{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR, 50-373-LR Diablo Canyon Nuclear Power Plant July 29, 2024 Units 1 and 2 BRIEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP ON APPEAL OF LBP-24-06 Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.
1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240-393-9285 dcurran@harmoncurran.com Counsel to San Luis Obispo Mothers for Peace Hallie Templeton Friends of the Earth 1101 15th Street, 11th Floor Washington, DC 20005 434-326-4647 htempleton@foe.org Counsel to Friends of the Earth Caroline Leary Environmental Working Group 1250 I St N.W.
Washington, DC 20005 202-667-6982 cleary@ewg.org Counsel to Environmental Working Group July 29, 2024


In the matter of Pacific Gas and Electric Company Docket Nos. 50 -275 -LR, 50 -373 -LR Diablo Canyon Nuclear Power Plant July 29, 2024 Units 1 and 2
TABLE OF CONTENTS Table of Authorities...ii I.
INTRODUCTION..i II.
FACTUAL AND PROCEDURAL BACKGROUND...3 A. Issues Raised in Petitioners Hearing Request.3 B. Passage of S.B. 846 by the California Legislature...3 C. Commitment by NRC Chairman Hanson to California Senator Padilla for Seismic Review and Public Participation During License Renewal Proceeding..4 D. Petitioners Hearing Request and Shutdown Petition in Response to NRC Extension of Deadline for Pressure Vessel Inspection..5 E. PG&Es License Renewal Application7 F. Petitioners Hearing Request and Seismic Enforcement Petition8 III.
ARGUMENT.9 A. Contention 1 is Admissible..9
: 1. Petitioners claims fall within the scope of this license renewal proceeding...11
: 2. Petitioners claims are sufficiently specific to warrant admission of the contention.14 B. Contention 2 is Admissible14 C. Contention 3 is Admissible17 IV.
CONCLUSION19


BR IEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF T HE EARTH AND ENVIRONMENTAL WORKING GROUP ON APPEAL OF LBP -24 -06
ii ii TABLE OF AUTHORITIES Judicial Decisions Porter County Chapter of the Izaak Walton League v. NRC, 606 F.2d 1363 (D.C. Cir. 1979)19 Texas v. United States, 86 F.Supp.3d 591 (S.D. Tex. 2015).12 Union of Concerned Scientists v. NRC, 735 F.2d 1435 (D.C. Cir. 1984).11, 13, 18 United States v. Morgan, 118 F.Supp. 621 (S.D.N.Y. 1953)12 Federal Statutes Atomic Energy Act..5, 12, 19 42 U.S.C. § 2232(a)..12 42 U.S.C. § 2239(a)..19 Coastal Zone Management Act (CZMA), 16 U.S.C. § 1451, et seq..1, 3, 8, 17, 18 National Environmental Policy Act5, 11, 12 Regulations 10 C.F.R. § 2.206.7 10 C.F.R. § 2.311.1 10 C.F.R. § 2.341(c)(3)1 10 C.F.R. Part 51...5, 11 10 C.F.R. Part 54.5, 11, 14 10 C.F.R. § 54.21...14 Administrative Decisions Entergy Nuclear Operations, Inc. (Indian Point, Units 1 and 2),
LBP-08-13, 68 N.R.C. 43 (2008)..18 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2),
CLI-82-12A, 16 N.R.C. 7 (1982)...9


Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.
iii iii Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), LBP-10-15, 72 N.R.C. 257, 280 (2010)...9 U.S. Dept. of Energy (High-Level Waste Repository), LBP-09-06, 69 N.R.C. 367, 408 (2006)
1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240 -393 -9285 dcurran@harmoncurran.com Counsel to San Luis Obispo Mothers for Peac e H allie Templeton Friends of the Earth 1101 15 th Street, 11 th Floor Washington, DC 20005 434 -326 -4647 htempleton@foe.org Counsel to Friends of the Earth
(LBP-09-06)...15 California Statutes Senate Bill 846 (2022)...3, 4, 7, 13 Cal. Pub. Utils. Code § 712.7(c)(2).4 Cal. Pub. Resources Code § 25548.3(c)(9).4 Miscellaneous Hearing on the Nuclear Regulatory Commissions Proposed Fiscal Year 2024 Budget (April 19, 2023),
 
https://www.epw.senate.gov/public/index.cfm/hearings?ID=DD1B6EC6-588A-4A56-9961-F9961BE122705
C aroline Leary Environmental Working Group 1250 I St N.W.
Washington, DC 20005 202 -667 -6982 cleary@ewg.org Counsel to Environmental Working Group
 
July 29, 2024
 
TABLE OF CONTENTS
 
Table of Aut horities...ii I. INTRODUCTION..i II. F ACTUAL AND PROCEDURAL BACKGROUND...3
 
A. Issues Raised in Petitioners Hearing Request. 3
 
B. P assage of S.B. 846 by the California Legislature...3
 
C. C ommitment by NRC Chairman Hanson to California Senator Padilla for Seismic Review and Public Participation During License Renewal Proceeding.. 4
 
D. P etitioners Hearing Request and Shutdown Petition in Response to NRC Extension of Deadline for Pressure Vessel Inspection..5
 
E. PG&E s License Renewal Application 7
 
F. Petitioners Hearing Request and Seismic Enforcement Petition 8 III. A RGUMENT.9
 
A. Contention 1 is Admissible..9
: 1. P etitioners claims fall within the scope of this license renewal proceeding...11
: 2. Petitioners claims are sufficiently specific to warrant admission of the contention.14
 
B. C ontention 2 is A dmissible 1 4 C. Contention 3 is A dmissible 17
 
IV. CONCLUSION 19
 
ii
 
TABLE OF AUTHORITIES
 
Judicial Decisions
 
Porter County Chapter of the Izaak Walton League v. NRC, 606 F.2d 1363 (D.C. Cir. 1979) 19
 
Texas v. United States, 86 F.Supp.3d 591 (S.D. Tex. 2015).12
 
Union of Concerned Scientists v. NRC, 735 F.2d 1435 (D.C. Cir. 1984).11, 13, 18
 
United States v. Morgan, 118 F.Supp. 621 (S.D.N.Y. 1953) 12
 
Federal Statutes
 
Atomic Energy Act..5, 12, 19
 
42 U.S.C. § 2232(a)..12
 
42 U.S.C. § 2239(a)..19
 
Coastal Zone Management Act ( CZMA ), 16 U.S.C. § 1451, et seq..1, 3, 8, 17, 18
 
Nation al Environmental P olicy Act 5, 11, 12
 
Regulations
 
10 C.F.R. § 2.206.7
 
10 C.F.R. § 2.311.1
 
10 C.F.R. § 2.341 (c)(3) 1
 
10 C.F.R. Part 51...5, 11
 
10 C.F.R. Part 54.5, 11, 14
 
10 C.F.R. § 54.21...14
 
Administrative Dec isions
 
Entergy Nuclear Operations, Inc. (Indian Point, Units 1 and 2),
LBP -08 -13, 68 N.R.C. 43 (2008)..18
 
Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2),
CLI -82 -12A, 16 N.R.C. 7 (1982)...9
 
ii iii
 
Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), LBP -10 -15, 72 N.R.C. 257, 280 (2010)...9
 
U.S. Dept. of Energy (High -Level Waste Repository), LBP -09 -06, 69 N.R.C. 367, 408 (2006)
( LBP -09 -06 )...15
 
California Statutes
 
Senate Bill 846 (2022)...3, 4, 7, 13
 
Cal. Pub. Utils. Code § 712.7(c)(2).4
 
Cal. Pub. Resources Code § 25548.3(c)(9).4
 
Miscellaneous
 
Hearing on the Nuclear Regulatory Commission s Proposed Fiscal Year 2024 Budget (April 19, 2023),
https://www.epw.senate.gov/public/index.cfm/hearings?ID=DD1B6EC6 -588A -4A56 -9961 -
F9961BE12270 5
 
iii UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION
 
In the matter of Pacific Gas and Electric Company Docket Nos. 50 -275 -LR, 50 -373 -LR Diablo Canyon Nuclear Power Plant July 29, 2024 Units 1 and 2
 
BRIEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EAR TH AND ENV IRONMENTAL WORKING GROUP ON APPEAL OF LBP -24 -06 I. INTRODUCTION Pursuant to 10 C.F.R. §§ 2.311 and 2.341 (c)(3), Petitioners San Luis Obispo Mothers for
 
Peace (SLOMFP), Friends of the Earth ( FoE ), and Environmental Working Group (EWG)
 
hereby brief the Commissioners of the U.S. Nuclear Regulatory Commission ( NRC or
 
Commission ) regarding their appeal of LBP -24 -06, the Atomic Safety and Licensing Board s
 
(ASLBs or Boards) Memorandum and Order (Denying Request for Hearing and
 
Terminating Proceeding) (July 3, 2024) (hereinafter LBP -24 -06). 1 LBP -24 -06 erroneously and
 
arbitrarily denies the public a hearing on crucial sa fety and environmental issues raised by
 
Pacific Gas and Electric Company s (PG&Es) proposal to operate the Diablo Canyon nuclear
 
power plant ( DCPP ) another twenty years past its operating license expiration dates of 2024
 
(Unit 1) and 2025 (Unit 2). These issues include the unacceptable risk of a se ismic core damage
 
accident, PG&Es failure to ensure the integrity of the Unit 1 reactor pressure vessel, and
 
significant questions raised by the California Coastal Commission (CCC) about whether
 
PG&E complies with the federal Coastal Zone Management Act ( CZMA ).


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR, 50-373-LR Diablo Canyon Nuclear Power Plant July 29, 2024 Units 1 and 2 BRIEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP ON APPEAL OF LBP-24-06 I.
INTRODUCTION Pursuant to 10 C.F.R. §§ 2.311 and 2.341(c)(3), Petitioners San Luis Obispo Mothers for Peace (SLOMFP), Friends of the Earth (FoE), and Environmental Working Group (EWG) hereby brief the Commissioners of the U.S. Nuclear Regulatory Commission (NRC or Commission) regarding their appeal of LBP-24-06, the Atomic Safety and Licensing Boards (ASLBs or Boards) Memorandum and Order (Denying Request for Hearing and Terminating Proceeding) (July 3, 2024) (hereinafter LBP-24-06).1 LBP-24-06 erroneously and arbitrarily denies the public a hearing on crucial safety and environmental issues raised by Pacific Gas and Electric Companys (PG&Es) proposal to operate the Diablo Canyon nuclear power plant (DCPP) another twenty years past its operating license expiration dates of 2024 (Unit 1) and 2025 (Unit 2). These issues include the unacceptable risk of a seismic core damage accident, PG&Es failure to ensure the integrity of the Unit 1 reactor pressure vessel, and significant questions raised by the California Coastal Commission (CCC) about whether PG&E complies with the federal Coastal Zone Management Act (CZMA).
1 Petitioners submitted their contentions in Request by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Hearing on Pacific Gas & Electric Companys License Renewal Application for the Diablo Canyon Nuclear Plant (March 4, 2024)
1 Petitioners submitted their contentions in Request by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Hearing on Pacific Gas & Electric Companys License Renewal Application for the Diablo Canyon Nuclear Plant (March 4, 2024)
(Hearing Request).
(Hearing Request).  
2
 
As discussed below, Petitioners concerns are longstanding and serious. They also affect
 
the risks and environmental impacts of current operation as well as future operation. Therefore,
 
Petitioners have taken every opportunity, at all levels of the agency, to ensure those concerns are addressed for both the current license term and the prospective license renewal term. 2 But the
 
NRC has rebuffed the Petitioners at every turn, thereby insulating PG&Es unsafe operation of
 
DCPP from public scrutiny. LBP -24 -06 constitutes the latest rebuff, barring Petitioners from
 
providing any input to the agencys momentous and potentially disastrous decision to approve
 
operation of DCPP for another twenty years.
 
Petitioners respectfully submit that the Board erred in ruling that none of Petitioners three contentions is admissible. 3 In addition, the Board unlawfully repudiated a binding
 
commitment by the Commission to conduct a comprehensive review of the se ismic risk to
 
DCPP, and to include the public in that review through the hearing process. Therefore, the
 
petition should have been granted. Petitioners respectfully submit that the Commission should
 
reverse LBP -24 -06 and grant them a hearing.


2 As discussed below, Petitioners concerns are longstanding and serious. They also affect the risks and environmental impacts of current operation as well as future operation. Therefore, Petitioners have taken every opportunity, at all levels of the agency, to ensure those concerns are addressed for both the current license term and the prospective license renewal term.2 But the NRC has rebuffed the Petitioners at every turn, thereby insulating PG&Es unsafe operation of DCPP from public scrutiny. LBP-24-06 constitutes the latest rebuff, barring Petitioners from providing any input to the agencys momentous and potentially disastrous decision to approve operation of DCPP for another twenty years.
Petitioners respectfully submit that the Board erred in ruling that none of Petitioners three contentions is admissible.3 In addition, the Board unlawfully repudiated a binding commitment by the Commission to conduct a comprehensive review of the seismic risk to DCPP, and to include the public in that review through the hearing process. Therefore, the petition should have been granted. Petitioners respectfully submit that the Commission should reverse LBP-24-06 and grant them a hearing.
2 Petitioners note that the distinction between the current operating license term and the license renewal term has been blurred by the NRCs grant to PG&E of an exemption from the NRCs Timely Renewal rule, 10 C.F.R. § 2.109(b). The exemption will allow PG&E to continue operating DCPP without interruption until the NRC has ruled on PG&Es license renewal application - an unknown period of time. Petitioners appealed the exemption to the U.S. Court of Appeals but their petition for review was denied in San Luis Obispo Mothers for Peace, et al. v.
2 Petitioners note that the distinction between the current operating license term and the license renewal term has been blurred by the NRCs grant to PG&E of an exemption from the NRCs Timely Renewal rule, 10 C.F.R. § 2.109(b). The exemption will allow PG&E to continue operating DCPP without interruption until the NRC has ruled on PG&Es license renewal application - an unknown period of time. Petitioners appealed the exemption to the U.S. Court of Appeals but their petition for review was denied in San Luis Obispo Mothers for Peace, et al. v.
NRC, [CITE]. Petitioners request for rehearing or rehearing en banc is pending before the Court.
NRC, [CITE]. Petitioners request for rehearing or rehearing en banc is pending before the Court.
3 The ASLB correctly found that all three of the Petitioners have standing. LBP-24-06, slip op. at 21-15. Thus, the issue of standing is not briefed here.


