TURKEY POINT UNXTS 3 & 4 ADMINISTRATIVE PROCEDURE 0301 .
TURKEY POINT UNXTS 3 & 4 ADMINISTRATIVE PROCEDURE 0301 .
AUGUST 23    1976
AUGUST 23    1976
: 1. 0 Title:
: 1. 0
 
==Title:==
OPERATOR REgUALXFXCATION PROGRAM 2.0  A    royal        and  List 'of Effective    Pa es:
OPERATOR REgUALXFXCATION PROGRAM 2.0  A    royal        and  List 'of Effective    Pa es:
l
l
Line 177: Line 179:
: i. Applicable portions of Title 10, Chapter                I, Code of Federal Regulations.                        ~ ~
: i. Applicable portions of Title 10, Chapter                I, Code of Federal Regulations.                        ~ ~
: 2.        The    results of annual examinations shall be analyzed to determine subjects to be emphasized.                    Additionally, any reactor problems which de;clop, which would be useful for
: 2.        The    results of annual examinations shall be analyzed to determine subjects to be emphasized.                    Additionally, any reactor problems which de;clop, which would be useful for
                       ,'he operator to'be familiar with, shall be discussed and
                       ,'he operator to'be familiar with, shall be discussed and the underlying theory, Nuclear, Mechanical, and Thermodynamics shall    be taught to the depth required.
:.
the underlying theory, Nuclear, Mechanical, and Thermodynamics shall    be taught to the depth required.
: 3.        A minimum      of  100 hours          of lecture time will be scheduled for each operating      shift. Each          shift shall be rotated from their shift schedule to the training shift schedule in order to operating
: 3.        A minimum      of  100 hours          of lecture time will be scheduled for each operating      shift. Each          shift shall be rotated from their shift schedule to the training shift schedule in order to operating
               ~
               ~
                    ,
off-shift training. Where a licensee has scored less than provide              80% on a specific category of the annual examination he shall be advised of the lectures at which his attendance is required. The majority of lectures will be given by the Training Department Staff. Where the specialized knowledge or intimate familiarity of a plant staff member or an individual outside the training organization is avail-
off-shift training. Where a licensee has scored less than provide              80% on a specific category of the annual examination he shall be advised of the lectures at which his attendance is required. The majority of lectures will be given by the Training Department Staff. Where the specialized knowledge or intimate familiarity of a plant staff member or an individual outside the training organization is avail-
                       ~    able or desirable, this individual should give the lecture.
                       ~    able or desirable, this individual should give the lecture.
Line 195: Line 194:
MINISTRATIVE PROCEDURE 0301,      AGE 6 FNSED OPERATOR RE U      FICATI      ROGRAH
MINISTRATIVE PROCEDURE 0301,      AGE 6 FNSED OPERATOR RE U      FICATI      ROGRAH
             .;4                                      k 4
             .;4                                      k 4
* The Training Department Staff shall not be required to take the .
The Training Department Staff shall not be required to take the .
Annual Examinations. They shall, however, demonstrate and maintain their proficiency by preparing, conducting, and evaluating training programs designed to maintain or increase licensed operators pro<<
Annual Examinations. They shall, however, demonstrate and maintain their proficiency by preparing, conducting, and evaluating training programs designed to maintain or increase licensed operators pro<<
ficiencies during their requalification training.
ficiencies during their requalification training.
Line 276: Line 275:
: c. he Training Coordinator shall be responsible for completion, within the two year cycle of evaluations as listed.
: c. he Training Coordinator shall be responsible for completion, within the two year cycle of evaluations as listed.
Mandatory:  OP  20001, 20002, 20003, 20005, 20006, 0208.1, 1008.2, 1008.3, 1508.2, 5108.1, 5508.1 and Annunciator, List  At least ten targets p'icked at rand'om.
Mandatory:  OP  20001, 20002, 20003, 20005, 20006, 0208.1, 1008.2, 1008.3, 1508.2, 5108.1, 5508.1 and Annunciator, List  At least ten targets p'icked at rand'om.
!
At least six:  OP 1008 4y 1008 6 '1108 lg 1208 2y 1608
At least six:  OP 1008 4y 1008 6 '1108 lg 1208 2y 1608
                                             ~              ~        ~ lj 2608 ly 2608 2y 3108 2 ~ 3108 ly 3408 lp 10308 1,
                                             ~              ~        ~ lj 2608 ly 2608 2y 3108 2 ~ 3108 ly 3408 lp 10308 1,
Line 283: Line 281:


