ML112000665: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/07/2011
| issue date = 02/07/2011
| title = 2011 Kewaunee Power Station, Initial Examination Miscellaneous Correspondence
| title = 2011 Kewaunee Power Station, Initial Examination Miscellaneous Correspondence
| author name = Walton R K
| author name = Walton R
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:2011 KEWAUNEE POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE 11.' UNITED NUCLEAR REGULATORY REGION 2443 WARRENVILLE ROAD, SUITE LISLE, ILLINIOIS January 31, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060*6711  
{{#Wiki_filter:2011 KEWAUNEE POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE
 
11.'
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 11/
2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 January 31, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060*6711


==SUBJECT:==
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL  
OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Kewaunee Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Daniel E. Laing, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
 
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," during the week of February 14, 2011. The NRC staff will administer the operating tests during the weeks of February 7 and 14, 2011. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Kewaunee Power Station.
Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Daniel E. Laing, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," during the week of February 14, 2011.
If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.
The NRC staff will administer the operating tests during the weeks of February 7 and 14, 2011.
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.
Please contact your Chief Examiner, Mr. Raymond K. Walton, at 630-829-9836, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Please contact your Chief Examiner, Mr. Raymond K. Walton, at 630-829-9836, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
D. Heacock In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ D. Heacock I n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html(the Public Electronic Reading Room). Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ DISTRIBUTION:
 
Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\KEW 01 11 DRS OL EXAM APPROVAL.DOCX o Publicly Available 0 Non-Publicly Available  
D. Heacock                                     -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
-0 Sensitive 0 Non-Sensitive To receive a copy of this document , Indicate In the box "CO =Copy w/o attach/enel "E" =Copy with attach/enel "N" =No copy OFFICE RIII:DRS Ic RIII:DRS IN RIII:DRS N I NAME JRKweiser:coat}G RKWalton HPeterson .l/I...t::J DATE 01/(}-'\I2011 If 01/;,/2011 011 >/12011 '(I' OFFICIAL RECORD COpy
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:     Distribution via ListServ
* UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 2443 WARRENVILLE ROAD, SUITE LISLE, ILLINIOIS August31,2010 Mr. David A. President and Chief Nuclear Dominion Energy Kewaunee, Innsbrook Technical 5000 Dominion Glen Allen, VA KEWAUNEE POWER CONFIRMATION OF INITIAL LICENSE  
 
D. Heacock                                               -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html(the Public Electronic Reading Room).
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:       Distribution via ListServ DISTRIBUTION:
Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\KEW 01 11 DRS OL EXAM APPROVAL.DOCX o Publicly Available           0 Non-Publicly Available                 -0 Sensitive             0 Non-Sensitive
                                                          =                        =
To receive a copy of this document, Indicate In the box "CO Copy w/o attach/enel "E" Copy with attach/enel "N" =No copy OFFICE       RIII:DRS         Ic       RIII:DRS         IN     RIII:DRS                 N                     I NAME         JRKweiser:coat}G RKWalton k\{~1                    HPeterson         .l/I...t::J DATE         01/(}-'\I2011     If     01/;,/2011               011 >/12011 '(I' OFFICIAL RECORD COpy
* UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 August31,2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
==SUBJECT:==
KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
In a telephone conversation on August 10, 2010, between Mr. Dan Lang, Manager of Nuclear Training and Raymond Keith Walton, Chief Examiner, arrangements were made for the administration of licensing examinations at the Kewaunee Power Station during the weeks of February 7 and 14, 2011. In addition, the U. S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 17, 2011. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator licenSing Examination Standards for Power Reactors!'
 
The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
In a telephone conversation on August 10, 2010, between Mr. Dan Lang, Manager of Nuclear Training and Raymond Keith Walton, Chief Examiner, arrangements were made for the administration of licensing examinations at the Kewaunee Power Station during the weeks of February 7 and 14, 2011. In addition, the U. S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 17, 2011.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by October 11, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by November 17, 2010. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55. .40(b)(3>>.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator licenSing Examination Standards for Power Reactors!' The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
an authorized representative of the facility licensee shall approve the outlines, examinations.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by October 11, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by November 17, 2010.
and tests before they are submitted to the NRC for review and approval.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b)(3>>. an authorized representative of the facility licensee shall approve the outlines, examinations. and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC pOlicies and guidelines that will be in effect while the written examinations and operating tests are being administered.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
D. Heacock To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the 'first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Appendix E of NUREG-1021 contains a number of NRC pOlicies and guidelines that will be in effect while the written examinations and operating tests are being administered.
Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Papetwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
 
The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
D. Heacock                                       -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAIPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-O018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessibfe from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}. Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the 'first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page Letter to David A. Heacock from Hironori Peterson, dated August 31, 2010.
This letter contains information collections that are subject to the Papetwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAIPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-O018), Office of Management and Budget, Washington, DC 20503.
KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer D. Heacock To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessibfe from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}.
The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.
Send comments regarding this burden estimate or any other aspect of these information collectibns, including suggestions for reducing the burden, to the Records and FOINPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV;and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the poliCies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page
Sincerely, IlJI/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page DOCUMENT NAME: KEW 08 10 DRS OL EXAM CONFIRMATION.DOCX o Publicly Available  
 
-0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, Indicate in the concurrence box "C" =Copy without attach/enc. "E" = Copy with attac hI encl "N" = No copy OFFICE RIII:DRS IN RIII:DRS 1ft! I I NAME RKWalton:co
Letter to David A. Heacock from Hironori Peterson, dated August 31, 2010.
().\.J HPeterson JJv1 DATE 08f1.,'110 08fl:,V10 OFFICIAL RECORD
 
, Letter to David A. Heacock from Hironori Peterson dated August 31,2010.
==SUBJECT:==
KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer Distribution:
KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale UNITED NUCLEAR REGULATORY REGION 2443 WARRENVILLE ROAD, SUITE LISLE, ILLINOIS February 19, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 CONFIRMATION OF INITIAL OPERATOR LICENSE KEWAUNEE POWER  
 
D. Heacock                                                 -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collectibns, including suggestions for reducing the burden, to the Records and FOINPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV;and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the poliCies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.
Sincerely, IlJI/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page DOCUMENT NAME: KEW 08 10 DRS OL EXAM CONFIRMATION.DOCX o Publicly Available       -       0 Non-Publicly Available           0 Sensitive               0 Non-Sensitive To receive a copy of this document, Indicate in the concurrence box "C" =Copy without attach/enc. "E" = Copy with attachIencl "N" = No copy OFFICE         RIII:DRS         IN   RIII:DRS             1ft!                 I                         I NAME           RKWalton:co   ().\.J   HPeterson       JJv1 DATE           08f1.,'110             08fl:,V10       *~V OFFICIAL RECORD COPY
 
Letter to David A. Heacock from Hironori Peterson dated August 31,2010.
 
==SUBJECT:==
KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer Distribution:
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532*4352 February 19, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
==SUBJECT:==
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
KEWAUNEE POWER STATION


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
In a letter dated September 11,2009 (09-0461), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in February 2011 and February 2013 at the Kewaunee Power Station. We have scheduled the examinations as requested.
 
The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in February 2013 was scheduled to begin during the week of February 18, 2013. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination.
In a letter dated September 11,2009 (09-0461), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in February 2011 and February 2013 at the Kewaunee Power Station. We have scheduled the examinations as requested. The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in February 2013 was scheduled to begin during the week of February 18, 2013. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination.
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination. The letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
The letter indicated each examination has more than nine applicants taking the examinations.
Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule.
Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
D. Heacock In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{the Public Electronic Reading Room). Sincerely, Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ D. Heacock In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, /£11-/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ DISTRIBUTION:
 
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPIVIKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\Work in Progress\KEW 02_10 DRS OL.doc o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive f d ocument, In d' e b ox "C" = >py w/o attach/encl "E" Opy wi th =T o receive a cO!JY 0 t h is . lcate in t h Co =C attac hi en cI "N" N o copy OFFICE RIII:DRS IP RIII:DRS RIII:DRS.bIl\l"" I (L, JKweise'flco DMcNeil HPeterson  
D. Heacock In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{the Public Electronic Reading Room).
---*,,,,,,, If//DATE 02/18 110 021{t{ 110 02/\\ 110 OFFICIAL RECORD I Dominion Resources Services, 'IHH) I Jominion Boulevard.
Sincerely,
Clen Allen. VA  
                                          ~    Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:     Distribution via ListServ
\\.1> \ddrc,,, WWW.dQ01.com September 11, 2009 United States Nuclear Regulatory Commission Serial No.: 09-481 Attention:
 
Document Control Desk NLOS/GLA Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC. (DEK) DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. (DNC) NPF-49 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)
D. Heacock                                                       -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
NPF-417 KEWAUNEE POWER STATION DPR-32/37 MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 &2 NRC REGULATORY ISSUE  
Sincerely,
                                                                  /£11-/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:       Distribution via ListServ DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPIVIKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\Work in Progress\KEW 02_10 DRS OL.doc o Publicly Available             0 Non-Publicly Available             0 Sensitive         0 Non-Sensitive To receive a cO!JY 0 f t his d ocument, .Ind'lcate in t he box "C" =Co>py w/o attach/encl "E" =COpy wi th attachiencI "N" =No copy OFFICE           RIII:DRS .bIl\l""   I (L,     RIII:DRS            IP      RIII:DRS            IAI                          I NAME            JKweise'flco                   DMcNeil ~                    HPeterson ---*,,,,,,,
DATE                                                                                            If//
02/\\ 110                      02/18 110                   021{t{ 110 OFFICIAL RECORD COPY
 
Dominion Resources Services, Inc.
'IHH) I Jominion Boulevard. Clen Allen. VA ..'.\1*"(
\\.1> \ddrc,,, WWW.dQ01.com September 11, 2009 United States Nuclear Regulatory Commission                       Serial No.:   09-481 Attention: Document Control Desk                                 NLOS/GLA Washington, DC 20555                                             Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC. (DEK)                                           DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)                                       NPF-49 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)                                 NPF-417 KEWAUNEE POWER STATION                                                         DPR-32/37 MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE  


==SUMMARY==
==SUMMARY==
2009-11 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2009-11, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs). No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. David Llewellyn at (804) 273-4314.
2009-11 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2009-11, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
Very truly yours, l/L. N. Hartz Vice President  
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. David Llewellyn at (804) 273-4314.
-Nuclear Support Services Attachments U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 SN 09-481 Scheduling of Operator licensing Examinations cc page 2 of 3 U. S. Nuclear Regulatory Commission Region" Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Dr. V. Sreenivas NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852 Os. K. R. Cotton NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 16 E15 11555 Rockville Pike Rockville, MD 20852 Ms. C. J. Sanders NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 B1A 11555 Rockville Pike Rockville, MD 20852 Mr. P. S. Tam NRC Senior Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 H4A 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station SN 09-481 Scheduling of Operator Licensing Examinations cc page 3 of 3 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION
Very truly yours, I"),~)    l/ ~~:
('G-200&)
J' L. N. Hartz Vice President - Nuclear Support Services Attachments cc:        U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 315Q.0131 EXPIRES: 1013112011 EstImeted burden fer to comply with thl$ voluntary informalion coIeQtion IIICI\IfI.$I:
 
hour. InfonnatIoIl coIIedIon II UMd 10 plen budgets lind _roe. for operator Send IXlmmenlll bunten flallmale;;:j ReCorda and FOlAiPrivaq SelVlcn Bnmeh *5 F ). U.S. Nuclear R lory Ccmm/asion.
SN 09-481 Scheduling of Operator licensing Examinations cc page 2 of 3 U. S. Nuclear Regulatory Commission Region" Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Dr. V. Sreenivas NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852 Os. K. R. Cotton NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 16 E15 11555 Rockville Pike Rockville, MD 20852 Ms. C. J. Sanders NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 B1A 11555 Rockville Pike Rockville, MD 20852 Mr. P. S. Tam NRC Senior Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 H4A 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station
WashiIlQli!l, DC 20555-000
 
* ora-mall to 8:' and 10 the Deale 0IIIcer. Office of lio and .10202. (315Q.0131), Offtce of Manlqflmenl lind Budget. Was 20503. I II means used 10 an ,nfDm'llltlo coIIIii:tlon den not dl8ptay a curren.V wild OMS contml number,lIMt NRC "18Y not conduct or.::.nsor, and. person Is nol required to respond to. the informatbn coil
SN 09-481 Scheduling of Operator Licensing Examinations cc page 3 of 3 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
* n n Kewaunee Power StatlOD NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010-CY2011-CY2012-Cy 2013-ESTIMATED NUMBER OF LICENSEE*PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER CY 2010-Cyl011-CY2012-Cy2013-NUMBER OF REACTOR OPERATORS 0 4 0 S NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 5 0 9 NUMBER OF SENIOR REACTOR OPERATORS  
 
