ML23307A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ML23307A077 Form 2.1-1 Examination Preparation Checklist Facility: ____McGuire__________________________                                       Date of Examination: _Jul/Aug2023___
{{#Wiki_filter:Form 2.1-1 Examination Preparation Checklist Facility: ____McGuire__________________________
Developed by: Written:         Facility x       NRC             //   Operating:     Facility   x     NRC Chief Target Task Description                                             Examiners Date*
Date of Examination: _Jul/Aug2023___
Initials
Developed by: Written:
: 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations,                   MB
Facility x NRC  
  -240          arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
//
  -210     2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).                               MB
Operating:
: 3. Facility licensee contact briefed on examination security and other requirements (D.4). As         MB applicable, the facility licensee contact submits to the NRC any prescreened K/As for
Facility x
  -210 elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
NRC Target Date*
  -210     4. Reference material due for NRC-prepared examinations (F).                                           MB
Task Description Chief Examiners Initials
  -210     5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).       MB
-240
: 6. Written examination outline developed by the NRC and sent to the facility licensee contact         MB
: 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
  -195 (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
MB
: 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as MB
-210
  -150          applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
: 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
: 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee         MB
MB  
  -136 (ES-2.3).
-210
: 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility                 MB
: 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
  -100 licensee review (ES-2.3).
MB
: 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms;               MB
-210
  -75          quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
: 4. Reference material due for NRC-prepared examinations (F).
  -60     11. Preliminary waiver/excusal requests due (ES-2.2 E.1).                                               MB
MB  
: 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors             MB
-210
  -50 authorization to proceed with the facility review granted (ES-2.3 D).
: 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
  -50     13. Examination review results discussed between the NRC and the facility licensee (B.14).               MB
MB  
  -35     14. Examination preparatory week conducted by the NRC and the facility licensee (I).                     MB
-195
  -30     15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).           MB
: 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
: 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1               MB
MB
  -14 prepared (ES-2.2 C and E).
-150
    -7     17. Written examinations and operating tests approved by the NRC supervisor (C.9)                       MB
: 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
: 18. Facility licensee management feedback on the examination requested by the NRC                       MB
MB
    -7 supervisor (C.10).
-136
: 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility       MB
: 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
    -7 (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
MB
    -7     20. Written examination administration guidelines reviewed with the facility licensee (D.14).           MB
-100
    -7     21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).                 MB
: 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
MB
-75
: 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
MB
-60
: 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
MB  
-50
: 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
MB
-50
: 13. Examination review results discussed between the NRC and the facility licensee (B.14).
MB  
-35
: 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
MB  
-30
: 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
MB  
-14
: 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
MB
-7
: 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
MB  
-7
: 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
MB
-7
: 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
MB
-7
: 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
MB  
-7
: 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
MB
* Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
* Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
ML23307A077


Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility:   McGuire                       Dates of Examination: Jul/Aug 2023 Date Activity Description Complete
Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: McGuire Dates of Examination: Jul/Aug 2023 Activity Description Date Complete
: 1. *Received postexamination package from facility licensee and 8/23/23 verified complete. (ES-4.4)
: 1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 8/23/23
: 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination           9/19/23 completed. (ES-4.4)
: 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 9/19/23
: 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.         9/19/23 (ES-3.6)
: 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
: 4. *Completed NRC chief examiner review of operating test and written 9/19/23 examination grading. (ES-3.6 and ES-4.4)
(ES-3.6) 9/19/23
: 5. Completed licensing official review.                                       9/20/23
: 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 9/19/23
: 6. Mailed licenses, preliminary results, and pass letters.                     9/20/23
: 5. Completed licensing official review.
: 7. Notified facility licensee of results.                                     9/20/23
9/20/23
: 8. Issued the examination report (refer to Operator Licensing Manual 9/20/23 Chapter (OLMC) 510, Operator Licensing Examination Reports).
: 6. Mailed licenses, preliminary results, and pass letters.
: 9. Returned reference material after final resolution of any informal 10/6/23 NRC staff reviews, hearing demands, or both.
9/20/23
: 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and 10/10/23 Management Directive 3.53, NRC Records and Document Management Program).
: 7. Notified facility licensee of results.
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.
9/20/23
: 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
9/20/23
: 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
10/6/23
: 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
10/10/23
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.  


Edward R. Pigott J_DUKE                                                                                Site Vice President McGuire Nuclear Station ENERGY                                                                                   Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 Edward.Pigott@duke-energy.com deleted RA-23-0220 August 23, 2023                                                                     10 CFR 55.5 Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257
J_ DUKE Edward R. Pigott Site Vice President McGuire Nuclear Station  
ENERGY Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 Edward.Pigott@duke-energy.com deleted RA-23-0220 August 23, 2023 Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257  


==SUBJECT:==
==SUBJECT:==
Duke Energy Carolinas, LLC (Duke Energy)
Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023.
McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 10 CFR 55.5 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023.
Specific items attached include:
Specific items attached include:
* Student answer sheets and Exam cover pages
Student answer sheets and Exam cover pages Master copy of the RO and SRO examinations and answer keys Student questions/proctor responses during the written examination Student Seating Chart ES-1.3-1, Examination Security Agreement Post Exam Comments Questions or comments should be directed to Steven Mosteller at (980) 875-5981 or Jeff Thomas at (980) 875-4499.
* Master copy of the RO and SRO examinations and answer keys
Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President  
* Student questions/proctor responses during the written examination
* Student Seating Chart
* ES-1.3-1, Examination Security Agreement
* Post Exam Comments Questions or comments should be directed to Steven Mosteller at (980) 875-5981 or Jeff Thomas at (980) 875-4499.
Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President


U.S. Nuclear Regulatory Commission RA-23-0220 Page2 Attachment cc:   Mr. Thomas A Stephen, Chief Operations Branch 1 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Mark Bates U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001}}
U.S. Nuclear Regulatory Commission RA-23-0220 Page2 Attachment cc:
Mr. Thomas A Stephen, Chief Operations Branch 1 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Mark Bates U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001}}

Latest revision as of 07:57, 25 November 2024

301 ADAMS 2B
ML23307A077
Person / Time
Site: McGuire, Mcguire  
Issue date: 11/03/2023
From:
NRC/RGN-II
To:
References
50-369/23-301, 50-370/23-301 50-369/OL-23, 50-370/OL-23
Download: ML23307A077 (1)


Text

Form 2.1-1 Examination Preparation Checklist Facility: ____McGuire__________________________

Date of Examination: _Jul/Aug2023___

Developed by: Written:

Facility x NRC

//

Operating:

Facility x

NRC Target Date*

Task Description Chief Examiners Initials

-240

1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

MB

-210

2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).

MB

-210

3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

MB

-210

4. Reference material due for NRC-prepared examinations (F).

MB

-210

5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).

MB

-195

6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

MB

-150

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

MB

-136

8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).

MB

-100

9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).

MB

-75

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

MB

-60

11. Preliminary waiver/excusal requests due (ES-2.2 E.1).

MB

-50

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).

MB

-50

13. Examination review results discussed between the NRC and the facility licensee (B.14).

MB

-35

14. Examination preparatory week conducted by the NRC and the facility licensee (I).

MB

-30

15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).

MB

-14

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).

MB

-7

17. Written examinations and operating tests approved by the NRC supervisor (C.9)

MB

-7

18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

MB

-7

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

MB

-7

20. Written examination administration guidelines reviewed with the facility licensee (D.14).

MB

-7

21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).

MB

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

ML23307A077

Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: McGuire Dates of Examination: Jul/Aug 2023 Activity Description Date Complete

1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 8/23/23
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 9/19/23
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6) 9/19/23

4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 9/19/23
5. Completed licensing official review.

9/20/23

6. Mailed licenses, preliminary results, and pass letters.

9/20/23

7. Notified facility licensee of results.

9/20/23

8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

9/20/23

9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

10/6/23

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

10/10/23

  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

J_ DUKE Edward R. Pigott Site Vice President McGuire Nuclear Station

ENERGY Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 Edward.Pigott@duke-energy.com deleted RA-23-0220 August 23, 2023 Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257

SUBJECT:

Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 10 CFR 55.5 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023.

Specific items attached include:

Student answer sheets and Exam cover pages Master copy of the RO and SRO examinations and answer keys Student questions/proctor responses during the written examination Student Seating Chart ES-1.3-1, Examination Security Agreement Post Exam Comments Questions or comments should be directed to Steven Mosteller at (980) 875-5981 or Jeff Thomas at (980) 875-4499.

Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President

U.S. Nuclear Regulatory Commission RA-23-0220 Page2 Attachment cc:

Mr. Thomas A Stephen, Chief Operations Branch 1 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Mark Bates U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001