ML21028A443: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC Staff Presentation-Open Session GEH Topical Report NEDC-33911P, Revision 0, Supplement 1, BWRX-300 Containment Performance BWRX-300 Small Modular Reactor ACRS Subcommittee Meeting February 3, 2021 1
{{#Wiki_filter:}}
 
Presentation Outline
* NRC Staff Review Team
* BWRX-300 Containment Background
* NRC Staff Overview of NEDC-33911P 2
 
NRC Staff Review Team
* NRR Containment and Plant Systems Branch (SCPB)
      - Chang-Yang Li
      - Angelo Stubbs
* NRR Nuclear Systems Performance Branch (SNSB)
      - Syed Haider
* NRR Mechanical Engineering and Inservice Testing Branch (EMIB)
      - Yueh-Li (Renee) Li
      - Thomas Scarbrough
* NRR Vessels and Internals Branch (NVIB)
      - Dan Widrevitz
* NRR New Reactor Licensing Branch (NRLB)
      - Rani Franovich
      - George Wunder 3
 
BWRX-300 Containment Design Background
* BWRX-300 containment is an underground subterranean steel or reinforced concrete primary containment vessel (PCV) or a combination of steel and reinforced concrete
* Containment heat is removed by Passive Containment Cooling System (PCCS)
* Combustible gas control is not required for design basis accidents (DBAs) because the BWRX-300 containment atmosphere is well mixed and the containment atmosphere is initially nitrogen-inerted 4
 
BWRX-300 Containment Performance NEDC-33911P provides design requirements, analytical methods, acceptance criteria, and regulatory bases for:
* Containment and the Passive Containment Cooling System (PCCS)
* Containment isolation valves (CIVs)
* Analytical methods evaluating containment performance
* Acceptance criteria for the BWRX-300 containment performance in accordance with the design requirements specified for the containment, PCCS, and CIVs 5
 
Overview of NRC Staff Review
* Piping and Valves Design Relevant to Containment Performance
* Containment Functional Design
* Containment Heat Removal Systems
* Secondary Containment Functional Design
* Containment Isolation System
* Combustible Gas Control in Containment
* Containment Leakage Testing
* Fracture Prevention of Containment Pressure Boundary 6}}

Revision as of 08:21, 18 January 2022

ACRS Fc NRC Staff Public LTR BWRx-300 Containment Performance Final Slides
ML21028A443
Person / Time
Issue date: 01/28/2021
From:
NRC/NRR/DNRL/NRLB
To:
Shea J
References
Download: ML21028A443 (6)


Text