ML24149A315

From kanterella
Jump to navigation Jump to search
Notice of Supplemental Standing Declaration
ML24149A315
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/28/2024
From: Curran D, Leary C, Leah Parks
Environmental Working Group, Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 57031, 50-275-LR-2, 50-323-LR-2
Download: ML24149A315 (0)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR, 50-373-LR-2 Diablo Canyon Nuclear Power Plant Units 1 and 2

NOTICE OF FILING OF SUPPLEMENTAL DECLARATION OF LINDA PARKS As permitted by the Atomic Safety and Licensing Board during the Initial Prehearing

Conference on May 22, 2024, Petitioners San Luis Obispo Mothers for Peace and Environmental

Working Group hereby submit the attached Supplemental Declaration of Linda Parks in support

of Environmental Working Groups representational standing to participate in this proceeding.

Respectfully submitted,

__/signed electronically by/___

Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.

1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240-393-9285 dcurran@harmoncurran.com

__/signed electronically by/___

Caroline Leary Environmental Working Group 1250 I St N.W.

Washington, DC 20005 202-667-6982 cleary@ewg.org Counsel to Environmental Working Group

May 28, 2024

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR, 50-373-LR-2 Diablo Canyon Nuclear Power Plant Units 1 and 2

SUPPLEMENTAL DECLARATION OF LINDA PARKS Under penalty of perjury, Linda Parks declares as follows:

1. My name is Linda Parks. I am a supporter of Environmental Working Group (EWG). On March 1, 2024, I prepared a declaration in support of a hearing request and petition to intervene in this proceeding by EWG. The statements in my March 1 declaration continue to be true and correct. A copy of that declaration is attached.
2. The purpose of this Supplemental Declaration is to clarify that in addition to being a subscriber to EWGs newsletter and generally endorsing EWGs advocacy efforts, I provide financial support to EWG. In 2024, I donated $41.50 to the organization.

Executed in Accordance with 10 C.F.R. § 2.304(d) by Linda Parks May 28, 2024

TINITED STATES OF AMERICA NUCLEAR REGULATORY COMMI S SION BEFORETHE SECRETARY

In the matter of Pacific Gas and Electric Company Docket Nos. 5A-275-L& 5A-373-LR Diablo Canyon Nuclear Power Plant Units I and?

DECLARATION OF LINI}A PARKS

Under penalty of perjury, Linda Parks declares as follows:

t. My name is Linda Parks. I am a supporter of Environmental Working Group (EWG). As an EWG supporter, I receive monthly EWG emails that provides me with public education information about health risks posed by toxic and radiological contamination of consumer products and the environment. In these emails, EWG regularly asks about supporters' concerns and opinions in order to guide it in establishing organizational goals. I am pleased with EWG'S work and believe EWG generally represents my interests and concerns.
2. I live at 242Butte Drive, Los Osos. My home is located within the SO-mile ingestion pathway zone of Diablo Canyon Unit I and Unit 2 nuclear reactors (DCPP).
3. I am aware that the licensee, Pacific Gas and Electric Company (PG&E), has requested the U.S. Nuclear Regulatory Commission (NRC) to renew the DCPP operating licenses for 20 years.
4. Based on my knowledge that the Diablo Canyon nuclear reactors are operating with aging equipment, including an embrittled reactor pressure vessel that has not been inspected for over 20 years; and based on the location of the Diablo Canyon reactors on or neax a web of significant earthquake faults, I believe that the continued operation of the Diablo Canyon reactors for a renewed license term poses an unacceptable radiological accident risk that jeopardizes my health and safety and the environment.
5. Therefore,I have authorized EWG to represent my interests by submitting ahearing request in this license renewal proceeding.

Evec.uted in Acc"wdance with lQ Q.f,fi,, {2.30.4.(d,\\ -b}t

Date: March 1,2024 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR, 50-373-LR-2 Diablo Canyon Nuclear Power Plant Units 1 and 2

CERTIFICATE OF SERVICE I certify that on May 28, 2024, I posted Notice of Filing of Supplemental Declaration of Linda Parks and attached Supplemental Declaration of Linda Parks on the NRCs Electronic Information Exchange.

__/signed electronically by/___

Diane Curran