Approach for a New Regulatory Guidance Infrastructure for Digital Instrumentation and Control (I&C)
ML20113E839
Person / Time
Issue date: 04/28/2020
From: Paul Kallan
NRC/NRR/DNRL/NRLB
To:
Kallan P
References
Download: ML20113E839 (9)


Text

DRAFT APPROACH FOR A NEW REGULATORY GUIDANCE INFRASTRUCTURE FOR DIGITAL INSTRUMENTATION AND CONTROL (I&C)

Category 2 Public Meeting April 28, 2020 1

  • Meeting Purpose
  • Background
  • Draft Approach for a New I&C Regulatory Guidance Infrastructure
  • Highest NRC Priority Areas
  • Next Steps 2

Presentation Outline

3 Meeting Purpose

  • Discuss with the Nuclear Energy Institute (NEI) and industry, the NRCs draft approach for achieving a simpler and more effective I&C regulatory infrastructure.
  • Obtain feedback from NEI and industry including which areas are of higher priority.

4 Background

  • NRC continues to strive to improve the clarity and cohesiveness of the I&C regulatory infrastructure.
  • While the NRC staff has focused to date on tactical improvements, it is now transitioning to modernizing and streamlining the overall I&C regulatory infrastructure.
  • As a first step, the NRC staff developed a draft approach for streamlining the I&C Regulatory Guide (RG) infrastructure framework.

5 Approach for a New I&C Regulatory Guide Infrastructure Framework Figure 1, DRAFT Approach for a New I&C Regulatory Guide Infrastructure Framework -

See attachment to meeting notice

6 Highest NRC Priority Areas

  • RG 1.152 - Criteria for Computers o Update to endorse IEEE 7-4.3.2-2016 and retire ISG-04 for digital communication systems

Assess graded-approach alternatives for the specified software integrity level guidance in IEEE-1012-2016 o

Assess the feasibility of consolidating criteria in RGs 1.168 through 1.173 for a more efficient demonstration of software quality

7 Next Steps

  • Receive industry feedback on the draft I&C regulatory guidance infrastructure and highest priority areas.
  • Finalize the new I&C RG infrastructure framework.
  • Implement plans for updating I&C regulatory guidance.

8 References

  • [1] U.S. NRC, SECY 19-0112, Annual Update on the Integrated Strategy to Modernize the U.S. Nuclear Regulatory Commission's Digital Instrument and Control Regulatory Infrastructure, November 2019, (ADAMS Accession No. ML19261B629).
  • [2] U.S. NRC, Final Report for the Strategic Assessment of the Digital Instrumentation and Control Regulatory Infrastructure, December 2019, (ADAMS Accession No. ML19351D933).
  • [3] Figure 1 DRAFT Approach for a New I&C Regulatory Guidance Infrastructure (ADAMS Accession No. ML20100J219).

9