Section 7 - Appendix V, Significant Enforcement Actions Issued, 2020 - - 2021-2022 Information Digest, Vol. 33
ML21300A312
Person / Time
Issue date: 10/31/2021
From: Couret I
Office of Public Affairs
To:
Malone, Tina
Shared Package
ML21300A234 List:
References
NUREG-1350, Volume 33
Download: ML21300A312 (2)


Text

138 l APPENDICES APPENDIX V Significant Enforcement Actions Issued, 2020 Significant (escalated) enforcement actions include notices of violation (NOVs) for severity level (SL) I, II, or III violations; NOVs associated with inspection findings that the significance determination process (SDP) categorizes as White, Yellow, or Red; civil penalties (CPs); and enforcement-related orders. The NRC Enforcement Policy also allows related violations to be categorized collectively as a single problem. Escalated enforcement actions are issued to reactor, materials, and individual licensees; nonlicensees; and fuel cycle facility licensees.

Action #

Name Type Issue Date Enforcement Action EA-19-079 Bittner Engineering, Inc.

Materials 02/12/2020 SLIII Problem/NOV EA-19-127 Municipality of Anchorage Materials 02/13/2020 SLIII/NOV EA-19-141 Sanders Medical Products Materials 03/03/2020 (2) SLIII/NOV EA-19-025 Duke Energy (H.B. Robinson Steam Electric Plant)

Reactor 03/11/2020 Confirmatory Order result of an ADR mediation EA-19-126 Avera St. Luke's Hospital Materials 03/11/2020 SLIII Problem/NOV IA-20-005 Mr. Stanley Schultz Individual 03/11/2020 SLIII/NOV EA-19-108 Schultz Surveying & Engineering Inc.

Materials 03/11/2020 SLIII Problem/NOV IA-20-025 Mr. Michael Paul Individual 03/12/2020 SLIII/NOV EA-19-071 Reed College Reactor 03/16/2020 Confirmatory Order result of an ADR mediation IA-19-035 Dr. Melinda Krahenbuhl Individual 03/16/2020 Order banning for three years; withdrawn following ADR mediation EA-19-112 Southern Nuclear Operating Co. (Vogtle Electric Generating Plant)

Reactor 03/31/2020 White/NOV EA-19-068 Lantheus Medical Imaging Materials 04/23/2020 SLIII Problem/NOV; SLIII/NOV/

CP-$7,500 IA-19-033 Mr. César Blanco Individual 04/23/2020 SLIII Problem/NOV EA-19-136 Thrasher Engineering Materials 04/27/2020 SLIII/NOV/CP-$7,500 EA-20-014 Alt and Witzig Engineering, Inc.

Materials 05/13/2020 (2) SLIII/NOV/CP-$8,500 EA-20-047 Christian Wheeler Engineering Materials 06/18/2020 SLIII/NOV EA-20-046 Bayou Inspection Services, Inc.

Materials 06/22/2020 SLIII/NOV EA-19-096 Hot Asphalt Paving, Inc.

Materials 06/24/2020 SLIII/NOV/CP-$7,500 EA-20-010 Centro Comprensivo de Cancer de la UPR Materials 06/30/2020 SLIII Problem/NOV IA-20-023 Mr. Dennis Bergmooser Individual 07/15/2020 SLIII/NOV IA-20-040 Dr. Melinda Krahenbuhl Individual 07/27/2020 Confirmatory Order result of an ADR mediation; Order IA-19-035 withdrawn for three year ban on July 27, 2020 EA-20-057 Virginia Electric and Power Co. (Surry Power Station)

Reactor 07/30/2020 White/NOV EA-20-003 Avera McKennan Materials 08/12/2020 SLIII Problem/NOV/CP-$7,500 IA-20-008 Mr. Joseph Shea Individual 08/24/2020 Order banning for five years; Order rescinded on January 22, 2021

APPENDICES l 139 APPENDIX V Significant Enforcement Actions Issued, 2020 (continued)

IA-20-009 Ms. Erin Henderson Individual 08/24/2020 SLII/NOV; NOV rescinded on January 22, 2021 EA-20-006 EA-20-007 Tennessee Valley Authority (Watts Bar Nuclear Plant)

Reactor 08/24/2020 SLI Problem/NOV; SLII Prob lem/NOV/CP-$606,942; Order Imposing CP issued October 29, 2020; Hearing requested by TVA on November 30, 2020 EA-20-065 St. Luke's Regional Medical Center Materials 09/15/2020 SLIII Problem/NOV/CP-$7,500 EA-20-095 International Isotopes, Inc.

Materials 09/17/2020 SLIII/NOV EA-20-018 Entergy Operations, Inc. (Arkansas Nuclear One)

Reactor 09/23/2020 SLIII/NOV IA-20-027 Mr. Todd Hegeman Individual 09/24/2020 SLIII/NOV IA-20-028 Mr. James Johnson Individual 09/24/2020 SLIII/NOV IA-20-029 Mr. Thomas Spivey Individual 09/24/2020 SLIII/NOV IA-20-030 Mr. Denver Lee Individual 09/24/2020 SLIII/NOV EA-19-132 St. Joseph's Regional Medical Center Materials 10/07/2020 SLIII Problem/NOV/CP-$7,500 EA-20-050 Sanford Medical Center Materials 10/16/2020 SLIII Problem/NOV EA-20-073 International Isotopes, Inc.

Materials 10/20/2020 SLII Problem/NOV EA-20-051 The Queen's Medical Center Materials 10/27/2020 SLIII Problem/NOV/CP-$7,500 EA-19-092 Tennessee Valley Authority (Watts Bar Nuclear Plant)

Reactor 11/06/2020 SLII/NOV; (2) SL III/NOV, SL II/

NOV/CP $303,471 IA-20-017 Mr. Billy Johnson Individual 11/06/2020 SLII/NOV; SLIII/NOV IA-20-018 Mr. William Sprinkle Individual 11/06/2020 SLIII/NOV; NOV withdrawn on July 23, 2021 IA-20-020 Mr. Todd Blakenship Individual 11/06/2020 SLIII/NOV; NOV withdrawn on July 23, 2021 EA-20-054 Arizona Public Service Co. (Palo Verde Nuclear Generating Station)

Reactor 11/17/2020 Confirmatory Order result of an ADR mediation EA-20-056 Armed Forces Radiobiological Research Institute Reactor 11/19/2020 Confirmatory Order result of an ADR mediation EA-20-110 TTL Associates Materials 12/03/2020 (2) SLIII/NOV EA-20-066 NAC International Non-licensee 12/21/2020 SLIII/NOV/SLIV Action #

Name Type Issue Date Enforcement Action