ML21230A360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:xLPR Version 2 NRC-EPRI Capstone Reports xLPR User Group Meeting August 18, 2021 1
 
BACKGROUND
* xLPR Version 1 (Pilot Study) Capstone Reports NUREG-2110              EPRI 1022860 2
 
VERSION 2 CAPSTONE REPORTS COMING SOON!
NUREG-2247            EPRI 3002013307 3
 
VERSION 2 CAPSTONE REPORT OVERVIEW 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4 UNCERTAINTIES 5 TRIAL INPUTS AND ANALYSES 6 RECOMMENDATIONS 7 CONCLUSIONS 8 REFERENCES 4
 
VERSION 2 CAPSTONE REPORT CONTENTS (1/6) 1  INTRODUCTION 1 INTRODUCTION 2 CODE  STRUCTURE,
    > Primer        OPERATION, on Probabilistic    AND THEORY Fracture Mechanics 3 QUALITY  ASSURANCE
    > Summary  of Pilot Study 4 UNCERTAINTIES
    > Version 2 Objectives 5 TRIAL INPUTS AND ANALYSES
    > Development  Team 6 RECOMMENDATIONS 7 CONCLUSIONS 8 REFERENCES 5
 
VERSION 2 CAPSTONE REPORT CONTENTS (2/6) 1 INTRODUCTION 2  CODE 2 CODE      STRUCTURE, STRUCTURE,              OPERATION, OPERATION, AND  THEORY          AND THEORY 3 QUALITY  ASSURANCE
    > Features, Problem Representation, Basic Design and Operation 4 UNCERTAINTIES
    > Models 5 TRIAL INPUTS AND ANALYSES
    > Computational  Framework 6 RECOMMENDATIONS 7 CONCLUSIONS 8 REFERENCES 6
 
VERSION 2 CAPSTONE REPORT CONTENTS (3/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3  QUALITY 3 QUALITY          ASSURANCE ASSURANCE 4 UNCERTAINTIES
    > Standards 5 TRIAL INPUTS AND ANALYSES
    > Software Development Process 6 RECOMMENDATIONS
    > Verification and Validation 7 CONCLUSIONS
    > External Reviews 8 REFERENCES 7
 
VERSION 2 CAPSTONE REPORT CONTENTS (4/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4  UNCERTAINTIES 4 UNCERTAINTIES 5 TRIAL INPUTS AND ANALYSES
    > Background 6 RECOMMENDATIONS
    > Major Assumptions and Simplifications 7 CONCLUSIONS 8 REFERENCES 8
 
VERSION 2 CAPSTONE REPORT CONTENTS (5/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4 UNCERTAINTIES 5  TRIAL 5 TRIAL      INPUTS INPUTS            AND ANALYSES AND ANALYSES 6 RECOMMENDATIONS
    > Input Cases and Scenarios 7 CONCLUSIONS
    > Selection of Analysis Results 8 REFERENCES 9
 
VERSION 2 CAPSTONE REPORT CONTENTS (6/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4 UNCERTAINTIES 5 TRIAL INPUTS AND ANALYSES 6 RECOMMENDATIONS 7  CONCLUSIONS 7 CONCLUSIONS 8 REFERENCES
    > NRC/RES and EPRI Goals and Objectives for Version 2 Fully Achieved 10
 
VERSION 2 CAPSTONE REPORT SUPPORTING TECHNICAL REPORTS 11
 
VERSION 2 CAPSTONE REPORT SUPPORTING TECHNICAL REPORT LISTING
* Models*
* Computational Framework*
      - Welding Residual Stresses
* Sources and Treatment of
      - Crack Initiation                  Uncertainties*
      - Stress Intensity Factors
* Inputs*
      - Cyclic Stress Intensity Factors
* Scenario Analyses*
      - Crack Growth and Coalescence
* Acceptance Criteria (ML16271A436)
      - Crack Transition
      - Crack Opening Displacement
* Project Integration Board*
      - Leak Rate
* External Review Board (ML17276A683)
      - Crack Stability
      - Inservice Inspection
* Packaged under ML16341B038 12
 
VERSION 2 QUALITY ASSURANCE DOCUMENTS 13}}

Revision as of 01:23, 9 September 2021

NRC-EPRI Capstone Reports
ML21230A360
Person / Time
Issue date: 08/18/2021
From:
NRC/RES/DE
To:
Homiack M
Shared Package
ML21230A354 List:
References
Download: ML21230A360 (13)


Text

xLPR Version 2 NRC-EPRI Capstone Reports xLPR User Group Meeting August 18, 2021 1

BACKGROUND

  • xLPR Version 1 (Pilot Study) Capstone Reports NUREG-2110 EPRI 1022860 2

VERSION 2 CAPSTONE REPORTS COMING SOON!