-UPGRADE 0 3 0 0 NUMBER OF SENIOR REACTOR OPERATORS*
NRC FORM 538               U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315Q.0131                                EXPIRES: 1013112011
LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02J0712011 OZl18l2013 AL lERNATE DATE 0212112011 0310412013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 20U MARCH JUNE SEPTEMBER OECeMBER MARCH JUNE SEPTEMBER OECEMBER ESTIMATED NUMBER OF CANDIDATES 14 "IRC FORM 536 (10-2OO8)
('G-200&)                                                       EstImeted burdenfer res~e to comply with thl$ voluntary informalion coIeQtion IIICI\IfI.$I: hour.       InfonnatIoIl coIIedIon II UMd 10 plen budgets lind _roe. for operator ~tIon.. Send IXlmmenlll ~eid~bunten flallmale;;:j ReCorda and FOlAiPrivaq SelVlcn Bnmeh *5 F ). U.S.
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10-2OIlf)
OPERATOR LICENSING                        Nuclear R         lory Ccmm/asion. WashiIlQli!l, DC 20555-000
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011 eatlmated burden per to comply with thill VOlunlary Informallon coIIacIIon request: 1 hour. IIlnlonnatloO coIIecIkm ia ueed to pIIIn budget and 1810\1rce8 for operator ._lnatlons.
* or~t EXAMINATION DATA                        a-mall to and ~
Send _II"'eo buri:Jen estimate to the ReQords and FOJAlPrlvacy Service. BI"Il1Ilh  
8:' and 10 the Deale 0IIIcer. Office of       lion
-6 F ). U.s. NuoJ_ CommlAlon.
                                                                                                  .10202. (315Q.0131), Offtce of Manlqflmenl lind Budget. Was                   20503. I II means used 10 l~ an ,nfDm'llltlon coIIIii:tlon den not dl8ptay a curren.V wild OMS contml number,lIMt NRC "18Y not conduct or.::.nsor, and. person Is nol required to respond to. the informatbn coil
DC 20566-000
* F~ClUTY                                                                                                            NRC REGION Kewaunee Power StatlOD III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010           CY2011 CY2012 Cy 2013 LICENSEE*PREPARED                 0                           1                                 0                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                           0                                 0                               0 EXAMINATIONS B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER                   CY 2010 Cyl011                           CY2012 Cy2013 NUMBER OF REACTOR                       0                     4                                 0                               S OPERATORS NUMBER OF SENIOR REACTOR                     0                     5                                 0                               9 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE                     0                     3                                 0                               0 NUMBER OF SENIOR REACTOR                                           0                                  0                                0 OPERATORS* LIMITED                     0 PROPOSED DATES PRIMARY DATE                                   02J0712011                                                       OZl18l2013 ALlERNATE DATE                                 0212112011                                                       0310412013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE CY 2010                                                     CY 20U PROPOSED NUMBER MARCH       JUNE     SEPTEMBER OECeMBER             MARCH               JUNE         SEPTEMBER OECEMBER ESTIMATED NUMBER OF                                                                                                         14 CANDIDATES "IRC FORM 536 (10-2OO8)                                                                                               PRINTED ON RECYCLED PAPER
* or .-mall 10 In and to the Desk OI!Icer, 0IIIce of In lio Ind 10202. (3150-0131).
 
0IIk:8 of BU!Iget, W
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMS: NO. 3150-0131                           EXPIRES: 1013112011
* 20503. If a means wiecI to Irnpoee lin lion colleCllon dow not dleplay II currently valid OMS control number. Iba NRC may not and a parson Is nol required 10 respond to, the information
                                                                                                                                "'eo eatlmated burden per re6~ns. to comply with thill VOlunlary Informallon (10-2OIlf) coIIacIIon request: 1 hour. IIlnlonnatloO coIIecIkm ia ueed to pIIIn budgets and 1810\1rce8 for operator ._lnatlons. Send _ I I                      buri:Jen estimate to the ReQords and FOJAlPrlvacy Service. BI"Il1Ilh -6 F ). U.s.
* n s FACIUTY MlIIstoae Unit :2 NRC REGION 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 -CV 2011-CY 2012 -Cy2013-ESTIMATED NUMBER OF L1CENSEE-PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 -CY2011-CylOJ2-CylO13-NUMBER OF REACTOR OPERATORS 0 5 0 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 7 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 4 0 :2 NUMBER OF SENIOR REACTOR OPERATORS
OPERATOR LICENSING                        NuoJ_ ~ CommlAlon. Wasll~. DC 20566-000
* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/1312011 0311012013 ALTERNATE DATE 0312012.11 031l4l2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY lOllMARCH JUNE SEPTEMBER DECEMBER MARCH JUNE DECEMBER ESTIMATED NUMBER OF CANDIDATES 12 NRC FORM 5311 (10.2G08)
* or ~et
PRINTED ON R£CYCI.S)
                                                                  .-mall 10 In       GlIIOnrc~. and to the Desk OI!Icer, 0IIIce of In         lion EXAMINATION DATA                        Ind RegU\~~E                    10202. (3150-0131). 0IIk:8 of Man~and BU!Iget, W
PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10..2008) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. 315().()131 EXPIRES: 10131/2011 Estimated burden p9r 10 comply with this volunlal}'
* 20503. If a means wiecI to Irnpoee lin           lion colleCllon dow not dleplay II currently valid OMS control number. Iba NRC may not condu~nsor. and a parson Is nol required 10 respond to, the information
inrormatlon coIIec:IIon nKlU881: 1 hour. Ie Inlolmatloil cohctIanand rNourcu for op9ralOr _Inallona.
* FACIUTY                                                                                                         NRC REGION MlIIstoae Unit :2 1
Sand c:omm....  
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                     CY 2010
'nL burilen ..Umata 10 the RIICOIdI and FOlAlPrtvacy S'1VicH -6 F ). u.s NucI_ Comminton. DC or liltem e-mail 10 In and to !hit Ol'llce ot I nnallo and AlJaInioS'E B-102021f (3150-0131).
                                            -                 CV 2011
0!II0It Of an BIIlfIJeJ, W ngion. 20503. a ..-ne uied to Impose an lio c;o)llii:!Ion doea not dllplay a cummIIy valid OMB collll'tll number, tile NRC II1lIY nol conduct and a parson Is not required to respond to, th Intormallon coli
                                                                -                           CY 2012 Cy2013 ESTIMATED NUMBER OF L1CENSEE-PREPARED                 0                           1                               0                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                 0                           0                                 0                             0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010             CY2011 CylOJ2                           CylO13 NUMBER OF REACTOR                       0                     5                               0                               6 OPERATORS NUMBER OF SENIOR REACTOR                     0                     7                               0                               6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                           4                                0                              :2 OPERATORS-UPGRADE                         0 NUMBER OF SENIOR REACTOR                                           0                                0                              0 OPERATORS
* el e . n d n FACILITY Millstone Unit 3 NReREGION 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010CY2011-CY 1012-CY 2013 -ESTIMATED NUMBER OF lICENSEE*PREPARED EXAMINATIONS 0 I 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINAnONS 0 0 0 0 B. INITIAL OPERATOR LlCENSEEXAMINA"rlONS PROPOSED NUMBER CY 1010-CylOll-CV 2011-CylO13-NUMBER OF REACTOR OPERATORS 0 3 0 6 NUMBER OF SENIOR REACTOR OPERATORS
* LIMITED                     0 PROPOSED DATES PRIMARY DATE                                 03/1312011                                                     0311012013 ALTERNATE DATE                                 0312012.11                                                     031l4l2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                   CY lOll PROPOSED NUMBER MARCH      JUNE     SEPTEMBER DECEMBER           MARCH               JUNE           ~EPTEMBER DECEMBER ESTIMATED NUMBER OF                                                                                                     12 CANDIDATES NRC FORM 5311 (10.2G08)                                                                                           PRINTED ON R£CYCI.S) PAPER
.. INSTANT 0 7 0 6 NUMBER OF SENIOR REACTOR OPERATORS*
 
UPGRADE 0 4 0 2 NUMBER OF SENIOR REACTOR OPERATORS*
NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 315().()131                               EXPIRES: 10131/2011 (10..2008)                                                        Estimated burden p9r I'ft~n.e 10 comply with this volunlal}' inrormatlon coIIec:IIon and    rNourcunKlU881: 1 hour. _Inallona.
LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 07/1011011 0210312013 ALTERNATE DATE 07/17120lJ 0211712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 1011MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE DECEMBER ESTIMATED NUMBER OF CANDIDATES 11 !liRe FORM 536 111l-2OD8)
for op9ralOr                  cohctIani=-:~r ~
PRINTED ON RECYCLED PAPER NRC FORM 536 (10-2008)
Ie InlolmatloilSand c:omm....           'nL burilen OPERATOR LICENSING                        ..Umata 10 the RIICOIdI and FOlAlPrtvacy S'1VicH                     -6 F ). u.s.
U.S. NUCLEAR REGULATORY COMMISSION OPERA TOR LICENSING EXAMINATION DATA FACIlITY North Anna Power Station APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011 Estimated burden  
NucI_ R=~ Comminton. ~n. DC                                           or ~liltemel e-mail 10 In       I~rc.s:. and to !hit Desk.~. Ol'llce ot I nnallon EXAMINATION DATA                        and ~.:Yr AlJaInioS'E B-102021f (3150-0131). 0!II0It Of ~and BIIlfIJeJ, W     ngion.     20503.       a ..-ne uied to Impose an             lion c;o)llii:!Ion doea not dllplay a cummIIy valid OMB collll'tll number, tile NRC II1lIY nol conduct o~nsor. and a parson Is not required to respond to, th e Intormallon coli
.. to comply with this volunl_ry Infonna1ion coIIldiDn request: hour. It InfonneUon collection Is used 10 budgllls and reaoll\'C8l lor opanrtor _lneIIonll.
* FACILITY                                                                                                             NReREGION Millstone Unit 3 1
Send colllllltllla burden ullmate to the ReCOIdIl and Services Brench -6 F 3). U,S. Nuclear =tory CommI8IIon.
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                     CY 2010 CY2011 CY 1012                         CY 2013 ESTIMATED NUMBER OF lICENSEE*PREPARED                 0                             I                                 0                                 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                             0                                 0                                 0 EXAMINAnONS B. INITIAL OPERATOR LlCENSEEXAMINA"rlONS PROPOSED NUMBER CY 1010 CylOll CV 2011                         CylO13 NUMBER OF REACTOR                       0                     3                                 0                                 6 OPERATORS NUMBER OF SENIOR REACTOR                     0                      7                                0                                  6 OPERATORS .. INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                       0                     4                                 0                                 2 NUMBER OF SENIOR REACTOR                                                                               0                                0 OPERATORS* LIMITED                     0                     0 PROPOSED DATES PRIMARY DATE                                   07/1011011                                                       0210312013 ALTERNATE DATE                                 07/17120lJ                                                       0211712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                     CY 1011 PROPOSED                                -                                                              -
Was
NUMBER MARCH      JUNE     SEPTEMBER DECEMBER             MARCH               JUNE         ~EPTEMBER DECEMBER ESTIMATED NUMBER OF                                                                                                         11 CANDIDATES
* 0
!liRe FORM 536 111l-2OD8)                                                                                               PRINTED ON RECYCLED PAPER
* or e-mail 10 and to th8 Desk of I and Reg=.:nllireo NE 9010202. (3150-013 oJ and Was C 20503. If
 