3 The ASLB correctly found that all three of the Petitioners have standing. LBP -24 -06, slip op. at 21 -15. Thus, the issue of standing is not briefed here.
3 II.
3
FACTUAL AND PROCEDURAL BACKGROUND A. Issues Raised in Petitioners Hearing Request In their Hearing Request, Petitioners sought an adjudicatory hearing on three significant safety and environmental risks and adverse environmental impacts that have plagued DCPP for decades and the severity of which has become progressively more clear or has worsened over time:
 
* the significant risk of a devastating seismic accident posed by DCPPs location on and near a web of earthquake faults, including thrust faults in the Irish Hills that have an unacceptably high potential to cause a core damage accident (i.e., approximately one in a thousand per year of operation);
II. FACTUAL AND PROCEDURAL BACKGROUND
* the heightened vulnerability of the Unit 1 reactor pressure vessel to fracture during a loss-of-coolant accident, due to its defective composition, indications of embrittlement during 2003 surveillance and testing, and PG&Es failure to conduct any surveillance or testing since then; and
 
* the significant adverse effects of continued operation of DCPPs once-through cooling system on the marine environment, as witnessed by the California Coastal Commissions (CCCs) refusal to accept PG&Es application for certification under the CZMA.
A. Issues Raised in Petitioners Hearing Request
B. Passage of S.B. 846 by the California Legislature Petitioners longstanding concerns would have been conclusively resolved by PG&Es planned closure of the DCPP reactors on their operating license expiration dates in 2024 (Unit 1) and 2025 (Unit 2). Under that plan, as approved by the California Public Utilities Commission (CPUC) in 2018, DCPP would have been decommissioned and replaced with renewable energy sources. But in 2022, out of unsubstantiated concern that closure of DCPP would make
 
In their Hearing Request, Petitioners sought an adjudicatory hearing on three significant
 
sa fety and environmental risks and adverse environmental impacts that have plagued DCPP for
 
decades and the severity of which has become progressively more clear or has worsened over
 
time:
* the significant risk of a devastating seismic accident posed by DCPPs location on and


near a web of earthquake faults, including thrust faults in the Irish Hills that have an
4 the State vulnerable to summer energy shortages, the California Senate Bill (S.B.) 846, reversing the CPUCs decision approving PG&Es closure plan. The Legislature directed PG&E to seek NRC approval of license renewal for operation until 2030.4 Underlying the Legislatures directive was an implicit assumption that before permitting continued operation of DCPP, the NRC would undertake a robust reexamination of seismic and other safety risks to DCPP. In fact, the Legislature held open the possibility that as a result, the NRC might even order upgrades that could prove too expensive to justify continued operation of the reactors. These assumptions were reflected in a covenant that:
[I]f the United States Nuclear Regulatory Commission or any state agency requires, during the process of relicensing the Diablo Canyon powerplant, seismic safety or other safety modifications to the powerplant that would exceed the loan amount specified in paragraph (1) of subdivision (a), any application or approval to extend the operation period the commission shall promptly evaluate whether the extension of the Diablo Canyon powerplant remains a cost-effective means to meet Californias mid-term reliability needs, before any subsequent authorization and appropriation by the Legislature of an amount in excess of the loan amount.5 Thus, the Legislatures directive to PG&E to apply for NRC permission to operate for five more years past 2025 was based on the Legislatures assumptions that PG&E would not seek more than five years renewal and that the NRCs license renewal review would thoroughly assess all issues relevant to the safety of continued operation, including seismic risk.
C. Commitment by NRC Chairman Hanson to California Senator Padilla for Seismic Review and Public Participation During License Renewal Proceeding The following spring, in a hearing of the U.S. Senate Environment and Public Works Committee, California Senator Alex Padilla questioned NRC Chairman Christopher T. Hanson regarding the scope of the seismic safety review that the NRC planned to undertake for DCPP:
4 Cal. Pub. Utils. Code § 712.7(c)(2) 5 Cal. Pub. Resources Code § 25548.3(c)(9) (emphasis added).


unacceptably high potential to cause a core damage accident (i.e., approximately one in a
5 And in the same spirit but more specifically, not just maintaining safety standards more broadly, but continuing to be operationally safe with specific concern about seismic risk, which have talked about for years here, and maintaining of that. Any comments here would be helpful. Also a friendly reminder to anticipate that when you do have these public hearings.6 Mr. Hanson responded:
 
Of course. We are going to be looking at updated safety information as part of that license renewal process. We did require all plants to take a look at the enhanced, relook at their risks after Fukushima. Diablo, of course, did look at their seismic risk and we will take another look at that as part of the license renewal process. 7 Accordingly, under questioning by Senator Padilla, Chairman Hanson and his fellow Commissioners committed - formally and without rebuttal or qualification - to undertake a new review of seismic risks to DCPP during the license renewal process. This commitment was extremely significant, given that (a) NRC regulations for implementation of the Atomic Energy Act (10 C.F.R. Part 54) excused PG&E from addressing seismic risks in the safety portion of its license renewal application and (b) NRC regulations for the implementation of the National Environmental Policy Act (NEPA) (10 C.F.R. Part 51) excused PG&E from addressing seismic risks in its Environmental Report.8 D. Petitioners Hearing Request and Shutdown Petition in Response to NRC Extension of Deadline for Pressure Vessel Inspection In the summer of 2023, Petitioners learned of a letter from the NRC Staff to PG&E that extended, for the fourth time in seventeen years, the NRCs deadline for conducting surveillance 6 Hearing on the Nuclear Regulatory Commissions Proposed Fiscal Year 2024 Budget (April 19, 2023), Remarks of Sen. Alex Padilla (emphasis added). A recording of the hearing is posted on the Committees website at:
thousand per year of operation);
https://www.epw.senate.gov/public/index.cfm/hearings?ID=DD1B6EC6-588A-4A56-9961-F9961BE12270. Sen. Padillas question can be found at approximately 1:45:26.
* the heightened vulnerability of the Unit 1 reactor pressure vessel to fracture during a
 
loss -of -coolant accident, due to its defective composition, indications of embrittlement
 
during 2003 surveillance and testing, and PG&Es failure to conduct any surveillance or
 
testing since then; and
* the significant adverse effects of continued operation of DCPPs once -through cooling
 
system on the marine environment, as witnessed by the California Coastal Commissions
 
(CCCs) refusal to accept PG&Es application for certification under the C ZMA.
 
B. Passage of S.B. 846 by the California Legislature
 
Petitioners longstanding concerns would have been conclusively resolved by PG&Es
 
planned closure of the DCPP reactors on their operating license expiration dates in 2024 (Unit 1)
 
and 2025 (Unit 2). Under that plan, as approved by the California Public Utilities Commission
 
( CPUC ) in 2018, DCPP would have been decommissioned and replaced with renewable
 
energy sources. But in 2022, out of unsubstantiated concern that closure of DCPP would make 4
 
the State vulnerable to summer energy shortages, the California Senate Bi ll ( S.B. ) 846,
 
reversing the CPUCs decision approving PG&Es closure plan. The Legislature directed PG&E
 
to se ek NRC approval of license renewal for operation until 2030. 4
 
Underlying the Legislatures directive was an implicit assumption that before permitting
 
continued operation of DCPP, the NRC would undertake a robust reexamination of se ismic and
 
other sa fety risks to DCPP. In fact, the Legislature held open the possibility that as a result, the
 
NRC might even order upgrades that could prove too expensive to justify continued operation of
 
the reactors. These assumptions were reflected in a covenant that:
 
[I]f the United States Nuclear Regulatory Commission or any state agency requires, during the process of relicensing the Diablo Canyon powerplant, se ismic safety or other safety modifications to the powerplant that would exceed the loan amount specified in paragraph (1) of subdivision (a), any application or approval to extend the operation period the commission shall promptly evaluate whether the extension of the Diablo Canyon powerplant remains a cost -effective means to meet Californias mid -term reliability needs, before any subsequent authorization and appropriation by the Legislature of an amount in excess of the loan amount. 5
 
Thus, the Legislatures directive to PG&E to apply for NRC permission to operate for five more
 
years past 2025 was based on the Legislatures assumptions that PG&E would not se ek more
 
than five years renewal and that the NRCs license renewal review would thoroughly assess all
 
issues relevant to the sa fety of continued operation, including se ismic risk.
 
C. Commitment by NRC Chairman Hanson to California Senator Padilla for Seismic Review and Public Participation During License Renewal Proceeding
 
The following spring, in a hearing of the U.S. Senate Environment and Public Works
 
Committee, California Senator Alex Padilla questioned NRC Chairman Christopher T. Hanson
 
regarding the scope of the se ismic sa fety review that the NRC planned to undertake for DCPP:
 
4 Cal. Pub. Utils. Code § 712.7(c)(2)
 
5 Ca l. Pub. Resources Code § 25548.3(c)(9) (emphasis added).
5
 
And in the sa me spirit but more specifically, not just maintaining sa fety standards more broadly, but continuing to be operationally sa fe with specific concern about se ismic risk, which have talked about for years here, and maintaining of that. Any comments here would be helpful. Also a friendly reminder to anticipate that when you do have these public hearings. 6
 
Mr. Hanson responded:
Of course. We are going to be looking at updated sa fety information as part of that license renewal process. We did require all plants to take a look at the enhanced, relook at their risks after Fukushima. Diablo, of course, did look at their se ismic risk and we will take another look at that as part of the license renewal process. 7
 
Accordingly, under questioning by Senator Padilla, Chairman Hanson and his fellow
 
Commissioners committed - formally and without rebuttal or qualification - to undertake a new
 
review of se ismic risks to DCPP during the license renewal process. This commitment was
 
extremely significant, given that (a) NRC regulations for implementation of the Atomic Energy
 
Act (10 C.F.R. Part 54) excused PG&E from addressing se ismic risks in the sa fety portion of its
 
license renewal application and (b) NRC regulations for the implementation of the National
 
Environmental Policy Act ( NEPA ) (10 C.F.R. Part 51) excused PG&E from addressing se ismic risks in its Environmental Report. 8
 
D. Petitioners Hearing Request and Shutdown Petition in Response to NRC Extension of Deadline for Pressure Vessel Inspection
 
In the summer of 2023, Petitioners learned of a letter from the NRC Staff to PG&E that
 
extended, for the fourth time in seventeen years, the NRC s deadline for conducting surveillance
 
6 Hearing on the Nuclear Regulatory Commissions Proposed Fiscal Year 2024 Budget (April 19, 2023), Remarks of Sen. Alex Padilla (emphasis added). A recording of the hearing is posted on the Committees website at:
https://www.epw.senate.gov/public/index.cfm/hearings?ID=DD1B6EC6 -588A -4A56 - 9961 -
F9961BE12270. Sen. Padillas question can be found at approximately 1:45:26.
7 Id. (emphasis added). Chairman Hansons response can be found at approximately 1:45:55.
7 Id. (emphasis added). Chairman Hansons response can be found at approximately 1:45:55.
8 See Florida Power & Light Co. (Turkey Point Nuclear Generating Plant,Units 3 and 4), CLI-01-17, 54 NRC 3, 8 (2001); 10 C.F.R. Part 51, Subpart A, Appendix B.


8 See Florida Power & Light Co. (Turkey Point Nuclear Generating Plant,Units 3 and 4), CLI -
6 of the DCPP Unit 1 pressure vessel for signs of embrittlement.9 Petitioners SLOMFP and FoE reviewed the record of the previous extensions and discovered that the proposed extension altered a deadline the NRC had set in 2006 in a license amendment proceeding to extend Unit 1s operating license by three years to recover the period of low-power testing. At the same time, SLOMFP and FoE retained a highly qualified and experienced technical expert, Dr. Digby Macdonald, Professor Emeritus at the University of California, to evaluate the body of publicly-available documents regarding the condition of the Unit 1 pressure vessel. Dr. Macdonald advised SLOMFP and FoE that not only was the proposed extension unjustified, but that Unit 1 should be closed immediately due to PG&Es longstanding failure to monitor the condition of the pressure vessel and the significant possibility that the pressure vessel was embrittled and could not survive a loss of coolant accident.
01 -17, 54 NRC 3, 8 (2001); 10 C.F.R. Part 51, Subpart A, Appendix B.
Therefore, with a supporting declaration by Dr. Macdonald, SLOMFP and FoE requested a hearing on the proposed extension on the grounds that it constituted an operating license amendment and should not be granted because it would jeopardize public health and safety. They also petitioned the Commissioners to shut down Unit 1 immediately, pending the completion of surveillance on the Unit 1 pressure vessel.10 However, the Commission refused to consider the 9 Letter from Jennifer L Dixon-Herrity, NRC to Paula Gerfen, PG&E re: Diablo Canyon Nuclear Power Plant, Unit 1 - Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule (EPID L-2023-LLL-0012) (ADAMS Accession No. ML120330497).
6
10 Request to the NRC Commissioners by San Luis Obispo Mothers for Peace and Friends of the Earth for a Hearing on NRC Staff Decision Effectively Amending Diablo Canyon Unit 1 Operating License to Extend the Schedule for Surveillance of the Unit 1 Pressure Vessel and Request for Emergency Order Requiring Immediate Shutdown of Unit 1 Pending Completion of Tests and Inspections of Pressure Vessel, Public Disclosure of Results, Public Hearing, and Determination by the Commission that Unit 1 Can Safely Resume Operation (Sept. 14, 2023) at 1-3 (ADAMS Accession No. ML23257A302).  
 
of the DCPP Unit 1 pressure vessel for signs of embrittlement. 9 Petitioners SLOMFP and FoE
 
reviewed the record of the previous extensions and discovered that the proposed extension
 
altered a deadline the NRC had se t in 2006 in a license amendment proceeding to extend Unit 1s
 
operating license by three years to recover the period of low -power testing. At the sa me time,
 
SLOMFP and FoE retained a highly qualified and experienced technical expert, Dr. Digby
 
Macdonald, Professor Emeritus at the University of California, to evaluate the body of publicly -
 
available documents regarding the condition of the Unit 1 pressure vessel. Dr. Macdonald
 
advised SLOMFP and FoE that not only was the proposed extension unjustified, but that Unit 1
 
should be closed immediately due to PG&Es longstanding failure to monitor the condition of
 
the pressure vessel and the significant possibility that the pressure vessel was embrittled and
 
could not survive a loss of coolant accident.
 
Therefore, with a supporting declaration by Dr. Macdonald, SLOMFP and FoE requested
 
a hearing on the proposed extension on the grounds that it constituted an operating license
 
amendment and should not be granted because it would jeopardize public health and safety. They
 
also petitioned the Commissioners to shut down Unit 1 immediately, pending the completion of
 
surveillance on the Unit 1 pressure vessel. 10 However, the Commission refused to consider the
 
9 Letter from Jennifer L Dixon -Herrity, NRC to Paula Gerfen, PG&E re: Diablo Canyon Nuclear Power Plant, Unit 1 - Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule (EPID L -2023 -LLL -0012) (ADAMS Accession No. ML120330497 ).
 
