ML093370680: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML093370680
| number = ML093370680
| issue date = 12/10/2009
| issue date = 12/10/2009
| title = Correction Letter Regarding Review of Biennial Decommissioning Funding Report and Plan for Projected Shortfall (TAC ME0533 and ME0534)
| title = Correction Letter Regarding Review of Biennial Decommissioning Funding Report and Plan for Projected Shortfall
| author name = Bamford P
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 10, 2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 LIMERICK GENERATING STATION, UNITS 1 AND 2 -
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 10, 2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
CORRECTION LETTER REGARDING REVIEW OF BIENNIAL DECOMMISSIONING FUNDING REPORT AND PLAN FOR PROJECTED SHORTFALL (TAC NOS.
 
ME0533 AND ME0534)  
==SUBJECT:==
LIMERICK GENERATING STATION, UNITS 1 AND 2 - CORRECTION LETTER REGARDING REVIEW OF BIENNIAL DECOMMISSIONING FUNDING REPORT AND PLAN FOR PROJECTED SHORTFALL (TAC NOS. ME0533 AND ME0534)


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
By letter dated September 25,2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092040018), the U.S. Nuclear Regulatory Commission (NRC) provided you with a summary of the biennial decommissioning status report review for Limerick Generating Station, Units 1 and 2. During a review of the records for this activity, it was noted by the NRC staff that the actual date of signature for this letter was September 29, 2009, and not September 25, 2009, as indicated. Since the issuance date of the letter is not significant with respect to the status report review, the original letter dated September 25, 2009, will remain as an official agency record in ADAMS and will not be re-issued. Please contact me at 301-415-2833 if you have any questions.
Sincerely, Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv December 10, 2009 Mr. Charles G.
Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 LIMERICK GENERATING STATION, UNITS 1 AND 2 -
CORRECTION LETTER REGARDING REVIEW OF BIENNIAL DECOMMISSIONING FUNDING REPORT AND PLAN FOR PROJECTED SHORTFALL (TAC NOS.
ME0533 AND ME0534)


==Dear Mr. Pardee:==
By letter dated September 25,2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092040018), the U.S. Nuclear Regulatory Commission (NRC) provided you with a summary of the biennial decommissioning status report review for Limerick Generating Station, Units 1 and 2. During a review of the records for this activity, it was noted by the NRC staff that the actual date of signature for this letter was September 29, 2009, and not September 25, 2009, as indicated. Since the issuance date of the letter is not significant with respect to the status report review, the original letter dated September 25, 2009, will remain as an official agency record in ADAMS and will not be re-issued.
By letter dated September 25, 2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092040018), the U.S. Nuclear Regulatory Commission (NRC) provided you with a summary of the biennial decommissioning status report review for Limerick Generating Station, Units 1 and 2. During a review of the records for this activity, it was noted by the NRC staff that the actual date of signature for this letter was September 29, 2009, and not September 25, 2009, as indicated. Since the issuance date of the letter is not significant with respect to the status report review, the original letter dated September 25, 2009, will remain as an official agency record in ADAMS and will not be re-issued. Please contact me at 301-415-2833 if you have any questions.
Please contact me at 301-415-2833 if you have any questions.
Sincerely, /raJ Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.
Sincerely, Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv
50-352 and 50-353 cc: Distribution via Listserv DISTRIBUTION:
 
PUBLIC RidsNrrLAABaxter RidsNrrPMPBamford RidsRgn1 MailCenter Resource RidsOgcRp Resource LPL1-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-2 Resource RidsNrrDprPfpb Resource ASimmons, NRR ACCESSION NUMBER' ML093370680 OFFICE LPL1-2/PM LPL 1-2/LA LPL1-2/BC NAME PBamford ABaxter HChernoff DATE 12/3/09 12/9/09 12/10/09 OFFICIAL RECORD}}
' ML093370680 OFFICE     LPL1-2/PM     LPL1-2/LA     LPL1-2/BC NAME       PBamford       ABaxter       HChernoff DATE       12/3/09       12/9/09       12/10/09}}

Latest revision as of 21:54, 21 March 2020

Correction Letter Regarding Review of Biennial Decommissioning Funding Report and Plan for Projected Shortfall
ML093370680
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/10/2009
From: Peter Bamford
Plant Licensing Branch 1
To: Pardee C
Exelon Nuclear
Bamford, Peter J., NRR/DORL 415-2833
References
TAC ME0533, TAC ME0534
Download: ML093370680 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 10, 2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - CORRECTION LETTER REGARDING REVIEW OF BIENNIAL DECOMMISSIONING FUNDING REPORT AND PLAN FOR PROJECTED SHORTFALL (TAC NOS. ME0533 AND ME0534)

Dear Mr. Pardee:

By letter dated September 25,2009, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092040018), the U.S. Nuclear Regulatory Commission (NRC) provided you with a summary of the biennial decommissioning status report review for Limerick Generating Station, Units 1 and 2. During a review of the records for this activity, it was noted by the NRC staff that the actual date of signature for this letter was September 29, 2009, and not September 25, 2009, as indicated. Since the issuance date of the letter is not significant with respect to the status report review, the original letter dated September 25, 2009, will remain as an official agency record in ADAMS and will not be re-issued.

Please contact me at 301-415-2833 if you have any questions.

Sincerely, Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv

' ML093370680 OFFICE LPL1-2/PM LPL1-2/LA LPL1-2/BC NAME PBamford ABaxter HChernoff DATE 12/3/09 12/9/09 12/10/09