ML24026A300: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:KP-NRC-2401- | {{#Wiki_filter:KP-NRC-2401- 008 | ||
January 26, 2024 | January 26, 2024 Docket No. 50-611 Docket No. 50-612 | ||
US Nuclear Regulatory Commission ATTN: | US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | ||
==Subject:== | ==Subject:== | ||
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - | Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7 | ||
==References:== | ==References:== | ||
: 1. | : 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122) | ||
: 2. | : 2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446) | ||
In July 2023 | In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) | ||
(Reference 1) as part of the | (Reference 1) as part of the Construction Permit Application (CPA) for t he Hermes 2 non-power reactor. | ||
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 7 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in . Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA. | This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 7 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA. | ||
If you have any questions or need any additional information, please contact Rachel Haigh at haigh@kairospower.com or (704) 412- | If you have any questions or need any additional information, please contact Rachel Haigh at haigh@kairospower.com or (704) 412-5920, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | ||
I declare under penalty of perjury that the foregoing is true and correct. | I declare under penalty of perjury that the foregoing is true and correct. | ||
Line 46: | Line 46: | ||
==Enclosure:== | ==Enclosure:== | ||
Changes to Hermes 2 | Changes to Hermes 2 PSAR Chapter 7 | ||
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A | Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2401- 008 Page 2 | ||
xc (w/enclosure): | xc (w/enclosure): | ||
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensin | William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensin g Branch}} |
Latest revision as of 19:36, 5 October 2024
ML24026A300 | |
Person / Time | |
---|---|
Site: | Hermes File:Kairos Power icon.png |
Issue date: | 01/26/2024 |
From: | Hastings P Kairos Power |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML24026A299 | List: |
References | |
KP-NRC-2401-008 | |
Download: ML24026A300 (1) | |
Text
KP-NRC-2401- 008
January 26, 2024 Docket No. 50-611 Docket No. 50-612
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
- 2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446)
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR)
(Reference 1) as part of the Construction Permit Application (CPA) for t he Hermes 2 non-power reactor.
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 7 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA.
If you have any questions or need any additional information, please contact Rachel Haigh at haigh@kairospower.com or (704) 412-5920, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 26, 2024
Sincerely,
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to Hermes 2 PSAR Chapter 7
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2401- 008 Page 2
xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensin g Branch