10 Request to the NRC Commissioners by San Luis Obispo Mothers for Peace and Friends of the Earth for a Hearing on NRC Staff Decision Effectively Amending Diablo Canyon Unit 1 Operating License to Extend the Schedule for Surveillance of the Unit 1 Pressure Vessel and Request for Emergency Order Requiring Immediate Shutdown of Unit 1 Pending Completion of Tests and Inspections of Pressure Vessel, Public Disclosure of Results, Public Hearing, and Determination by the Commission that Unit 1 Ca n Safely Resume Operation (Sept. 14, 2023) at 1-3 (ADAMS Accession No. ML23257A302).
7
 
petition and instead referred it back to the NRC Staff. 11 A Petition Review Board (PRB)
 
convened by the Staff has issued a final decision denying the petition. 12
 
A. PG&Es License Renewal Application
 
In November 2023, PG&E applied to the NRC for renewal of the DCPP operating
 
licenses for twenty years (although S.B. 846 contemplates renewal of only five years, se e 4
 
above). Once again, Petitioners retained Dr. Macdonald, this time to evaluate the question of
 
whether PG&E had justified continued reliance on the Unit 1 pressure vessel during the proposed
 
license renewal term. Dr. Macdonald advised Petitioners that continued operation of DCPP was
 
not justified due to (a) the defective composition of the Unit 1 pressure vessel when it was
 
purchased; (b) indications of embrittlement in 2003 surveillance tests; and (c) PG&Es failure,
 
since the 2003 tests, to monitor the condition of the pressure vessel.


7 petition and instead referred it back to the NRC Staff.11 A Petition Review Board (PRB) convened by the Staff has issued a final decision denying the petition.12 A. PG&Es License Renewal Application In November 2023, PG&E applied to the NRC for renewal of the DCPP operating licenses for twenty years (although S.B. 846 contemplates renewal of only five years, see 4 above). Once again, Petitioners retained Dr. Macdonald, this time to evaluate the question of whether PG&E had justified continued reliance on the Unit 1 pressure vessel during the proposed license renewal term. Dr. Macdonald advised Petitioners that continued operation of DCPP was not justified due to (a) the defective composition of the Unit 1 pressure vessel when it was purchased; (b) indications of embrittlement in 2003 surveillance tests; and (c) PG&Es failure, since the 2003 tests, to monitor the condition of the pressure vessel.
Petitioners also retained another highly experienced and qualified technical expert, Dr.
Petitioners also retained another highly experienced and qualified technical expert, Dr.
 
Peter Bird, Professor Emeritus of Geology and Geophysics at the University of California at Los Angeles, to evaluate the seismic risk of continuing to operate DCPP past its operating license expiration dates. Dr. Bird, who has previously participated in seismic risk evaluations for DCPP, advised the Petitioners that PG&E and the NRC had systematically underestimated the significant risk of a core damage accident due to rupture of thrust faults in the Irish Hills that underlie and surround DCPP. According to Dr. Bird, the risk of seismic core damage due to 11 Secretary Order (Denying Hearing Request and Referring Request for Immediate Action to the Executive Director for Operations for Consideration Under 10 C.F.R. § 2.206)
Peter Bird, Professor Emeritus of Geology and Geophysics at the University of California at Los
 
Angeles, to evaluate the se ismic risk of continuing to operate DCPP past its operating license
 
expiration dates. Dr. Bird, who has previously participated in se ismic risk evaluations for DCPP,
 
advised the Petitioners that PG&E and the NRC had systematically underestimated the
 
significant risk of a core damage accident due to rupture of thrust faults in the Irish Hills that
 
underlie and surround DCPP. According to Dr. Bird, the risk of se ismic core damage due to
 
11 Secretary Order (Denying Hearing Request and Referring Request for Immediate
 
Action to the Executive Director for Operations for Consideration Under 10 C.F.R. § 2.206)
(Oct. 2, 2023) (unpublished) (ADAMS Accession No. ML23275A225). Petitioners appealed the Commissions refusal to grant them a hearing on the extension to the U.S. Court of Appeals for the Ninth Circuit in San Luis Obispo Mothers for Peace and Friends of the Earth v. NRC, No.
(Oct. 2, 2023) (unpublished) (ADAMS Accession No. ML23275A225). Petitioners appealed the Commissions refusal to grant them a hearing on the extension to the U.S. Court of Appeals for the Ninth Circuit in San Luis Obispo Mothers for Peace and Friends of the Earth v. NRC, No.
23 - 3882. The case is briefed and oral argument has been scheduled for November.
23-3882. The case is briefed and oral argument has been scheduled for November.
12 Letter from Jamie Pelton to Diane Curran (June 18, 2024) (ADAMS Accession No. ADAMS Accession No. ML24155A218).  


12 Letter from Jamie Pelton to Diane Curran (June 18, 2024) (ADAMS Accession No. ADAMS Accession No. ML24155A218).
8 these thrust faults alone is at least one in a thousand per year - a level so high that it meets the NRCs criteria for immediate shutdown of a nuclear reactor.13 A. Petitioners Hearing Request and Seismic Enforcement Petition On March 4, 2024, supported by declarations from both Dr. Bird and Dr. Macdonald, Petitioners submitted contentions challenging the safety of continued operation of DCPP in a license renewal term.14 Petitioners also submitted a contention challenging PG&Es failure to comply with the CZMA.15 In addition, based on Dr. Birds assessment of the high risk posed by current operation of DCPP, Petitioners also submitted a request to the Commissioners to immediately shut down DCPP pending further evaluation of seismic risks.16 Once again, the Commission refused to consider Petitioners request and referred it back to the NRC Staff.17 The Staff s PRB has issued a preliminary decision denying the petition.18 As 13 Declaration of Peter Bird, Ph.D (March 4, 2024) (ADAMS Accession No. ML24067A06)
8
 
these thrust faults alone is at least one in a thousand per year - a level so high that it meets the NRCs criteria for immediate shutdown of a nuclear reactor. 13
 
A. Petitioners Hearing Request and Seismic Enforcement Petition
 
On Ma rch 4, 2024, supported by declarations from both Dr. Bird and Dr. Macdonald,
 
Petitioners submitted contentions challenging the sa fety of continued operation of DCPP in a
 
license renewal term. 14 Petitioners also submitted a contention challenging PG&Es failure to
 
comply with the CZMA. 15
 
In addition, based on Dr. Birds assessment of the high risk posed by current operation of
 
DCPP, Petitioners also submitted a request to the Commissioners to immediately shut down DCPP pending further evaluation of se ismic risks. 16
 
Once again, the Commission refused to consider Petitioners request and referred it back to the NRC Staff. 17 The Staff s PRB has issued a preliminary decision denying the petition. 18 As
 
13 Declaration of Peter Bird, Ph.D (March 4, 2024) (ADAMS Accession No. ML24067A06)
(Bird Declaration).
(Bird Declaration).
 
14 Hearing Request at 7-16 (Contention 1: Continued Operation of DCPP Under a Renewed License Poses an Unacceptable Safety Risk and Significant Adverse Environmental Impact of Seismic Core Damage); 16-18 (Contention 2: PG&E Fails to Provide an Adequate Plan to Monitor and Manage he Effects of Aging on Unit 1 Reactor Pressure Vessel).
14 Hearing Request at 7 -16 (Contention 1: Continued Operation of DCPP Under a Renewed License Poses an Unacceptable Safety Risk and Significant Adverse Environmental Impact of Seismic Core Damage); 16 -18 (Contention 2: PG&E Fails to Provide an Adequate Plan to Monitor and Manage he Effects of Aging on Unit 1 Reactor Pressure Vessel).
15 Hearing Request at 18-21 (Contention 3: PG&E Fails to Demonstrate Compliance With the Coastal Zone Management Act).
15 Hearing Request at 18 -21 (Contention 3: PG&E Fails to Demonstrate Compliance With the Coastal Zone Management Act).
 
16 Petition by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Shutdown of Diablo Canyon Nuclear Power Plant Due to Unacceptable Risk of Seismic Core Damage Accident (March 4, 2024) (ADAMS Accession No. ML24067A066) 17 Secretary Order (Mar. 12, 2024) (unpublished) (ADAMS Accession No. ML24072A529).
16 Petition by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Shutdown of Diablo Canyon Nuclear Power Plant Due to Unacceptable Risk of Seismic Core Damage Accident (March 4, 2024) (ADAMS Accession No. ML24067A066) 17 Secretary Order (Mar. 12, 2024) (unpublished) (ADAMS Accession No. ML24072A529).
18 Email from Perry Buckberg, NRC, to Diane Curran, et al. (May 15, 2024) (ADAMS Accession No. ML24136A162).


18 Email from Perry Buckberg, NRC, to Diane Curran, et al. (May 15, 2024) (ADAMS Accession No. ML24136A162).
9 contemplated by PRB procedures, Dr. Bird appeared before the PRB on July 17, 2024, and provided a briefing.19 The PRB has not yet issued a final decision.
9
Both PG&E and the NRC Staff opposed Petitioners Hearing Request.20 On May 22, 2024, the ASLB held an oral argument on Petitioners standing and the admissibility of contentions. The ASLB issued LBP-24-06 on July 3, 2024, finding that Petitioners had standing but denying admission of all three of their contentions.
 
III.
contemplated by PRB procedures, Dr. Bird appeared before the PRB on July 17, 2024, and provided a briefing. 19 The PRB has not yet issued a final decision.
ARGUMENT A. Contention 1 is Admissible.
 
The risk of a serious earthquake at DCPP has been a controversial subject since construction of DCPP when the Hosgri fault was discovered to lie three miles from the DCPP site, throwing into doubt the adequacy of the reactors seismic design. At that time, two Commissioners dissented from the Commissions decision to approve the licensing of DCPPP.21 In 2008, during the first license renewal proceeding (and prior to the termination of that proceeding at PG&Es request), the Shoreline fault was discovered only 600 meters from DCPP.
Both PG&E and the NRC Staff opposed Petitioners Hearing Request. 20 On Ma y 22,
That discovery halted the progress of the license review while PG&E updated its seismic analysis.22 Thus, both knowledge and concern about seismic risk to DCPP have expanded in 19 See Supplemental Declaration of Peter Bird, Ph.D (June 7, 2024) (ADAMS Accession No.
 
2024, the ASLB held an oral argument on Petitioners standing and the admissibility of
 
contentions. The ASLB issued LBP -24 -06 on July 3, 2024, finding that Petitioners had standing
 
but denying admission of all three of their contentions.
 
III. ARGUMENT
 
A. Contention 1 is Admissible.
 
The risk of a serious earthquake at DCPP has been a controversial subject since
 
construction of DCPP when the Hosgri fault was discovered to lie three miles from the DCPP
 
site, throwing into doubt the adequacy of the reactors se ismic design. At that time, two Commissioners dissented from the Commissions decision to approve the licensing of DCPPP. 21
 
In 2008, during the first license renewal proceeding (and prior to the termination of that
 
proceeding at PG&Es request), the Shoreline fault was discovered only 600 meters from DCPP.
 
That discovery halted the progress of the license review while PG&E updated its se ismic
 
analysis. 22 Thus, both knowledge and concern about se ismic risk to DCPP have expanded in
 
19 See Supplemental Declaration of Peter Bird, Ph.D (June 7, 2024) (ADAMS Accession No.
24162A079) 20 Pacific Gas and Electric Companys Answer Opposing the Hearing Request Filed by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group (March 29, 2024) (PG&E Answer); NRC Staff Answer Opposing the San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group Hearing Request (March 29, 2024)
24162A079) 20 Pacific Gas and Electric Companys Answer Opposing the Hearing Request Filed by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group (March 29, 2024) (PG&E Answer); NRC Staff Answer Opposing the San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group Hearing Request (March 29, 2024)
(NRC Staff Answer).
(NRC Staff Answer).
21 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), CLI 12A, 16 N.R.C. 7, 8-14 (1982). The Commission effectively approved the licensing of DCPP by refusing to take review of an Appeal Board decision approving the granting of the licenses.
22 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), LBP 15, 72 N.R.C. 257, 280 (2010).


21 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), CLI -82 -
10 tandem over the decades. Thus, as Senator Padilla noted in his discussion with Chairman Hanson, seismic risk has concerned him.23 To date, PG&Es seismic studies have primarily focused on the Hosgri fault, the Shoreline fault, and other strike-slip faults to the southwest of the reactors. Two thrust faults (the Los Osos fault and the San Luis Bay fault) were also modeled, but their hazard was systematically underestimated through PG&Es assignment of arbitrarily steep dips, unrealistically slow slip-rates, and limited extents of their seismogenic areas. For these modeled faults, PG&E most recently (in 2024) estimated seismic core damage frequency (SCDF) at approximately 3 x 10-5 per year and cited that value in its 2023 Environmental Report.24 As demonstrated by Dr. Bird, however, thrust faults in the Irish Hills beneath and to the northeast of DCPP constitute a source of seismic risk that is significantly greater, because they produce strong shaking that leads to a much higher chance of seismic core damage.25 Taking into account the recent experience of a severe earthquake on analogous thrust faults under the Noto Peninsula of Japan, Dr. Bird estimates that SCDF from the thrust faults in the Irish Hills could be as high as 1.4 x 10-3/year, a factor of 47 times higher than estimated by PG&E.26 Under NRC guidance, this rate of core damage frequency is high enough to warrant immediate shutdown of a reactor.27 23 See discussion above at page 5.
12A, 16 N.R.C. 7, 8 -14 (1982). The Commission effectively approved the licensing of DCPP by refusing to take review of an Appeal Board decision approving the granting of the licenses.
24 Bird Declaration at 3-4.
 
25 Id. at 4, 5-10.
22 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), LBP -10 -
15, 72 N.R.C. 257, 280 (2010).
10
 
tandem over the decades. Thus, as Senator Padilla noted in his discussion with Chairman Hanson, se ismic risk has concerned him. 23
 
To date, PG&Es se ismic studies have primarily focused on the Hosgri fault, the
 
Shoreline fault, and other strike -slip faults to the southwest of the reactors. Two thrust faults (the
 
Los Osos fault and the San Luis Ba y fault) were also modeled, but their hazard was
 
systematically underestimated through PG&Es assignment of arbitrarily ste ep dips,
 
unrealistically slow slip -rates, and limited extents of their seismogenic areas. For these modeled
 
faults, PG&E most recently (in 2024) estimated se ismic core damage frequency ( SCDF ) at approximately 3 x 10 -5 per year and cited that value in its 2023 Environmental Report. 24 As
 
demonstrated by Dr. Bird, however, thrust faults in the Irish Hills beneath and to the northeast of
 
DCPP constitute a source of se ismic risk that is significantly greater, because they produce strong shaking that leads to a much higher chance of se ismic core damage. 25 Taking into account
 
the recent experience of a severe earthquake on analogous thrust faults under the Noto Peninsula
 
of Japan, Dr. Bird estimates that SCDF from the thrust faults in the Irish Hills could be as high as 1.4 x 10 -3/year, a factor of 47 times higher than estimated by PG&E. 26 Under NRC guidance, this
 
rate of core damage frequency is high enough to warrant immediate shutdown of a reactor. 27
 
23 See discussion above at page 5.
 
24 Bird Declaration at 3 -4.
 
25 Id. at 4, 5 -10.
 
26 Id. at 4. In other words, as asserted by Dr. Bird, the severe accident that PG&E asserts will occur only once in 33,000 years may actually occur every ~715 years. That means that a license extension for 20 years would incur an additional ~2.8% probability of a severe accident.
26 Id. at 4. In other words, as asserted by Dr. Bird, the severe accident that PG&E asserts will occur only once in 33,000 years may actually occur every ~715 years. That means that a license extension for 20 years would incur an additional ~2.8% probability of a severe accident.
27 Hearing Request at 13 and note 27 (citing Office Instruction LIC-101, License Amendment Review Procedures (Rev. 6, July 31, 2020) (NRC Accession No. ML19248C539).


