ENS 55320: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 23: | Line 23: | ||
This report is being made per 10 CFR 50.72(b)(2)(iv)(B) for a RPS actuation, 4 hr. notification, and per 10 CFR 50.72(b)(3)(iv)(A) for an automatic actuation of the Auxiliary Feedwater system, 8 hr. notification. | This report is being made per 10 CFR 50.72(b)(2)(iv)(B) for a RPS actuation, 4 hr. notification, and per 10 CFR 50.72(b)(3)(iv)(A) for an automatic actuation of the Auxiliary Feedwater system, 8 hr. notification. | ||
The NRC Resident Inspector and Illinois Emergency Management Agency have been informed. | The NRC Resident Inspector and Illinois Emergency Management Agency have been informed. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20210623en.html#en55320 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 | ||
Line 32: | Line 32: | ||
| Initial reactor mode = Power Operation | | Initial reactor mode = Power Operation | ||
| Current power = 0 | | Current power = 0 | ||
| Current reactor mode = | | Current reactor mode = Hot Standby | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Latest revision as of 06:30, 23 June 2021
Where | |
---|---|
Braidwood Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.75 h-0.115 days <br />-0.0164 weeks <br />-0.00377 months <br />) | |
Opened: | Matthew Marzano 03:06 Jun 21, 2021 |
NRC Officer: | Thomas Herrity |
Last Updated: | Jun 21, 2021 |
55320 - NRC Website
| |