| title = Point Beach Nuclear Plant, Units 1 and 2 - Request for Clarification EPU LAR 261 HELB Review (Eeeb)
| title = Request for Clarification EPU LAR 261 HELB Review (Eeeb)
| author name = Beltz T A
| author name = Beltz T
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Hale S
| addressee name = Hale S
Line 9: Line 9:
| docket = 05000266, 05000301
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| license number = DPR-024, DPR-027
| contact person = beltz T A, NRR/DORL/LPL3-1, 301-415-3049
| contact person = beltz T, NRR/DORL/LPL3-1, 301-415-3049
| document type = E-Mail
| document type = E-Mail
| page count = 1
| page count = 1
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Beltz, Terry Sent: Tuesday, October 19, 2010 7:40 AM To: Hale, Steve Cc: Abbott, Liz; Costedio, James; Flentje, Fritzie; Hanneman, Harv; Sa hay, Prem; Pascarelli, Robert  
{{#Wiki_filter:From: Beltz, Terry Sent: Tuesday, October 19, 2010 7:40 AM To: Hale, Steve Cc: Abbott, Liz; Costedio, James; Flentje, Fritzie; Hanneman, Harv; Sahay, Prem; Pascarelli, Robert


==Subject:==
==Subject:==
Point Beach Nuclear Plant, Units 1 and 2 -
Point Beach Nuclear Plant, Units 1 and 2 - Request for Clarification re: EPU LAR 261 HELB Review (EEEB)
Request for Clarification re: EPU LAR 261 HELB Review (EEEB) Steve The NRC staff in the Electrical Engineering Branch has the following requests for clarification (please see below) related to your April 28, 2010, (ADAMS Accession No. ML 101190081) response to RAI EEEB-5. Please contact me to set up a conference call to discuss these issues with our reviewer.
Steve The NRC staff in the Electrical Engineering Branch has the following requests for clarification (please see below) related to your April 28, 2010, (ADAMS Accession No. ML101190081) response to RAI EEEB-5.
The sole purpose of this e-mail is to prepare you and others for the proposed conference call. This mail does not formally request additional information, and does not formally convey an NRC staff position.
Please contact me to set up a conference call to discuss these issues with our reviewer.
Sincerely, Terry A Beltz, Senior Project Manager NRR/ADRO/DORL/LPL3-1 (301) 415-3049 *************************************************************************
The sole purpose of this e-mail is to prepare you and others for the proposed conference call. This e mail does not formally request additional information, and does not formally convey an NRC staff position.
The following questions pertain to the staff's review of impact of the EPU on Environmental Qualification of Electric Equipment due to High Energy Line Breaks (HELB). In its LAR, the licensee stated that its evaluation of EPU conditions demonstrated the continued qualification of the equipment  
Sincerely, Terry A Beltz, Senior Project Manager NRR/ADRO/DORL/LPL3-1 (301) 415-3049 The following questions pertain to the staff's review of impact of the EPU on Environmental Qualification of Electric Equipment due to High Energy Line Breaks (HELB).
... to ensure that the margins required by Institute of Electrical and Electronic Engineers (IEEE) 323-1974 are maintained.
In its LAR, the licensee stated that its evaluation of EPU conditions demonstrated the continued qualification of the equipment ... to ensure that the margins required by Institute of Electrical and Electronic Engineers (IEEE) 323-1974 are maintained. In response to staff's RAI question EEEB-5 dated April 28, 2010, the licensee provided LOCA temperature and pressure profiles.
In response to staff's RAI question EEEB-5 dated April 28, 2010, the licensee provided LOCA temperature and pressure profiles.
Please provide clarification to the following additional questions:
Please provide clarification to the following additional questions:  
: 1. Provide clarification to the margin shown on Figure 1 (LOCA Pressure vs. Time) of the applicant's response to the staffs RAI for the first peak of DEHL and the composite EQ curve and how it meets the margin value requirement for pressure in IEEE 323-1974.
: 1. Provide clarification to the margin shown on Figure 1 (LOCA Pressure vs. Time) of the applicant's response to the staffs RAI for the first peak of DEHL and the composite EQ curve and how it meets the margin value requirement for pressure in IEEE 323-1974.  
: 2. Provide clarification to the margin shown on Figure 2 (LOCA Temperature vs. Time) of the applicant's response to the staffs RAI for the current LOCA minimum safety injection (MINSI) temperature at 1.0E+04 second and the composite EQ curve to demonstrate how it meets the margin value requirement for temperature in IEEE 323-1974.}}
: 2. Provide clarification to the margin shown on Figure 2 (LOCA Temperature vs. Time) of the applicant's response to the staffs RAI for the current LOCA minimum safety injection (MINSI) temperature at 1.0E+04 second and the composite EQ curve to demonstrate how it meets the margin value requirement for temperature in IEEE 323-1974.}}

Latest revision as of 13:25, 11 March 2020

Request for Clarification EPU LAR 261 HELB Review (Eeeb)
ML103000383
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/19/2010
From: Beltz T
Plant Licensing Branch III
To: Hale S
Point Beach
beltz T, NRR/DORL/LPL3-1, 301-415-3049
References
Download: ML103000383 (1)


Text

From: Beltz, Terry Sent: Tuesday, October 19, 2010 7:40 AM To: Hale, Steve Cc: Abbott, Liz; Costedio, James; Flentje, Fritzie; Hanneman, Harv; Sahay, Prem; Pascarelli, Robert

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Request for Clarification re: EPU LAR 261 HELB Review (EEEB)

Steve The NRC staff in the Electrical Engineering Branch has the following requests for clarification (please see below) related to your April 28, 2010, (ADAMS Accession No. ML101190081) response to RAI EEEB-5.

Please contact me to set up a conference call to discuss these issues with our reviewer.

The sole purpose of this e-mail is to prepare you and others for the proposed conference call. This e mail does not formally request additional information, and does not formally convey an NRC staff position.

Sincerely, Terry A Beltz, Senior Project Manager NRR/ADRO/DORL/LPL3-1 (301) 415-3049 The following questions pertain to the staff's review of impact of the EPU on Environmental Qualification of Electric Equipment due to High Energy Line Breaks (HELB).

In its LAR, the licensee stated that its evaluation of EPU conditions demonstrated the continued qualification of the equipment ... to ensure that the margins required by Institute of Electrical and Electronic Engineers (IEEE) 323-1974 are maintained. In response to staff's RAI question EEEB-5 dated April 28, 2010, the licensee provided LOCA temperature and pressure profiles.

Please provide clarification to the following additional questions:

1. Provide clarification to the margin shown on Figure 1 (LOCA Pressure vs. Time) of the applicant's response to the staffs RAI for the first peak of DEHL and the composite EQ curve and how it meets the margin value requirement for pressure in IEEE 323-1974.
2. Provide clarification to the margin shown on Figure 2 (LOCA Temperature vs. Time) of the applicant's response to the staffs RAI for the current LOCA minimum safety injection (MINSI) temperature at 1.0E+04 second and the composite EQ curve to demonstrate how it meets the margin value requirement for temperature in IEEE 323-1974.