~ ~
~ ~
6 VM  J FLORIDA POWE  ' j.) LIGHT COMPANY                                      .~-;  gure 4-
6 VM  J FLORIDA POWE  ' j.) LIGHT COMPANY                                      .~-;  gure 4-TURKEY POINI    NITS 3 AND 4                                              23/7,6 OFF'ITE    LICENSED PERSONNEL  - LOG OF ON MATCH DUTY    IN CONTROL ROOM.
                                                                                                                          -''
TURKEY POINI    NITS 3 AND 4                                              23/7,6 OFF'ITE    LICENSED PERSONNEL  - LOG OF ON MATCH DUTY    IN CONTROL ROOM.
PAGE 12 t
PAGE 12 t
[ INSTRUCTIONS: 1. 8 hours  within any 3 month period is  recommended. Over 4 months without watch time  -  suspension    until g
[ INSTRUCTIONS: 1. 8 hours  within any 3 month period is  recommended. Over 4 months without watch time  -  suspension    until g

Latest revision as of 19:20, 2 February 2020

11/16/1976 Letter Attached Proposed Revision to Administrative Procedure 0301, Licensed Operator Requalification Program
ML18227D313
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/16/1976
From: Robert E. Uhrig
Florida Power & Light Co
To: Collins P
Office of Nuclear Reactor Regulation
References
Download: ML18227D313 (24)


Text

~ /

~ e ~ I ~ ~

4 ~ ~

~ ~

~

~

Q R

r 0R ~ ~

Dk%L%% o

~,

Qi

~

W ~

~

Q ~

e s

o R

o s

0 P. O. BOX 013100, MIAMI, FL 33101 gd I!/i FLORIDA POWER 4 LIGHT COMPANY November 16, 1976

'I PBgII!gtOPJ Ooc!$ !: Fl!8 ~-76-348 Division of Project Management Attention: Mr. Paul F. Collins goy 19 1976~

Operator Licensing Branch, Room '330 U.S. War,s SIOUI 1~>> 17 U. S. Nuclear Regulatory Commission, g0MMISS l014 gdl Sod14+

Washington, .D., C.,- 20555

Dear Mr.'ollins:

Attached herewith is a proposed revision dated. August 23, 1976, to the Turkey Point Plant Administrat've, Procedure 0301, Licensed Operator Requalification Program. Its conten s reflect Mr. K. '.

the conversations between Mr. R. J. Bursey of the NRC and Beatty o f Florida Power 6 Light Company.

This proposed revision was originally submitted on Septembe 17i 1976i and is resubmitted in accordance with the verbal request of Mr. R. J. Bursey to Mr. K. E. Beatty.

Your timely review is appreciated.

Very truly yours, Robert E. Uhrig JJ.i Vice President i/..,'c<

US+RC REU/EIEY/DNJ/MAS/cpc Attachment god/ ), U 1~

guCL'EP U S COMV. >

cc: Robert Lowenstein, Esquire '7 Norman C. Moseley, Region Zl E

r 11820 PEOPLE... SERVING PEOPLE

I'(

$ / g I

I!

d k

FLORIDA POWER & iLIG17T 'COMPANY.

TURKEY POINT UNXTS 3 & 4 ADMINISTRATIVE PROCEDURE 0301 .

AUGUST 23 1976

1. 0

Title:

OPERATOR REgUALXFXCATION PROGRAM 2.0 A royal and List 'of Effective Pa es:

l

2. 1 ~Atove1: Supt.','ICENSED t

Change dated'/23/76 Reviewed by PNSC' ' ' 'August 23 1976 Approved by', ~; ~ Plant 1974 2.2 . List of Effective Pa es:

I

~Pa e . Date ~Pa e 'ate '~Pa e "Date '~Pa e Date 1 8/23/76 4 . 8/23/76 7 8/23/76 10 8/23/76 2 8/23/76 5 8/23/76 8 8/23/76 11 8/23/76 3 8/23/76 6 8/23/76 9 8/23/76 12 8/23/76, 3.0 ~Sco e:

3.1 PuzOIoee

This procedure provides instructions for conducting a requalification

. program which will assure that licensed operators and senior reactor operators maintain their proficiency.

3,2 Discussion:

There is a .stipulation for license renewal which requires each licensed individual to. demonstrate his continued competency. Competence may be demonstrated, in lieu of re-examination, by completion of an approved requalification pr'ogram.

The program will repeat on a continuing one year cycle, and in brief, will consist of:

1. A series of lectures, written examinations, revie~ of operating procedures and discussion sessions off shift.
2. On shift training wherein at least the required number of reactivity changes are performed, plant changes/modifications, operating proce-dure revisions and reportable occurrences are discussed, and perform-ance under both simulated and actual off-normal and emergency situa-tions is evaluat'ed.

ADMINISTRATIVE PROCEDURE 0301, PAGE 2 8/23/76 LICEN OPERATOR RE UALIFICATION PR Qf I

3. As individual licenses near the expiration date participation in the will be reviewed, evaluations of performance will be analyzed, 'rogram deficiencies will be rectified and a request for license renewal will be submitted to the USNRC.
4. Non-shift personnel who hold licenses and desire to keep their licenses effective shall participate fully in the program except for off-shift sessions devoted to subjects where their specialized knowledge precludes the need to attend.
3. 3 ~Authozlh 10 CFR 50.54

'I (i-l), 10 CFR 55.31 (e) and Appendix A to 10 CFR 55

3. 4 Def initions: I 3.4.1 Licensed 0 erator or Licensee: an individual who holds an effective USNRC operator or senior operator license for Turkey Point Plant and who intends to maintain his license current.

3.4.2 .Lecture Se ment: may consist of several lecture sessions covering a particular topic or category.

3.4.3 Off-Site Licensee: A licensee who is;

1. Not permanently assigned to the'urkey Point Plant, or
2. Assigned to Turkey Point Plant but who has been absent fiom the site for greater than 90 days at a time.

3.4.4 Trainin De artment Staff: The training organization consists of the Training Supervisor, and up to three Licensed Instructors who are permanently assigned to the department.

PJ J

4.0 Precautions

None.

5.0 Res onsibilities:

5.1 The Trainin Su ervisor is to:

1. From the results of prior examinations, evaluations and suggestions by licensed operators, determine topics to be included in regularly scheduled lectures. Prepare the material and give lectures on these specific topics or appoint a competent individual to prepare and give.

lectures on specific topics.

2. Prepare examinations on lecture topics and an annual operator and senior operator NRC type examination.
3. Prepare a list of procedures to be reviewed on a scheduled off-shift basis.
4. Schedule off-shift discussion sessions on topics suggested by licensed operators or of current interest, such as plant changes and modifica-tions, plant operating problems, reportable occurrences. Uhere deemed advisable, appoint an individual fully conversant with the topic to lead the discussion.
5. Arrange for competent examiners to give on-shift oral evaluations of off-normal and emergency procedures.
6. 4%en actual off-normalities/emergencies occur, request the Nuclear.

Plant Superviso- to prepare evaluation sheets for licensed members of his crew.

ADMINISTRATIVEPROCEDURE 0301, PAGE 3 LICENSED OPERATOR RE UALIFICATION PROGRAM

7. Review the suits of written exams and eva ations and, where required, provide intensive individual training.

'.8. Maintain the records required to document 'the training given each licensee.

5.2 The 0 erations Su erintendent-Nuclear; Shall coordinate with the Training Supervisor to prepare a schedule for off-shift training sessions.

5.3 The Nuclear Plant Su ervisor in char e of each'shift:

1. Shall be familiar with the performance of operators on his shift.

When requested by the Training Supervisor, he will, on the form provided, evaluate the performance of members of his crew during actual off-normal/emergency situations and discuss the evaluations.

2. Copies of all documents distributed pursuant to Section 7.1 below will be sent to the nuclear control room, and posted in a binder provided for their receipt. Each shift supervisor shall ensure that each member of his crew reviews these documents and initials

~

the acknowledgement section of the cover letter associated with these changes.

~ '. r The individual log of reactivity changes for licansed crew members shall be kept. The licensee is to make entrees which shall be validated by the Nuclear Plant Supervisor. At int:ervals, the super-

"- -- visor is'o review the logs of his shift members to assure that the required number of changes will be made within 'the two year cycle.

5.4 Each Licensee Shall:

1. Attend required off-shift lectures and discussion sessions and take scheduled written examinations and evaluations.

2; Maintain his log of reactivity changes.