27 Hearing Request at 13 and note 27 (citing Office Instruction LIC -101, License Amendment Review Procedures (Rev. 6, July 31, 2020) (NRC Accession No. ML19248C539).
11 Petitioners presented these specific concerns in their Hearing Request, supporting them with the detailed and well-documented declaration of Dr. Bird. They also relied on Chairman Hansons commitment to Sen. Padilla that the NRC would d at seismic risk as part of the license renewal process.28 But the ASLB rejected Petitioners claims.
11
 
Petitioners presented these specific concerns in their Hearing Request, supporting them
 
with the detailed and well -documented declaration of Dr. Bird. They also relied on Chairman
 
Hansons commitment to Sen. Padilla that the NRC would d at se ismic risk as part of the license renewal process. 28 But the ASLB rejected Petitioners claims.
: 1. Petitioners claims fall within the scope of this license renewal proceeding.
: 1. Petitioners claims fall within the scope of this license renewal proceeding.
First, the ASLB held that consideration of Petitioners contention is out of scope because it is barred by NRC regulations: Part 54 regulations limiting the scope of a safety review for license renewal to the adequacy of the licensees aging management program for passive structures and Part 51 regulations barring NEPA consideration of issues covered by the 2013 License Renewal GEIS.29 In light of these barriers, the ASLB ruled that the Petitioners were required to submit a waiver petition in order to obtain consideration of Contention 1.30 The ASLB also rejected Petitioners argument that Chairman Hansons commitment to Senator Padilla overrode the NRCs Part 54 and Part 51 regulations and rendered Petitioners claims material to the NRCs license renewal decision under Union of Concerned Scientists v. NRC, 735 F.2d 1435, 1438 (D.C. Cir. 1984) (finding that a rule that denie[d] a right to a hearing on a material factor relied upon by the Commission in making its licensing decisions... was issued in excess of the Commission's authority under section 189(a), and must be vacated). While the ASLB conceded that the caselaw was unclear on the subject, it expressed grave doubt as to whether the Commission could be bound by Chairman Hansons statements.31 28 See discussion above at page 5.
29 LBP-24-06, slip op. at 28, 33-35.
30 Id., slip op. at 35-37.
31 Id., slip op. at 29 and note 127. Petitioners note that LBP-24-06 appears to assume that Petitioners reliance on Chairman Hansons commitment is limited to the portion of Contention 1


First, the ASLB held that consideration of Petitioners contention is out of scope because
12 Petitioners respectfully submit that in the circumstances of this proceeding, caselaw cited in LBP-24-06 (at page 29 n. 127) supports a finding that Chairman Hansons commitment to conduct a thorough review of seismic risks to DCPP during the license renewal process is binding on the Commission. In Texas v. United States, 86 F.Supp.3d 591, 654 n.64 (S.D. Tex.
 
2015), for instance, the District Court relied on representations by an IRS commissioner regarding the eligibility of a certain class of taxpayers for earned income tax credits. And in United States v. Morgan, 118 F.Supp. 621, 699 (S.D.N.Y. 1953), the District Court found that writings by commissioners of the Securities and Exchange Commission who addressed the meaning of statutory provision on which they had been in close cooperation with the members of the Congress who formulated the terms of some of the statutory provisions provided information that while not binding was persuasive and helpful, especially as they are those of public officials of ripe experience in dealing with this very subject matter from day to day.
it is barred by NRC regulations: Part 54 regulations limiting the scope of a sa fety review for
Here, as in Texas and Morgan, Chairman Hanson and his fellow Commissioners are closely familiar with the general regulatory framework of the NRCs regulatory process, including the conceptual framework that ordinarily excludes seismic risk issues from the license renewal review process. And they are just as closely familiar with their obligation and plenary power, as the NRC officials with ultimate responsibility for carrying out the requirements of the Atomic Energy Act, to ensure that under no circumstances will operation of Diablo Canyon or any other nuclear power plant pose an unacceptable risk to public health and safety.32 Further, that is based on Atomic Energy Act-based safety requirements, not NEPA. Id., slip op. at 28.
 
license renewal to the adequacy of the licensees aging management program for passive
 
structures and Part 51 regulations barring NEPA consideration of issues covered by the 2013 License Renewal GEIS. 29 In light of these barriers, the ASLB ruled that the Petitioners were
 
required to submit a waiver petition in order to obtain consideration of Contention 1. 30 The
 
ASLB also rejected Petitioners argument that Chairman Hansons commitment to Senator
 
Padilla overrode the NRCs Part 54 and Part 51 regulations and rendered Petitioners claims
 
material to the NRCs license renewal decision under Union of Concerned Scientists v. NRC, 735
 
F.2d 1435, 1438 (D.C. Cir. 1984) (finding that a rule that denie[d] a right to a hearing on a
 
material factor relied upon by the Commission in making its licensing decisions... was issued
 
in excess of the Commission's authority under section 189(a), and must be vacated). While the
 
ASLB conceded that the caselaw was unclear on the subject, it expressed grave doubt as to whether the Commission could be bound by Chairman Hansons statements. 31
 
28 See discussion above at page 5.
 
29 LBP -24 -06, slip op. at 28, 33 -35.
 
30 Id., slip op. at 35 -37.
 
31 Id., slip op. at 29 and note 127. Petitioners note that LBP -24 -06 appears to assume that Petitioners reliance on Chairman Hansons commitment is limited to the portion of Contention 1
 
12
 
Petitioners respectfully submit that in the circumstances of this proceeding, caselaw cited
 
in LBP -24 -06 (at page 29 n. 127) supports a finding that Chairman Hansons commitment to
 
conduct a thorough review of se ismic risks to DCPP during the license renewal process is
 
binding on the Commission. In Texas v. United States, 86 F.Supp.3d 591, 654 n.64 (S.D. Tex.
 
2015), for instance, the District Court relied on representations by an IRS commissioner
 
regarding the eligibility of a certain class of taxpayers for earned income tax credits. And in
 
United States v. Morgan, 118 F.Supp. 621, 699 (S.D.N.Y. 1953), the District Court found that
 
writings by commissioners of the Securities and Exchange Commission who addressed the
 
meaning of statutory provision on which they had been in close cooperation with the members
 
of the Congress who formulated the terms of some of the statutory provisions provided
 
information that while not binding was persuasive and helpful, especially as they are those of
 
public officials of ripe experience in dealing with this very subject matter from day to day.
 
Here, as in Texas and Morgan, Chairman Hanson and his fellow Commissioners are
 
closely familiar with the general regulatory framework of the NRCs regulatory process,
 
including the conceptual framework that ordinarily excludes se ismic risk issues from the license
 
renewal review process. And they are just as closely familiar with their obligation and plenary
 
power, as the NRC officials with ultimate responsibility for carrying out the requirements of the
 
Atomic Energy Act, to ensure that under no circumstances will operation of Diablo Canyon or any other nuclear power plant pose an unacceptable risk to public health and safety. 32 Further,
 
that is based on Atomic Energy Act -based safety requirements, not NEPA. Id., slip op. at 28.
That assumption is incorrect. Section A of Contention 1 (Statement of Contention) invokes both the Atomic Energy Act and NEPA. Hearing Request at 7. Section C (Demonstration that the Contention is Within the Scope of the Proceeding) also invokes both the Atomic Energy Act and NEPA in claiming reliance on Chairman Hansons commitment to Senator Padilla. Id. at 14.
That assumption is incorrect. Section A of Contention 1 (Statement of Contention) invokes both the Atomic Energy Act and NEPA. Hearing Request at 7. Section C (Demonstration that the Contention is Within the Scope of the Proceeding) also invokes both the Atomic Energy Act and NEPA in claiming reliance on Chairman Hansons commitment to Senator Padilla. Id. at 14.
32 42 U.S.C. § 2232(a).


32 42 U.S.C. § 2232(a).
13 they surely are aware that few people outside the NRC are familiar with the byzantine and loopholed structure of the NRCs license renewal process, which limits the safety review to aging management issues and excludes seismic risks from environmental reviews based on the NRCs Generic Environmental Impact Statement for License Renewal. Case in point is the California Legislature, which assumed in passing S.B. 846 that the NRCs license renewal review would review seismic risk to DCPP before allowing an extended operating license term.33 Finally, as conveyed by Senator Padilla, seismic risk to DCPP constitutes a longstanding and grave concern to the Senator as well as his constituents.34 Thus, Chairman Hansons unqualified assurance to Senator Padilla that the NRC will take another look at seismic risk as part of the license renewal process must be taken to constitute an assurance that means just what it reasonably appears to mean: that the NRC will examine seismic risk with new eyes and in a comprehensive manner, and that it will be conducted as part of the license renewal process, i.e., will be a condition of license renewal. And if the seismic review is conducted as material part of the license renewal proceeding as promised, that necessarily means that it will be subject to public participation through the adjudicatory process.35 33 See discussion above at 4.
13
 
they surely are aware that few people outside the NRC are familiar with the byzantine and
 
loopholed structure of the NRCs license renewal process, which limits the sa fety review to
 
aging management issues and excludes se ismic risks from environmental reviews based on the
 
NRCs Generic Environmental Impact Statement for License Renewal. Ca se in point is the
 
California Legislature, which assumed in passing S.B. 846 that the NRCs license renewal
 
review would review se ismic risk to DCPP before allowing an extended operating license term. 33
 
Finally, as conveyed by Senator Padilla, se ismic risk to DCPP constitutes a longstanding and
 
grave concern to the Senator as well as his constituents. 34
 
Thus, Chairman Hansons unqualified assurance to Senator Padilla that the NRC will
 
take another look at se ismic risk as part of the license renewal process must be taken to
 
constitute an assurance that means just what it reasonably appears to mean: that the NRC will
 
examine se ismic risk with new eyes and in a comprehensive manner, and that it will be
 
conducted as part of the license renewal process, i.e., will be a condition of license renewal. And
 
if the se ismic review is conducted as material part of the license renewal proceeding as promised,
 
that necessarily means that it will be subject to public participation through the adjudicatory
 
process. 35
 
33 See discussion above at 4.
 
34 See discussion above at 5.
34 See discussion above at 5.
35 Union of Concerned Scientists v. NRC, 735 F.2d at 1438. According to the Board, Chairman Hansons statement could reasonably be interpreted to mean that the seismic risks [Chairman Hanson] referenced were related to those that already had been considered as part of the agencys safety review - which are limited to aging management programs and time-limited aging analyses. LBP-24-06, slip op. at 30. But this crabbed alternative interpretation does not bear objective scrutiny. Senator Padilla stated his inquiry in the broadest possible terms, and Chairman Hanson responded in kind, without qualification. Further, none of his fellow commissioners demurred or sought to qualify his statement. Thus, they can reasonably be presumed to have agreed with and supported his promise.


35 Union of Concerned Scientists v. NRC, 735 F.2d at 1438. According to the Board, Chairman Hansons statement could reasonably be interpreted to mean that the seismic risks [Chairman Hanson] referenced were related to those that already had been considered as part of the agencys safety review - which are limited to aging management programs and time -limited aging analyses. LBP -24 -06, slip op. at 30. But this crabbed alternative interpretation does not bear objective scrutiny. Senator Padilla stated his inquiry in the broadest possible terms, and Chairman Hanson responded in kind, without qualification. Further, none of his fellow commissioners demurred or sought to qualify his statement. Thus, they can reasonably be presumed to have agreed with and supported his promise.
14
14
: 2. Petitioners claims are sufficiently specific to warrant admission of the contention.
: 2. Petitioners claims are sufficiently specific to warrant admission of the contention.
 
The ASLB also ruled that with respect to its safety claims, Contention 1 is inadmissible for its failure to dispute with specificity the exact portions of PG&Es license renewal application the Petitioners disputed.36 But this ruling is tautological. It would not be possible for Petitioners to dispute PG&Es license renewal application, because the NRCs Part 54 regulations do not require PG&E to address seismic risk in the safety portion of its application.
The ASLB also ruled that with respect to its sa fety claims, Contention 1 is inadmissible
Petitioners comprehensively cited all relevant PG&E studies and reports bearing on the question of seismic risk to DCPP including the Environmental Report, which constitutes a part of PG&Es license renewal application.37 If the Commission upholds Chairman Hansons commitment to Senator Padilla, it will find that Dr. Bird has comprehensively analyzed every one of PG&Es reports that is relevant to the question of whether extended operation of DCPP in a license renewal term can be conducted safely.
 
B. Contention 2 is Admissible.
for its failure to dispute with specificity the exact portions of PG&Es license renewal application the Petitioners disputed. 36 But this ruling is tautological. It would not be possible for
 
Petitioners to dispute PG&Es license renewal application, because the NRCs Part 54
 
regulations do not require PG&E to address se ismic risk in the sa fety portion of its application.
 
Petitioners comprehensively cited all relevant PG&E studies and reports bearing on the question
 
of se ismic risk to DCPP including the Environmental Report, which constitutes a part of PG&Es license renewal application. 37 If the Commission upholds Chairman Hansons commitment to
 
Senator Padilla, it will find that Dr. Bird has comprehensively analyzed every one of PG&Es
 
reports that is relevant to the question of whether extended operation of DCPP in a license
 
renewal term can be conducted safely.
 
B. Contention 2 is A dmissible.
Petitioners Contention 2 asserts that:
Petitioners Contention 2 asserts that:
PG&Es license renewal application does not include an adequate plan to monitor and manage the effects of aging due to embrittlement of the Unit 1 reactor pressure vessel
PG&Es license renewal application does not include an adequate plan to monitor and manage the effects of aging due to embrittlement of the Unit 1 reactor pressure vessel (RPV) or an adequate time-limited aging analysis (TLAA), as required by 10 C.F.R.  
( RPV ) or an adequate time -limited aging analysis (TLAA), as required by 10 C.F.R.
§ 54.21.38 As Petitioners assert in their Basis Statement, PG&Es proposed aging management program for the reactor pressure vessel relies heavily upon and perpetuates the preexisting and inadequate surveillance program that PG&E has used during the decades-old initial operating license period. Petitioners rely for this assertion on the expert declaration of Dr. Digby Macdonald, 36 LBP-24-06, slip op. at 32.
§ 54.21. 38
37 See Hearing Request at 7-13, Bird Declaration, ¶¶ 10-13, 14(6), 15, 30, 34.
 
