications Task Force:== | ==Dear Members of the Technical Specifications Task Force:== | ||
By {{letter dated|date=March 22, 2022|text=letter dated March 22, 2022}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22081A224), the Technical Specifications Task Force submitted Traveler TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program, to the U.S. Nuclear Regulatory Commission (NRC). The traveler was submitted as part of the consolidated line item improvement process (CLIIP). Traveler TSTF-591, Revision 0, is approved as a CLIIP traveler. The NRC staffs final traveler safety evaluation is enclosed. | By {{letter dated|date=March 22, 2022|text=letter dated March 22, 2022}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22081A224), the Technical Specifications Task Force submitted Traveler TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program, to the U.S. Nuclear Regulatory Commission (NRC). The traveler was submitted as part of the consolidated line item improvement process (CLIIP). Traveler TSTF-591, Revision 0, is approved as a CLIIP traveler. The NRC staffs final traveler safety evaluation is enclosed. | ||
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov. | If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Mahmoud Jardaneh, Acting Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753 | Mahmoud Jardaneh, Acting Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753 | ||
==Enclosure:== | ==Enclosure:== | ||
Final Traveler SE cc: See next page | |||
Technical Specifications Task Force Project No. 753 cc: | |||
Technical Specifications Task Force | |||
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann Email: brian.mann@excelservices.com Drew Richards STP Nuclear Operating Company 12090 FM 521 Mail Code: N5016 Wadsworth, TX 77483 Email: amrichards@stpegs.com Kevin Lueshen Constellation Energy Generation 4300 Winfield Road Warrenville IL 60555 Email: kevin.lueshen@constellation.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Phil H. Lashley Energy Harbor 168 E. Market St. | Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann Email: brian.mann@excelservices.com Drew Richards STP Nuclear Operating Company 12090 FM 521 Mail Code: N5016 Wadsworth, TX 77483 Email: amrichards@stpegs.com Kevin Lueshen Constellation Energy Generation 4300 Winfield Road Warrenville IL 60555 Email: kevin.lueshen@constellation.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Phil H. Lashley Energy Harbor 168 E. Market St. | ||
Akron, OH 44308 Email: phlashley@energyharbor.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 Email: wasparkm@southernco.com | Akron, OH 44308 Email: phlashley@energyharbor.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 Email: wasparkm@southernco.com | ||
ML23262B440, Package ML23262B229, Cover letter ML23262B230, Final traveler SE | ML23262B440, Package ML23262B229, Cover letter ML23262B230, Final traveler SE | ||
*Concurred via email NRR-106 OFFICE NRR/DRA/ | |||
NRR/DORL/LPL2-1/BC NAME RPascerelli Michael Markley DATE 9/1/2023 9/20/2023 OFFICE OGC/NLO* | |||
NRR/DSS/STSB/PM* | |||
NRR/DSS/STSB/ABC NAME MWoods/DRoth MHoncharik MJardaneh DATE 9/7/2023 9/19/2023 9/21/2023}} | |||
Latest revision as of 08:44, 25 November 2024
| ML23262B229 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 09/21/2023 |
| From: | Jardaneh M NRC/NRR/DSS |
| To: | NRC/NRR/DSS/STSB |
| References | |
| EPID L-2022-PMP-0003 | |
| Download: ML23262B229 (3) | |
Text
September 21, 2023 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
FINAL SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-591, REVISION 0, REVISE RISK-INFORMED COMPLETION TIME (RICT) PROGRAM (EPID L-2022-PMP-0003)
Dear Members of the Technical Specifications Task Force:
By letter dated March 22, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22081A224), the Technical Specifications Task Force submitted Traveler TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program, to the U.S. Nuclear Regulatory Commission (NRC). The traveler was submitted as part of the consolidated line item improvement process (CLIIP). Traveler TSTF-591, Revision 0, is approved as a CLIIP traveler. The NRC staffs final traveler safety evaluation is enclosed.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.
Sincerely,
/RA/
Mahmoud Jardaneh, Acting Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
Enclosure:
Final Traveler SE cc: See next page
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann Email: brian.mann@excelservices.com Drew Richards STP Nuclear Operating Company 12090 FM 521 Mail Code: N5016 Wadsworth, TX 77483 Email: amrichards@stpegs.com Kevin Lueshen Constellation Energy Generation 4300 Winfield Road Warrenville IL 60555 Email: kevin.lueshen@constellation.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Phil H. Lashley Energy Harbor 168 E. Market St.
Akron, OH 44308 Email: phlashley@energyharbor.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 Email: wasparkm@southernco.com
ML23262B440, Package ML23262B229, Cover letter ML23262B230, Final traveler SE
- Concurred via email NRR-106 OFFICE NRR/DRA/
NRR/DORL/LPL2-1/BC NAME RPascerelli Michael Markley DATE 9/1/2023 9/20/2023 OFFICE OGC/NLO*
NRR/DSS/STSB/PM*
NRR/DSS/STSB/ABC NAME MWoods/DRoth MHoncharik MJardaneh DATE 9/7/2023 9/19/2023 9/21/2023