ML20138M726: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:-- . _. . - _ - . - . . . - - . ._ . --- . . - . - . _ _ - - - - . --- | ||
4 | |||
i ! | |||
! | |||
! - | |||
i . | |||
i | |||
j ENCLOSURE 1 ; | |||
' ; | |||
NOTICE OF VIOLATION i | |||
i | |||
! | |||
1 | |||
l | |||
' | |||
Duke Power Company Docket Nos. 50-369 & 50-370 | |||
McGuire Nuclear Station License Nos. NPF-9 & NPF-17 | |||
i | |||
The following violations were identified during an inspection conducted on ; | |||
August 21 - September 20, 1985. The Severity levels are assigned in accordance ! | |||
with the NRC Enforcement Policy (10 CFR Part 2, Appendix C). | |||
1. Technical Specification 3.8.1.1 states that with one diesel generator ; | |||
, | |||
inoperable, all systems, subsystems, trains, components and devices that | |||
i depend upon the remaining operable diesel generator as a source of emergency | |||
1 power must also be operable for that train to be operable and states that if | |||
two trains are inoperable for two hours, the unit must be in at least hot | |||
standby within the next six hours and cold shutdown within the following 30 | |||
hours. | |||
, | |||
Technical Specification 3.4.3 requires for a pressurizer to be operable, | |||
, that at least two groups of pressurizer heaters be operable each having a | |||
J capacity of at least 150 KW. | |||
Contrary to the above, on September 11, 1985, two trains of pressurizer | |||
' | |||
heaters with their required emergency power supplies were not available from | |||
i 9:50 a.m. until 7:33 p.m. on September 11, 1985. | |||
This is a Severity Level IV violation (Supplement I) applicable to Unit 1. | |||
2. Technical Specification 6.8.1 requires that current written approved | |||
procedures be established implemented and maintained covering shift relief, | |||
turnover and maintenance of minimum shift complement. | |||
Contrary to the above, on September 6,1985, at 3:00 p.m., none of the | |||
Senior Reactor Operators (SRO) designated on the shift supervisor's turnover | |||
checklist as being required to be in the control room at the time were | |||
present. A non-designated SR0 was present in the control room. | |||
l This is a Severity level IV violation (Supplement I), applicable to Units 1 | |||
and 2. | |||
8511040256 851021 | |||
PDR ADOCK 05000369 | |||
DCT E l 1985 8 | |||
Date: | |||
4 | |||
4 | |||
i | |||
,,, _-,m., - , . | |||
. , - _ . . , _ . , _ , . . _ , m__m _.., ._. ,, .._.,.,m_-,,w,,_...- , . . . , .,,y 3,,.,% y ,ec,.--gm- | |||
}} | }} | ||
Revision as of 07:25, 22 July 2020
| ML20138M726 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/21/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20138M724 | List: |
| References | |
| 50-369-85-30, 50-370-85-32, NUDOCS 8511040256 | |
| Download: ML20138M726 (1) | |
See also: IR 05000821/2009020
Text
-- . _. . - _ - . - . . . - - . ._ . --- . . - . - . _ _ - - - - . ---
4
i !
!
! -
i .
i
j ENCLOSURE 1 ;
' ;
i
!
1
l
'
Duke Power Company Docket Nos. 50-369 & 50-370
McGuire Nuclear Station License Nos. NPF-9 & NPF-17
i
The following violations were identified during an inspection conducted on ;
August 21 - September 20, 1985. The Severity levels are assigned in accordance !
with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).
1. Technical Specification 3.8.1.1 states that with one diesel generator ;
,
inoperable, all systems, subsystems, trains, components and devices that
i depend upon the remaining operable diesel generator as a source of emergency
1 power must also be operable for that train to be operable and states that if
two trains are inoperable for two hours, the unit must be in at least hot
standby within the next six hours and cold shutdown within the following 30
hours.
,
Technical Specification 3.4.3 requires for a pressurizer to be operable,
, that at least two groups of pressurizer heaters be operable each having a
J capacity of at least 150 KW.
Contrary to the above, on September 11, 1985, two trains of pressurizer
'
heaters with their required emergency power supplies were not available from
i 9:50 a.m. until 7:33 p.m. on September 11, 1985.
This is a Severity Level IV violation (Supplement I) applicable to Unit 1.
2. Technical Specification 6.8.1 requires that current written approved
procedures be established implemented and maintained covering shift relief,
turnover and maintenance of minimum shift complement.
Contrary to the above, on September 6,1985, at 3:00 p.m., none of the
Senior Reactor Operators (SRO) designated on the shift supervisor's turnover
checklist as being required to be in the control room at the time were
present. A non-designated SR0 was present in the control room.
l This is a Severity level IV violation (Supplement I), applicable to Units 1
and 2.
8511040256 851021
PDR ADOCK 05000369
DCT E l 1985 8
Date:
4
4
i
,,, _-,m., - , .
. , - _ . . , _ . , _ , . . _ , m__m _.., ._. ,, .._.,.,m_-,,w,,_...- , . . . , .,,y 3,,.,% y ,ec,.--gm-