38 Hearing Request at 16.  
As Petitioners assert in their Ba sis Statement, PG&Es proposed aging management program
 
for the reactor pressure vessel relies heavily upon and perpetuates the preexisting and inadequate
 
surveillance program that PG&E has used during the decades -old initial operating license
 
period. Petitioners rely for this assertion on the expert declaration of Dr. Digby Macdonald,
 
36 LBP -24 -06, slip op. at 32.
 
37 See Hearing Request at 7 -13, Bird Declaration, ¶¶ 10 -13, 14(6), 15, 30, 34.
 
38 Hearing Request at 16.
15
 
which se ts forth a se t of fundamental deficiencies in PG&Es monitoring program, including its disregard of serious indications of embrittlement. 39 As summarized in the contention s Ba sis
 
Statement, [t]aking all of these deficiencies into account, Dr. Macdonald concludes that the
 
NRC must reject PG&Es license renewal application because it relies on this outdated preexisting program without addressing or resolving multiple serious inadequacies. 40
 
The ASLB rejected Contention 2, ruling that Petitioners and Dr. Macdonald had focused
 
impermissibly on sa fety problems in the current license term rather than the prospective license
 
renewal term. 41 In making this ruling, however, the ASLB failed to consider the detail and
 
specificity with which Dr. Macdonald demonstrated that in Shakespeares words, Whats past is
 
prologue. For instance, in Section IV of his Declaration, Dr. Macdonald provided specific and
 
detailed quotations from PG&Es license renewal application that demonstrate reliance by the
 
LRA on previous results of PG&Es reactor pressure vessel surveillance program for its
 
TLAAs. 42 Dr. Macdonald also cited specific portions of the LRA to demonstrate that PG&E
 
implicitly relies on deadlines in its current operating license for withdrawal of surveillance
 
39 Id. (citing Exhibit 3, Declaration of Digby Macdonald, Ph.D (March 4, 2024) (Macdonald Declaration)).


15 which sets forth a set of fundamental deficiencies in PG&Es monitoring program, including its disregard of serious indications of embrittlement.39 As summarized in the contentions Basis Statement, [t]aking all of these deficiencies into account, Dr. Macdonald concludes that the NRC must reject PG&Es license renewal application because it relies on this outdated preexisting program without addressing or resolving multiple serious inadequacies.40 The ASLB rejected Contention 2, ruling that Petitioners and Dr. Macdonald had focused impermissibly on safety problems in the current license term rather than the prospective license renewal term.41 In making this ruling, however, the ASLB failed to consider the detail and specificity with which Dr. Macdonald demonstrated that in Shakespeares words, Whats past is prologue. For instance, in Section IV of his Declaration, Dr. Macdonald provided specific and detailed quotations from PG&Es license renewal application that demonstrate reliance by the LRA on previous results of PG&Es reactor pressure vessel surveillance program for its TLAAs.42 Dr. Macdonald also cited specific portions of the LRA to demonstrate that PG&E implicitly relies on deadlines in its current operating license for withdrawal of surveillance 39 Id. (citing Exhibit 3, Declaration of Digby Macdonald, Ph.D (March 4, 2024) (Macdonald Declaration)).
40 Hearing Request at 17.
40 Hearing Request at 17.
41 U.S. Dept. of Energy (High-Level Waste Repository), LBP-09-06, 69 N.R.C. 367, 408 (2006)
(LBP-09-06). In LBP-09-06, the ASLB accepted contentions wherein the expert opinions supporting the contentions were detailed in the contentions themselves and supported by a brief statement of adoption in the expert declaration. Petitioners could have taken that approach, but chose instead to provide detailed technical support for the main points of the contention in the expert declaration. In both cases, the contention and supporting declaration, taken together, put other parties on notice of the petitioners concerns and thereby satisfied the objective of 10 C.F.R. § 2.309(f)(1)(v) and (vi) to ensure that only those contentions that have been demonstrated to have sufficient substance to warrant further consideration on the merits will be admitted.
42 See Macdonald Declaration, Section IV, ¶¶ 12-18.


41 U.S. Dept. of Energy (High -Level Waste Repository), LBP -09 -06, 69 N.R.C. 367, 408 (2006)
16 Capsule B and the conduct of ultrasonic testing, without explicitly setting new deadlines as part of the license renewal application.43 Thus, Dr. Macdonald documented his observation that:
(LBP -09 -06). In LBP -09 -06, the ASLB accepted contentions wherein the expert opinions supporting the contentions were detailed in the contentions themselves and supported by a brief statement of adoption in the expert declaration. Petitioners could have taken that approach, but chose instead to provide detailed technical support for the main points of the contention in the expert declaration. In both cases, the contention and supporting declaration, taken together, put other parties on notice of the petitioners concerns and thereby satisfied the objective of 10 C.F.R. § 2.309(f)(1)(v) and (vi) to ensure that only those contentions that have been demonstrated to have sufficient substance to warrant further consideration on the merits will be admitted.
[T]he LRA incorporates and depends heavily on previous tests and analyses of RPV embrittlement at DCPP and other reactors for its conclusion that (a) the Unit 1 RPV is entering the period of license renewal in a reasonably safe condition that complies with NRC regulations and (b) its condition can be adequately managed throughout the license renewal term.44 As Dr. Macdonald further attested, PG&Es conclusions in these sections of the LRA are not justified because PG&E has failed to demonstrate that the Unit 1 reactor pressure vessel is safe to operate in the current license term, let alone a renewal term.45 These deficiencies include PG&Es inexplicable and gravely concerning decision to discard surveillance data showing that the Unit RPV would approach the NRCs screening limit for embrittlement at the end of its current operating life (¶¶ 19.a and 19.b), substitution of data from other reactors without applying a larger error band (¶ 19.c), failing to speed up the RPV monitoring schedule to get a better sense of its condition (¶¶ 19.d and 19.f), and unreasonable extending the schedule for ultrasound testing of the beltline region (¶¶ 19.e, 19.f, and 19.g). These explicitly-stated deficiencies support Dr. Macdonalds conclusion that:
 
42 See Macdonald Declaration, Section IV, ¶¶ 12 -18.
16
 
Capsule B and the conduct of ultrasonic testing, without explicitly setting new deadlines as part of the license renewal application. 43 Thus, Dr. Macdonald documented his observation that:
 
[T]he LRA incorporates and depends heavily on previous tests and analyses of RPV embrittlement at DCPP and other reactors for its conclusion that (a) the Unit 1 RPV is entering the period of license renewal in a reasonably sa fe condition that complies with NRC regulations and (b) its condition can be adequately managed throughout the license renewal term. 44
 
As Dr. Macdonald further attested, PG&Es conclusions in these sections of the LRA are not
 
justified because PG&E has failed to demonstrate that the Unit 1 reactor pressure vessel is sa fe
 
to operate in the current license term, let alone a renewal term. 45 These deficiencies include
 
PG&Es inexplicable and gravely concerning decision to discard surveillance data showing
 
that the Unit RPV would approach the NRCs screening limit for embrittlement at the end of its
 
current operating life (¶¶ 19.a and 19.b), substitution of data from other reactors without
 
applying a larger error band (¶ 19.c), failing to speed up the RPV monitoring schedule to get a
 
better sense of its condition (¶¶ 19.d and 19.f), and unreasonable extending the schedule for
 
ultrasound testing of the beltline region (¶¶ 19.e, 19.f, and 19.g). These explicitly -sta te d
 
deficiencies support Dr. Macdonalds conclusion that:
 
[T]he NRC lacks a reasonable basis to approve PG&Es license renewal application.
[T]he NRC lacks a reasonable basis to approve PG&Es license renewal application.
Unless and until the NRC establishes that the Unit 1 pressure vessel can operate with a reasonable degree of safety, it has no basis to permit continued operation in a license renewal term. 46
Unless and until the NRC establishes that the Unit 1 pressure vessel can operate with a reasonable degree of safety, it has no basis to permit continued operation in a license renewal term.46 43 Id., ¶¶ 14, 16.
 
43 Id., ¶¶ 14, 16.
 
44 Id., ¶ 19.
44 Id., ¶ 19.
45 Id., Section V, ¶¶ 19-21 (citing Declaration of Digby Macdonald, Ph.D in Support of Hearing Request and Request for Emergency Order by San Luis Obispo Mothers for Peace and Friends of the Earth (Sept. 14, 2023) (NRC Accession No. ML23257A302)).
46 Id., ¶ 21.


45 Id., Section V, ¶¶ 19 -21 (citing Declaration of Digby Macdonald, Ph.D in Support of Hearing Request and Request for Emergency Order by San Luis Obispo Mothers for Peace and Friends of the Earth (Sept. 14, 2023) (NRC Accession No. ML23257A302)).
17 With these specific and well-supported statements, Dr. Macdonalds Declaration established that PG&Es license renewal application depends on the results of the current reactor vessel surveillance program and related analyses for its assertions that the Unit 1 RPV can be adequately managed during the license renewal term. As in Entergy Nuclear Operations, Inc.
 
(Indian Point, Units 1 and 2), LBP-08-13, 68 N.R.C. 43, 131 (2008), Petitioners lawfully based their contention on serious embrittlement issues that are not adequately addressed in [the licensees license renewal application].47 Therefore, Petitioners have more than sufficiently raised a genuine issue to be resolved at an evidentiary hearing.48 C. Contention 3 is Admissible.
46 Id., ¶ 21.
17
 
With these specific and well -supported statements, Dr. Macdonalds Declaration
 
established that PG&Es license renewal application depends on the results of the current reactor
 
vessel surveillance program and related analyses for its assertions that the Unit 1 RPV can be
 
adequately managed during the license renewal term. As in Entergy Nuclear Operations, Inc.
 
(Indian Point, Units 1 and 2), LBP -08 -13, 68 N.R.C. 43, 131 (2008), Petitioners lawfully based
 
their contention on serious embrittlement issues that are not adequately addressed in [the licensees license renewal application]. 47 Therefore, Petitioners have more than sufficiently
 
raised a genuine issue to be resolved at an evidentiary hearing. 48
 
C. Contention 3 is A dmissible.
Petitioners Contention 3 asserts:
Petitioners Contention 3 asserts:
The NRC may not approve renewal of PG&Es operating licenses for DCPP because PG&E has not demonstrated compliance with the Coastal Zone Management Act
The NRC may not approve renewal of PG&Es operating licenses for DCPP because PG&E has not demonstrated compliance with the Coastal Zone Management Act (CZMA), 16 U.S.C. § 1451, et seq. For the same reason, PG&Es Environmental Report also fails to satisfy the requirements of NRCs own regulations mandating the content of environmental reports.49 In support of their contention, Petitioners attached a letter from the CCC to PG&E withholding approval of PG&Es Coastal Zone Consistency Certification (Consistency Certification) pending resolution of a set of deficiencies identified by the CCC.50 In addition to state approval of its Consistency Certification, PG&E may be required to obtain one or more coastal development permits (CDPs).51 47 Id., 68 N.R.C. at 131.
( CZMA ), 16 U.S.C. § 1451, et seq. For the sa me reason, PG&Es Environmental Report also fails to sa tisfy the requirements of NRCs own regulations mandating the content of environmental reports. 49
 
In support of the ir contention, Petitioners attached a letter from the CCC to PG&E withholding
 
approval of PG&Es Coastal Zone Consistency Certification (Consistency Certification) pending resolution of a se t of deficiencies identified by the CCC. 50 In addition to sta te approval
 
of its Consistency Certification, PG&E may be required to obtain one or more coastal
 
development permits (CDPs). 51
 
47 Id., 68 N.R.C. at 131.
 
48 Id.
48 Id.
49 Hearing Request at 18 (footnote omitted).
49 Hearing Request at 18 (footnote omitted).
50 Exhibit 4, Letter from Tom Luster, CCC, to Tom Jones, PG&E re: Pacific Gas & Electric Companys Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant, San Luis Obispo County - Incomplete Consistency Certification at 3-8 (Dec. 7, 2023) (CCC Letter).
51 Hearing Request at 19 (citing Cal. Public Resources Code § 30600).


50 Exhibit 4, Letter from Tom Luster, CCC, to Tom Jones, PG&E re: Pacific Gas & Electric Companys Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant, San Luis Obispo County - Incomplete Consistency Certification at 3 -8 (Dec. 7, 2023) (CCC Letter).
18 The ASLB agree[d] with Petitioners that the CZMA requires the NRC ultimately to receive a concurrence in a licensees consistency certification.52 But the Board ruled that Contention 3 nevertheless is inadmissible because the CZMA does not require an applicant to include with the application to the federal agency a concurrence by the state agency.53 Thus, according to the Board, the contention is unripe. Petitioners must wait until some undesignated time in the future, when - if PG&E has not obtained the necessary concurrence - they may seek to file a motion to reopen the record or a motion to file a new contention.54 The Boards ruling is unlawful under Union of Concerned Scientists, 735 F.2d at 1438, 1443. As conceded by the ASLB, a concurrence from the CCC is essential to the NRCs licensing decision, and therefore it is a material issue on which the NRC must offer a hearing. In Union of Concerned Scientists, the petitioners challenged an NRC rule that conditioned the issuance of reactor operating licenses on the conduct of offsite emergency planning exercises and yet excluded the outcome of the exercises from the subject matter of hearing requests by characterizing them as part of the operational inspection process.55 The rationale for the rule was that by treating the exercises as inspections and holding them close to the time of licensing, the exercises would be more meaningful.56 But the NRC was unwilling to delay licensing by holding hearings on the outcome of the exercises.
 
52 LBP-24-06, slip op. at 48. See also id., slip op. at 50 (finding that a consistency determination (by the state or the Secretary) is required prior to the issuance of any license renewal here.).
51 Hearing Request at 19 (citing Ca l. Public Resources Code § 30600).
53 Id. (emphasis in original).
18
 
The ASLB agree[d] with Petitioners that the CZMA requires the NRC ultimately to receive a concurrence in a licensees consistency certification. 52 But the Board ruled that
 
Contention 3 nevertheless is inadmissible because the CZMA does not require an applicant to include with the application to the federal agency a concurrence by the sta te agency. 53 Thus,
 
according to the Board, the contention is unripe. Petitioners must wait until some undesignated
 
time in the future, when - if PG&E has not obtained the necessary concurrence - they may se ek to file a motion to reopen the record or a motion to file a new contention. 54
 
The Boards ruling is unlawful under Union of Concerned Scientists, 735 F.2d at 1438,
 
1443. As conceded by the ASLB, a c oncurrence from the CCC is essential to the NRCs
 
licensing decision, and therefore it is a material issue on which the NRC must offer a hearing. In
 
Union of Concerned Scientists, the petitioners challenged an NRC rule that conditioned the
 
issuance of reactor operating licenses on the conduct of offsite emergency planning exercises
 
and yet excluded the outcome of the exercises from the subject matter of hearing requests by characterizing them as part of the operational inspection process. 55 The rationale for the rule
 
was that by treating the exercises as inspections and holding them close to the time of licensing,
 
the exercises would be more meaningful. 56 But the NRC was unwilling to delay licensing by
 
holding hearings on the outcome of the exercises.
 
