ML24136A254: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 21: | Line 21: | ||
{{#Wiki_filter:KP-NRC-2405-006 | {{#Wiki_filter:KP-NRC-2405-006 | ||
May 15, 2024 | May 15, 2024 Docket No. 50-611 Docket No. 50-612 | ||
US Nuclear Regulatory Commission ATTN: | US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | ||
==Subject:== | ==Subject:== | ||
Line 35: | Line 35: | ||
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) | In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) | ||
(Reference 1) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor. | (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor. | ||
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 9 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in . Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA. | This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 9 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA. | ||
If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 215-9252 or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 215-9252 or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | ||
Line 51: | Line 51: | ||
Changes to Hermes 2 PSAR Chapter 9 | Changes to Hermes 2 PSAR Chapter 9 | ||
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A | Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2405-006 Page 2 | ||
xc (w/enclosure): | xc (w/enclosure): | ||
Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}} | Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}} |
Latest revision as of 14:04, 4 October 2024
ML24136A254 | |
Person / Time | |
---|---|
Site: | Hermes, 99902069 File:Kairos Power icon.png |
Issue date: | 05/15/2024 |
From: | Hastings P Kairos Power |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML24136A253 | List: |
References | |
KP-NRC-2405-006 | |
Download: ML24136A254 (1) | |
Text
KP-NRC-2405-006
May 15, 2024 Docket No. 50-611 Docket No. 50-612
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 9
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
- 2. Audit Plan, Nuclear Regulatory Commission, Kairos Power LLC - Plan for a General Audit of the Hermes 2 Construction Permit Application (EPID No. L-2023-CPS-0000),
October 3, 2023, (ML23268A446)
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR)
(Reference 1) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor.
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 9 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA.
If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 215-9252 or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on May 15, 2024
Sincerely,
Peter Hastings, PE
Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to Hermes 2 PSAR Chapter 9
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2405-006 Page 2
xc (w/enclosure):
Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch