ML15076A510: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 41: Line 41:
SRO-U l/C              3,6                      4,6,7                4,7                      7      4    4  2 MAJ              5                        5                      5                      3      2    2  1 D          TS                                                                                        0      0    2  2 RX                                    3                                                  1      1    1  0 RO x          NOR                      1,2                                                              2      1    1  1 SRO-I l/C                      4,7,        1,2                                                5      4    4  2 D
SRO-U l/C              3,6                      4,6,7                4,7                      7      4    4  2 MAJ              5                        5                      5                      3      2    2  1 D          TS                                                                                        0      0    2  2 RX                                    3                                                  1      1    1  0 RO x          NOR                      1,2                                                              2      1    1  1 SRO-I l/C                      4,7,        1,2                                                5      4    4  2 D
SRO-U 8
SRO-U 8
MAJ                      5            5                                                  2      2    2  1 D          TS                                                                                        0      0    2  2 RO          RX                                                          3                              1      1    1  0
MAJ                      5            5                                                  2      2    2  1 D          TS                                                                                        0      0    2  2 RO          RX                                                          3                              1      1    1  0 D
                                                                                                  .
SRO-I NOR        1,2                  3                                                          3      1    1  1 x          l/C        3,4                  1,2,4                      1,2,6                          8      4    4  2 SRO-U                  5                    5                          5                              3 MAJ                                                                                              2    2  1 D          TS        1,4                  1,4                                                        4      0    2  2 RO          RX                                                                                                1    1  0 D                                                                                        ..
D SRO-I NOR        1,2                  3                                                          3      1    1  1 x          l/C        3,4                  1,2,4                      1,2,6                          8      4    4  2 SRO-U                  5                    5                          5                              3 MAJ                                                                                              2    2  1 D          TS        1,4                  1,4                                                        4      0    2  2 RO          RX                                                                                                1    1  0 D                                                                                        ..
NOR                                                                                              1    1  1 SRO-I D
NOR                                                                                              1    1  1 SRO-I D
SRO-U l/C                                                                                              4    4  2 MAJ                                                                                              2    2  1 D                .
SRO-U l/C                                                                                              4    4  2 MAJ                                                                                              2    2  1 D                .

Latest revision as of 14:35, 5 February 2020

2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-5 Revision 1
ML15076A510
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML14328A661 List:
References
50-266/15-301, 50-301/15-301
Download: ML15076A510 (2)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Point Beach U1 /U2 Date of Exam : February 23, 2015 Operating Test No.: 2015-301 A E Scenarios p v 1 2 3 4 T M p E 0 I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I A

M c s A B s A B s A B s A B L u A T R T 0 R T 0 R T 0 R T 0 M(*)

N y 0 c p 0 c p 0 c p 0 c p p

R I u T

E RO RX 2 1 1 1 0 x

SRO-I NOR 3 3 2 1 1 1 D

SRO-U l/C 3,6 4,6,7 4,7 7 4 4 2 MAJ 5 5 5 3 2 2 1 D TS 0 0 2 2 RO RX 3 1 1 1 0 D

SRO-I NOR 1,2 3 '" 3 1 1 1 x l/C 3,4 1,2 1,2,4 /

7 4 4 2 SRO-U MAJ 5 5 5 3 2 2 1 D TS 1,4 2,4 *'*

4 0 2 2 RO RX 3 3'/ 1 1 1 0 D

SRO-I NOR 1,2 3 3 1 1 1 x l/C 4,7, 1,2,4 1,2,6 9 4 4 2 SRO-U 8 D MAJ 5 5 5 3 2 2 1 TS 1,4 2 0 2 2 RO RX 1 1 0 D

SRO-I NOR 1 1 1 D llC 4 4 2 SRO-U MAJ . 2 2 1 D TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-0-1 event numbers for each event type ; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls {ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additiona lly serves in the BOP position , one l/C malfunction can be credited toward th e two l/C malfunctions required for the ATC position.

2. Reactivity manipulations may be cond ucted under normal or controlled abnormal conditions (refer to Section 0.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical , both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Point Beach U1 /U2 Date of Exam: February 23, 2015 Operating Test No .: 2015-301 A E Scenarios p v T M 1 2 3 4 p E 0 I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I A

M c s A B s A B s A B s A B L u A T R T 0 R T 0 R T 0 R T 0 M(*)

N y 0 c p 0 c p 0 c p 0 c p p

R I u T

E RO RX 2 1 1 1 0 x NOR 3 3 2 1 1 1 SRO-I D

SRO-U l/C 3,6 4,6,7 4,7 7 4 4 2 MAJ 5 5 5 3 2 2 1 D TS 0 0 2 2 RX 3 1 1 1 0 RO x NOR 1,2 2 1 1 1 SRO-I l/C 4,7, 1,2 5 4 4 2 D

SRO-U 8

MAJ 5 5 2 2 2 1 D TS 0 0 2 2 RO RX 3 1 1 1 0 D

SRO-I NOR 1,2 3 3 1 1 1 x l/C 3,4 1,2,4 1,2,6 8 4 4 2 SRO-U 5 5 5 3 MAJ 2 2 1 D TS 1,4 1,4 4 0 2 2 RO RX 1 1 0 D ..

NOR 1 1 1 SRO-I D

SRO-U l/C 4 4 2 MAJ 2 2 1 D .

TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type ; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC}"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions ,

including at least two instrument or component (l/C) malfunctions and one major transient, in the ATC position . If an Instant SRO additionally serves in the BOP position , one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section 0 .5.d} but must be significant per Section C.2 .a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additiona l instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical , both instrument and component malfunctions should be included ; only those that require verifiab le actions that provide insight to the applicant's competence count toward the minimum requ irements specified for the applicant's license level in the right-hand columns.