* means uSed to Impoae an lion coII8CtiIn doea not _illY' QIII'IIlfly valid OMS oonllOl number. tho NRC may!lOt conduct Ind _ plrean i. !lOt requIred to relpond to, the Information on. NRCREGIOH D A. PROPOSED EXAMINATION PREPARATION PROPOSED NUMBER CY 1010-CY2011-Cy2012-CY 2013-ESTIMATED NUMBER OF lICENSEE*PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE PROPOSED NUMBER NUMBER OF NUMBER OF SENIOR OPERATORS* NUMBER OF SENIOR NUMBER OF SENIOR OPERATORS
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131                           EXPIRES: 1013112011 (10-2008)                                                      Estimated burden ~r res~n.. to comply with this volunl_ry Infonna1ion coIIldiDn request: hour.       It InfonneUon collection Is used 10 ~ budgllls and reaoll\'C8l lor opanrtor _lneIIonll. Send colllllltllla ~B burden OPERATOR LICENSING EXAMINATION DATA Nuclear e-mail 10 and
* PROPOSED DATES PRIMARY DATE ALTERNATE DATE CylOlO-9 6 3 0 CylOl1-0 0 0 0 06117/2110 Ot;/141l010 CylO12-9 7 3 0 Cy2013-0 0 0 0 0611112012 0611812012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)
                                                                          =tory ullmate to the ReCOIdIl and FOIAlP~Services Brench -6 F 3). U,S.
PROPOSED CY 2010 CY 1011NUMBER MARCH JUNE iSEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 16 NRC FORM 538 110-200II)
Reg=.:nllireo CommI8IIon. Was
PRINTED ON RECYCLED PAPeR NRC FORM 536 U.S. NUCLEAR REGULATORY CO_ISSION (1t>-2008)
                                                                                  ~rc'8'iv. and to th8 Desk NE 9010202. (3150-013
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 Estim8led burden par to comply with this voluntary lnfonnatlo ooIlacOon requ8$l: 1 hour. '-Informllllon oohclion Is used 10 plan budge end ntlQUrcea for uaminldlonl.
                                                                                                                  *0
Send comme" III I'dinB burilen estimate to the ReGOrde and FOlA/Pl'lvaoy Se -5 F 3). U.S. Nuc::lNr CommIssion, Welllll1Qll!n.
* or ~
DC
of I oJ ~and S~ Was                 C 20503. If
* 01' e-mell 10 in and 10 the Desk of In end Reg\!lJI.:r, AtfIllniDc NE 8*10202. (3150-0131), of an Budget. W nglon 20603. If a mae". uMcIlO Impose en nformetio cofttiCIIon don not dIIplay II currently valid OMS conlIOI number, Ihe NRC I1I8Y not conduct and e peraon I, not required 10 reapond to. the inronnatlon coli on. d n n ll FACILITY Surry Power Station NRC REGION II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010-Cy2011-CY 2012-Cy2G13-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 0 0 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 1 0 1 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010-Cy201l-CY2012-ey2013-NUMBER OF REACTOR OPERATORS 9 0 J1 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 10 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS  
* means uSed to Impoae an             lion coII8CtiIn doea not _illY'   QIII'IIlfly valid OMS oonllOl number. tho NRC may i.
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 0712612010 08I131Z012 At TERNATE DATE 0810112010 081l0lZ011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011MARCH JUNE SEPTEMBEA DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 18 NRC FORM 536 (1t>-200&)
                                                                !lOt conduct~DIlIor. Ind _ plrean !lOt requIred to relpond to, the Information       on.
PRINTED ON RECYClED PAPER October 7, 2008 Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 CONFIRMATION OF INITIALlREQUALIFICATION OPERATOR LICENSE EXAMINATIONS:
FACIlITY                                                                                                        NRCREGIOH North Anna Power Station D
KEWAUNEE POWER STATION  
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 1010 CY2011                         Cy2012 CY 2013 lICENSEE*PREPARED                 1                         0                                 1                               0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                   0                         0                                 0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CylOlO CylOl1                        CylO12 Cy2013 NUMBER OF REACTOR                        9                  0                                9                              0 OPERATORS NUMBER OF SENIOR REACTOR                      6                  0                                7                              0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR                                                                            3 OPERATORS-UPGRADE                          3                  0                                                                0 NUMBER OF SENIOR REACTOR OPERATORS
* LIMITED                      0                  0                                0                              0 PROPOSED DATES PRIMARY DATE               06117/2110                                      0611112012 ALTERNATE DATE               Ot;/141l010                                    0611812012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                 CY 1011 PROPOSED                                -                                                          -
NUMBER MARCH       JUNE     iSEPTEMBER DECEMBER       MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                                               16 CANDIDATES NRC FORM 538 110-200II)                                                                                           PRINTED ON RECYCLED PAPeR
 
NRC FORM 536               U.S. NUCLEAR REGULATORY CO_ISSION APPROVED BY OMB: NO. 3150-0131                             EXPIRES: 1013112011 (1t>-2008)                                                    Estim8led burden par res~e to comply with this voluntary lnfonnatlo n ooIlacOon requ8$l: 1 hour.       '- Informllllon oohclion Is used 10 plan budge ll end ntlQUrcea for o~ uaminldlonl. Send comme" III                     I'dinB burilen OPERATOR LICENSING                      estimate to the ReGOrde and FOlA/Pl'lvaoy Se                         -5 F 3). U.S.
Nuc::lNr ~1ak.Ify CommIssion, Welllll1Qll!n. DC
* 01' ~
Ila9IsCnro.~v. and 10 the Desk EXAMINATION DATA                      e-mell 10 in end   Reg\!lJI.:r, AtfIllniDcNE 8*10202. (3150-0131),
of In of ~ and Budget. W       nglon         20603. If a mae". uMcIlO Impose en nformetion cofttiCIIon don not dIIplay II currently valid OMS conlIOI number, Ihe NRC I1I8Y not conduct o~neor. and e peraon I, not required 10 reapond to. the inronnatlon coli on.
FACILITY                                                                                                         NRC REGION Surry Power Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF Cy 2010           Cy2011 CY 2012                         Cy2G13 LICENSEE-PREPARED               0                         0                                 0                                 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                 1                         0                                   1                                 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                   CY 2010
                                            -               Cy201l CY2012                         ey2013 NUMBER OF REACTOR                       9                   0                                 J1                                 0 OPERATORS NUMBER OF SENIOR REACTOR                     10                   0                                   6                                 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                       0                 0                                   2                                 0 NUMBER OF SENIOR REACTOR                                         0                                  0                                0 OPERATORS - LIMITED                     0 PROPOSED DATES PRIMARY DATE               0712612010                                         08I131Z012 AtTERNATE DATE             0810112010                                         081l0lZ011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                   CY 2011 PROPOSED                              -                                                            -
NUMBER MARCH      JUNE     SEPTEMBEA DECEMBER         MARCH                 JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                                             18 CANDIDATES NRC FORM 536 (1t>-200&)                                                                                             PRINTED ON RECYClED PAPER
 
October 7, 2008 Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
==SUBJECT:==
CONFIRMATION OF INITIALlREQUALIFICATION OPERATOR LICENSE EXAMINATIONS: KEWAUNEE POWER STATION


==Dear Mr. Christian:==
==Dear Mr. Christian:==


In a letter dated August 14, 2008 (08-0436), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in April 2009, February 2011, and October 2012 at the Kewaunee Power Station. We have scheduled the examinations as requested.
In a letter dated August 14, 2008 (08-0436), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in April 2009, February 2011, and October 2012 at the Kewaunee Power Station. We have scheduled the examinations as requested. The examination requested in April 2009 will begin the week of April 13, 2009. The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in October 2012 was scheduled to begin during the week of October 29,2012. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
The examination requested in April 2009 will begin the week of April 13, 2009. The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in October 2012 was scheduled to begin during the week of October 29,2012. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination.
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination. The letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination.
A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program.
The letter indicated each examination has more than nine applicants taking the examinations.
We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of November 17, 2008. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr.
Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule.
Dell McNeil of my staff at 630-829-9737.
Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
 
A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of November 17, 2008. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations.
D. Christian                                   -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and M;:magement System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
Sincerely, IRA!
D. Christian In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and M;:magement System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:     S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer
Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing Operations T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer D. Christian In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.htmi. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No, DPR-43 cc: S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing Operations T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of p, Schmidt, State Liaison DISTRIBUTION:
 
Daniel Collins Tamara Bloomer Patrick Milano RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\KEW 100708 DRS OL.DOC X Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T' f h'IS d
D. Christian                                                     -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.htmi.
* d'
Sincerely, IRA!
* h e b "C" = C I eDC I"" == C "th attac hi I "N" =-No copy o receIVe a COPl 0 t ocument, ID Icate ID t ox OPY W 0 attac hi E opy WI eDC OFFICE RIII:DRS I RIII:DRS I RIII:DRS I I NAME JKweiser:cco DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No, DPR-43 cc:       S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin p, Schmidt, State Liaison Officer DISTRIBUTION:
* Janet Kweiser From: Carmen Olteanu Sent: Monday, October 20, 2008 2:38 PM To: Daniel Collins; Tamara Bloomer; Patrick Milano; RidsNrrDirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; DRPIII; DRSIII; Patricia Buckley; Tammy  
Daniel Collins Tamara Bloomer Patrick Milano RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\KEW 100708 DRS OL.DOC X Publicly Available                 0 Non-Publicly Available               0 Sensitive         0 Non-Sensitive T     ' a COPl 0f t h'IS d ocument, ID o receIVe
* t he box "C" = COPY WI0 attachieDCI""
* d'Icate ID                                    E == Copy WI"th attachieDCI "N" =-No copy OFFICE           RIII:DRS             I         RIII:DRS           I         RIII:DRS               I                     I NAME             JKweiser:cco                     DMcNeil                       HPeterson DATE             10/02/08                         10/02/08                     10/07/08 OFFICIAL RECORD COPY
* Janet Kweiser From:                 Carmen Olteanu Sent:                 Monday, October 20, 2008 2:38 PM To:                   Daniel Collins; Tamara Bloomer; Patrick Milano; RidsNrrDirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak


==Subject:==
==Subject:==
Kewaunee Letter Re Confirmation of Initial Attachments:
Kewaunee Letter Re Confirmation of Initial Exam Attachments:           KEW 100708 DRS OL.doc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession
KEW 100708 DRS The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession  
  #ML082880670.
#ML082880670.
1
1 Dominion Resources Servites, Inc. )Dominion**
 
,(1110 Dominion Boulevard.
Dominion Resources Servites, Inc.
Lien AII.-I1. VA '\(1.,11 \X :b'lddres.s:
,(1110 Dominion Boulevard. Lien AII.-I1. VA '\(1.,11
www.dom.com August 14, 2008 United States Nuclear Regulatory Commission Serial No.: 08-0436 Attention:
                                                                          )Dominion**
Document Control Desk NLOS/MBB Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. lDEK) NPF-49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC) NPF-4f7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)
\X :b'lddres.s: www.dom.com August 14, 2008 United States Nuclear Regulatory Commission                         Serial No.:   08-0436 Attention: Document Control Desk                                     NLOS/MBB Washington, DC 20555                                                 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. lDEK)                                               NPF-49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)                                           NPF-4f7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)                                     DPR-32/3?
DPR-32/3?
KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE  
KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE  


==SUMMARY==
==SUMMARY==
2008-16 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATION§ In response to NRC Regulatory Issue Summary 2008-16. enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs). No new commitments are intended by this letter. If you have any questions concerning this information.
2008-16 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATION§ In response to NRC Regulatory Issue Summary 2008-16. enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
please contact Mr. David Llewellyn at (804) 273-4314.
No new commitments are intended by this letter. If you have any questions concerning this information. please contact Mr. David Llewellyn at (804) 273-4314.
Very truly yours, Director -Nuclear Licensing  
Very truly yours, c.~urk-Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
& Operations Support Dominion Resources Services, Inc. for Dominion Energy Kewaunee, Inc., Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments SN 08-0436 Scheduling of Operator Licensing Examinations cc page 1 of 2 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW. Suite 23 T85 Atlanta. GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Ms. C. J. Project U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. S. P. Project U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 Mr. P. S. Senior Project U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738 SN 08-0436 Scheduling of Operator Licensing Examinations cc page 2 of 2 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector Kewaunee Power Station NRC FORMS36 U.S. NUCLEAR REGULATORY COMMISSION (11*2005)
for Dominion Energy Kewaunee, Inc.,
OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 Estimated burden per 10 comply with this voluntary Information collection request 1 oour. his informalion collection is used to pia n budgets and resources lor operator examinetlons.
Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments
Send comments burden estimate to the Records and FOlAlPrivacv Services Branch -5 F 3}. U.S. Nuclear Commission.
 
Washington.
SN 08-0436 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW. Suite 23 T85 Atlanta. GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Ms. C. J. Sanders Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. S. P. Lingam Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 Mr. P. S. Tam Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738
DC 20555-000
 
* or bl. Internet e-mail to In and to the Desk Officer. Ollica 01 In ormation and Regulatory Affairs, NE B*10202. (J150-01Jl), Office 01 and Budget. Washington.
SN 08-0436 Scheduling of Operator Licensing Examinations cc page 2 of 2 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector Kewaunee Power Station
DC 2()50J. If a means used to impose an Information collection does not display a currently valki OMS cootrol number. Iha NRC may nOI conduct or sponsor. and a person is not required to respond 10. the information oolledlon.
 
FACILITY Kewaunee Power Station NRC REGION \II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09CY 10CY 11CY 12ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09CY 10CY 11CY 12-NUMBER OF REACTOR OPERATORS 5 0 5 5 NUMBER OF SENIOR REACTOR OPERATORS" INSTANT 8 0 9 9 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS  
NRC FORMS36                 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131                           EXPIRES: 08131/2008 (11*2005)                                                        Estimated burden per res~onse 10 comply with this voluntary Information collection request 1 oour. his informalion collection is used to pia n budgets and resources lor operator examinetlons. Send comments ~ardin~ burden estimate to the Records and FOlAlPrivacv Services Branch -5 F 3}. U.S.
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/13/2009 0210712011 10/15/2012 ALTERNATE DATE 05/04/2009 0212112011 10/29/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 09 ---" CY 10 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER EST!MATED NUMBER OF CANDIDATES 15  FORM 536 18-20051 PRINTED ON RECYCLED PAPER NRC FORMS36 U.S. NUCLEAR REGULATORY COMMISSION (8-2005) OPERA TOR LICENSING EXAMINATION DATA APPROveO BY OMB: NO. 3 I 5().{l I 31 EXPIRES: 0613112008 Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations.
OPERATOR LICENSING                      Nuclear R~Ulatory Commission. Washington. DC 20555-000
Send comments burden eatimata 10 Ihe ReCo<<l. and FOIAIPrivacy Services Branch \ *S F 3). U.S. Nuclear R:'JluIe\DtY Commlsslon.
* or bl. Internet e-mail to In ocoliecls@nrc.~y. and to the Desk Officer. Ollica 01 In ormation EXAMINATION DATA                        and Regulatory Affairs, NE B*10202. (J150-01Jl), Office 01 Man~emenl and Budget. Washington. DC 2()50J. If a means used to impose an Information collection does not display a currently valki OMS cootrol number. Iha NRC may nOI conduct or sponsor. and a person is not required to respond 10. the information oolledlon.
Washington, DC 20555-000 , or Intemel e-mail to i ocoIlectSOnrc.and to the Desk Officer, Office 0/ In ormation and RegulatClr( Allm, NE a.1 0202, (3150-0131).
FACILITY                                                                                                       NRC REGION Kewaunee Power Station
Office of and Budge!. Washington.
                                                                                                                \II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 11                          CY 12 PROPOSED NUMBER                       CY 09
DC 20503. If a means used to impose an nformalion collection does no! display a currently valid OMS oonlrol number, the NRC may not conduct and a person is not required to respond to. the Infonnation col on, FACILITY Millstone Power Station Unit 2 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09-CY 10CY 11CY 12ESTIMATED NUMBER OF lICENSEE*PREPARED EXAMINATIONS 0 1 0 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09-CY 10-CY 11-CY 12-NUMBER OF REACTOR OPERATORS 4 4 0 0 NUMBER OF SENIOR REACTOR OPERATORS*
                                              -              CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED                 1                         0                               1                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                         0                               0                             0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY 09 CY 10                        CY 11 CY 12 NUMBER OF REACTOR                       5                 0                               5                             5 OPERATORS NUMBER OF SENIOR REACTOR                                         0                                9                              9 8
INSTANT 3 8 0 0 NUMBER OF SENIOR REACTOR OPERATORS*
OPERATORS" INSTANT NUMBER OF SENIOR REACTOR 0                 0                               1                             1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                       0                 0                               0                               0 PROPOSED DATES PRIMARY DATE               04/13/2009                                     0210712011                       10/15/2012 ALTERNATE DATE               05/04/2009                                     0212112011                       10/29/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY   09                                               CY        10 PROPOSED                                ---"                                                       -
UPGRADE 6 2 0 0 NUMBER OF SENIOR REACTOR OPERATORS*
NUMBER MARCH       JUNE     SEPTEMBER DECEMBER       MARCH               JUNE         SEPTEMBER DECEMBER EST!MATED NUMBER OF                                     15 CANDIDATES N~C  FORM 536 18-20051                                                                                           PRINTED ON RECYCLED PAPER
LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 01/1912009 0611412010 AL TERNA TE DATE 01126/2009 06128/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 09 CY 10 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 12 NRC FORM 536 (8-2005) PRImED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (8-2005) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. 315G-0131 EXPIRES: 0813112008 Estimated burden per to comply with this voluntary Information collection request: 1 hour. his Information collection is usad 10 plan budgets and resources for operator examinations  
 
*. Send comments burden estimate to the Records and FOWPrivacy Serviees Branch *5 F 3). U.S. Nudear Commission.
NRC FORMS36                 U.S. NUCLEAR REGULATORY COMMISSION   APPROveO BY OMB: NO. 3I 5().{l I 31                     EXPIRES:   0613112008 (8-2005)                                                          Estimated burden per res~onae to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardl~ burden eatimata 10 Ihe ReCo<<l. and FOIAIPrivacy Services Branch \ *S F 3). U.S.
WashlnglQn.
OPERATOR LICENSING                          Nuclear R:'JluIe\DtY Commlsslon. Washington, DC 20555-000 , or b~ Intemel e-mail to i ocoIlectSOnrc.~v' and to the Desk Officer, Office 0/ In ormation EXAMINATION DATA                          and RegulatClr( Allm, NE     a. 10202, (3150-0131). Office of M~nI and Budge!. Washington. DC 20503. If a means used to impose an nformalion collection does no! display a currently valid OMS oonlrol number, the NRC may not conduct o~onsor. and a person is not required to respond to. the Infonnation col   on, FACILITY                                                                                                       NRC REGION Millstone Power Station Unit 2 I
DC 20555..000
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 09               CY 10
* or b" intemet e.mallto In lind to the Desk OffIcer. Office 01 In armation and Regulatory Affairs. NE .10202. (3150-0131).
                                                                -                            CY 11
OffIce of and Budget. WaShington.
                                                                                                  -                         CY 12 lICENSEE*PREPARED                 0                           1                               0                             0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                   0                           0                               0                             0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10                         CY 11
DC 20503. If a means usad 10 impose an 1nlormalion collection does not display a currently valid OMS control number, !he NRC may not conduct or se;,nsor.
                                                                                                  -                           CY
and a person is nat required to respond to, the Information collect
                                                                                                                                  -  12 NUMBER OF REACTOR                       4                     4                               0                             0 OPERATORS NUMBER OF SENIOR REACTOR                                           8                                0                              0 3
* FACILITY Millstone Power Station Unit 3 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09-CY 10-CY 11CY 12-ESTIMATED NUMBER OF lICENSEE*PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09-CY 10-CY 11CY 12-NUMBER OF REACTOR OPERATORS 6 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS
OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 6                     2                               0                             0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS* LIMITED                     0                     0                               0                             0 PROPOSED DATES PRIMARY DATE               01/1912009         0611412010 ALTERNATE DATE               01126/2009         06128/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     09                                                   CY     10 PROPOSED                              .
* INSTANT 8 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS*
NUMBER MARCH         JUNE     SEPTEMBER DECEMBER           MARCH               JUNE         SEPTEMBER DECEMBER ESTIMATED NUMBER OF           12 CANDIDATES NRC FORM 536 (8-2005)                                                                                               PRImED ON RECYCLED PAPER
UPGRADE 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS  
 
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09/14/2009 0112512011 ALTERNATE DATE 09/2812009 01118/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 09 CY 10 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 12 NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION (8*2005) OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008 Estimated burden per to comply with this voluntary information collection request 1 hour. Is information collection is used to plan budgets and _roes for operator examinations.
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 315G-0131                           EXPIRES: 0813112008 (8-2005)                                                        Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his Information collection is usad 10 plan budgets and resources for operator examinations*. Send comments ~ardln~ burden estimate to the Records and FOWPrivacy Serviees Branch *5 F 3). U.S.
Sand comments estimate to the Records and FOIAIPrivaey Services Branch *5 F ). U.S. Nud_ R::?,ulatofy Commission.
OPERATOR LICENSING                        Nudear ~ulatory Commission. WashlnglQn. DC 20555..000
Waahlnglon.
* or b" intemet e.mallto In ocallecls@nrc.~v. lind to the Desk OffIcer. Office 01 In armation EXAMINATION DATA                        and Regulatory Affairs. NE .10202. (3150-0131). OffIce of Man~t and Budget. WaShington. DC 20503. If a means usad 10 impose an 1nlormalion collection does not display a currently valid OMS control number, !he NRC may not conduct or se;,nsor. and a person is nat required to respond to, the Information collect
DC 20555-000
* FACILITY                                                                                                       NRC REGION Millstone Power Station Unit 3 I
* Of :10 Iiltemel e-mail 10 in OCOlledllQnn:.gov.
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10                           CY 11 CY 12 ESTIMATED NUMBER OF lICENSEE*PREPARED                 1                         0                               1                               0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                   0                         0                               0                             0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09             CY 10
and 10 thit Desk OIIIcer. omca of I rmatIon and AffaIrS. NE 8-10202, (3150-0131).
                                                              -                           CY 11 CY 12 NUMBER OF REACTOR 6                   0                               8                             0 OPERATORS NUMBER OF SENIOR REACTOR                                         0                                4                              0 8
0fIice of Manaqemant Budget. Washington DC 20503. If a means uSed to Impose an Information oollection does no! diSplay a currenUy valid OMS control number. the NRC may nol conduct or .ponsor. and a parson ia not required to respond to. the Information cdlection.
OPERATORS
FACIUTY North Anna Power Station NRC REGION /I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09-CY 10CY 11-CY 12ESTIMATED NUMBER OF UCENSEE-PREPARED EXAMINATIONS 1 (written only) 1 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09-CY 10-CY 11-CY 12-NUMBER OF REACTOR OPERATORS 3 12 0 10 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 1 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS*
* INSTANT NUMBER OF SENIOR REACTOR 2                   0                               0                             0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0                   0                               0                             0 PROPOSED DATES PRIMARY DATE               09/14/2009                                       0112512011 ALTERNATE DATE             09/2812009                                       01118/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     09                                                 CY       10 PROPOSED                                                                                            --
UPGRADE 2 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS
NUMBER MARCH       JUNE     SEPTEMBER DECEMBER         MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                   12 CANDIDATES NRC FORM 536 (8-2005)                                                                                             PRINTED ON RECYCLED PAPER
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE *0210212009 0610712010 0611112012 ALTERNATE DATE 0112712009 0611412010 0611812012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 09 CY 10 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 17 NRC FORM 536 (&.2005) PRlNTEO ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008
 
{8-2005) Estimated burden per to comply with this voluntary Information collection request 1 hour. his information collection is used to plan budgets and resources for operator examinations.
NRC FORM 636                 U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMS: NO. 3150-0131                             EXPIRES: 0813112008 (8*2005)                                                          Estimated burden per res~n88 to comply with this voluntary information collection request 1 hour.     Is information collection is used to plan budgets and _roes for operator examinations. Sand comments ~anlin~bllrdan estimate to the Records and FOIAIPrivaey Services Branch *5 F ). U.S.
Send oomments burden OPERA TOR LICENSING estimate !o the Records and FOIA/Privacy Services Branch *5 F 3). U.S. Nuclear Commission, DC 20555-000 ,or Intamel EXAMINATION DATA e-mail 10 in OCOllecls@nrc'SOIl, and to the Desk Officer, Office of In ormation and Affairs, NE B*l0202, (3150-0131).
OPERATOR LICENSING                          Nud_ R::?,ulatofy Commission. Waahlnglon. DC 20555-000
Offtce 01 Managemen!
* Of             :10 Iiltemel EXAMINATION DATA                            e-mail 10 in OCOlledllQnn:.gov. and 10 thit Desk OIIIcer. omca   of I rmatIon and Ragulat~ AffaIrS. NE 8-10202, (3150-0131). 0fIice of Manaqemant ~d Budget. Washington DC 20503. If a means uSed to Impose an Information oollection does no! diSplay a currenUy valid OMS control number. the NRC may nol conduct or .ponsor. and a parson ia not required to respond to. the Information cdlection.
and Wash nglon, DC 20503. If II means used to impose an information collectlon does not display II currenUy IIBlid OMS control number, the NRC may not conduct or sconsor, and a person is not required 10 respond to, the Information collect on. FACILITY NRC REGION Surry Power Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12---ESTIMATED NUMBER OF L1CENSEE*PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 1 1 1 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12---NUMBER OF REACTOR 0 14 12 0 OPERATORS NUMBER OF SENIOR REACTOR 0 OPERATORS*
FACIUTY                                                                                                           NRC REGION North Anna Power Station
INSTANT 6 6 0 NUMBER OF SENIOR REACTOR 6 2 4 0 OPERATORS*
                                                                                                                    /I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                       CY 09
UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS*
                                              -               CY 10 CY 11                             CY 12 ESTIMATED NUMBER OF UCENSEE-PREPARED                   1                          1                                0                                1 EXAMINATIONS           (written only)
LIMITED PROPOSED DATES PRIMARY OATE 07/20/2009 07126/2010 10/31/2011 AL TERNA TE DATE 07/2712009 0810212010 11114/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES N'lC FORM 536 (8*200S) PRINTED ON RECYClED PAPER SN 08-0436 Scheduling of Operator Licensing Examinations bc page 1 of 1 bc: (electronic distribution except as noted by*) Mr. C. A. McClain, NAPS Mr. J. B. Scott, Jr., NAPS Mr. W. F. Shura, NAPS Mr. A. T. Barbee, SPS Mr. D. H. Wilson, SPS Mr. J. T. Spence, MPS Mr. T. A. Horner, MPS Mr. M. J. Cote, MPS Mr. F. Winks, IN2NE Mr. T. W. Kulterman, SPS Mr. P. Kemp, NAPS Mr. B. A. Garber, SPS Mr. W. D. Bartron, MPS Mr. T. L. Breene, KPS Mr. D. W. Allen, KPS Mr. D. M. Emery, KPS Mr. B. Krauth, MPS Mr. W. E. Brown, MPS Mr. D. Llewellyn, IN2NE Ms. N. Wen borne, KPS Mr. C. Tarantino, IN2SE Ms. L. Cuoco, Tredegar Lie File* Records Management  
ESTIMATED NUMBER OF NRC*PREPARED                     0                           0                                 0                                 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12 NUMBER OF REACTOR                         3                 12                                 0                               10 OPERATORS NUMBER OF SENIOR REACTOR                                             5                                0                                5 1
* (bc original), INGW D. A. Sommers H. A. Royal ACTION PLAN 1. None. VERIFICATION OF ACCURACY 1. Estimates given to Margaret Bennett per David Llewellyn's e-mail dated 7/24/08. REQUIRED CHANGES TO THE UFSAR OR QA TOPICALREPORT None. 1 Dominion Resources Services, Inc. 5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com August 16, 2007 United States Nuclear Regulatory Commission Serial No.: 07-0517 Attention:
OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                         2                   3                                 0                                 3 NUMBER OF SENIOR REACTOR 0                   0                                 0                                 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                 *0210212009         0610712010                                                       0611112012 ALTERNATE DATE                 0112712009         0611412010                                                       0611812012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     09                                                   CY     10 PROPOSED                                ---                                                          ~--
Document Control Desk NLOS/MBB Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. (DEK) NPF-49 DOMINION NUCLEAR CONNEC"rlCUT, INC. (DNC) NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)
NUMBER MARCH         JUNE       SEPTEMBER DECEMBER           MARCH               JUNE         SEPTEMBER DECEMBER ESTIMATED NUMBER OF           17 CANDIDATES NRC FORM 536 (&.2005)                                                                                                 PRlNTEO ON RECYCLED PAPER
DPR-32/37 KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 &3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE  
 
