ML20132A686: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project =
| stage = Other
}}
}}



Latest revision as of 07:45, 10 August 2022

Requests Addl Info Re 850627 Application for Renewal of Certificate of Compliance 9049 for Model GE-500.Response Requested within 30 Days of Ltr Date
ML20132A686
Person / Time
Site: 07109049
Issue date: 09/19/1985
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Irwin H
ADVANCED MEDICAL SYSTEMS, INC.
References
NUDOCS 8509250404
Download: ML20132A686 (2)


Text

-_

7/- 9@?

i NETdRH TQ L kk!!a 396-gg  ;

FCTC:CEW 71-9049 SEP 191985 Advanced Medical Systems, Inc.

ATTN: Mr. Howard R. Irwin 5463 Horning Road >

Pittsburgh, PA 15236 Gentlemen:

This refers to your application dated June 27, 1985, requesting renewal of Certificate of Compliance No. 9049 for the Hodel No. GE-500 packaging.

In connection with our review, we need the infomation identified in the enclosure to this letter.

The information requested should be submitted within 30 days from the date of this letter. The additional information requested by this letter should be submitted in the form of revised pages.

If you have any questions regarding this matter, we would be pleased to meet with you and your staff.

Sincerely, giptoni s gm .

Ch M d. MacDonald, Chief -

Transportation Certification Branch  ;

l Division of Fuel Cycle and  ;

, Material Safety, NitSS

Enclosure:

As stated

! Distribution: w/ enc 1

Docket File i NRC PDR
IE HQ Region I_ '

i CEWilliams l RH0degaarden

! IMSS R/F l FCTC R/F '

8509250404 e50919

PDR ADOCK 07109049 l

C PM i t

.FCTC..[ C. . , , ,

,FCT . .. . , . . .. . . . . . . . .

i *=^" 11amstalm kH0degaarden CEMacDonald ' ' ' ' ' ' ' ' ' ' ~

! .u=> ~5 /j/55" "N/y/55" ' " 9'/[y85'

......~... . .. ..f . . . . . .. .. . . . . . . . . . .. ' ' .' . ' . ' . ..

l nne roau na oo.so uncu ono OFFICIAL RECORD COPY

Advanced fledical Systems, Inc.

Podel flo. GE-100 Packaoe Docket flo. 71-9049 Enc 1 to ltr dtd: SEP19 W

l. The application lists Drawing No.129D4690 as being Revision 1 while the certificate of compliance lists the drawing as Revision 0.

Discuss Revision 1 changes and the effect the changes have on package performance.

2. The packaging drawings, with the exception of Drawing No. 12904690, are not acceptable. Provide a legible set of packaging drawings.
3. The present certificate of compliance and the referenced General Electric application list the packaging weight as 7,800 lbs.

Discuss the packaging changes which resulted in a 300 lb increase in packaging weight and the effect the changes have on package performance.

4. Operating Procedures i

o Operations requiring radiation surveys and checks for surface contamination of the packaging should require compliance with 10 CFR 5571.47 and 71.87.

o Operating procedures should specify torque requirements for all closure bolts.

o Procedures for unloading the package should include a statement regarding compliance with the requirenents of 10 CFR 520.205.

o In Step "aa," the empty packaging label should be in accordance with 49 CFR 5172.450.

o The procedures for preparation of an empty package for transport

should refer to the requirements of 10 CFR 5173.427.

t OFFICE) ............ ............. ............. .............. ............. ............. .............

S"**"'> ............ ............. .............. ............. ............. ............. .............

DATE% ............ ............. ............. .............. ............. ............. .. ..........

1 sne ronu aia no sai nneu o24 OFFICIAL RECORD COPY

._ _ -__ _- . -.