ML24103A242: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
{{#Wiki_filter:KP-NRC-2404-004
{{#Wiki_filter:KP-NRC-2404-004


April 12, 2024                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Docket No. 50-                                                 611 Docket No. 50-612
April 12, 2024 Docket No. 50- 611 Docket No. 50-612


US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmation of Information                         for the Review of the Hermes 2 PSAR Chapter 5
Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5


==References:==
==References:==
: 1.           Letter, Kairos Power LLC to Document Control Desk , Submittal of the         Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0,                       July 14, 2023 (ML23195A122)
: 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
: 2.           Nuclear Regulatory Commission, Kairos Power         LLC Hermes 2 General                                                     Audit Plan, October 3, 2023 (ML23268A446)
: 2. Nuclear Regulatory Commission, Kairos Power LLC Hermes 2 General Audit Plan, October 3, 2023 (ML23268A446)
: 3.           Email, Michael Orenak (Nuclear Regulatory Commission) to Drew Peebles (Kairos Power) and Darrell Gardner (Kairos Power),                         Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report,         April 12, 2024 (ML24103A176)
: 3. Email, Michael Orenak (Nuclear Regulatory Commission) to Drew Peebles (Kairos Power) and Darrell Gardner (Kairos Power), Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report, April 12, 2024 (ML24103A176)


In July 2023, Kairos Power LLC submitted its Preliminary Safety Analysis Report (PSAR)               (Reference 1) in support of the construction permit application (CPA)           for the Hermes 2 non         -power reactor. In October 2023, the Nuclear Regulatory Commission provided the Hermes 2             General                                                     Audit Plan (Reference 2).                 As a result of that audit, the Nuclear Regulatory Commission (NRC) provided two           requests for confirmation of information (RCIs) that the staff will use in their preliminary safety evaluation (Reference 3).               The enclosure to this letter provides Kairos Powers confirmation of each RCI. Kairos Power requests NRC review of this information in support of continued review of the Hermes 2             CPA.
In July 2023, Kairos Power LLC submitted its Preliminary Safety Analysis Report (PSAR) (Reference 1) in support of the construction permit application (CPA) for the Hermes 2 non -power reactor. In October 2023, the Nuclear Regulatory Commission provided the Hermes 2 General Audit Plan (Reference 2). As a result of that audit, the Nuclear Regulatory Commission (NRC) provided two requests for confirmation of information (RCIs) that the staff will use in their preliminary safety evaluation (Reference 3). The enclosure to this letter provides Kairos Powers confirmation of each RCI. Kairos Power requests NRC review of this information in support of continued review of the Hermes 2 CPA.


If you have any questions or need any additional information, please contact Delaney Simmons at Simmons@kairospower.com or at (505)                         218-7013, or Darrell Gardner                 at gardner@kairospower.com or (704) 769-1226.
If you have any questions or need any additional information, please contact Delaney Simmons at Simmons@kairospower.com or at (505) 218-7013, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.


I declare under penalty of perjury that the foregoing is true and correct.
I declare under penalty of perjury that the foregoing is true and correct.
Line 40: Line 40:
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Peter Hastings, PE Vice President, Regulatory Affairs and Quality


Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A                                                                                                                                                                                                                                                                                                                                                                                                                                                                   5201 Hawking Dr SE                                                                                                                                                                                                                                                                                                                                                               2115 Rexford Rd, Suite 325 Alameda, CA 94501                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Albuquerque, NM 87106                                                                                                                                                                                                                                                                                                                                                                                                                                     Charlotte, NC 28211 KP-NRC-2404-004 Page 2
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2404-004 Page 2


==Enclosures:==
==Enclosures:==
: 1)                           Kairos Power Response to NRC Requests for Confirmation of Information for the           Review of the Hermes 2 PSAR Chapter 5
: 1) Kairos Power Response to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5


xc (w/enclosure):
xc (w/enclosure):


William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}}
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}}

Latest revision as of 18:58, 4 October 2024

Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5
ML24103A242
Person / Time
Site: Hermes  File:Kairos Power icon.png
Issue date: 04/12/2024
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24103A241 List:
References
KP-NRC-2404-004
Download: ML24103A242 (1)


Text

KP-NRC-2404-004

April 12, 2024 Docket No. 50- 611 Docket No. 50-612

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5

References:

1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
2. Nuclear Regulatory Commission, Kairos Power LLC Hermes 2 General Audit Plan, October 3, 2023 (ML23268A446)
3. Email, Michael Orenak (Nuclear Regulatory Commission) to Drew Peebles (Kairos Power) and Darrell Gardner (Kairos Power), Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report, April 12, 2024 (ML24103A176)

In July 2023, Kairos Power LLC submitted its Preliminary Safety Analysis Report (PSAR) (Reference 1) in support of the construction permit application (CPA) for the Hermes 2 non -power reactor. In October 2023, the Nuclear Regulatory Commission provided the Hermes 2 General Audit Plan (Reference 2). As a result of that audit, the Nuclear Regulatory Commission (NRC) provided two requests for confirmation of information (RCIs) that the staff will use in their preliminary safety evaluation (Reference 3). The enclosure to this letter provides Kairos Powers confirmation of each RCI. Kairos Power requests NRC review of this information in support of continued review of the Hermes 2 CPA.

If you have any questions or need any additional information, please contact Delaney Simmons at Simmons@kairospower.com or at (505) 218-7013, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on April 12, 2024

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2404-004 Page 2

Enclosures:

1) Kairos Power Response to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5

xc (w/enclosure):

William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch