ML20064D367: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 24: | Line 24: | ||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
As requested by Mr. W. O. Miller, Chief License Fee Management franch, we are enclosing a check for $1200.00 , the Class 11 fee for our requested Construction Permit extension. The requested extension is ad-ministrative In nature and as explained in our September 26, 1978 letter, | As requested by Mr. W. O. Miller, Chief License Fee Management franch, we are enclosing a check for $1200.00 , the Class 11 fee for our requested Construction Permit extension. The requested extension is ad-ministrative In nature and as explained in our {{letter dated|date=September 26, 1978|text=September 26, 1978 letter}}, | ||
~ | ~ | ||
serial number 443, has no safety or environmental significance. | serial number 443, has no safety or environmental significance. | ||
,Mr. A. W. Dromerick, a member of your staff, has asked that we ex;Jain why the completion of the Reactor Coolant System has been revised, and how much delay can we attribute to item 4 on our IIst, hanger design and final stress analysis. The major Reactor Coolant System problems were: | ,Mr. A. W. Dromerick, a member of your staff, has asked that we ex;Jain why the completion of the Reactor Coolant System has been revised, and how much delay can we attribute to item 4 on our IIst, hanger design and final stress analysis. The major Reactor Coolant System problems were: | ||
! modifications to the RTD by-pass valve resulting from the stress analysis and to system related trip valves, review of weld joint procedures and i quality control research on alleged undergrinding of weld joints. The potential delay attributable to hanger iesign and final stress analysis is approximately four weeks. . | ! modifications to the RTD by-pass valve resulting from the stress analysis and to system related trip valves, review of weld joint procedures and i quality control research on alleged undergrinding of weld joints. The potential delay attributable to hanger iesign and final stress analysis is approximately four weeks. . | ||
Since our September 26, 1978 letter, it became necessary to loan a North Anna Unit 2 Reactor Coolant Pump motor to Surry Power Station. The maximum potential delay attributable to this new problem is approximately four weeks. | Since our {{letter dated|date=September 26, 1978|text=September 26, 1978 letter}}, it became necessary to loan a North Anna Unit 2 Reactor Coolant Pump motor to Surry Power Station. The maximum potential delay attributable to this new problem is approximately four weeks. | ||
Very ruly yours | Very ruly yours | ||
: k. / | : k. / | ||
Revision as of 23:32, 31 May 2023
| ML20064D367 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 10/31/1978 |
| From: | Brown S VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Parr O Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7811060102 | |
| Download: ML20064D367 (1) | |
Text
- . - -
VIROINIA EI.ECTRIC AND Powza COMPANY R acux oxo.VinouxrA soset October 31, 1978 Mr. Harold R. Denton, Director Serial No. 602/101978 Office of Nuclear Reactor Regulation LQA/RMN:esir Attn: Mr. O. D. Parr, Chief [/
Light Water Reactors Branch No. 3 Docket No.(50-339',
Division of Project Management U. S. Nuclear Regulatory Commission V
Washington, DC 20555
Dear Mr. Denton:
As requested by Mr. W. O. Miller, Chief License Fee Management franch, we are enclosing a check for $1200.00 , the Class 11 fee for our requested Construction Permit extension. The requested extension is ad-ministrative In nature and as explained in our September 26, 1978 letter,
~
serial number 443, has no safety or environmental significance.
,Mr. A. W. Dromerick, a member of your staff, has asked that we ex;Jain why the completion of the Reactor Coolant System has been revised, and how much delay can we attribute to item 4 on our IIst, hanger design and final stress analysis. The major Reactor Coolant System problems were:
! modifications to the RTD by-pass valve resulting from the stress analysis and to system related trip valves, review of weld joint procedures and i quality control research on alleged undergrinding of weld joints. The potential delay attributable to hanger iesign and final stress analysis is approximately four weeks. .
Since our September 26, 1978 letter, it became necessary to loan a North Anna Unit 2 Reactor Coolant Pump motor to Surry Power Station. The maximum potential delay attributable to this new problem is approximately four weeks.
Very ruly yours
- k. /
C.Br)own,Jr.
Sa Vice P esident-Power St tion
/.
Engi ering and Constr ion Attachment Voucher check no. 9661 for $1200.00 t
r-781106 of a 2- b A(p.