ML22230D064: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:KP-NRC-2208-004 August 18, 2022 | {{#Wiki_filter:KP-NRC-2208- 004 | ||
August 18, 2022 Docket No. 50-7513 | |||
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | |||
==Subject:== | ==Subject:== | ||
Line 24: | Line 28: | ||
==References:== | ==References:== | ||
: 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376) | : 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376) | ||
: 2. Audit Plan, Nuclear Regulatory Commission, Kairos Power, LLC - Plan for an Audit of The Hermes Constructure Permit Preliminary Safety Analysis Report Chapters 4 and 13, February 23, 2022 (ML22041B665) | : 2. Audit Plan, Nuclear Regulatory Commission, Kairos Power, LLC - Plan for an Audit of The Hermes Constructure Permit Preliminary Safety Analysis Report Chapters 4 and 13, February 23, 2022 ( ML22041B665) | ||
In September 2021, Kairos Power submitted a Preliminary Safety Analysis Report (PSAR) (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor. This letter transmits changes to the pages of the PSAR to address NRC feedback received on Chapter 4 in the PSAR Chapters 4 and 13 Audit (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1. | In September 2021, Kairos Power submitted a Preliminary Safety Analysis Report (PSAR) (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor. This letter transmits changes to the pages of the PSAR to address NRC feedback received on Chapter 4 in the PSAR Chapters 4 and 13 Audit (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1. | ||
Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA. | Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA. | ||
If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 215-9252, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 215-9252, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | ||
I declare under penalty of perjury that the foregoing is true and correct. | I declare under penalty of perjury that the foregoing is true and correct. | ||
Executed on August 18, 2022 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality | Executed on August 18, 2022 | ||
Sincerely, | |||
Peter Hastings, PE Vice President, Regulatory Affairs and Quality | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Changes to PSAR Chapter 4 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A | : 1. Changes to PSAR Chapter 4 | ||
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 | |||
KP-NRC-2208- 004 Page 2 | |||
xc (w/enclosure): | |||
William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, NRR Advanced Reactor Licensing Branch}} | William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, NRR Advanced Reactor Licensing Branch}} |
Latest revision as of 04:58, 16 November 2024
ML22230D064 | |
Person / Time | |
---|---|
Site: | Hermes File:Kairos Power icon.png |
Issue date: | 08/18/2022 |
From: | Hastings P Kairos Power |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML22230D063 | List: |
References | |
KP-NRC-2208-004 | |
Download: ML22230D064 (2) | |
Text
KP-NRC-2208- 004
August 18, 2022 Docket No. 50-7513
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Preliminary Safety Analysis Report Chapter 4
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376)
- 2. Audit Plan, Nuclear Regulatory Commission, Kairos Power, LLC - Plan for an Audit of The Hermes Constructure Permit Preliminary Safety Analysis Report Chapters 4 and 13, February 23, 2022 ( ML22041B665)
In September 2021, Kairos Power submitted a Preliminary Safety Analysis Report (PSAR) (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor. This letter transmits changes to the pages of the PSAR to address NRC feedback received on Chapter 4 in the PSAR Chapters 4 and 13 Audit (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1.
Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.
If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 215-9252, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 18, 2022
Sincerely,
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosures:
- 1. Changes to PSAR Chapter 4
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211
KP-NRC-2208- 004 Page 2
xc (w/enclosure):
William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, NRR Advanced Reactor Licensing Branch