ENS 56769: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 24: Line 24:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
Diablo Canyon Unit 2 was unaffected.
Diablo Canyon Unit 2 was unaffected.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231002en.html#en56769
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231003en.html#en56769
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Revision as of 07:30, 3 October 2023

ENS 56769 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-0.2 h-0.00833 days <br />-0.00119 weeks <br />-2.7396e-4 months <br />)
Opened: Brian Engleton
03:02 Oct 1, 2023
NRC Officer: Ernest West
Last Updated: Oct 1, 2023
56769 - NRC Website
Loading map...