| title = Remediation Training And Reevaluation Of Two Individual Performance Deficiencies
| title = Remediation Training and Reevaluation of Two Individual Performance Deficiencies
| docket = 05000482
| docket = 05000482
| inspection report = IR 05000482/2012005
| inspection report = IR 05000482/2012005
Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.11
| Inspection procedure = IP 71111.11
| Inspector = C Long, C Osterholtz, C Peabody, J Laughlin, N O,'Keefe S, Hedger T, Buchananc Peabody, G Apger, G George, G Guerra, G Ryan, J Laughlin, N O,'Keefe N, Okonkwo P, Elkmann R, Strobl
| Inspector = C Long, C Osterholtz, C Peabody, J Laughlin, N O'Keefe, S Hedger, T Buchananc, Peabodyg Apger, G George, G Guerra, G Ryan, J Laughlin, N O'Keefe, N Okonkwo, P Elkmann, R Stroble
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  
| description = The inspectors noted that two individuals had not completed remediation training and evaluation by the end of the inspection period. One individual was still receiving intense remediation training specific to the identified performance deficiencies that would continue until at least January 2013. The other individual was experiencing adverse medical issues and would not be available to return to duty and thus be unavailable for remediation and reexamination until at least March 2013. Pending resolution and NRC review of the remediation and reexamination of these individual performance deficiencies, this item remains unresolved: URI 05000482/2012005-03, Remediation Training and Reevaluation of Two Individual Performance Deficiencies.
| description = The inspectors noted that two individuals had not completed remediation training and evaluation by the end of the inspection period. One individual was still receiving intense remediation training specific to the identified performance deficiencies that would continue until at least January 2013. The other individual was experiencing adverse medical issues and would not be available to return to duty and thus be unavailable for remediation and reexamination until at least March 2013. Pending resolution and NRC review of the remediation and reexamination of these individual performance deficiencies, this item remains unresolved: URI 05000482/2012005-03, Remediation Training and Reevaluation of Two Individual Performance Deficiencies.
}}
}}

Latest revision as of 00:19, 22 February 2018

03
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Report IR 05000482/2012005 Section 1R11
Date counted Dec 31, 2012 (2012Q4)
Type: URI:
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.11
Inspectors (proximate) C Long
C Osterholtz
C Peabody
J Laughlin
N O'Keefe
S Hedger
T Buchananc
Peabodyg Apger
G George
G Guerra
G Ryan
J Laughlin
N O'Keefe
N Okonkwo
P Elkmann
R Stroble
INPO aspect
'