ML061160475: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:MONITORING WELL STATUS (Wed, Dec 14,2005-1530 hrs)1DX Sample Result (Highest Value) | {{#Wiki_filter:MONITORING WELL STATUS (Wed, Dec 14,2005-1530 hrs) 1DX Well Location Status Next Samples Sample Result Number Step Taken (Highest Value) | ||
MW-30 | MW-111 Transformer Yard Baseline Sample PT Continue to SampleWeekly 302,000 pCiJ/ (11/04/05) | ||
Not ready for this sample MOB side walk U-2 SFB Alley Way | MW-30 U-2 SFB Drille5lkeep Fully Developed Well Raw Water: 399,000 pCi/I (11/23/05) | ||
No ready yet for this sample MW-31 | Transducer installed Packer test Water: 600,000 pCi/l (11/24/05) | ||
"Developed Well": Not ready for this sample MW-31 MOB side walk DrilleIoday Continue drilling MW-32 Need Eng Evaluation prior to U-2 SFB Alley Way Metal magnotometer indication in hole begin drilling &eo) -- | |||
MW-33 Transformer Yard Purging well Get water sample MW-34 Transformer Yard Well installed Sampled water-awaiting results MW-35 Transformer Yard Well installed Sampled water-awaiting results MW-36 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-37 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-38 South U-3 Boundary Well in service Continue periodic sampling Note: | |||
* We are using the vacuum truck on MW-32 to attempt to clear materiai in weji hole hole tha. may be on Lop of a Intluai objecL. This hole has bccn vacuumed approximately 7' down, but a magnetometer is indir-ating metal is in the vicinity of the probe at the 7'deep level. Will get engineering evaluation prior to drilling for status or determination of metv -<-ition.lnformation In thiS record waS &MO inaccordance Nr_W Iof b hmMPUs Ai FOWAwhan | |||
MONITORING WELL STATUS (Nov. 28,2005) | |||
ImIbr LcEEaiion | |||
'-'A | |||
'.,LUuS Saiiijle Rn buiR Number Stev Taken (Hii~hest Value) | |||
MW-111 Transformer Yard Baseline Sample Pt Continue to Sample Weekly 302,000 pCi/l (11/04/05) | |||
MW-30 U-2 SFB Drilled 61' deep Fully Develop Well Raw Water: 399,000 pCi/l (11/23/05) | |||
Packer test Water: 600,000 pCi/l (11/24/05) | |||
"Developed Well": No ready yet for this sample MW-31 U-2 SFB Alley way No action yet Remove pavement Vacuum excavation Drill Well MW-32 U-2 MOB Sidewalk No action yet Remove pavement Vacuum excavation Drill well MW-33 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-34 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-35 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-36 U-2 Turbine Bldg No action yet Jack Hammer pavemtent Vacuum excavation Drill Well LvI v .0 I U- Turbin S.out Bldg: | |||
) | |||
UI BoundIjUr Jo act HOn pcve n T tack TAU . r paement Vacuum excavation Drill Well MW-38 South U-3 Boundar y Jack Hammered pavement Vacuum excavation Drill Well}} |
Latest revision as of 06:42, 23 March 2020
ML061160475 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 12/14/2005 |
From: | - No Known Affiliation |
To: | Office of Nuclear Reactor Regulation |
References | |
FOIA/PA-2006-0081 | |
Download: ML061160475 (2) | |
Text
MONITORING WELL STATUS (Wed, Dec 14,2005-1530 hrs) 1DX Well Location Status Next Samples Sample Result Number Step Taken (Highest Value)
MW-111 Transformer Yard Baseline Sample PT Continue to SampleWeekly 302,000 pCiJ/ (11/04/05)
MW-30 U-2 SFB Drille5lkeep Fully Developed Well Raw Water: 399,000 pCi/I (11/23/05)
Transducer installed Packer test Water: 600,000 pCi/l (11/24/05)
"Developed Well": Not ready for this sample MW-31 MOB side walk DrilleIoday Continue drilling MW-32 Need Eng Evaluation prior to U-2 SFB Alley Way Metal magnotometer indication in hole begin drilling &eo) --
MW-33 Transformer Yard Purging well Get water sample MW-34 Transformer Yard Well installed Sampled water-awaiting results MW-35 Transformer Yard Well installed Sampled water-awaiting results MW-36 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-37 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-38 South U-3 Boundary Well in service Continue periodic sampling Note:
- We are using the vacuum truck on MW-32 to attempt to clear materiai in weji hole hole tha. may be on Lop of a Intluai objecL. This hole has bccn vacuumed approximately 7' down, but a magnetometer is indir-ating metal is in the vicinity of the probe at the 7'deep level. Will get engineering evaluation prior to drilling for status or determination of metv -<-ition.lnformation In thiS record waS &MO inaccordance Nr_W Iof b hmMPUs Ai FOWAwhan
MONITORING WELL STATUS (Nov. 28,2005)
ImIbr LcEEaiion
'-'A
'.,LUuS Saiiijle Rn buiR Number Stev Taken (Hii~hest Value)
MW-111 Transformer Yard Baseline Sample Pt Continue to Sample Weekly 302,000 pCi/l (11/04/05)
MW-30 U-2 SFB Drilled 61' deep Fully Develop Well Raw Water: 399,000 pCi/l (11/23/05)
Packer test Water: 600,000 pCi/l (11/24/05)
"Developed Well": No ready yet for this sample MW-31 U-2 SFB Alley way No action yet Remove pavement Vacuum excavation Drill Well MW-32 U-2 MOB Sidewalk No action yet Remove pavement Vacuum excavation Drill well MW-33 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-34 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-35 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-36 U-2 Turbine Bldg No action yet Jack Hammer pavemtent Vacuum excavation Drill Well LvI v .0 I U- Turbin S.out Bldg:
)
UI BoundIjUr Jo act HOn pcve n T tack TAU . r paement Vacuum excavation Drill Well MW-38 South U-3 Boundar y Jack Hammered pavement Vacuum excavation Drill Well