ML21300A296: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 13:24, 18 January 2022

Section 7 - Appendix F, Commercial Nuclear Power Reactor Operating Licenses - Issued by Year, 2021-2022 Information Digest, Vol. 33
ML21300A296
Person / Time
Issue date: 10/31/2021
From: Couret I
Office of Public Affairs
To:
Malone, Tina
Shared Package
ML21300A234 List:
References
NUREG-1350, Volume 33
Download: ML21300A296 (1)


Text

APPENDIX F Commercial Nuclear Power Reactor Operating Licenses Issued by Year 1969 Dresden 2* Cooper McGuire 1 Hope Creek 1 Ginna* D.C. Cook 1 Salem 2 Millstone 3 Nine Mile Point 1* (1974) FitzPatrick Sequoyah 2 Palo Verde 2 Hatch 1 1982 LaSalle 1 Perry 1 1970 Point Beach 1* Oconee 3 Summer 1 1987 Beaver Valley 2 Robinson 2 Peach Bottom 3 Susquehanna 1 Braidwood 1 1971 Dresden 3 Prairie Island 1 1983 McGuire 2 Byron 2 Monticello 1* (1970) Prairie Island 2 St. Lucie 2 Clinton 1 1972 Palisades* (1971) 1975 Millstone 2 1984 Callaway Harris 1(1986)

Quad Cities 1 1976 Beaver Valley 1 Columbia Nine Mile Point 2 Quad Cities 2 Browns Ferry 3 Diablo Canyon 1 Palo Verde 3 Surry 1 Brunswick 1 Grand Gulf 1 Vogtle 1 Turkey Point 3 Calvert Cliffs 2 LaSalle 2 (1983) 1988 Braidwood 2 1973 Browns Ferry 1 Salem 1 Susquehanna 2 South Texas Project 1 Oconee 1 St. Lucie 1 1985 Byron 1 Oconee 2 1977 Davis-Besse 1 Catawba 1 1989 Limerick 2 Peach Bottom 2 D.C. Cook 2 Diablo Canyon 2 South Texas Project 2 Point Beach 2* Farley 1 Fermi 2 Vogtle 2 Surry 2 1978 Arkansas Nuclear 2 Limerick 1 1990 Comanche Peak 1 Turkey Point 4 Hatch 2 Palo Verde 1 Seabrook 1 1974 Arkansas Nuclear 1 North Anna 1 River Bend 1 1993 Comanche Peak 2 Browns Ferry 2 1980 North Anna 2 Waterford 3 1996 Watts Bar 1 Brunswick 2 Sequoyah 1 Wolf Creek 1 2015 Watts Bar 2 Calvert Cliffs 1 1981 Farley 2 1986 Catawba 2

  • The Atomic Energy Commission issued a provisional operating license allowing commercial operations.

Notes: This list is limited to reactors licensed to operate. Year is based on the date the initial full-power operating license was issued.

NRC-abbreviated reactor names are listed. Data are current as of August 2021; the next printed update will be in September 2022.