ENS 54691: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 9: Line 9:
| unit = 1
| unit = 1
| utype = GE-4, GE-4
| utype = GE-4, GE-4
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| emergency class = Non Emergency  
| emergency class = Non Emergency
| notification date = 05/03/2020 11:43
| notification date = 05/03/2020 11:43
| notification by = Tom Rydzewski
| notification by = Tom Rydzewski
Line 23: Line 23:
This event requires a 4-hour Emergency Notification System (ENS) notification in accordance with 10 CFR 50.72(b)(2)(iv)(B) and an 8-hour ENS notification in accordance with 10 CFR 50.72(b)(3)(iv)(A) and 10 CFR 50.72(b)(3)(iv)(B).
This event requires a 4-hour Emergency Notification System (ENS) notification in accordance with 10 CFR 50.72(b)(2)(iv)(B) and an 8-hour ENS notification in accordance with 10 CFR 50.72(b)(3)(iv)(A) and 10 CFR 50.72(b)(3)(iv)(B).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200504en.html#en54691
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200504en.html#en54691
}}{{unit info
| Unit =  1
| type =
| Scram code =  A/R
| Reactor critical =  Y
| Initial power =  76
| Initial reactor mode =  Power Operation
| Current power =  0
| Current reactor mode =  Hot Shutdown
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Latest revision as of 12:40, 15 January 2021

ENS 54691 +/-
Where
Susquehanna Talen Energy icon.png
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-0.63 h-0.0263 days <br />-0.00375 weeks <br />-8.62974e-4 months <br />)
Opened: Tom Rydzewski
11:43 May 3, 2020
NRC Officer: Donald Norwood
Last Updated: May 3, 2020
54691 - NRC Website
Loading map...