NRC FORM     536           U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMS: NO. 3150-0131                           EXPIRES: 0813112008
{8-2005)                                                         Estimated burden per res~onse to comply with this voluntary Information collection request 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send oomments ~rd~ burden estimate !o the Records and FOIA/Privacy Services Branch *5 F 3). U.S.
OPERATOR LICENSING                        Nuclear Re~ulatory Commission, Washi~n, DC 20555-000 ,or ~ Intamel e-mail 10 in OCOllecls@nrc'SOIl, and to the Desk Officer, Office of In ormation EXAMINATION DATA                          and RegUlafo~ Affairs, NE B*l0202, (3150-0131). Offtce 01 Managemen! and Budge~ Wash nglon, DC 20503.         If II means used to impose an information collectlon does not display II currenUy IIBlid OMS control number, the NRC may not conduct or sconsor, and a person is not required 10 respond to, the Information collect on.
FACILITY                                                                                                           NRC REGION Surry Power Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 09 CY 10 CY 11 CY 12 L1CENSEE*PREPARED                 0                           0                               0                               0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                     1                           1                               1                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10                           CY 11
                                                                                                  -                          CY 12 NUMBER OF REACTOR                                           14                               12 0                                                                                      0 OPERATORS NUMBER OF SENIOR REACTOR                                           6                                6                                0 0
OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 6                     2                               4                               0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 0                     0                               0                               0 OPERATORS* LIMITED PROPOSED DATES PRIMARY OATE                 07/20/2009         07126/2010                     10/31/2011 ALTERNATE DATE               07/2712009         0810212010                     11114/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     09                                                   CY       10 PROPOSED                               --                                                          -
NUMBER             MARCH       JUNE     SEPTEMBER DECEMBER           MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF           20                                                                       20 CANDIDATES N'lC FORM 536 (8*200S)                                                                                               PRINTED ON RECYClED PAPER
 
SN 08-0436 Scheduling of Operator Licensing Examinations bc page 1 of 1 bc: (electronic distribution except as noted by*)
Mr. C. A. McClain, NAPS Mr. J. B. Scott, Jr., NAPS Mr. W. F. Shura, NAPS Mr. A. T. Barbee, SPS Mr. D. H. Wilson, SPS Mr. J. T. Spence, MPS Mr. T. A. Horner, MPS Mr. M. J. Cote, MPS Mr. F. Winks, IN2NE Mr. T. W. Kulterman, SPS Mr. P. Kemp, NAPS Mr. B. A. Garber, SPS Mr. W. D. Bartron, MPS Mr. T. L. Breene, KPS Mr. D. W. Allen, KPS Mr. D. M. Emery, KPS Mr. B. Krauth, MPS Mr. W. E. Brown, MPS Mr. D. Llewellyn, IN2NE Ms. N. Wen borne, KPS Mr. C. Tarantino, IN2SE Ms. L. Cuoco, Tredegar Lie File*
Records Management * (bc original), INGW CONCURRENCE D. A. Sommers H. A. Royal ACTION PLAN
: 1. None.
VERIFICATION OF ACCURACY
: 1. Estimates given to Margaret Bennett per David Llewellyn's e-mail dated 7/24/08.
REQUIRED CHANGES TO THE UFSAR OR QA TOPICALREPORT 1      None.
 
Dominion Resources Services, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com August 16, 2007 United States Nuclear Regulatory Commission                   Serial No.:   07-0517 Attention: Document Control Desk                               NLOS/MBB Washington, DC 20555                                           Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. (DEK)                                         NPF-49 DOMINION NUCLEAR CONNEC"rlCUT, INC. (DNC)                                   NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)                               DPR-32/37 KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE  


==SUMMARY==
==SUMMARY==
2007-17 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2007-17, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs). No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. John Hayden at (804) 273-2707.
2007-17 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2007-17, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
C. L. Funderburk Director -Nuclear Licensing  
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. John Hayden at (804) 273-2707.
&Operations Support Dominion Resources Services, Inc. for Dominion Energy Kewaunee, Inc., Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments AUG 2 1 SN 07-0517 Scheduling of Operator Licensing Examinations cc page 1 of 2 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 . Mr. J. D. Project U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. R. A. Project U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 Mr. S. P. Project U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 SN 07-0517 Scheduling of Operator licensing Examinations cc page 2 of 2 Mr. P. D. Milano Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738 Mr. R. I. Treadway NRC Senior Resident Inspector Millstone Power Station Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. E. Riggs NRC Senior Resident Inspector Surry Power Station Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (8-2005) OPERATOR LICENSING EXAMINATION DATA APPRoveD BY OMS; NO. 315O-<l131 EXPIRES; 0813112008 Estimated burden per to comply with this voluntary information collection request: 1 hour. hilS informallon colledlon is IISed to plan budgets and resources for operator examinations.
C. L. Funderburk Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Send comments burden estimate to the Records and FOIAIF'rlvacy Services Branch *5 F 3), U.S. Nuclear Commiaaion, Washlngkm.
for Dominion Energy Kewaunee, Inc.,
DC 20555-000
Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments AUG 2 1 2007
* or ::h internet e-maH to i
 
* and to the Desk OffICer. Offlce of I ormation and Regurat:rr 10202. (3150-0131).
SN 07-0517 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc:  U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 .
Offlce of and Budget. Wash 20503. If II means IlSed to impose an IIlformalion collection dee. not display a curremly valid OMB conIrDI number. the NRC may not conduct or sponsor, and a person Is not required to respond to. the information collection.
Mr. J. D. Hughey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. R. A. Jervey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 Mr. S. P. Lingam Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738
FACILITY KEWAUNEE POWER STATION NRC REGION Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE OPOSED NUMBER CY08 CY-D]. CYJJL CY 11" ESTIMATED NUMBER OF LlCENSEE-PREPARED EXAMINATIONS 0 15 0 15 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08CY 09Cyl0CY 11NUMBER OF REACTOR OPERATORS 0 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 9 0 9 NUMBER OF SENIOR REACTOR OPERATORS*
 
UPGRADE 0 1 0 1 '. NUMBER OF SENIOR REACTOR OPERATORS LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/13/2009 02/07/2011 ALTERNATE DATE 05/04/2009 02/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 08 -_._.,. CY 09 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 538 (8-2005) PRINTED ON RECYCLEO PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMS: NO.31S()'0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per to comply with this voluntary information coIIeetion request: 1 hour. 's information coneclion ill used to plan budgets and nssourees for operator examinations.
SN 07-0517 Scheduling of Operator licensing Examinations cc page 2 of 2 Mr. P. D. Milano Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738 Mr. R. I. Treadway NRC Senior Resident Inspector Millstone Power Station Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. E. Riggs NRC Senior Resident Inspector Surry Power Station Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station
Send comments r1rdins burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch -5 F 3). U,S. Nuclear Commission.
 
Washinglon, OC 20555-000 , or::t; Intemet EXAMINATION DATA
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION APPRoveD BY OMS; NO. 315O-<l131                         EXPIRES; 0813112008 (8-2005)                                                        Estimated burden per r.s~ons. to comply with this voluntary information collection request: 1 hour. hilS informallon colledlon is IISed to plan budgets and resources for operator examinations. Send comments ~rdin~ burden estimate to the Records and FOIAIF'rlvacy Services Branch *5 F 3), U.S.
* OV, and to the Desk OfIicer, OffIce of I ormalion a 10202, (315().O131).
OPERATOR LICENSING                        Nuclear R~ulato Commiaaion, Washlngkm. DC 20555-000
Offtce of and Budget, WashIng! 20503. If a means uSed 10 impose an information colleetion doaa not splay a currenUy valid OMS control number, the NRC may nol conduct and a person is not required 10 respond to. the information coil on. FACILITY HRCREGION MILLSTONE POWER STATION UNIT 2 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11-ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED a 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 6 2 0 NUMBER OF SENIOR REACTOR OPERATORS  
* or             ::h internet e-maH to i
-LIMITED 0 0 0 0 PR9pOSED DATES PRIMARY DATE 01/19/2009 09/15/2009 12/07/2110 ALTERNATE DATE 01/12/2009 09/29/2009 12/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 12 NUMBER OF CANDIDATES NRC FORM 536 (6-2005) PRINTED ON RECYCLED PAPER NRC FORM 536 (8-2005) U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0813112008 Estimated burden per response to comply with this voluntary information ooIIection request: 1 hour. This infonnation collection is used to n budgets and resources for operator examlnetions.
* and to the Desk OffICer. Offlce of I ormation EXAMINATION DATA                        and Regurat:rr                 10202. (3150-0131). Offlce of Ma~ and Budget. Wash               20503. If II means IlSed to impose an IIlformalion collection dee. not display a curremly valid OMB conIrDI number. the NRC may not conduct or sponsor, and a person Is not required to respond to. the information collection.
Send comments g bumen estimate to the Records and FOIA/Prlvacy S . 53), U.S. Nuclear Regulatory Commission, Washington, 0 by internet e-mail to and to the Desk Officer, Office of Information and Affa , (31S()'{)131).
FACILITY                                                                                                     NRC REGION KEWAUNEE POWER STATION                                                                                   Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE OPOSED NUMBER                   CY08               CY-D].                         CYJJL                           CY 11" ESTIMATED NUMBER OF LlCENSEE-PREPARED                   0                 15                               0                               15 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0                 0                               0                                 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 08              CY 09                          Cyl0                            CY 11 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS                       0                 5                               0                               5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT                   0                 9                               0                               9 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                   0                 1                               0                               1 NUMBER OF SENIOR REACTOR OPERATORS LIMITED                 0                 0                               0                               0 PROPOSED DATES PRIMARY DATE 04/13/2009                                                 02/07/2011 ALTERNATE DATE                                 05/04/2009                                                 02/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY   08                                                 CY      09 PROPOSED                              -_._.,.
Office of Management and Budget, Washington.
NUMBER MARCH       JUNE     SEPTEMBER DECEMBER         MARCH               JUNE         SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 538 (8-2005)                                                                                           PRINTED ON RECYCLEO PAPER
DC 20:)1.1;'.  
 
