ML20064D367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 24: Line 24:
==Dear Mr. Denton:==
==Dear Mr. Denton:==


As requested by Mr. W. O. Miller, Chief License Fee Management franch, we are enclosing a check for $1200.00 , the Class 11 fee for our requested Construction Permit extension. The requested extension is ad-ministrative In nature and as explained in our September 26, 1978 letter,
As requested by Mr. W. O. Miller, Chief License Fee Management franch, we are enclosing a check for $1200.00 , the Class 11 fee for our requested Construction Permit extension. The requested extension is ad-ministrative In nature and as explained in our {{letter dated|date=September 26, 1978|text=September 26, 1978 letter}},
                                                                     ~
                                                                     ~
serial number 443, has no safety or environmental significance.
serial number 443, has no safety or environmental significance.
                                             ,Mr. A. W. Dromerick, a member of your staff, has asked that we ex;Jain why the completion of the Reactor Coolant System has been revised, and how much delay can we attribute to item 4 on our IIst, hanger design and final stress analysis. The major Reactor Coolant System problems were:
                                             ,Mr. A. W. Dromerick, a member of your staff, has asked that we ex;Jain why the completion of the Reactor Coolant System has been revised, and how much delay can we attribute to item 4 on our IIst, hanger design and final stress analysis. The major Reactor Coolant System problems were:
!                            modifications to the RTD by-pass valve resulting from the stress analysis and to system related trip valves, review of weld joint procedures and i                            quality control research on alleged undergrinding of weld joints. The potential delay attributable to hanger iesign and final stress analysis is approximately four weeks.                                                                                            .
!                            modifications to the RTD by-pass valve resulting from the stress analysis and to system related trip valves, review of weld joint procedures and i                            quality control research on alleged undergrinding of weld joints. The potential delay attributable to hanger iesign and final stress analysis is approximately four weeks.                                                                                            .
Since our September 26, 1978 letter, it became necessary to loan a North Anna Unit 2 Reactor Coolant Pump motor to Surry Power Station. The maximum potential delay attributable to this new problem is approximately four weeks.
Since our {{letter dated|date=September 26, 1978|text=September 26, 1978 letter}}, it became necessary to loan a North Anna Unit 2 Reactor Coolant Pump motor to Surry Power Station. The maximum potential delay attributable to this new problem is approximately four weeks.
Very ruly yours
Very ruly yours
: k.          /
: k.          /

Revision as of 23:32, 31 May 2023

Remits Fee for Class 2 CP Extension.Delay Caused by Hanger Design & Final Stress Analysis.Reactor Coolant Pump Motor on Loan to Surry,Causing 4 Wk Delay
ML20064D367
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/31/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7811060102
Download: ML20064D367 (1)


Text

- . - -

VIROINIA EI.ECTRIC AND Powza COMPANY R acux oxo.VinouxrA soset October 31, 1978 Mr. Harold R. Denton, Director Serial No. 602/101978 Office of Nuclear Reactor Regulation LQA/RMN:esir Attn: Mr. O. D. Parr, Chief [/

Light Water Reactors Branch No. 3 Docket No.(50-339',

Division of Project Management U. S. Nuclear Regulatory Commission V

Washington, DC 20555

Dear Mr. Denton:

As requested by Mr. W. O. Miller, Chief License Fee Management franch, we are enclosing a check for $1200.00 , the Class 11 fee for our requested Construction Permit extension. The requested extension is ad-ministrative In nature and as explained in our September 26, 1978 letter,

~

serial number 443, has no safety or environmental significance.

,Mr. A. W. Dromerick, a member of your staff, has asked that we ex;Jain why the completion of the Reactor Coolant System has been revised, and how much delay can we attribute to item 4 on our IIst, hanger design and final stress analysis. The major Reactor Coolant System problems were:

! modifications to the RTD by-pass valve resulting from the stress analysis and to system related trip valves, review of weld joint procedures and i quality control research on alleged undergrinding of weld joints. The potential delay attributable to hanger iesign and final stress analysis is approximately four weeks. .

Since our September 26, 1978 letter, it became necessary to loan a North Anna Unit 2 Reactor Coolant Pump motor to Surry Power Station. The maximum potential delay attributable to this new problem is approximately four weeks.

Very ruly yours

k. /

C.Br)own,Jr.

Sa Vice P esident-Power St tion

/.

Engi ering and Constr ion Attachment Voucher check no. 9661 for $1200.00 t

r-781106 of a 2- b A(p.

--- -, w--- ,y.---.,,---.w 9 - -., ,.

--p , y '-*'

  • f ' - ' ' - - ---