ENS 56769: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
| unit = 1
| unit = 1
| utype = W-4-LP, W-4-LP
| utype = W-4-LP, W-4-LP
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 10/01/2023 03:02
| notification date = 10/01/2023 03:02
Line 24: Line 24:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
Diablo Canyon Unit 2 was unaffected.
Diablo Canyon Unit 2 was unaffected.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231002en.html#en56769
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231003en.html#en56769
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 15:56, 4 January 2024

ENS 56769 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.2 h-0.00833 days <br />-0.00119 weeks <br />-2.7396e-4 months <br />)
Opened: Brian Engleton
03:02 Oct 1, 2023
NRC Officer: Ernest West
Last Updated: Oct 1, 2023
56769 - NRC Website
Loading map...