..If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMS: NO.31S()'0131                           EXPIRES: 08/31/2008 (8-2005)
FAGILIIY MILLSTONE POWER STATION UNIT 3 NRC REGION Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY09 CY...lQ..
Estimated burden per (es~se to comply with this voluntary information coIIeetion request: 1 hour.     's information coneclion ill used to plan budgets and nssourees for operator examinations. Send comments r1rdins burden estimate to the Records and FOINPrivacy Services Branch -5 F 3). U,S.
CYJ.L ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS o 1 1 o ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS o o o o B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR OPERATORS o 6 8 o NUMBER OF SENIOR REACTOR OPERATORS
OPERATOR LICENSING                        Nuclear ~EI9u1atory Commission. Washinglon, OC 20555-000 ,         or::t; Intemet
* INSTANT o 8 4 o NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE o 2 o a NUMBER OF SENIOR REACTOR OPERATORS*
* OV, and to the Desk OfIicer, OffIce of I ormalion EXAMINATION DATA                        a                               10202, (315().O131). Offtce of Man~ and Budget, WashIng!           20503. If a means uSed 10 impose an information colleetion doaa not splay a currenUy valid OMS control number, the NRC may nol conduct o~n$Or. and a person is not required 10 respond to. the information coil   on.
LIMITED o o o o PROPOSED DATES PRIMARY DATE 06/16/2009 01/25/2011 AL TERNA TE DATE 06/23/2009 01/18/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 08 CY 09 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 14 12 NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (8-2005) OPERA TOR LICENSING EXAMINATION DATA APPROVEO BY OMS: NO. 3150-0131 EXPIRES: 0813112008 Estimated burden fer to comply with this voluntary Informalion collection request hour. his inlomalion coIectlon is used to plan budgets and resources for operator examinalions.
FACILITY                                                                                                       HRCREGION MILLSTONE POWER STATION UNIT 2                                                                             Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 08             CY 09                           CY   10                         CY 11 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                 1                     1                               1                               0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS                  a                     0                               0                               0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY 08             CY   09                       CY   10                         CY 11 NUMBER OF REACTOR OPERATORS                     4                     0                               4                               0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT                 5                     0                               8                               0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                   4                     6                               2                               0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED               0                   0                               0                                 0 PR9pOSED DATES PRIMARY DATE           01/19/2009         09/15/2009                   12/07/2110 ALTERNATE DATE           01/12/2009         09/29/2009                   12/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     08                                                   CY     09 PROPOSED                               -
Send comments burllen estimate to the Records and FOIAIPrivacy Services Branch *5 F 3), U.S. NUClear Commission, Washington, OC 20555-000 ,or blc internet .mall to j ocoIleds@nrc.gov, and to the Oesk OIIicer, OfIice of In omation and Affairs, NE B-10202, (3150.0131), 0IIk:e of Management and Budget, Washington!
NUMBER MARCH       JUNE     SEPTEMBER DECEMBER         MARCH               JUNE         SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                                                                                   12 CANDIDATES NRC FORM 536 (6-2005)                                                                                             PRINTED ON RECYCLED PAPER
DC 20503. If a means used to impose an infomation collection does not diSplay a currently valid OMS control number, the NRC may not conduct and a person is not required to respond 10, tile information coil on. FACILITY NORTH ANNA POWER STATION NRC REGION Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 08CY09--Cy 10 CY 11ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08-CY09-Cy 10-CY 11NUMBER OF REACTOR OPERATORS 9 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS*
 
INSTANT 3 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS*
NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131                             EXPIRES: 0813112008 (8-2005)                                                        Estimated burden per response to comply with this voluntary information ooIIection request: 1 hour. This infonnation collection is used to     n budgets and resources for operator examlnetions. Send comments                   g bumen estimate to the Records and FOIA/Prlvacy S .                             53), U.S.
UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS  
OPERATOR LICENSING                        Nuclear Regulatory Commission, Washington, 0                           by internet e-mail to infoeolieCtsQnrc:~,. and to the Desk Officer, Office of Information EXAMINATION DATA                        and Regulal~ Affa                     , (31S()'{)131). Office of Management and Budget, Washington. DC 20:)1.1;'. ..If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/09/2008 06/07/2010 ALTERNATE DATE 06/16/2008 06/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 08 CY 09MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 12 NRC FORM 536 (11-2005)
FAGILIIY                                                                                                           NRC REGION MILLSTONE POWER STATION UNIT 3                                                                               Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                                         CY09                           CY...lQ..                         CYJ.L ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS o                   1                               1                                 o ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS                   o                   o                               o                                 o B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY 08             CY 09                           CY 10                             CY 11 NUMBER OF REACTOR OPERATORS o                   6                               8                                 o NUMBER OF SENIOR REACTOR OPERATORS
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315()..O131 EXPIRES: 08131/2008 (8-2005) Estimated burden per to comply with this voluntary information ooUection request: 1 hour. his information collection is used to plan budgets and resources fer operator examinations.
* INSTANT               o                   8                               4                                 o NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                   o                   2                               o                                 a NUMBER OF SENIOR REACTOR OPERATORS* LIMITED                 o                   o                               o                                 o PROPOSED DATES PRIMARY DATE                                 06/16/2009                   01/25/2011 ALTERNATE DATE                                 06/23/2009                   01/18/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY   08                                                   CY 09 PROPOSED NUMBER MARCH       JUNE   SEPTEMBER DECEMBER           MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14                                                                                       12 CANDIDATES NRC FORM 536 (8-2005)                                                                                               PRINTED ON RECYCLED PAPER
Send comments OPERA TOR LICENSING estimate to the Records and FQtAlPrivacy Servi U. S. Nuclear Commission, Washington, DC , or EXAMINATION DATA e-mail and to the Desk OftIcer*.of I rmation and Reg Affeirs. NE 9-10202, (3150-0131).
 
OfIIce of and Budget, DC 20503. If a means used to Impose an Information coIJ!lction does display a currel"llly valid OMS control number, \he NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION   APPROVEO BY OMS: NO. 3150-0131                           EXPIRES:   0813112008 (8-2005)                                                          Estimated burden fer re$~onse to comply with this voluntary Informalion collection request hour. his inlomalion coIectlon is used to plan budgets and resources for operator examinalions. Send comments r~ai'dln~ burllen OPERATOR LICENSING                        estimate to the Records and FOIAIPrivacy Services Branch ~ *5 F 3), U.S.
FACILITY NRC REGION SURRY POWER STATION Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy08 CY 09 CylO CY11----ESTIMATED NUMBER OF LICENSEE*PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 1 0 1 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 08 CY 09 CYIO CYll-NUMBER OF REACTOR 8 15 0 10 OPERATORS NUMBER OF SENIOR REACTOR 3 5 0 4 OPERATORS
NUClear R~ulatory Commission, Washington, OC 20555-000 ,or blc internet
* INSTANT NUMBER OF SENIOR REACTOR 3 4 0 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 O' 0 0 OPERATORS*
                                                                  .mall to j ocoIleds@nrc.gov, and to the Oesk OIIicer, OfIice of In omation EXAMINATION DATA                        and Regulat~ Affairs, NE B-10202, (3150.0131), 0IIk:e of Management and Budget, Washington! DC 20503. If a means used to impose an infomation collection does not diSplay a currently valid OMS control number, the NRC may not conduct o~onsor. and a person is not required to respond 10, tile information coil   on.
LIMITED PROPOSED DATES PRIMARY DATE 03/17/2008 10/12/2009 05/17/2011 ALTERNATE DATE 03/24/2008 11/24/2009 06/17/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAonON (GFE) SCHEDULE CY _QL CY 09 PROPOSED '--' NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 20 NUMBER OF CANDIDATES NRC FORM 536 (8-2006) PRINTED ON RECYCLED PAPER}}
FACILITY                                                                                                         NRC REGION NORTH ANNA POWER STATION                                                                                     Region I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 08              CY09                            Cy 10                           CY 11 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                   1                 0                               1                             0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS                   0                   0                               0                             0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY09                           Cy 10
                                                                                                  -                           CY 11 NUMBER OF REACTOR OPERATORS                       9                 0                               10                             0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT                   3                 0                               4                             0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                     2                 0                               3                             0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                 0                 0                               0                             0 PROPOSED DATES PRIMARY DATE                                                               06/07/2010 06/09/2008 ALTERNATE DATE 06/16/2008                                       06/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08                                                     CY       09 PROPOSED                                ,~,-"",---
NUMBER MARCH      JUNE        SEPTEMBER DECEMBER        MARCH              JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                                               12 CANDIDATES NRC FORM 536 (11-2005)                                                                                             PRINTED ON RECYCLED PAPER
 
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315()..O131                           EXPIRES: 08131/2008 (8-2005)                                                       Estimated burden per res~onse to comply with this voluntary information ooUection request: 1 hour. his information collection is used to plan budgets and resources fer operator examinations. Send comments~r-r.~T~:iiien estimate to the Records and FQtAlPrivacy Servi                               U. S.
OPERATOR LICENSING                      Nuclear R~u1atory Commission, Washington, DC                       , or ~intemet EXAMINATION DATA                       e-mail t:uiiii~:;:lIeds@nrc.gov. and to the Desk OftIcer*. ~? of I rmation and Reg         Affeirs. NE 9-10202, (3150-0131). OfIIce of Man~ and Budget, vv;~nrfot~ DC 20503. If a means used to Impose an Information coIJ!lction does     display a currel"llly valid OMS control number, \he NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
FACILITY                                                                                                           NRC REGION SURRY POWER STATION                                                                                         Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF Cy08
                                            -              CY 09
                                                                -                            CylO CY11 LICENSEE*PREPARED                                     0                                 0                               0 EXAMINATIONS 0
ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS                  1                   1                                 0                                 1 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     Cy 08             CY 09                           CYIO                             CYll NUMBER OF REACTOR                                                                         0                             10 OPERATORS 8                  15 NUMBER OF SENIOR REACTOR OPERATORS
* INSTANT 3                   5                                 0                               4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                  3                   4                                 0                               3 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED                0                   O'                                 0                               0 PROPOSED DATES PRIMARY DATE 03/17/2008         10/12/2009                                                     05/17/2011 ALTERNATE DATE 03/24/2008         11/24/2009                                                     06/17/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAonON (GFE) SCHEDULE CY _QL                                                     CY 09 PROPOSED                                                                                               '--'
NUMBER MARCH       JUNE     SEPTEMBER DECEMBER           MARCH               JUNE             SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                   20 CANDIDATES NRC FORM 536 (8-2006)                                                                                               PRINTED ON RECYCLED PAPER}}

Latest revision as of 19:48, 10 March 2020

2011 Kewaunee Power Station, Initial Examination Miscellaneous Correspondence
ML112000665
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/07/2011
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML111370599 List:
References
Download: ML112000665 (41)


Text

2011 KEWAUNEE POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE

11.'

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 11/

2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 January 31, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060*6711

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Kewaunee Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Daniel E. Laing, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," during the week of February 14, 2011.

The NRC staff will administer the operating tests during the weeks of February 7 and 14, 2011.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Raymond K. Walton, at 630-829-9836, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

D. Heacock -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ

D. Heacock -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\KEW 01 11 DRS OL EXAM APPROVAL.DOCX o Publicly Available 0 Non-Publicly Available -0 Sensitive 0 Non-Sensitive

To receive a copy of this document, Indicate In the box "CO Copy w/o attach/enel "E" Copy with attach/enel "N" =No copy OFFICE RIII:DRS Ic RIII:DRS IN RIII:DRS N I NAME JRKweiser:coat}G RKWalton k\{~1 HPeterson .l/I...t::J DATE 01/(}-'\I2011 If 01/;,/2011 011 >/12011 '(I' OFFICIAL RECORD COpy

  • UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 August31,2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Heacock:

In a telephone conversation on August 10, 2010, between Mr. Dan Lang, Manager of Nuclear Training and Raymond Keith Walton, Chief Examiner, arrangements were made for the administration of licensing examinations at the Kewaunee Power Station during the weeks of February 7 and 14, 2011. In addition, the U. S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 17, 2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator licenSing Examination Standards for Power Reactors!' The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by October 11, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by November 17, 2010.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b)(3>>. an authorized representative of the facility licensee shall approve the outlines, examinations. and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC pOlicies and guidelines that will be in effect while the written examinations and operating tests are being administered.

D. Heacock -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the 'first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Papetwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAIPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-O018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessibfe from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}.

Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page

Letter to David A. Heacock from Hironori Peterson, dated August 31, 2010.

SUBJECT:

KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer

D. Heacock -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collectibns, including suggestions for reducing the burden, to the Records and FOINPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV;and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the poliCies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.

Sincerely, IlJI/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page DOCUMENT NAME: KEW 08 10 DRS OL EXAM CONFIRMATION.DOCX o Publicly Available - 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, Indicate in the concurrence box "C" =Copy without attach/enc. "E" = Copy with attachIencl "N" = No copy OFFICE RIII:DRS IN RIII:DRS 1ft! I I NAME RKWalton:co ().\.J HPeterson JJv1 DATE 08f1.,'110 08fl:,V10 *~V OFFICIAL RECORD COPY

Letter to David A. Heacock from Hironori Peterson dated August 31,2010.

SUBJECT:

KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer Distribution:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532*4352 February 19, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

KEWAUNEE POWER STATION

Dear Mr. Heacock:

In a letter dated September 11,2009 (09-0461), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in February 2011 and February 2013 at the Kewaunee Power Station. We have scheduled the examinations as requested. The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in February 2013 was scheduled to begin during the week of February 18, 2013. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination. The letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

D. Heacock In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{the Public Electronic Reading Room).

Sincerely,

~ Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ

D. Heacock -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely,

/£11-/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPIVIKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\Work in Progress\KEW 02_10 DRS OL.doc o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a cO!JY 0 f t his d ocument, .Ind'lcate in t he box "C" =Co>py w/o attach/encl "E" =COpy wi th attachiencI "N" =No copy OFFICE RIII:DRS .bIl\l"" I (L, RIII:DRS IP RIII:DRS IAI I NAME JKweise'flco DMcNeil ~ HPeterson ---*,,,,,,,

DATE If//

02/\\ 110 02/18 110 021{t{ 110 OFFICIAL RECORD COPY

Dominion Resources Services, Inc.