52 LBP -24 -06, slip op. at 48. See also id., slip op. at 50 (finding that a consistency determination (by the sta te or the Secretary) is required prior to the issuance of any license renewal here.).
53 Id. (emphasis in ori ginal).
 
54 Id., slip op. at 51.
54 Id., slip op. at 51.
55 735 F.2d at 140.
55 735 F.2d at 140.
56 Id.


56 Id.
19 The Court reversed the NRC rule, holding that once a hearing on a licensing proceeding is begun, it must encompass all material factors bearing on the licensing decision raised by the requester.57 In so ruling, the Court explicitly rejected the NRCs invitation to petitioners to reopen the hearing if the exercise identifies fundamental defects in the emergency preparedness plans, finding that the offer to apply a discretionary standard for whether to grant a hearing was not consistent with the strict hearing requirements of Section 189(a) of the Atomic Energy Act, 42 U.S.C. § 2239(a).58 Here, Petitioners have provided evidence, in the form of a letter to PG&E from the CCC, that the CCC is not satisfied with PG&Es certification. This evidence is sufficient to raise a genuine and material dispute with PG&E as to whether it will be able to obtain the necessary concurrence. The NRC may not reject the contention now as unripe and later impose a heightened pleading standard on Petitioners for litigating their concern. While the Commission may hold the contention in abeyance pending further developments, it may not reject the contention now and place extra burdens on Petitioners at whatever time in the future the NRC deems ripe for raising this material issue.
19
IV.
 
CONCLUSION For the foregoing reasons, the Commission should reverse LBP-24-06 and admit Petitioners contentions.
The Court reversed the NRC rule, holding that once a hearing on a licensing proceeding
 
is begun, it must encompass all material factors bearing on the licensing decision raised by the
 
requester. 57 In so ruling, the Court explicitly rejected the NRCs invitation to petitioners to
 
reopen the hearing if the exercise identifies fundamental defects in the emergency preparedness
 
plans, finding that the offer to apply a discretionary standard for whether to grant a hearing was
 
not consistent with the strict hearing requirements of Section 189(a) of the Atomic Energy Act, 42 U.S.C. § 2239(a). 58
 
Here, Petitioners have provided evidence, in the form of a letter to PG&E from the CCC,
 
that the CCC is not sa tisfie d with PG&Es certification. This evidence is sufficient to raise a
 
genuine and material dispute with PG&E as to whether it will be able to obtain the necessary
 
concurrence. The NRC may not reject the contention now as unripe and later impose a
 
heightened pleading standard on Petitioners for litigating their concern. While the Commission
 
may hold the contention in abeyance pending further developments, it may not reject the
 
contention now and place extra burdens on Petitioners at whatever time in the future the NRC
 
deems ripe for raising this material issue.
 
IV. CONCLUSION F or the foregoing reasons, the Commission should reverse LBP -24 -06 and admit
 
Petitioners contentions.
 
57 735 F.2d at 1443 (citing Porter County Chapter of the Izaak Walton League v. NRC, 606 F.2d 1363, 1368 (D.C. Cir. 1979) ("such proceedings as are begun shall be formal, public hearings").
57 735 F.2d at 1443 (citing Porter County Chapter of the Izaak Walton League v. NRC, 606 F.2d 1363, 1368 (D.C. Cir. 1979) ("such proceedings as are begun shall be formal, public hearings").
58 Id.


58 Id.
20 Respectfully submitted,
20
 
Respectfully submitted,
 
__/signed electronically by/___
__/signed electronically by/___
Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.
Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.
1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240 -393 -9285 dcurran@harmoncurran.com
1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240-393-9285 dcurran@harmoncurran.com Counsel to San Luis Obispo Mothers for Peace
 
Counsel to San Luis Obispo Mothers for Peace
 
__/signed electronically by/___
__/signed electronically by/___
Hallie Templeton Friends of the Earth 1101 15 th Street, 11 th Floor Washington, DC 20005 434 -326 -4647 htempleton@foe.org
Hallie Templeton Friends of the Earth 1101 15th Street, 11th Floor Washington, DC 20005 434-326-4647 htempleton@foe.org Counsel to Friends of the Earth
 
Counsel to Friends of the Earth
 
__/signed electronically by/___
__/signed electronically by/___
Caroline Leary Environmental Working Group 1250 I St N.W.
Caroline Leary Environmental Working Group 1250 I St N.W.
Washington, DC 20005 202 -667 -6982 cleary@ewg.org
Washington, DC 20005 202-667-6982 cleary@ewg.org Counsel to Environmental Working Group July 29, 2024  
 
Counsel to Environmental Working Group
 
July 29, 2024 21
 
CERTIFICATE OF SERVICE
 
I certify that on July 29, 2024, I pos ted the foregoing NOTICE OF APPEAL OF LBP -24 -06 BY SAN LUIS OBISPO MO THERS FOR PEACE, FRIENDS OF T HE EARTH AND ENVIRONMENTAL WORKIN G GROUP and BRIEF BY SAN LUIS OBISPO MO THERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKIN G GROUP ON APPEAL OF LBP -24 -06 the NRCs Electronic Information Exchange.


21 CERTIFICATE OF SERVICE I certify that on July 29, 2024, I posted the foregoing NOTICE OF APPEAL OF LBP-24-06 BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP and BRIEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP ON APPEAL OF LBP-24-06 the NRCs Electronic Information Exchange.
__/signed electronically by/___
__/signed electronically by/___
Hallie Templeton}}
Hallie Templeton}}

Latest revision as of 17:14, 24 November 2024

Brief by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group on Appeal of LBP-24-06
ML24211A288
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/29/2024
From: Curran D, Leary C, Templeton H
Environmental Working Group, Friends of the Earth, Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, San Luis Obispo Mothers for Peace
To:
NRC/OCM
SECY RAS
References
RAS 57063, 50-275-LR, 50-373-LR, LBP-24-06
Download: ML24211A288 (0)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR, 50-373-LR Diablo Canyon Nuclear Power Plant July 29, 2024 Units 1 and 2 BRIEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP ON APPEAL OF LBP-24-06 Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.

1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240-393-9285 dcurran@harmoncurran.com Counsel to San Luis Obispo Mothers for Peace Hallie Templeton Friends of the Earth 1101 15th Street, 11th Floor Washington, DC 20005 434-326-4647 htempleton@foe.org Counsel to Friends of the Earth Caroline Leary Environmental Working Group 1250 I St N.W.

Washington, DC 20005 202-667-6982 cleary@ewg.org Counsel to Environmental Working Group July 29, 2024

TABLE OF CONTENTS Table of Authorities...ii I.

INTRODUCTION..i II.

FACTUAL AND PROCEDURAL BACKGROUND...3 A. Issues Raised in Petitioners Hearing Request.3 B. Passage of S.B. 846 by the California Legislature...3 C. Commitment by NRC Chairman Hanson to California Senator Padilla for Seismic Review and Public Participation During License Renewal Proceeding..4 D. Petitioners Hearing Request and Shutdown Petition in Response to NRC Extension of Deadline for Pressure Vessel Inspection..5 E. PG&Es License Renewal Application7 F. Petitioners Hearing Request and Seismic Enforcement Petition8 III.

ARGUMENT.9 A. Contention 1 is Admissible..9

1. Petitioners claims fall within the scope of this license renewal proceeding...11
2. Petitioners claims are sufficiently specific to warrant admission of the contention.14 B. Contention 2 is Admissible14 C. Contention 3 is Admissible17 IV.

CONCLUSION19

ii ii TABLE OF AUTHORITIES Judicial Decisions Porter County Chapter of the Izaak Walton League v. NRC, 606 F.2d 1363 (D.C. Cir. 1979)19 Texas v. United States, 86 F.Supp.3d 591 (S.D. Tex. 2015).12 Union of Concerned Scientists v. NRC, 735 F.2d 1435 (D.C. Cir. 1984).11, 13, 18 United States v. Morgan, 118 F.Supp. 621 (S.D.N.Y. 1953)12 Federal Statutes Atomic Energy Act..5, 12, 19 42 U.S.C. § 2232(a)..12 42 U.S.C. § 2239(a)..19 Coastal Zone Management Act (CZMA), 16 U.S.C. § 1451, et seq..1, 3, 8, 17, 18 National Environmental Policy Act5, 11, 12 Regulations 10 C.F.R. § 2.206.7 10 C.F.R. § 2.311.1 10 C.F.R. § 2.341(c)(3)1 10 C.F.R. Part 51...5, 11 10 C.F.R. Part 54.5, 11, 14 10 C.F.R. § 54.21...14 Administrative Decisions Entergy Nuclear Operations, Inc. (Indian Point, Units 1 and 2),

LBP-08-13, 68 N.R.C. 43 (2008)..18 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2),

CLI-82-12A, 16 N.R.C. 7 (1982)...9

iii iii Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), LBP-10-15, 72 N.R.C. 257, 280 (2010)...9 U.S. Dept. of Energy (High-Level Waste Repository), LBP-09-06, 69 N.R.C. 367, 408 (2006)

(LBP-09-06)...15 California Statutes Senate Bill 846 (2022)...3, 4, 7, 13 Cal. Pub. Utils. Code § 712.7(c)(2).4 Cal. Pub. Resources Code § 25548.3(c)(9).4 Miscellaneous Hearing on the Nuclear Regulatory Commissions Proposed Fiscal Year 2024 Budget (April 19, 2023),

https://www.epw.senate.gov/public/index.cfm/hearings?ID=DD1B6EC6-588A-4A56-9961-F9961BE122705

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR, 50-373-LR Diablo Canyon Nuclear Power Plant July 29, 2024 Units 1 and 2 BRIEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP ON APPEAL OF LBP-24-06 I.

INTRODUCTION Pursuant to 10 C.F.R. §§ 2.311 and 2.341(c)(3), Petitioners San Luis Obispo Mothers for Peace (SLOMFP), Friends of the Earth (FoE), and Environmental Working Group (EWG) hereby brief the Commissioners of the U.S. Nuclear Regulatory Commission (NRC or Commission) regarding their appeal of LBP-24-06, the Atomic Safety and Licensing Boards (ASLBs or Boards) Memorandum and Order (Denying Request for Hearing and Terminating Proceeding) (July 3, 2024) (hereinafter LBP-24-06).1 LBP-24-06 erroneously and arbitrarily denies the public a hearing on crucial safety and environmental issues raised by Pacific Gas and Electric Companys (PG&Es) proposal to operate the Diablo Canyon nuclear power plant (DCPP) another twenty years past its operating license expiration dates of 2024 (Unit 1) and 2025 (Unit 2). These issues include the unacceptable risk of a seismic core damage accident, PG&Es failure to ensure the integrity of the Unit 1 reactor pressure vessel, and significant questions raised by the California Coastal Commission (CCC) about whether PG&E complies with the federal Coastal Zone Management Act (CZMA).

1 Petitioners submitted their contentions in Request by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Hearing on Pacific Gas & Electric Companys License Renewal Application for the Diablo Canyon Nuclear Plant (March 4, 2024)

(Hearing Request).

2 As discussed below, Petitioners concerns are longstanding and serious. They also affect the risks and environmental impacts of current operation as well as future operation. Therefore, Petitioners have taken every opportunity, at all levels of the agency, to ensure those concerns are addressed for both the current license term and the prospective license renewal term.2 But the NRC has rebuffed the Petitioners at every turn, thereby insulating PG&Es unsafe operation of DCPP from public scrutiny. LBP-24-06 constitutes the latest rebuff, barring Petitioners from providing any input to the agencys momentous and potentially disastrous decision to approve operation of DCPP for another twenty years.

Petitioners respectfully submit that the Board erred in ruling that none of Petitioners three contentions is admissible.3 In addition, the Board unlawfully repudiated a binding commitment by the Commission to conduct a comprehensive review of the seismic risk to DCPP, and to include the public in that review through the hearing process. Therefore, the petition should have been granted. Petitioners respectfully submit that the Commission should reverse LBP-24-06 and grant them a hearing.

2 Petitioners note that the distinction between the current operating license term and the license renewal term has been blurred by the NRCs grant to PG&E of an exemption from the NRCs Timely Renewal rule, 10 C.F.R. § 2.109(b). The exemption will allow PG&E to continue operating DCPP without interruption until the NRC has ruled on PG&Es license renewal application - an unknown period of time. Petitioners appealed the exemption to the U.S. Court of Appeals but their petition for review was denied in San Luis Obispo Mothers for Peace, et al. v.

NRC, [CITE]. Petitioners request for rehearing or rehearing en banc is pending before the Court.

3 The ASLB correctly found that all three of the Petitioners have standing. LBP-24-06, slip op. at 21-15. Thus, the issue of standing is not briefed here.

3 II.

FACTUAL AND PROCEDURAL BACKGROUND A. Issues Raised in Petitioners Hearing Request In their Hearing Request, Petitioners sought an adjudicatory hearing on three significant safety and environmental risks and adverse environmental impacts that have plagued DCPP for decades and the severity of which has become progressively more clear or has worsened over time:

  • the significant risk of a devastating seismic accident posed by DCPPs location on and near a web of earthquake faults, including thrust faults in the Irish Hills that have an unacceptably high potential to cause a core damage accident (i.e., approximately one in a thousand per year of operation);
  • the heightened vulnerability of the Unit 1 reactor pressure vessel to fracture during a loss-of-coolant accident, due to its defective composition, indications of embrittlement during 2003 surveillance and testing, and PG&Es failure to conduct any surveillance or testing since then; and
  • the significant adverse effects of continued operation of DCPPs once-through cooling system on the marine environment, as witnessed by the California Coastal Commissions (CCCs) refusal to accept PG&Es application for certification under the CZMA.

