05000483/FIN-2009006-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 13: Line 13:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71152
| Inspection procedure = IP 71152
| Inspector = C Smith, N O, 'Keefes Alferink, E Uribe, G Tutak
| Inspector = C Smith, N O'Keefe, S Alferink, E Uribe, G Tutak
| CCA = H.8
| CCA = H.8
| INPO aspect = WP.4
| INPO aspect = WP.4

Latest revision as of 00:15, 22 February 2018

01
Site: Callaway Ameren icon.png
Report IR 05000483/2009006 Section 4OA2
Date counted Mar 31, 2009 (2009Q1)
Type: NCV: Green
cornerstone Initiating Events, Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71152
Inspectors (proximate) C Smith
N O'Keefe
S Alferink
E Uribe
G Tutak
CCA H.8, Procedure Adherence
INPO aspect WP.4
'