ML20113E839
Jump to navigation
Jump to search
ML20113E839 | |
Person / Time | |
---|---|
Issue date: | 04/28/2020 |
From: | Paul Kallan NRC/NRR/DNRL/NRLB |
To: | |
Kallan P | |
References | |
Download: ML20113E839 (9) | |
Text
DRAFT APPROACH FOR A NEW REGULATORY GUIDANCE INFRASTRUCTURE FOR DIGITAL INSTRUMENTATION AND CONTROL (I&C)
Category 2 Public Meeting April 28, 2020 1
- Meeting Purpose
- Background
- Draft Approach for a New I&C Regulatory Guidance Infrastructure
- Highest NRC Priority Areas
- Next Steps 2
Presentation Outline
3 Meeting Purpose
- Discuss with the Nuclear Energy Institute (NEI) and industry, the NRCs draft approach for achieving a simpler and more effective I&C regulatory infrastructure.
- Obtain feedback from NEI and industry including which areas are of higher priority.
4 Background
- NRC continues to strive to improve the clarity and cohesiveness of the I&C regulatory infrastructure.
- While the NRC staff has focused to date on tactical improvements, it is now transitioning to modernizing and streamlining the overall I&C regulatory infrastructure.
- As a first step, the NRC staff developed a draft approach for streamlining the I&C Regulatory Guide (RG) infrastructure framework.
5 Approach for a New I&C Regulatory Guide Infrastructure Framework Figure 1, DRAFT Approach for a New I&C Regulatory Guide Infrastructure Framework -
See attachment to meeting notice
6 Highest NRC Priority Areas
- RG 1.153 - I&C Safety Criteria o Update to endorse IEEE 603-2018
- RG 1.152 - Criteria for Computers o Update to endorse IEEE 7-4.3.2-2016 and retire ISG-04 for digital communication systems
- RG 1.168 - Software V&V o
Assess graded-approach alternatives for the specified software integrity level guidance in IEEE-1012-2016 o
Assess the feasibility of consolidating criteria in RGs 1.168 through 1.173 for a more efficient demonstration of software quality
7 Next Steps
- Receive industry feedback on the draft I&C regulatory guidance infrastructure and highest priority areas.
- Implement plans for updating I&C regulatory guidance.
8 References
- [1] U.S. NRC, SECY 19-0112, Annual Update on the Integrated Strategy to Modernize the U.S. Nuclear Regulatory Commission's Digital Instrument and Control Regulatory Infrastructure, November 2019, (ADAMS Accession No. ML19261B629).
- [2] U.S. NRC, Final Report for the Strategic Assessment of the Digital Instrumentation and Control Regulatory Infrastructure, December 2019, (ADAMS Accession No. ML19351D933).
- [3] Figure 1 DRAFT Approach for a New I&C Regulatory Guidance Infrastructure (ADAMS Accession No. ML20100J219).
- [4] U.S. NRC, Regulatory Guidance documents available via: https://www.nrc.gov/reading-rm/doc-collections/#reg.
9