granted the request of Florida Power Corporation (the licensee) to withdraw two applications for proposed amendments to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Generating Plant, located in Citrus County, Florida.
granted the request of Florida Power Corporation (the licensee) to withdraw two applications for proposed amendments to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Generating Plant, located in Citrus County, Florida.
One of the proposed amendments would have modified the facility Technical Specifications to include the silicon-controlled rectifiers in appropriate surveillance and test sections. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May23,1984(49FR21829).          However, by letter dated April 11, 1989, the licensee withdrew the proposed change.
One of the proposed amendments would have modified the facility Technical Specifications to include the silicon-controlled rectifiers in appropriate surveillance and test sections. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May23,1984(49FR21829).          However, by {{letter dated|date=April 11, 1989|text=letter dated April 11, 1989}}, the licensee withdrew the proposed change.
The other proposed amendment would have added operability and surveillance requirements for the reactor trip breaker shunt trip attachment. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on November 30, 1988 (53 FR 48330). However, by letter dated April 11, 1989, the licensee withdrew the proposed change.
The other proposed amendment would have added operability and surveillance requirements for the reactor trip breaker shunt trip attachment. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on November 30, 1988 (53 FR 48330). However, by {{letter dated|date=April 11, 1989|text=letter dated April 11, 1989}}, the licensee withdrew the proposed change.
In both cases the licensee committed to incorporate the proposed changes consistent with NRC guidance in the Technical Specification Improvement Program (TSIP), and until approval of the TSIP submittal, to maintain operability requirements and surveillance procedures in accordance with current NRC guidance.
In both cases the licensee committed to incorporate the proposed changes consistent with NRC guidance in the Technical Specification Improvement Program (TSIP), and until approval of the TSIP submittal, to maintain operability requirements and surveillance procedures in accordance with current NRC guidance.
e904270416 890420
e904270416 890420

Latest revision as of 09:52, 5 October 2021

Notice of Withdrawal of 840116 & 850329 Applications for Amends to License DPR-72 to Modify Tech Specs to Include silicon-controlled Rectifiers in Appropriate Surveillance & Test Sections
ML20245C846
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/20/1989
From: Silver H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20245C843 List:
References
NUDOCS 8904270416
Download: ML20245C846 (2)


Text

W -

( r -

l 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION FLORIDA POWER CORPORATION DOCKET NO. 50-302 NOTICE OF WITHDRAWAL OF APPLICATIONS FOR AMENDMENTS TO FACILITY OPERATING LICENSE The United States Nuclear Regulatory Comission (the Comission) has

~

granted the request of Florida Power Corporation (the licensee) to withdraw two applications for proposed amendments to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Generating Plant, located in Citrus County, Florida.

One of the proposed amendments would have modified the facility Technical Specifications to include the silicon-controlled rectifiers in appropriate surveillance and test sections. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May23,1984(49FR21829). However, by . Proposed Changes Will Be Incorporated in Tech Spec Improvement Program|letter dated April 11, 1989]], the licensee withdrew the proposed change.

The other proposed amendment would have added operability and surveillance requirements for the reactor trip breaker shunt trip attachment. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on November 30, 1988 (53 FR 48330). However, by . Proposed Changes Will Be Incorporated in Tech Spec Improvement Program|letter dated April 11, 1989]], the licensee withdrew the proposed change.

In both cases the licensee committed to incorporate the proposed changes consistent with NRC guidance in the Technical Specification Improvement Program (TSIP), and until approval of the TSIP submittal, to maintain operability requirements and surveillance procedures in accordance with current NRC guidance.

e904270416 890420

\ DR ADOCK0500g2 I

a. .

For further details with respect to this action, see the applications for I amendments dated January 16, 1984 and March 29, 1985, respectively, and the licensee's letters dated April 11, 1989, which withdrew the applications for license amendnents. The~above documents are available for public inspection at the Comission's Public Document Room, 2120 L Street, N.W., Washington, D.C. , and at.the Crystal River Public Library, 668 N.W. First Avenue, Crystal River, Florida 32629.

Dated at Rockville, Maryland, this 20th day of April 1989.

FOR THE NUCLEAR EGULATORY COMhlSSION l

0 l

. a.v" b -

Harley Si er, Project Manager Project rectorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation