{{#Wiki_filter:INDEX 6.0 ADMINISTRATIVE CONTROLS SECTION PAGE 6A (THIS SPECIFICATION NUMBER IS NOT USED) . | {{#Wiki_filter:INDEX 6.0 ADMINISTRATIVE CONTROLS SECTION PAGE 6A (THIS SPECIFICATION NUMBER IS NOT USED) . .. .4 6.5 REPORTABLE EVENT ACTION .4........................................................6 6.6 SAFETY LIMIT VIOLATION .6. | ||
.. .4 6.5 REPORTABLE EVENT ACTION .4........................................................ | 6.7 PROCEDURES AND PROGRAMS ......................................... 6-5 6.8 _ REPORTING REQUIREMENTS 6.8.1 ROUTINE REPORTS ................................................ . 11 | ||
6 6.6 SAFETY LIMIT VIOLATION | . 6.t........ | ||
.6.6.7 PROCEDURES AND PROGRAMS ......................................... | Startup Report _. . .... . ... .......... 6-a Annual Reports... . .. ._ . ..... .*. 6-12 Annual Radiological Environmental Operating Report .6............_._ -13 Annual Radioactive Effluent Release Report . . _.. 63 CORE OPERATING LIMITS REPORT . 6-14 6.8.2 SPECIAL REPORTS .... 6-19 SEABROOK - UNrr I XXV Amendment No. 4, 67 ,r7 3;-,8 4 109 | ||
6-5 6.8 _ REPORTING REQUIREMENTS 6.8.1 ROUTINE REPORTS | |||
................................................ | ADMINISTRATIVE CONTROLS The Startup Report shall address each of the tests identified in the Final Safety Analysis Report and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required In license conditions based on other commitments shall be included in this report. | ||
.. | Startup Reports shall be submitted within: (1)90 days following completion of the Startup Test Program, (2)90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. If the Startup Report does not cover all three events (i.e., initial criticality, completion of Startup Test Program, and resumption or commencement of commercial operation), supplementary reports shall be submitted at least every 3 months until all three events have been completed. | ||
6-a Annual Reports... | |||
... ._ ...... .*. 6-12 Annual Radiological Environmental Operating Report .6............_._ | |||
-13 Annual Radioactive Effluent Release Report . | |||
._.. 63 CORE OPERATING LIMITS REPORT .6-14 6.8.2 SPECIAL REPORTS .... 6-19 SEABROOK -UNrr I XXV Amendment No. 4, | |||
Any corrective actions that were required to obtain satisfactory operation shall also be described. | |||
Any additional specific details required In license conditions based on other commitments shall be included in this report.Startup Reports shall be submitted within: (1) 90 days following completion of the Startup Test Program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. | |||
If the Startup Report does not cover all three events (i.e., initial criticality, completion of Startup Test Program, and resumption or commencement of commercial operation), supplementary reports shall be submitted at least every 3 months until all three events have been completed. | |||
ANNUAL REPORTS 6.8.1.2 Annual Reports covering the activities of the station as described below for the previous calendar year shall be submitted prior to March 1 of each year. The Initial report shall be submitted prior to March 1 of the year following initial criticality. | ANNUAL REPORTS 6.8.1.2 Annual Reports covering the activities of the station as described below for the previous calendar year shall be submitted prior to March 1 of each year. The Initial report shall be submitted prior to March 1 of the year following initial criticality. | ||
Reports required on an annual basis shall Include: The results of specific acthivty analyses | Reports required on an annual basis shall Include: | ||
(1) Reactor power history starting 48 hours prior to the first sample | The results of specific acthivty analyses Inwhich the primary coolant exceeded the limits of Specification 3.4.8. The following Information shall be Included: (1) Reactor power history starting 48 hours prior to the first sample Inwhich the limit was exceeded (in graphic and tabular format); (2) Results of the last isotopic analysis for radiolodine performed prior to exceeding the limit, results of analysis while limit was exceeded and results of one analysis after the radlolodine activity was reduced to less than limit. Each result should include date and time of sampling and the radiolodine concentrations; (3) | ||
-UNrr I 6-13 Amendment No. 34, 404 109}} | Clean-up flow history starting 48 hours prior to the first sample in which the limit was exceeded; (4) Graph of the 1-131 concentration (pCVgm) and one other radio-iodine Isotope concentration (pCVgm) as a function of time for the duration of the specific activity above the steady-state level; and (5) The time duration when the specific activity of the primary coolant exceeded the radlolodine limit. | ||
SEABROOK - UNIT 1 6-12 Amendment No. 34, 39, 55, 88, 404109 | |||
ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT 6.8.1.3 The annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May I of each year. The report shall include summaries, interpretations, and analysis of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in (1)the ODCM and (2)Sections IV.B.2, IV.B.3, and IV.C of Appendix I to 10 CFR Part 50. | |||
ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT 6.8.1.4 The Annual Radioactive Effluent Release Report covering the operation of the unit during the previous calendar year of operation shall be submitted by May 1 of each year. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be (1)consistent with the objectives outlined in the ODCM and PCP and (2)in conformance with 10 CFR 50.36a and Section IV.B.1 of Appendix I to 10 CFR Part 50. | |||
6.8.1.5 Deleted SEAB3ROOK - UNrr I 6-13 Amendment No. 34, 404 109}} |
Latest revision as of 05:30, 14 March 2020
ML061280282 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 05/05/2006 |
From: | Geoffrey Miller Plant Licensing Branch III-2 |
To: | Peschel J, St.Pierre G Florida Power & Light Energy Seabrook |
References | |
TAC MC9303 | |
Download: ML061280282 (3) | |
Text
INDEX 6.0 ADMINISTRATIVE CONTROLS SECTION PAGE 6A (THIS SPECIFICATION NUMBER IS NOT USED) . .. .4 6.5 REPORTABLE EVENT ACTION .4........................................................6 6.6 SAFETY LIMIT VIOLATION .6.
6.7 PROCEDURES AND PROGRAMS ......................................... 6-5 6.8 _ REPORTING REQUIREMENTS 6.8.1 ROUTINE REPORTS ................................................ . 11
. 6.t........
Startup Report _. . .... . ... .......... 6-a Annual Reports... . .. ._ . ..... .*. 6-12 Annual Radiological Environmental Operating Report .6............_._ -13 Annual Radioactive Effluent Release Report . . _.. 63 CORE OPERATING LIMITS REPORT . 6-14 6.8.2 SPECIAL REPORTS .... 6-19 SEABROOK - UNrr I XXV Amendment No. 4, 67 ,r7 3;-,8 4 109
ADMINISTRATIVE CONTROLS The Startup Report shall address each of the tests identified in the Final Safety Analysis Report and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required In license conditions based on other commitments shall be included in this report.
Startup Reports shall be submitted within: (1)90 days following completion of the Startup Test Program, (2)90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. If the Startup Report does not cover all three events (i.e., initial criticality, completion of Startup Test Program, and resumption or commencement of commercial operation), supplementary reports shall be submitted at least every 3 months until all three events have been completed.
ANNUAL REPORTS 6.8.1.2 Annual Reports covering the activities of the station as described below for the previous calendar year shall be submitted prior to March 1 of each year. The Initial report shall be submitted prior to March 1 of the year following initial criticality.
Reports required on an annual basis shall Include:
The results of specific acthivty analyses Inwhich the primary coolant exceeded the limits of Specification 3.4.8. The following Information shall be Included: (1) Reactor power history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample Inwhich the limit was exceeded (in graphic and tabular format); (2) Results of the last isotopic analysis for radiolodine performed prior to exceeding the limit, results of analysis while limit was exceeded and results of one analysis after the radlolodine activity was reduced to less than limit. Each result should include date and time of sampling and the radiolodine concentrations; (3)
Clean-up flow history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded; (4) Graph of the 1-131 concentration (pCVgm) and one other radio-iodine Isotope concentration (pCVgm) as a function of time for the duration of the specific activity above the steady-state level; and (5) The time duration when the specific activity of the primary coolant exceeded the radlolodine limit.
SEABROOK - UNIT 1 6-12 Amendment No. 34, 39, 55, 88, 404109
ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT 6.8.1.3 The annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May I of each year. The report shall include summaries, interpretations, and analysis of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in (1)the ODCM and (2)Sections IV.B.2, IV.B.3, and IV.C of Appendix I to 10 CFR Part 50.
ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT 6.8.1.4 The Annual Radioactive Effluent Release Report covering the operation of the unit during the previous calendar year of operation shall be submitted by May 1 of each year. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be (1)consistent with the objectives outlined in the ODCM and PCP and (2)in conformance with 10 CFR 50.36a and Section IV.B.1 of Appendix I to 10 CFR Part 50.
6.8.1.5 Deleted SEAB3ROOK - UNrr I 6-13 Amendment No. 34, 404 109