NUREG-2247 EPRI 3002013307 3

VERSION 2 CAPSTONE REPORT OVERVIEW 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4 UNCERTAINTIES 5 TRIAL INPUTS AND ANALYSES 6 RECOMMENDATIONS 7 CONCLUSIONS 8 REFERENCES 4

VERSION 2 CAPSTONE REPORT CONTENTS (1/6) 1 INTRODUCTION 1 INTRODUCTION 2 CODE STRUCTURE,

> Primer OPERATION, on Probabilistic AND THEORY Fracture Mechanics 3 QUALITY ASSURANCE

> Summary of Pilot Study 4 UNCERTAINTIES

> Version 2 Objectives 5 TRIAL INPUTS AND ANALYSES

> Development Team 6 RECOMMENDATIONS 7 CONCLUSIONS 8 REFERENCES 5

VERSION 2 CAPSTONE REPORT CONTENTS (2/6) 1 INTRODUCTION 2 CODE 2 CODE STRUCTURE, STRUCTURE, OPERATION, OPERATION, AND THEORY AND THEORY 3 QUALITY ASSURANCE

> Features, Problem Representation, Basic Design and Operation 4 UNCERTAINTIES

> Models 5 TRIAL INPUTS AND ANALYSES

> Computational Framework 6 RECOMMENDATIONS 7 CONCLUSIONS 8 REFERENCES 6

VERSION 2 CAPSTONE REPORT CONTENTS (3/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY 3 QUALITY ASSURANCE ASSURANCE 4 UNCERTAINTIES

> Standards 5 TRIAL INPUTS AND ANALYSES

> Software Development Process 6 RECOMMENDATIONS

> Verification and Validation 7 CONCLUSIONS

> External Reviews 8 REFERENCES 7

VERSION 2 CAPSTONE REPORT CONTENTS (4/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4 UNCERTAINTIES 4 UNCERTAINTIES 5 TRIAL INPUTS AND ANALYSES

> Background 6 RECOMMENDATIONS

> Major Assumptions and Simplifications 7 CONCLUSIONS 8 REFERENCES 8

VERSION 2 CAPSTONE REPORT CONTENTS (5/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4 UNCERTAINTIES 5 TRIAL 5 TRIAL INPUTS INPUTS AND ANALYSES AND ANALYSES 6 RECOMMENDATIONS

> Input Cases and Scenarios 7 CONCLUSIONS

> Selection of Analysis Results 8 REFERENCES 9

VERSION 2 CAPSTONE REPORT CONTENTS (6/6) 1 INTRODUCTION 2 CODE STRUCTURE, OPERATION, AND THEORY 3 QUALITY ASSURANCE 4 UNCERTAINTIES 5 TRIAL INPUTS AND ANALYSES 6 RECOMMENDATIONS 7 CONCLUSIONS 7 CONCLUSIONS 8 REFERENCES

> NRC/RES and EPRI Goals and Objectives for Version 2 Fully Achieved 10

VERSION 2 CAPSTONE REPORT SUPPORTING TECHNICAL REPORTS 11

VERSION 2 CAPSTONE REPORT SUPPORTING TECHNICAL REPORT LISTING

  • Models*
  • Computational Framework*

- Welding Residual Stresses

  • Sources and Treatment of

- Crack Initiation Uncertainties*

- Stress Intensity Factors

  • Inputs*

- Cyclic Stress Intensity Factors

  • Scenario Analyses*

- Crack Growth and Coalescence

- Crack Transition

- Crack Opening Displacement

  • Project Integration Board*

- Leak Rate

- Crack Stability

- Inservice Inspection

VERSION 2 QUALITY ASSURANCE DOCUMENTS 13