B. Passage of S.B. 846 by the California Legislature Petitioners longstanding concerns would have been conclusively resolved by PG&Es planned closure of the DCPP reactors on their operating license expiration dates in 2024 (Unit 1) and 2025 (Unit 2). Under that plan, as approved by the California Public Utilities Commission (CPUC) in 2018, DCPP would have been decommissioned and replaced with renewable energy sources. But in 2022, out of unsubstantiated concern that closure of DCPP would make

4 the State vulnerable to summer energy shortages, the California Senate Bill (S.B.) 846, reversing the CPUCs decision approving PG&Es closure plan. The Legislature directed PG&E to seek NRC approval of license renewal for operation until 2030.4 Underlying the Legislatures directive was an implicit assumption that before permitting continued operation of DCPP, the NRC would undertake a robust reexamination of seismic and other safety risks to DCPP. In fact, the Legislature held open the possibility that as a result, the NRC might even order upgrades that could prove too expensive to justify continued operation of the reactors. These assumptions were reflected in a covenant that:

[I]f the United States Nuclear Regulatory Commission or any state agency requires, during the process of relicensing the Diablo Canyon powerplant, seismic safety or other safety modifications to the powerplant that would exceed the loan amount specified in paragraph (1) of subdivision (a), any application or approval to extend the operation period the commission shall promptly evaluate whether the extension of the Diablo Canyon powerplant remains a cost-effective means to meet Californias mid-term reliability needs, before any subsequent authorization and appropriation by the Legislature of an amount in excess of the loan amount.5 Thus, the Legislatures directive to PG&E to apply for NRC permission to operate for five more years past 2025 was based on the Legislatures assumptions that PG&E would not seek more than five years renewal and that the NRCs license renewal review would thoroughly assess all issues relevant to the safety of continued operation, including seismic risk.

C. Commitment by NRC Chairman Hanson to California Senator Padilla for Seismic Review and Public Participation During License Renewal Proceeding The following spring, in a hearing of the U.S. Senate Environment and Public Works Committee, California Senator Alex Padilla questioned NRC Chairman Christopher T. Hanson regarding the scope of the seismic safety review that the NRC planned to undertake for DCPP:

4 Cal. Pub. Utils. Code § 712.7(c)(2) 5 Cal. Pub. Resources Code § 25548.3(c)(9) (emphasis added).

5 And in the same spirit but more specifically, not just maintaining safety standards more broadly, but continuing to be operationally safe with specific concern about seismic risk, which have talked about for years here, and maintaining of that. Any comments here would be helpful. Also a friendly reminder to anticipate that when you do have these public hearings.6 Mr. Hanson responded:

Of course. We are going to be looking at updated safety information as part of that license renewal process. We did require all plants to take a look at the enhanced, relook at their risks after Fukushima. Diablo, of course, did look at their seismic risk and we will take another look at that as part of the license renewal process. 7 Accordingly, under questioning by Senator Padilla, Chairman Hanson and his fellow Commissioners committed - formally and without rebuttal or qualification - to undertake a new review of seismic risks to DCPP during the license renewal process. This commitment was extremely significant, given that (a) NRC regulations for implementation of the Atomic Energy Act (10 C.F.R. Part 54) excused PG&E from addressing seismic risks in the safety portion of its license renewal application and (b) NRC regulations for the implementation of the National Environmental Policy Act (NEPA) (10 C.F.R. Part 51) excused PG&E from addressing seismic risks in its Environmental Report.8 D. Petitioners Hearing Request and Shutdown Petition in Response to NRC Extension of Deadline for Pressure Vessel Inspection In the summer of 2023, Petitioners learned of a letter from the NRC Staff to PG&E that extended, for the fourth time in seventeen years, the NRCs deadline for conducting surveillance 6 Hearing on the Nuclear Regulatory Commissions Proposed Fiscal Year 2024 Budget (April 19, 2023), Remarks of Sen. Alex Padilla (emphasis added). A recording of the hearing is posted on the Committees website at:

https://www.epw.senate.gov/public/index.cfm/hearings?ID=DD1B6EC6-588A-4A56-9961-F9961BE12270. Sen. Padillas question can be found at approximately 1:45:26.

7 Id. (emphasis added). Chairman Hansons response can be found at approximately 1:45:55.

8 See Florida Power & Light Co. (Turkey Point Nuclear Generating Plant,Units 3 and 4), CLI-01-17, 54 NRC 3, 8 (2001); 10 C.F.R. Part 51, Subpart A, Appendix B.

6 of the DCPP Unit 1 pressure vessel for signs of embrittlement.9 Petitioners SLOMFP and FoE reviewed the record of the previous extensions and discovered that the proposed extension altered a deadline the NRC had set in 2006 in a license amendment proceeding to extend Unit 1s operating license by three years to recover the period of low-power testing. At the same time, SLOMFP and FoE retained a highly qualified and experienced technical expert, Dr. Digby Macdonald, Professor Emeritus at the University of California, to evaluate the body of publicly-available documents regarding the condition of the Unit 1 pressure vessel. Dr. Macdonald advised SLOMFP and FoE that not only was the proposed extension unjustified, but that Unit 1 should be closed immediately due to PG&Es longstanding failure to monitor the condition of the pressure vessel and the significant possibility that the pressure vessel was embrittled and could not survive a loss of coolant accident.

Therefore, with a supporting declaration by Dr. Macdonald, SLOMFP and FoE requested a hearing on the proposed extension on the grounds that it constituted an operating license amendment and should not be granted because it would jeopardize public health and safety. They also petitioned the Commissioners to shut down Unit 1 immediately, pending the completion of surveillance on the Unit 1 pressure vessel.10 However, the Commission refused to consider the 9 Letter from Jennifer L Dixon-Herrity, NRC to Paula Gerfen, PG&E re: Diablo Canyon Nuclear Power Plant, Unit 1 - Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule (EPID L-2023-LLL-0012) (ADAMS Accession No. ML120330497).

10 Request to the NRC Commissioners by San Luis Obispo Mothers for Peace and Friends of the Earth for a Hearing on NRC Staff Decision Effectively Amending Diablo Canyon Unit 1 Operating License to Extend the Schedule for Surveillance of the Unit 1 Pressure Vessel and Request for Emergency Order Requiring Immediate Shutdown of Unit 1 Pending Completion of Tests and Inspections of Pressure Vessel, Public Disclosure of Results, Public Hearing, and Determination by the Commission that Unit 1 Can Safely Resume Operation (Sept. 14, 2023) at 1-3 (ADAMS Accession No. ML23257A302).

7 petition and instead referred it back to the NRC Staff.11 A Petition Review Board (PRB) convened by the Staff has issued a final decision denying the petition.12 A. PG&Es License Renewal Application In November 2023, PG&E applied to the NRC for renewal of the DCPP operating licenses for twenty years (although S.B. 846 contemplates renewal of only five years, see 4 above). Once again, Petitioners retained Dr. Macdonald, this time to evaluate the question of whether PG&E had justified continued reliance on the Unit 1 pressure vessel during the proposed license renewal term. Dr. Macdonald advised Petitioners that continued operation of DCPP was not justified due to (a) the defective composition of the Unit 1 pressure vessel when it was purchased; (b) indications of embrittlement in 2003 surveillance tests; and (c) PG&Es failure, since the 2003 tests, to monitor the condition of the pressure vessel.

Petitioners also retained another highly experienced and qualified technical expert, Dr.

Peter Bird, Professor Emeritus of Geology and Geophysics at the University of California at Los Angeles, to evaluate the seismic risk of continuing to operate DCPP past its operating license expiration dates. Dr. Bird, who has previously participated in seismic risk evaluations for DCPP, advised the Petitioners that PG&E and the NRC had systematically underestimated the significant risk of a core damage accident due to rupture of thrust faults in the Irish Hills that underlie and surround DCPP. According to Dr. Bird, the risk of seismic core damage due to 11 Secretary Order (Denying Hearing Request and Referring Request for Immediate Action to the Executive Director for Operations for Consideration Under 10 C.F.R. § 2.206)

(Oct. 2, 2023) (unpublished) (ADAMS Accession No. ML23275A225). Petitioners appealed the Commissions refusal to grant them a hearing on the extension to the U.S. Court of Appeals for the Ninth Circuit in San Luis Obispo Mothers for Peace and Friends of the Earth v. NRC, No.

23-3882. The case is briefed and oral argument has been scheduled for November.

12 Letter from Jamie Pelton to Diane Curran (June 18, 2024) (ADAMS Accession No. ADAMS Accession No. ML24155A218).

8 these thrust faults alone is at least one in a thousand per year - a level so high that it meets the NRCs criteria for immediate shutdown of a nuclear reactor.13 A. Petitioners Hearing Request and Seismic Enforcement Petition On March 4, 2024, supported by declarations from both Dr. Bird and Dr. Macdonald, Petitioners submitted contentions challenging the safety of continued operation of DCPP in a license renewal term.14 Petitioners also submitted a contention challenging PG&Es failure to comply with the CZMA.15 In addition, based on Dr. Birds assessment of the high risk posed by current operation of DCPP, Petitioners also submitted a request to the Commissioners to immediately shut down DCPP pending further evaluation of seismic risks.16 Once again, the Commission refused to consider Petitioners request and referred it back to the NRC Staff.17 The Staff s PRB has issued a preliminary decision denying the petition.18 As 13 Declaration of Peter Bird, Ph.D (March 4, 2024) (ADAMS Accession No. ML24067A06)

(Bird Declaration).

14 Hearing Request at 7-16 (Contention 1: Continued Operation of DCPP Under a Renewed License Poses an Unacceptable Safety Risk and Significant Adverse Environmental Impact of Seismic Core Damage); 16-18 (Contention 2: PG&E Fails to Provide an Adequate Plan to Monitor and Manage he Effects of Aging on Unit 1 Reactor Pressure Vessel).

15 Hearing Request at 18-21 (Contention 3: PG&E Fails to Demonstrate Compliance With the Coastal Zone Management Act).

16 Petition by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Shutdown of Diablo Canyon Nuclear Power Plant Due to Unacceptable Risk of Seismic Core Damage Accident (March 4, 2024) (ADAMS Accession No. ML24067A066) 17 Secretary Order (Mar. 12, 2024) (unpublished) (ADAMS Accession No. ML24072A529).

18 Email from Perry Buckberg, NRC, to Diane Curran, et al. (May 15, 2024) (ADAMS Accession No. ML24136A162).

9 contemplated by PRB procedures, Dr. Bird appeared before the PRB on July 17, 2024, and provided a briefing.19 The PRB has not yet issued a final decision.

Both PG&E and the NRC Staff opposed Petitioners Hearing Request.20 On May 22, 2024, the ASLB held an oral argument on Petitioners standing and the admissibility of contentions. The ASLB issued LBP-24-06 on July 3, 2024, finding that Petitioners had standing but denying admission of all three of their contentions.

III.

ARGUMENT A. Contention 1 is Admissible.

The risk of a serious earthquake at DCPP has been a controversial subject since construction of DCPP when the Hosgri fault was discovered to lie three miles from the DCPP site, throwing into doubt the adequacy of the reactors seismic design. At that time, two Commissioners dissented from the Commissions decision to approve the licensing of DCPPP.21 In 2008, during the first license renewal proceeding (and prior to the termination of that proceeding at PG&Es request), the Shoreline fault was discovered only 600 meters from DCPP.

That discovery halted the progress of the license review while PG&E updated its seismic analysis.22 Thus, both knowledge and concern about seismic risk to DCPP have expanded in 19 See Supplemental Declaration of Peter Bird, Ph.D (June 7, 2024) (ADAMS Accession No.

24162A079) 20 Pacific Gas and Electric Companys Answer Opposing the Hearing Request Filed by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group (March 29, 2024) (PG&E Answer); NRC Staff Answer Opposing the San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group Hearing Request (March 29, 2024)

(NRC Staff Answer).

21 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), CLI 12A, 16 N.R.C. 7, 8-14 (1982). The Commission effectively approved the licensing of DCPP by refusing to take review of an Appeal Board decision approving the granting of the licenses.

22 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), LBP 15, 72 N.R.C. 257, 280 (2010).

10 tandem over the decades. Thus, as Senator Padilla noted in his discussion with Chairman Hanson, seismic risk has concerned him.23 To date, PG&Es seismic studies have primarily focused on the Hosgri fault, the Shoreline fault, and other strike-slip faults to the southwest of the reactors. Two thrust faults (the Los Osos fault and the San Luis Bay fault) were also modeled, but their hazard was systematically underestimated through PG&Es assignment of arbitrarily steep dips, unrealistically slow slip-rates, and limited extents of their seismogenic areas. For these modeled faults, PG&E most recently (in 2024) estimated seismic core damage frequency (SCDF) at approximately 3 x 10-5 per year and cited that value in its 2023 Environmental Report.24 As demonstrated by Dr. Bird, however, thrust faults in the Irish Hills beneath and to the northeast of DCPP constitute a source of seismic risk that is significantly greater, because they produce strong shaking that leads to a much higher chance of seismic core damage.25 Taking into account the recent experience of a severe earthquake on analogous thrust faults under the Noto Peninsula of Japan, Dr. Bird estimates that SCDF from the thrust faults in the Irish Hills could be as high as 1.4 x 10-3/year, a factor of 47 times higher than estimated by PG&E.26 Under NRC guidance, this rate of core damage frequency is high enough to warrant immediate shutdown of a reactor.27 23 See discussion above at page 5.

24 Bird Declaration at 3-4.

25 Id. at 4, 5-10.

26 Id. at 4. In other words, as asserted by Dr. Bird, the severe accident that PG&E asserts will occur only once in 33,000 years may actually occur every ~715 years. That means that a license extension for 20 years would incur an additional ~2.8% probability of a severe accident.

27 Hearing Request at 13 and note 27 (citing Office Instruction LIC-101, License Amendment Review Procedures (Rev. 6, July 31, 2020) (NRC Accession No. ML19248C539).

11 Petitioners presented these specific concerns in their Hearing Request, supporting them with the detailed and well-documented declaration of Dr. Bird. They also relied on Chairman Hansons commitment to Sen. Padilla that the NRC would d at seismic risk as part of the license renewal process.28 But the ASLB rejected Petitioners claims.

1. Petitioners claims fall within the scope of this license renewal proceeding.

First, the ASLB held that consideration of Petitioners contention is out of scope because it is barred by NRC regulations: Part 54 regulations limiting the scope of a safety review for license renewal to the adequacy of the licensees aging management program for passive structures and Part 51 regulations barring NEPA consideration of issues covered by the 2013 License Renewal GEIS.29 In light of these barriers, the ASLB ruled that the Petitioners were required to submit a waiver petition in order to obtain consideration of Contention 1.30 The ASLB also rejected Petitioners argument that Chairman Hansons commitment to Senator Padilla overrode the NRCs Part 54 and Part 51 regulations and rendered Petitioners claims material to the NRCs license renewal decision under Union of Concerned Scientists v. NRC, 735 F.2d 1435, 1438 (D.C. Cir. 1984) (finding that a rule that denie[d] a right to a hearing on a material factor relied upon by the Commission in making its licensing decisions... was issued in excess of the Commission's authority under section 189(a), and must be vacated). While the ASLB conceded that the caselaw was unclear on the subject, it expressed grave doubt as to whether the Commission could be bound by Chairman Hansons statements.31 28 See discussion above at page 5.

29 LBP-24-06, slip op. at 28, 33-35.

30 Id., slip op. at 35-37.

31 Id., slip op. at 29 and note 127. Petitioners note that LBP-24-06 appears to assume that Petitioners reliance on Chairman Hansons commitment is limited to the portion of Contention 1

12 Petitioners respectfully submit that in the circumstances of this proceeding, caselaw cited in LBP-24-06 (at page 29 n. 127) supports a finding that Chairman Hansons commitment to conduct a thorough review of seismic risks to DCPP during the license renewal process is binding on the Commission. In Texas v. United States, 86 F.Supp.3d 591, 654 n.64 (S.D. Tex.

2015), for instance, the District Court relied on representations by an IRS commissioner regarding the eligibility of a certain class of taxpayers for earned income tax credits. And in United States v. Morgan, 118 F.Supp. 621, 699 (S.D.N.Y. 1953), the District Court found that writings by commissioners of the Securities and Exchange Commission who addressed the meaning of statutory provision on which they had been in close cooperation with the members of the Congress who formulated the terms of some of the statutory provisions provided information that while not binding was persuasive and helpful, especially as they are those of public officials of ripe experience in dealing with this very subject matter from day to day.

Here, as in Texas and Morgan, Chairman Hanson and his fellow Commissioners are closely familiar with the general regulatory framework of the NRCs regulatory process, including the conceptual framework that ordinarily excludes seismic risk issues from the license renewal review process. And they are just as closely familiar with their obligation and plenary power, as the NRC officials with ultimate responsibility for carrying out the requirements of the Atomic Energy Act, to ensure that under no circumstances will operation of Diablo Canyon or any other nuclear power plant pose an unacceptable risk to public health and safety.32 Further, that is based on Atomic Energy Act-based safety requirements, not NEPA. Id., slip op. at 28.

That assumption is incorrect. Section A of Contention 1 (Statement of Contention) invokes both the Atomic Energy Act and NEPA. Hearing Request at 7. Section C (Demonstration that the Contention is Within the Scope of the Proceeding) also invokes both the Atomic Energy Act and NEPA in claiming reliance on Chairman Hansons commitment to Senator Padilla. Id. at 14.

32 42 U.S.C. § 2232(a).

13 they surely are aware that few people outside the NRC are familiar with the byzantine and loopholed structure of the NRCs license renewal process, which limits the safety review to aging management issues and excludes seismic risks from environmental reviews based on the NRCs Generic Environmental Impact Statement for License Renewal. Case in point is the California Legislature, which assumed in passing S.B. 846 that the NRCs license renewal review would review seismic risk to DCPP before allowing an extended operating license term.33 Finally, as conveyed by Senator Padilla, seismic risk to DCPP constitutes a longstanding and grave concern to the Senator as well as his constituents.34 Thus, Chairman Hansons unqualified assurance to Senator Padilla that the NRC will take another look at seismic risk as part of the license renewal process must be taken to constitute an assurance that means just what it reasonably appears to mean: that the NRC will examine seismic risk with new eyes and in a comprehensive manner, and that it will be conducted as part of the license renewal process, i.e., will be a condition of license renewal. And if the seismic review is conducted as material part of the license renewal proceeding as promised, that necessarily means that it will be subject to public participation through the adjudicatory process.35 33 See discussion above at 4.

34 See discussion above at 5.

35 Union of Concerned Scientists v. NRC, 735 F.2d at 1438. According to the Board, Chairman Hansons statement could reasonably be interpreted to mean that the seismic risks [Chairman Hanson] referenced were related to those that already had been considered as part of the agencys safety review - which are limited to aging management programs and time-limited aging analyses. LBP-24-06, slip op. at 30. But this crabbed alternative interpretation does not bear objective scrutiny. Senator Padilla stated his inquiry in the broadest possible terms, and Chairman Hanson responded in kind, without qualification. Further, none of his fellow commissioners demurred or sought to qualify his statement. Thus, they can reasonably be presumed to have agreed with and supported his promise.

14

2. Petitioners claims are sufficiently specific to warrant admission of the contention.

The ASLB also ruled that with respect to its safety claims, Contention 1 is inadmissible for its failure to dispute with specificity the exact portions of PG&Es license renewal application the Petitioners disputed.36 But this ruling is tautological. It would not be possible for Petitioners to dispute PG&Es license renewal application, because the NRCs Part 54 regulations do not require PG&E to address seismic risk in the safety portion of its application.

Petitioners comprehensively cited all relevant PG&E studies and reports bearing on the question of seismic risk to DCPP including the Environmental Report, which constitutes a part of PG&Es license renewal application.37 If the Commission upholds Chairman Hansons commitment to Senator Padilla, it will find that Dr. Bird has comprehensively analyzed every one of PG&Es reports that is relevant to the question of whether extended operation of DCPP in a license renewal term can be conducted safely.

B. Contention 2 is Admissible.

Petitioners Contention 2 asserts that:

PG&Es license renewal application does not include an adequate plan to monitor and manage the effects of aging due to embrittlement of the Unit 1 reactor pressure vessel (RPV) or an adequate time-limited aging analysis (TLAA), as required by 10 C.F.R.

§ 54.21.38 As Petitioners assert in their Basis Statement, PG&Es proposed aging management program for the reactor pressure vessel relies heavily upon and perpetuates the preexisting and inadequate surveillance program that PG&E has used during the decades-old initial operating license period. Petitioners rely for this assertion on the expert declaration of Dr. Digby Macdonald, 36 LBP-24-06, slip op. at 32.

37 See Hearing Request at 7-13, Bird Declaration, ¶¶ 10-13, 14(6), 15, 30, 34.

38 Hearing Request at 16.

15 which sets forth a set of fundamental deficiencies in PG&Es monitoring program, including its disregard of serious indications of embrittlement.39 As summarized in the contentions Basis Statement, [t]aking all of these deficiencies into account, Dr. Macdonald concludes that the NRC must reject PG&Es license renewal application because it relies on this outdated preexisting program without addressing or resolving multiple serious inadequacies.40 The ASLB rejected Contention 2, ruling that Petitioners and Dr. Macdonald had focused impermissibly on safety problems in the current license term rather than the prospective license renewal term.41 In making this ruling, however, the ASLB failed to consider the detail and specificity with which Dr. Macdonald demonstrated that in Shakespeares words, Whats past is prologue. For instance, in Section IV of his Declaration, Dr. Macdonald provided specific and detailed quotations from PG&Es license renewal application that demonstrate reliance by the LRA on previous results of PG&Es reactor pressure vessel surveillance program for its TLAAs.42 Dr. Macdonald also cited specific portions of the LRA to demonstrate that PG&E implicitly relies on deadlines in its current operating license for withdrawal of surveillance 39 Id. (citing Exhibit 3, Declaration of Digby Macdonald, Ph.D (March 4, 2024) (Macdonald Declaration)).

40 Hearing Request at 17.

41 U.S. Dept. of Energy (High-Level Waste Repository), LBP-09-06, 69 N.R.C. 367, 408 (2006)

(LBP-09-06). In LBP-09-06, the ASLB accepted contentions wherein the expert opinions supporting the contentions were detailed in the contentions themselves and supported by a brief statement of adoption in the expert declaration. Petitioners could have taken that approach, but chose instead to provide detailed technical support for the main points of the contention in the expert declaration. In both cases, the contention and supporting declaration, taken together, put other parties on notice of the petitioners concerns and thereby satisfied the objective of 10 C.F.R. § 2.309(f)(1)(v) and (vi) to ensure that only those contentions that have been demonstrated to have sufficient substance to warrant further consideration on the merits will be admitted.

42 See Macdonald Declaration,Section IV, ¶¶ 12-18.

16 Capsule B and the conduct of ultrasonic testing, without explicitly setting new deadlines as part of the license renewal application.43 Thus, Dr. Macdonald documented his observation that:

[T]he LRA incorporates and depends heavily on previous tests and analyses of RPV embrittlement at DCPP and other reactors for its conclusion that (a) the Unit 1 RPV is entering the period of license renewal in a reasonably safe condition that complies with NRC regulations and (b) its condition can be adequately managed throughout the license renewal term.44 As Dr. Macdonald further attested, PG&Es conclusions in these sections of the LRA are not justified because PG&E has failed to demonstrate that the Unit 1 reactor pressure vessel is safe to operate in the current license term, let alone a renewal term.45 These deficiencies include PG&Es inexplicable and gravely concerning decision to discard surveillance data showing that the Unit RPV would approach the NRCs screening limit for embrittlement at the end of its current operating life (¶¶ 19.a and 19.b), substitution of data from other reactors without applying a larger error band (¶ 19.c), failing to speed up the RPV monitoring schedule to get a better sense of its condition (¶¶ 19.d and 19.f), and unreasonable extending the schedule for ultrasound testing of the beltline region (¶¶ 19.e, 19.f, and 19.g). These explicitly-stated deficiencies support Dr. Macdonalds conclusion that:

[T]he NRC lacks a reasonable basis to approve PG&Es license renewal application.

Unless and until the NRC establishes that the Unit 1 pressure vessel can operate with a reasonable degree of safety, it has no basis to permit continued operation in a license renewal term.46 43 Id., ¶¶ 14, 16.

44 Id., ¶ 19.

45 Id.,Section V, ¶¶ 19-21 (citing Declaration of Digby Macdonald, Ph.D in Support of Hearing Request and Request for Emergency Order by San Luis Obispo Mothers for Peace and Friends of the Earth (Sept. 14, 2023) (NRC Accession No. ML23257A302)).

46 Id., ¶ 21.

17 With these specific and well-supported statements, Dr. Macdonalds Declaration established that PG&Es license renewal application depends on the results of the current reactor vessel surveillance program and related analyses for its assertions that the Unit 1 RPV can be adequately managed during the license renewal term. As in Entergy Nuclear Operations, Inc.

(Indian Point, Units 1 and 2), LBP-08-13, 68 N.R.C. 43, 131 (2008), Petitioners lawfully based their contention on serious embrittlement issues that are not adequately addressed in [the licensees license renewal application].47 Therefore, Petitioners have more than sufficiently raised a genuine issue to be resolved at an evidentiary hearing.48 C. Contention 3 is Admissible.

Petitioners Contention 3 asserts:

The NRC may not approve renewal of PG&Es operating licenses for DCPP because PG&E has not demonstrated compliance with the Coastal Zone Management Act (CZMA), 16 U.S.C. § 1451, et seq. For the same reason, PG&Es Environmental Report also fails to satisfy the requirements of NRCs own regulations mandating the content of environmental reports.49 In support of their contention, Petitioners attached a letter from the CCC to PG&E withholding approval of PG&Es Coastal Zone Consistency Certification (Consistency Certification) pending resolution of a set of deficiencies identified by the CCC.50 In addition to state approval of its Consistency Certification, PG&E may be required to obtain one or more coastal development permits (CDPs).51 47 Id., 68 N.R.C. at 131.

48 Id.

49 Hearing Request at 18 (footnote omitted).

50 Exhibit 4, Letter from Tom Luster, CCC, to Tom Jones, PG&E re: Pacific Gas & Electric Companys Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant, San Luis Obispo County - Incomplete Consistency Certification at 3-8 (Dec. 7, 2023) (CCC Letter).

51 Hearing Request at 19 (citing Cal. Public Resources Code § 30600).

18 The ASLB agree[d] with Petitioners that the CZMA requires the NRC ultimately to receive a concurrence in a licensees consistency certification.52 But the Board ruled that Contention 3 nevertheless is inadmissible because the CZMA does not require an applicant to include with the application to the federal agency a concurrence by the state agency.53 Thus, according to the Board, the contention is unripe. Petitioners must wait until some undesignated time in the future, when - if PG&E has not obtained the necessary concurrence - they may seek to file a motion to reopen the record or a motion to file a new contention.54 The Boards ruling is unlawful under Union of Concerned Scientists, 735 F.2d at 1438, 1443. As conceded by the ASLB, a concurrence from the CCC is essential to the NRCs licensing decision, and therefore it is a material issue on which the NRC must offer a hearing. In Union of Concerned Scientists, the petitioners challenged an NRC rule that conditioned the issuance of reactor operating licenses on the conduct of offsite emergency planning exercises and yet excluded the outcome of the exercises from the subject matter of hearing requests by characterizing them as part of the operational inspection process.55 The rationale for the rule was that by treating the exercises as inspections and holding them close to the time of licensing, the exercises would be more meaningful.56 But the NRC was unwilling to delay licensing by holding hearings on the outcome of the exercises.

52 LBP-24-06, slip op. at 48. See also id., slip op. at 50 (finding that a consistency determination (by the state or the Secretary) is required prior to the issuance of any license renewal here.).

53 Id. (emphasis in original).

54 Id., slip op. at 51.

55 735 F.2d at 140.

56 Id.

19 The Court reversed the NRC rule, holding that once a hearing on a licensing proceeding is begun, it must encompass all material factors bearing on the licensing decision raised by the requester.57 In so ruling, the Court explicitly rejected the NRCs invitation to petitioners to reopen the hearing if the exercise identifies fundamental defects in the emergency preparedness plans, finding that the offer to apply a discretionary standard for whether to grant a hearing was not consistent with the strict hearing requirements of Section 189(a) of the Atomic Energy Act, 42 U.S.C. § 2239(a).58 Here, Petitioners have provided evidence, in the form of a letter to PG&E from the CCC, that the CCC is not satisfied with PG&Es certification. This evidence is sufficient to raise a genuine and material dispute with PG&E as to whether it will be able to obtain the necessary concurrence. The NRC may not reject the contention now as unripe and later impose a heightened pleading standard on Petitioners for litigating their concern. While the Commission may hold the contention in abeyance pending further developments, it may not reject the contention now and place extra burdens on Petitioners at whatever time in the future the NRC deems ripe for raising this material issue.

IV.

CONCLUSION For the foregoing reasons, the Commission should reverse LBP-24-06 and admit Petitioners contentions.

57 735 F.2d at 1443 (citing Porter County Chapter of the Izaak Walton League v. NRC, 606 F.2d 1363, 1368 (D.C. Cir. 1979) ("such proceedings as are begun shall be formal, public hearings").

58 Id.

20 Respectfully submitted,

__/signed electronically by/___

Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.

1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240-393-9285 dcurran@harmoncurran.com Counsel to San Luis Obispo Mothers for Peace

__/signed electronically by/___

Hallie Templeton Friends of the Earth 1101 15th Street, 11th Floor Washington, DC 20005 434-326-4647 htempleton@foe.org Counsel to Friends of the Earth

__/signed electronically by/___

Caroline Leary Environmental Working Group 1250 I St N.W.

Washington, DC 20005 202-667-6982 cleary@ewg.org Counsel to Environmental Working Group July 29, 2024

21 CERTIFICATE OF SERVICE I certify that on July 29, 2024, I posted the foregoing NOTICE OF APPEAL OF LBP-24-06 BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP and BRIEF BY SAN LUIS OBISPO MOTHERS FOR PEACE, FRIENDS OF THE EARTH AND ENVIRONMENTAL WORKING GROUP ON APPEAL OF LBP-24-06 the NRCs Electronic Information Exchange.

__/signed electronically by/___

Hallie Templeton