'IHH) I Jominion Boulevard. Clen Allen. VA ..'.\1*"(

\\.1> \ddrc,,, WWW.dQ01.com September 11, 2009 United States Nuclear Regulatory Commission Serial No.: 09-481 Attention: Document Control Desk NLOS/GLA Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC. (DEK) DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. (DNC) NPF-49 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion) NPF-417 KEWAUNEE POWER STATION DPR-32/37 MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE

SUMMARY

2009-11 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2009-11, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. David Llewellyn at (804) 273-4314.

Very truly yours, I"),~) l/ ~~:

J' L. N. Hartz Vice President - Nuclear Support Services Attachments cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415

SN 09-481 Scheduling of Operator licensing Examinations cc page 2 of 3 U. S. Nuclear Regulatory Commission Region" Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Dr. V. Sreenivas NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852 Os. K. R. Cotton NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 16 E15 11555 Rockville Pike Rockville, MD 20852 Ms. C. J. Sanders NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 B1A 11555 Rockville Pike Rockville, MD 20852 Mr. P. S. Tam NRC Senior Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 H4A 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station

SN 09-481 Scheduling of Operator Licensing Examinations cc page 3 of 3 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station

NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315Q.0131 EXPIRES: 1013112011

('G-200&) EstImeted burdenfer res~e to comply with thl$ voluntary informalion coIeQtion IIICI\IfI.$I: hour. InfonnatIoIl coIIedIon II UMd 10 plen budgets lind _roe. for operator ~tIon.. Send IXlmmenlll ~eid~bunten flallmale;;:j ReCorda and FOlAiPrivaq SelVlcn Bnmeh *5 F ). U.S.

OPERATOR LICENSING Nuclear R lory Ccmm/asion. WashiIlQli!l, DC 20555-000

  • or~t EXAMINATION DATA a-mall to and ~

8:' and 10 the Deale 0IIIcer. Office of lion

.10202. (315Q.0131), Offtce of Manlqflmenl lind Budget. Was 20503. I II means used 10 l~ an ,nfDm'llltlon coIIIii:tlon den not dl8ptay a curren.V wild OMS contml number,lIMt NRC "18Y not conduct or.::.nsor, and. person Is nol required to respond to. the informatbn coil

  • F~ClUTY NRC REGION Kewaunee Power StatlOD III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY2011 CY2012 Cy 2013 LICENSEE*PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cyl011 CY2012 Cy2013 NUMBER OF REACTOR 0 4 0 S OPERATORS NUMBER OF SENIOR REACTOR 0 5 0 9 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 3 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 02J0712011 OZl18l2013 ALlERNATE DATE 0212112011 0310412013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE CY 2010 CY 20U PROPOSED NUMBER MARCH JUNE SEPTEMBER OECeMBER MARCH JUNE SEPTEMBER OECEMBER ESTIMATED NUMBER OF 14 CANDIDATES "IRC FORM 536 (10-2OO8) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011

"'eo eatlmated burden per re6~ns. to comply with thill VOlunlary Informallon (10-2OIlf) coIIacIIon request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. IIlnlonnatloO coIIecIkm ia ueed to pIIIn budgets and 1810\1rce8 for operator ._lnatlons. Send _ I I buri:Jen estimate to the ReQords and FOJAlPrlvacy Service. BI"Il1Ilh -6 F ). U.s.

OPERATOR LICENSING NuoJ_ ~ CommlAlon. Wasll~. DC 20566-000

  • or ~et

.-mall 10 In GlIIOnrc~. and to the Desk OI!Icer, 0IIIce of In lion EXAMINATION DATA Ind RegU\~~E 10202. (3150-0131). 0IIk:8 of Man~and BU!Iget, W

  • 20503. If a means wiecI to Irnpoee lin lion colleCllon dow not dleplay II currently valid OMS control number. Iba NRC may not condu~nsor. and a parson Is nol required 10 respond to, the information
  • FACIUTY NRC REGION MlIIstoae Unit :2 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010

- CV 2011

- CY 2012 Cy2013 ESTIMATED NUMBER OF L1CENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CylOJ2 CylO13 NUMBER OF REACTOR 0 5 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 7 0 6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 0 :2 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS

  • LIMITED 0 PROPOSED DATES PRIMARY DATE 03/1312011 0311012013 ALTERNATE DATE 0312012.11 031l4l2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY lOll PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 5311 (10.2G08) PRINTED ON R£CYCI.S) PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 315().()131 EXPIRES: 10131/2011 (10..2008) Estimated burden p9r I'ft~n.e 10 comply with this volunlal}' inrormatlon coIIec:IIon and rNourcunKlU881: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. _Inallona.

for op9ralOr cohctIani=-:~r ~

Ie InlolmatloilSand c:omm.... 'nL burilen OPERATOR LICENSING ..Umata 10 the RIICOIdI and FOlAlPrtvacy S'1VicH -6 F ). u.s.

NucI_ R=~ Comminton. ~n. DC or ~liltemel e-mail 10 In I~rc.s:. and to !hit Desk.~. Ol'llce ot I nnallon EXAMINATION DATA and ~.:Yr AlJaInioS'E B-102021f (3150-0131). 0!II0It Of ~and BIIlfIJeJ, W ngion. 20503. a ..-ne uied to Impose an lion c;o)llii:!Ion doea not dllplay a cummIIy valid OMB collll'tll number, tile NRC II1lIY nol conduct o~nsor. and a parson Is not required to respond to, th e Intormallon coli

  • FACILITY NReREGION Millstone Unit 3 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY2011 CY 1012 CY 2013 ESTIMATED NUMBER OF lICENSEE*PREPARED 0 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINAnONS B. INITIAL OPERATOR LlCENSEEXAMINA"rlONS PROPOSED NUMBER CY 1010 CylOll CV 2011 CylO13 NUMBER OF REACTOR 0 3 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 7 0 6 OPERATORS .. INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 4 0 2 NUMBER OF SENIOR REACTOR 0 0 OPERATORS* LIMITED 0 0 PROPOSED DATES PRIMARY DATE 07/1011011 0210312013 ALTERNATE DATE 07/17120lJ 0211712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 1011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 11 CANDIDATES

!liRe FORM 536 111l-2OD8) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011 (10-2008) Estimated burden ~r res~n.. to comply with this volunl_ry Infonna1ion coIIldiDn request: hour. It InfonneUon collection Is used 10 ~ budgllls and reaoll\'C8l lor opanrtor _lneIIonll. Send colllllltllla ~B burden OPERATOR LICENSING EXAMINATION DATA Nuclear e-mail 10 and

=tory ullmate to the ReCOIdIl and FOIAlP~Services Brench -6 F 3). U,S.

Reg=.:nllireo CommI8IIon. Was

~rc'8'iv. and to th8 Desk NE 9010202. (3150-013

  • 0
  • or ~

of I oJ ~and S~ Was C 20503. If

  • means uSed to Impoae an lion coII8CtiIn doea not _illY' QIII'IIlfly valid OMS oonllOl number. tho NRC may i.

!lOt conduct~DIlIor. Ind _ plrean !lOt requIred to relpond to, the Information on.

FACIlITY NRCREGIOH North Anna Power Station D

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 1010 CY2011 Cy2012 CY 2013 lICENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CylOlO CylOl1 CylO12 Cy2013 NUMBER OF REACTOR 9 0 9 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 7 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 3 OPERATORS-UPGRADE 3 0 0 NUMBER OF SENIOR REACTOR OPERATORS

NUMBER MARCH JUNE iSEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CANDIDATES NRC FORM 538 110-200II) PRINTED ON RECYCLED PAPeR

NRC FORM 536 U.S. NUCLEAR REGULATORY CO_ISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (1t>-2008) Estim8led burden par res~e to comply with this voluntary lnfonnatlo n ooIlacOon requ8$l: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. '- Informllllon oohclion Is used 10 plan budge ll end ntlQUrcea for o~ uaminldlonl. Send comme" III I'dinB burilen OPERATOR LICENSING estimate to the ReGOrde and FOlA/Pl'lvaoy Se -5 F 3). U.S.

Nuc::lNr ~1ak.Ify CommIssion, Welllll1Qll!n. DC

  • 01' ~

Ila9IsCnro.~v. and 10 the Desk EXAMINATION DATA e-mell 10 in end Reg\!lJI.:r, AtfIllniDcNE 8*10202. (3150-0131),

of In of ~ and Budget. W nglon 20603. If a mae". uMcIlO Impose en nformetion cofttiCIIon don not dIIplay II currently valid OMS conlIOI number, Ihe NRC I1I8Y not conduct o~neor. and e peraon I, not required 10 reapond to. the inronnatlon coli on.

FACILITY NRC REGION Surry Power Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF Cy 2010 Cy2011 CY 2012 Cy2G13 LICENSEE-PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010

- Cy201l CY2012 ey2013 NUMBER OF REACTOR 9 0 J1 0 OPERATORS NUMBER OF SENIOR REACTOR 10 0 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 0712612010 08I131Z012 AtTERNATE DATE 0810112010 081l0lZ011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBEA DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 18 CANDIDATES NRC FORM 536 (1t>-200&) PRINTED ON RECYClED PAPER

October 7, 2008 Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CONFIRMATION OF INITIALlREQUALIFICATION OPERATOR LICENSE EXAMINATIONS: KEWAUNEE POWER STATION

Dear Mr. Christian:

In a letter dated August 14, 2008 (08-0436), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in April 2009, February 2011, and October 2012 at the Kewaunee Power Station. We have scheduled the examinations as requested. The examination requested in April 2009 will begin the week of April 13, 2009. The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in October 2012 was scheduled to begin during the week of October 29,2012. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination. The letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program.

We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of November 17, 2008. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr.

Dell McNeil of my staff at 630-829-9737.

D. Christian -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and M;:magement System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer

D. Christian -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.htmi.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No, DPR-43 cc: S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin p, Schmidt, State Liaison Officer DISTRIBUTION:

Daniel Collins Tamara Bloomer Patrick Milano RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\KEW 100708 DRS OL.DOC X Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T ' a COPl 0f t h'IS d ocument, ID o receIVe

  • t he box "C" = COPY WI0 attachieDCI""
  • d'Icate ID E == Copy WI"th attachieDCI "N" =-No copy OFFICE RIII:DRS I RIII:DRS I RIII:DRS I I NAME JKweiser:cco DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD COPY

Subject:

Kewaunee Letter Re Confirmation of Initial Exam Attachments: KEW 100708 DRS OL.doc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880670.

1

Dominion Resources Servites, Inc.

,(1110 Dominion Boulevard. Lien AII.-I1. VA '\(1.,11

)Dominion**

\X :b'lddres.s: www.dom.com August 14, 2008 United States Nuclear Regulatory Commission Serial No.: 08-0436 Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. lDEK) NPF-49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC) NPF-4f7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion) DPR-32/3?

KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE

SUMMARY

2008-16 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATION§ In response to NRC Regulatory Issue Summary 2008-16. enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information. please contact Mr. David Llewellyn at (804) 273-4314.

Very truly yours, c.~urk-Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

for Dominion Energy Kewaunee, Inc.,

Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments

SN 08-0436 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW. Suite 23 T85 Atlanta. GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Ms. C. J. Sanders Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. S. P. Lingam Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 Mr. P. S. Tam Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738

SN 08-0436 Scheduling of Operator Licensing Examinations cc page 2 of 2 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector Kewaunee Power Station

NRC FORMS36 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 (11*2005) Estimated burden per res~onse 10 comply with this voluntary Information collection request 1 oour. his informalion collection is used to pia n budgets and resources lor operator examinetlons. Send comments ~ardin~ burden estimate to the Records and FOlAlPrivacv Services Branch -5 F 3}. U.S.

OPERATOR LICENSING Nuclear R~Ulatory Commission. Washington. DC 20555-000

  • or bl. Internet e-mail to In ocoliecls@nrc.~y. and to the Desk Officer. Ollica 01 In ormation EXAMINATION DATA and Regulatory Affairs, NE B*10202. (J150-01Jl), Office 01 Man~emenl and Budget. Washington. DC 2()50J. If a means used to impose an Information collection does not display a currently valki OMS cootrol number. Iha NRC may nOI conduct or sponsor. and a person is not required to respond 10. the information oolledlon.

FACILITY NRC REGION Kewaunee Power Station

\II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 11 CY 12 PROPOSED NUMBER CY 09

- CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12 NUMBER OF REACTOR 5 0 5 5 OPERATORS NUMBER OF SENIOR REACTOR 0 9 9 8

OPERATORS" INSTANT NUMBER OF SENIOR REACTOR 0 0 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/13/2009 0210712011 10/15/2012 ALTERNATE DATE 05/04/2009 0212112011 10/29/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED ---" -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER EST!MATED NUMBER OF 15 CANDIDATES N~C FORM 536 18-20051 PRINTED ON RECYCLED PAPER

NRC FORMS36 U.S. NUCLEAR REGULATORY COMMISSION APPROveO BY OMB: NO. 3I 5().{l I 31 EXPIRES: 0613112008 (8-2005) Estimated burden per res~onae to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardl~ burden eatimata 10 Ihe ReCo<<l. and FOIAIPrivacy Services Branch \ *S F 3). U.S.

