ML053570226: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PSEG Nuclear LLC LR-N05-0587 DEC 1 5 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for November 2005 are being forwarded.
{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 Nuclear PSEG LLC LR-N05-0587 DEC 1 5 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for November 2005 are being forwarded.
Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99
50-354 Hope Creek 12/12/05 K. Hight (856) 339-3887 Reporting Period November 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)Maximum Dependable Capacity (MWe-Net)No. of hours reactor was critical No. of hours generator was on line (service hours)Unit reserve shutdown hours Net Electrical Energy (MWH)1083 ___________i__*
 
zt- 4 1049 4li ;',.> -Month Year-to-date Cumulative 720 7014 141801 720 6635 138715 0 0 0 764670 6868139 140656277 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)I=(1) Reason A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/License Examination F -Administrative G -Operational Error (Explain)H -Other (2) Method 1 -Manual 2 -Manual Trip/Scram 3 -Automatic Trip/Scram 4 -Continuation 5 -Other (Explain)
DOCKET NO.:         50-354 UNIT:    Hope Creek DATE:      12/12/05 COMPLETED BY:            K. Hight TELEPHONE:          (856) 339-3887 Reporting Period November 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)                 1083                                  ___________i__*
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/12/05 COMPLETED BY: F. Possessky TELEPHONE:
zt-  4 Maximum Dependable Capacity (MWe-Net)             1049                          4li;',.>
(856) 339-1160 Summary Of Monthly Operating Experience
Month          Year-to-date              Cumulative No. of hours reactor was critical                 720          7014                    141801 No. of hours generator was on line (service       720          6635                    138715 hours)
* The unit entered the month at -98% power.* On November 04, power was lowered to -88% to remove the 3A, 4A, and 5A feedwater heaters from service for troubleshooting.
Unit reserve shutdown hours                       0            0                        0 Net Electrical Energy (MWH)                       764670       6868139                 140656277 UNIT SHUTDOWNS NO. DATE         TYPE             DURATION REASON     METHOD OF         CORRECTIVE ACTION/
Power was restored to -99% on November 06.* At the end of the month, the unit remained at -99% and completed 87 days of continuous on-line operation.}}
F=FORCED         (HOURS)   (1)     SHUTTING           COMMENT S=SCHEDULED                           DOWN THE REACTOR     (2)
I=
(1) Reason                                             (2) Method A - Equipment Failure (Explain)                         1 - Manual B - Maintenance or Test                                 2 - Manual Trip/Scram C - Refueling                                           3 - Automatic Trip/Scram D - Regulatory Restriction                               4 - Continuation E - Operator Training/License Examination               5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other
 
DOCKET NO.:     50-354 UNIT: Hope Creek DATE:   12/12/05 COMPLETED BY:     F. Possessky TELEPHONE:     (856) 339-1160 Summary Of Monthly Operating Experience
* The unit entered the month at -98% power.
* On November 04, power was lowered to -88% to remove the 3A, 4A, and 5A feedwater heaters from service for troubleshooting. Power was restored to -99% on November 06.
* At the end of the month, the unit remained at -99% and completed 87 days of continuous on-line operation.}}

Latest revision as of 11:26, 14 March 2020

November 2005 Monthly Operating Report for Hope Creek
ML053570226
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/15/2005
From: Massaro M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0587
Download: ML053570226 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 Nuclear PSEG LLC LR-N05-0587 DEC 1 5 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for November 2005 are being forwarded.

Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/12/05 COMPLETED BY: K. Hight TELEPHONE: (856) 339-3887 Reporting Period November 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 ___________i__*

zt- 4 Maximum Dependable Capacity (MWe-Net) 1049 4li;',.>

Month Year-to-date Cumulative No. of hours reactor was critical 720 7014 141801 No. of hours generator was on line (service 720 6635 138715 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 764670 6868139 140656277 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

I=

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/12/05 COMPLETED BY: F. Possessky TELEPHONE: (856) 339-1160 Summary Of Monthly Operating Experience

  • The unit entered the month at -98% power.
  • On November 04, power was lowered to -88% to remove the 3A, 4A, and 5A feedwater heaters from service for troubleshooting. Power was restored to -99% on November 06.
  • At the end of the month, the unit remained at -99% and completed 87 days of continuous on-line operation.