Reactor Oversight Process: Difference between revisions

From kanterella
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 21: Line 21:


===[[Cross-Cutting Area]]s===
===[[Cross-Cutting Area]]s===
Describes the general cause of issues in one of these areas. Branches into [[cross-cutting aspect]]s.
* [[Human Performance]]
* [[Human Performance]]
* [[Safety Conscious Work Environment]]
* [[Safety Conscious Work Environment]]
* [[Problem Identification and Resolution]]
* [[Problem Identification and Resolution]]
== NRC Action Matrix ==
The NRC Action Matrix is the site ranking due to inspection and PI inputs.
* [[URL::https://www.nrc.gov/reactors/operating/oversight/actionmatrix-summary.html]]
=== Column ===
* [[Licensee Response Column]] - Most common / Normal state
* [[Regulatory Response Column]] - Possible. Typically due to one white input. Resolved after [[IP 95001]]
* [[Degraded Cornerstone Column]] - Rare
* [[Multiple/Repetitive Degraded Cornerstone Column]] - Very Rare
* [[Unacceptable Performance Column]] - Unheard of
==Inputs to ROP==
Inputs are labeled with a significance; green, white, yellow, red
===Findings===
Findings are evaluated and given a significance
===Performance Indicators (PI)===
{{main|NEI 99-02}}
[[Initiating Events]]
* [[Unplanned Scram]]
* [[Unplanned Power Change]]
* [[Unplanned Scrams with Complication]]
[[Mitigating Systems]]
* [[Safety System Functional Failure]]
* [[Emergency AC Power System]]
* [[High Pressure Injection System]]
* [[Heat Removal System]]
* [[Residual Heat Removal System]]
* [[Cooling Water System]]
[[Barrier Integrity]]
* [[Reactor Coolant System (RCS) Activity]]
* [[Reactor Coolant System (RCS) Leakage]]
[[Emergency Preparedness]]
* [[Drill/Exercise Performance]]
* [[Emergency Response Organization (ERO) Drill Participation]]
* [[Alert and Notification System Reliability]]
[[Public Radiation Safety]]
* [[Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM)]]
[[Occupational Radiation Safety]]
* [[Occupational Exposure Control Effectiveness]]
[[Physical Protection]]
* [[Security PI]]


==See also==
==See also==
* [[NRC Enforcement Policy]]
* [[NRC Enforcement Policy]]
* [[White Finding]]

Latest revision as of 12:58, 7 September 2024

The Reactor Oversight Process (ROP) is the NRC way issuing finding and violations at a low significance level but also provide a measurement which leads to higher enforcement actions.


Framework

NRC's Overall Safety Mission - Public Health and Safety as a Result of Civilian Nuclear Reactor Operation

Strategic Performance

  • Reactor Safety
  • Radiation Safety
  • Safeguards

Cornerstones

Cross-Cutting Areas

Describes the general cause of issues in one of these areas. Branches into cross-cutting aspects.

NRC Action Matrix

The NRC Action Matrix is the site ranking due to inspection and PI inputs.

Column

Inputs to ROP

Inputs are labeled with a significance; green, white, yellow, red

Findings

Findings are evaluated and given a significance

Performance Indicators (PI)

Initiating Events

Mitigating Systems

Barrier Integrity

Emergency Preparedness

Public Radiation Safety

Occupational Radiation Safety

Physical Protection

See also