ULNRC-05150, Attachment 3: Markup of Technical Specification Pages: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ULNRC-1S Iso ATTACHMENT 3 MARKUP OF TECHNICAL SPECIFICATION PAGES in accordance with the Freedom of Information Act, exemptions  
{{#Wiki_filter:Iso ULNRC-1S 3
-, ,E0IA-ý_ " ', h ,* .*:
ATTACHMENT PAGES SPECIFICATION TECHNICAL MARKUP OF with the Freedom of Information in accordance                          ,
February 2005 Chronology of Callaway MSIV Operability Issues January 23, 2006 The licensee completed a new MSL Break accident Analysis Case (Case 17). Case 17 considered the plant configuration with one MSIV actuator removed from service. The current licensee bases (CLB), including Technical Specifications (TS), and the accident analysis assumed, 141 million BTUs/hr containment cooler duty. Case 17 assumed 155 million BTUs/hr cooler duty. The 155 million BTUs/hr duty was based. on additional margin provided by clean, unblocked heat exchanger coils. The new Case 17 concluded the resulting peak containment temperature and pressure was bonded by CLB Cases 6 and 12 (the limiting Cases).Licensee prepared a 50.59 safety evaluation to add the new MSL Break accident Analysis Case (Case 17) to the CLB. The licensee .con.cluded that prior NRC approval was required.March 2005 i t J The licensee submitted a license amendment request to establish a 72 hour out of service time for an inoperable'MSIV actuator.55 z~--5,- .55-~ -.-5 ~ ~ <~s 55< '555ss55-5;i}}
          " ', h , .*:
Act, exemptions
,E0IA-&#xfd;_
 
Chronology of Callaway MSIV Operability Issues January 23, 2006 February 2005 The licensee completed a new MSL Break accident Analysis Case (Case 17). Case 17 considered the plant configuration with one MSIV actuator removed from service. The current licensee bases (CLB), including Technical Specifications (TS), and the accident analysis assumed, 141 million BTUs/hr containment cooler duty. Case 17 assumed 155 million BTUs/hr cooler duty. The 155 million BTUs/hr duty was based. on additional margin provided by clean, unblocked heat exchanger coils. The new Case 17 concluded the resulting peak containment temperature and pressure was bonded by CLB Cases 6 and 12 (the limiting Cases).
March 2005    Licensee prepared a 50.59 safety evaluation to add the new MSL Break accident Analysis Case (Case 17) to the CLB. The licensee .con.cluded that prior NRC approval was required.
i Jt The licensee submitted a license amendment request to establish a 72 hour out of service time for an inoperable'MSIV actuator.
55           z~--5,-
                                                .55
*J
;i
                                                  -~
5- - ~. -   <~s 55< 5 '555ss55-5
                                                                                ~-}}

Latest revision as of 00:06, 23 March 2020

Attachment 3: Markup of Technical Specification Pages
ML063170328
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/07/2006
From:
AmerenUE
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0230, ULNRC-05150
Download: ML063170328 (9)


Text

Iso ULNRC-1S 3

ATTACHMENT PAGES SPECIFICATION TECHNICAL MARKUP OF with the Freedom of Information in accordance ,

" ', h , .*:

Act, exemptions

,E0IA-ý_

Chronology of Callaway MSIV Operability Issues January 23, 2006 February 2005 The licensee completed a new MSL Break accident Analysis Case (Case 17). Case 17 considered the plant configuration with one MSIV actuator removed from service. The current licensee bases (CLB), including Technical Specifications (TS), and the accident analysis assumed, 141 million BTUs/hr containment cooler duty. Case 17 assumed 155 million BTUs/hr cooler duty. The 155 million BTUs/hr duty was based. on additional margin provided by clean, unblocked heat exchanger coils. The new Case 17 concluded the resulting peak containment temperature and pressure was bonded by CLB Cases 6 and 12 (the limiting Cases).

March 2005 Licensee prepared a 50.59 safety evaluation to add the new MSL Break accident Analysis Case (Case 17) to the CLB. The licensee .con.cluded that prior NRC approval was required.

i Jt The licensee submitted a license amendment request to establish a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out of service time for an inoperable'MSIV actuator.

55 z~--5,-

.55

  • J
i

-~

5- - ~. - <~s 55< 5 '555ss55-5

~-