OPERATOR LICENSING Nuclear R:'JluIe\DtY Commlsslon. Washington, DC 20555-000 , or b~ Intemel e-mail to i ocoIlectSOnrc.~v' and to the Desk Officer, Office 0/ In ormation EXAMINATION DATA and RegulatClr( Allm, NE a. 10202, (3150-0131). Office of M~nI and Budge!. Washington. DC 20503. If a means used to impose an nformalion collection does no! display a currently valid OMS oonlrol number, the NRC may not conduct o~onsor. and a person is not required to respond to. the Infonnation col on, FACILITY NRC REGION Millstone Power Station Unit 2 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 09 CY 10

- CY 11

- CY 12 lICENSEE*PREPARED 0 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11

- CY

- 12 NUMBER OF REACTOR 4 4 0 0 OPERATORS NUMBER OF SENIOR REACTOR 8 0 0 3

OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 6 2 0 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 01/1912009 0611412010 ALTERNATE DATE 01126/2009 06128/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED .

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005) PRImED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 315G-0131 EXPIRES: 0813112008 (8-2005) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is usad 10 plan budgets and resources for operator examinations*. Send comments ~ardln~ burden estimate to the Records and FOWPrivacy Serviees Branch *5 F 3). U.S.

OPERATOR LICENSING Nudear ~ulatory Commission. WashlnglQn. DC 20555..000

  • or b" intemet e.mallto In ocallecls@nrc.~v. lind to the Desk OffIcer. Office 01 In armation EXAMINATION DATA and Regulatory Affairs. NE .10202. (3150-0131). OffIce of Man~t and Budget. WaShington. DC 20503. If a means usad 10 impose an 1nlormalion collection does not display a currently valid OMS control number, !he NRC may not conduct or se;,nsor. and a person is nat required to respond to, the Information collect
  • FACILITY NRC REGION Millstone Power Station Unit 3 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12 ESTIMATED NUMBER OF lICENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10

- CY 11 CY 12 NUMBER OF REACTOR 6 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 8

OPERATORS

  • INSTANT NUMBER OF SENIOR REACTOR 2 0 0 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09/14/2009 0112512011 ALTERNATE DATE 09/2812009 01118/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008 (8*2005) Estimated burden per res~n88 to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Is information collection is used to plan budgets and _roes for operator examinations. Sand comments ~anlin~bllrdan estimate to the Records and FOIAIPrivaey Services Branch *5 F ). U.S.

OPERATOR LICENSING Nud_ R::?,ulatofy Commission. Waahlnglon. DC 20555-000

  • Of :10 Iiltemel EXAMINATION DATA e-mail 10 in OCOlledllQnn:.gov. and 10 thit Desk OIIIcer. omca of I rmatIon and Ragulat~ AffaIrS. NE 8-10202, (3150-0131). 0fIice of Manaqemant ~d Budget. Washington DC 20503. If a means uSed to Impose an Information oollection does no! diSplay a currenUy valid OMS control number. the NRC may nol conduct or .ponsor. and a parson ia not required to respond to. the Information cdlection.

FACIUTY NRC REGION North Anna Power Station

/I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09

- CY 10 CY 11 CY 12 ESTIMATED NUMBER OF UCENSEE-PREPARED 1 1 0 1 EXAMINATIONS (written only)

ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11 CY 12 NUMBER OF REACTOR 3 12 0 10 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 1

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2 3 0 3 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE *0210212009 0610712010 0611112012 ALTERNATE DATE 0112712009 0611412010 0611812012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED --- ~--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 17 CANDIDATES NRC FORM 536 (&.2005) PRlNTEO ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008

{8-2005) Estimated burden per res~onse to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send oomments ~rd~ burden estimate !o the Records and FOIA/Privacy Services Branch *5 F 3). U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washi~n, DC 20555-000 ,or ~ Intamel e-mail 10 in OCOllecls@nrc'SOIl, and to the Desk Officer, Office of In ormation EXAMINATION DATA and RegUlafo~ Affairs, NE B*l0202, (3150-0131). Offtce 01 Managemen! and Budge~ Wash nglon, DC 20503. If II means used to impose an information collectlon does not display II currenUy IIBlid OMS control number, the NRC may not conduct or sconsor, and a person is not required 10 respond to, the Information collect on.

FACILITY NRC REGION Surry Power Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 09 CY 10 CY 11 CY 12 L1CENSEE*PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 1 1 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 10 CY 11

- CY 12 NUMBER OF REACTOR 14 12 0 0 OPERATORS NUMBER OF SENIOR REACTOR 6 6 0 0

OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 6 2 4 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY OATE 07/20/2009 07126/2010 10/31/2011 ALTERNATE DATE 07/2712009 0810212010 11114/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED -- -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES N'lC FORM 536 (8*200S) PRINTED ON RECYClED PAPER

SN 08-0436 Scheduling of Operator Licensing Examinations bc page 1 of 1 bc: (electronic distribution except as noted by*)

Mr. C. A. McClain, NAPS Mr. J. B. Scott, Jr., NAPS Mr. W. F. Shura, NAPS Mr. A. T. Barbee, SPS Mr. D. H. Wilson, SPS Mr. J. T. Spence, MPS Mr. T. A. Horner, MPS Mr. M. J. Cote, MPS Mr. F. Winks, IN2NE Mr. T. W. Kulterman, SPS Mr. P. Kemp, NAPS Mr. B. A. Garber, SPS Mr. W. D. Bartron, MPS Mr. T. L. Breene, KPS Mr. D. W. Allen, KPS Mr. D. M. Emery, KPS Mr. B. Krauth, MPS Mr. W. E. Brown, MPS Mr. D. Llewellyn, IN2NE Ms. N. Wen borne, KPS Mr. C. Tarantino, IN2SE Ms. L. Cuoco, Tredegar Lie File*

Records Management * (bc original), INGW CONCURRENCE D. A. Sommers H. A. Royal ACTION PLAN

1. None.

VERIFICATION OF ACCURACY

1. Estimates given to Margaret Bennett per David Llewellyn's e-mail dated 7/24/08.

REQUIRED CHANGES TO THE UFSAR OR QA TOPICALREPORT 1 None.

Dominion Resources Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com August 16, 2007 United States Nuclear Regulatory Commission Serial No.: 07-0517 Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. (DEK) NPF-49 DOMINION NUCLEAR CONNEC"rlCUT, INC. (DNC) NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion) DPR-32/37 KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE

SUMMARY

2007-17 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2007-17, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. John Hayden at (804) 273-2707.

C. L. Funderburk Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

for Dominion Energy Kewaunee, Inc.,

Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments AUG 2 1 2007

SN 07-0517 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 .

Mr. J. D. Hughey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. R. A. Jervey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 Mr. S. P. Lingam Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738

SN 07-0517 Scheduling of Operator licensing Examinations cc page 2 of 2 Mr. P. D. Milano Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738 Mr. R. I. Treadway NRC Senior Resident Inspector Millstone Power Station Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. E. Riggs NRC Senior Resident Inspector Surry Power Station Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPRoveD BY OMS; NO. 315O-<l131 EXPIRES; 0813112008 (8-2005) Estimated burden per r.s~ons. to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. hilS informallon colledlon is IISed to plan budgets and resources for operator examinations. Send comments ~rdin~ burden estimate to the Records and FOIAIF'rlvacy Services Branch *5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulato Commiaaion, Washlngkm. DC 20555-000

  • or  ::h internet e-maH to i
  • and to the Desk OffICer. Offlce of I ormation EXAMINATION DATA and Regurat:rr 10202. (3150-0131). Offlce of Ma~ and Budget. Wash 20503. If II means IlSed to impose an IIlformalion collection dee. not display a curremly valid OMB conIrDI number. the NRC may not conduct or sponsor, and a person Is not required to respond to. the information collection.

FACILITY NRC REGION KEWAUNEE POWER STATION Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE OPOSED NUMBER CY08 CY-D]. CYJJL CY 11" ESTIMATED NUMBER OF LlCENSEE-PREPARED 0 15 0 15 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 08 CY 09 Cyl0 CY 11 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 9 0 9 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 1 0 1 NUMBER OF SENIOR REACTOR OPERATORS LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/13/2009 02/07/2011 ALTERNATE DATE 05/04/2009 02/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED -_._.,.

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 538 (8-2005) PRINTED ON RECYCLEO PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMS: NO.31S()'0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per (es~se to comply with this voluntary information coIIeetion request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. 's information coneclion ill used to plan budgets and nssourees for operator examinations. Send comments r1rdins burden estimate to the Records and FOINPrivacy Services Branch -5 F 3). U,S.

OPERATOR LICENSING Nuclear ~EI9u1atory Commission. Washinglon, OC 20555-000 , or::t; Intemet

  • OV, and to the Desk OfIicer, OffIce of I ormalion EXAMINATION DATA a 10202, (315().O131). Offtce of Man~ and Budget, WashIng! 20503. If a means uSed 10 impose an information colleetion doaa not splay a currenUy valid OMS control number, the NRC may nol conduct o~n$Or. and a person is not required 10 respond to. the information coil on.

FACILITY HRCREGION MILLSTONE POWER STATION UNIT 2 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 08 CY 09 CY 10 CY 11 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS a 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 6 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PR9pOSED DATES PRIMARY DATE 01/19/2009 09/15/2009 12/07/2110 ALTERNATE DATE 01/12/2009 09/29/2009 12/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (6-2005) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0813112008 (8-2005) Estimated burden per response to comply with this voluntary information ooIIection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonnation collection is used to n budgets and resources for operator examlnetions. Send comments g bumen estimate to the Records and FOIA/Prlvacy S . 53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, 0 by internet e-mail to infoeolieCtsQnrc:~,. and to the Desk Officer, Office of Information EXAMINATION DATA and Regulal~ Affa , (31S()'{)131). Office of Management and Budget, Washington. DC 20:)1.1;'. ..If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FAGILIIY NRC REGION MILLSTONE POWER STATION UNIT 3 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY09 CY...lQ.. CYJ.L ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS o 1 1 o ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS o o o o B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR OPERATORS o 6 8 o NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT o 8 4 o NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE o 2 o a NUMBER OF SENIOR REACTOR OPERATORS* LIMITED o o o o PROPOSED DATES PRIMARY DATE 06/16/2009 01/25/2011 ALTERNATE DATE 06/23/2009 01/18/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 12 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMS: NO. 3150-0131 EXPIRES: 0813112008 (8-2005) Estimated burden fer re$~onse to comply with this voluntary Informalion collection request hour. his inlomalion coIectlon is used to plan budgets and resources for operator examinalions. Send comments r~ai'dln~ burllen OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch ~ *5 F 3), U.S.

NUClear R~ulatory Commission, Washington, OC 20555-000 ,or blc internet

.mall to j ocoIleds@nrc.gov, and to the Oesk OIIicer, OfIice of In omation EXAMINATION DATA and Regulat~ Affairs, NE B-10202, (3150.0131), 0IIk:e of Management and Budget, Washington! DC 20503. If a means used to impose an infomation collection does not diSplay a currently valid OMS control number, the NRC may not conduct o~onsor. and a person is not required to respond 10, tile information coil on.

FACILITY NRC REGION NORTH ANNA POWER STATION Region I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 08 CY09 Cy 10 CY 11 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY09 Cy 10

- CY 11 NUMBER OF REACTOR OPERATORS 9 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 3 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/07/2010 06/09/2008 ALTERNATE DATE 06/16/2008 06/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED ,~,-"",---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (11-2005) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315()..O131 EXPIRES: 08131/2008 (8-2005) Estimated burden per res~onse to comply with this voluntary information ooUection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources fer operator examinations. Send comments~r-r.~T~:iiien estimate to the Records and FQtAlPrivacy Servi U. S.

OPERATOR LICENSING Nuclear R~u1atory Commission, Washington, DC , or ~intemet EXAMINATION DATA e-mail t:uiiii~:;:lIeds@nrc.gov. and to the Desk OftIcer*. ~? of I rmation and Reg Affeirs. NE 9-10202, (3150-0131). OfIIce of Man~ and Budget, vv;~nrfot~ DC 20503. If a means used to Impose an Information coIJ!lction does display a currel"llly valid OMS control number, \he NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION SURRY POWER STATION Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF Cy08

- CY 09

- CylO CY11 LICENSEE*PREPARED 0 0 0 EXAMINATIONS 0

ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 1 1 0 1 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 08 CY 09 CYIO CYll NUMBER OF REACTOR 0 10 OPERATORS 8 15 NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT 3 5 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 4 0 3 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 O' 0 0 PROPOSED DATES PRIMARY DATE 03/17/2008 10/12/2009 05/17/2011 ALTERNATE DATE 03/24/2008 11/24/2009 06/17/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAonON (GFE) SCHEDULE CY _QL CY 09 PROPOSED '--'

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 CANDIDATES NRC FORM 536 (8-2006) PRINTED ON RECYCLED PAPER