3. Ensure that he understands documents distributed pursuant to

~

. . Section 7.1 below and signify his understanding by initialing the acknowledgement letter associated with these changes.

4. Participate in special training programs where written examinations and evaluations indicate the need.

6.0

References:

10 CFR 50.54 (i-l), 10 CFR 55.31 (e) and Appendix A to 10 CFR 55 7.0 Records and Notification:

7.1 A copy of each. plant change or modification (or a summary of the plant change or modification), reportable occurrence, FSAR supplement, facility license amendment, and applicable procedure change shall be sent to the Nuclear Control Room, (for shift operators) and to the Training Superv"sor's Office (for non-shift operators). These locations should maintain these documents in loose leaf binders, designated for the receipt of Training Reports. Document Control is responsible. for posting all applicable changes in these binders periodically. Each licensee shall review these documents and shall so indicate by initialing the acknowledgement section of t:he Training Report Cover Letter associated with each posting. The completed training report cover letters shall be filed in Document Control. (See

. Figures lA and 1B for details).

AD STRATZVE PROCEDURE 0301, PAG 8(Z3/76 LICE OPERATOR RE UALIFICAXION PR Lo of 'Reactivit 'Chan 'es; Each licensee shall maintain h"a own log. ice-logs for shift operators will be maintained in the Nuclear Plant Supervisor's office. The logs for non-shift operators will be maintained in the Training Supervisor's office. These logs shall be updated at intervals not exceeding 2 months.

At the completion of each two year license cycle, the log will be placed in the licensee's Requalification File. See Figure 2.

7;3 Performance Evaluation Sheets:

Are to be maintained in the Training Department files until complet<.on of the licensee's two year cycle, then transferred to the Licensee's Requalification File maintained in Document Control.

See Figure 3.

7,4 Lo of On-Watch Dut -Off-Site Licensed Personnel:

This log will be displayed in a conspicuous location. Its purpose is to enable both the licensee and the Training Supervisor to assure that shift operation requirements are met. The logs need not be retained. Refer to Figure 4.

7.5 Records Relatin to Off Shift Trainin

l. Posted Schedule:

To be displayed in conspicuous locations and. shall show:

Shifts on Training Schedule Dates of lectures and the subject matter

'ates of procedure review and procedures to be discussed.

Dates of discussion sessions and the topics to be discussed.

~ . Dates of scheduled examinations.

'Multiple sessions will be required and the schedule, shall be posted sufficiently in advance to make the schedule arrangements necessaiy to allow licensees to attend a seqsgon.

Completed schedules shall be ke t in the'requalification program file maintained'in Document Control.

2. Attendance Records:

The lecturer or discussion leader shall maintain a record of attendance. Multiple scheduling of sessions should assist in assuring that all licensed operators can attend. Where circum-stances cause an absence, the necessity of make up shall be determined by the Training Supervisor. Written examinations shall not be missed. The Attendance Record is to be kept in the Requalification Program File.

3. Written Examinations:

The questions, together with the answers for examinations on lecture topic's and the yearly OP, SOP examination together with the grades made by each licensee shall be kept in the Requal-ification Program File.

I

4. Additional Trainin

~

Where-results of written examinations and evaluations indicate the need, study topics shall be assigned, tutoring shall be given and an examination formulated to test for acceptable knowle'dge.

'A resume and the grade achieved shall be placed in the licensee's" file maintain d in Dncumeut Control.

~ .

~

. :. ADMINISTaaATIVE PROCEDURE 0301, PAGE 5 8)23/76 LICEN OPERATOR RE UALIFICATION PRO

~

~

Re uest for License .Renewal:

As the date for. license renewal approaches, the Training Supervisor shall ensure that copies are prepared od the documents requuurres ttoosubstantiate the license renewal app1ication and former~to t e PIarib d'upercntsnde'rit=

,Nuclear or his designee for jrocessing..

8.0 Instructions:.

8. 1 Off Shif t Trainin:

8.1.1. Lecture Sessions

,1. Shall consist of topics which fall under general headings as listed.

a. . Theo~ and principles of operation.
b. General and specific plane operating charact ristics.
c. Plant instrumentation and control systems.
d. ~

Plant protection systems.'.

Engineered safety systems.

f. Normal, off-normal, and emergency operating procedures.
g. Radiation control and safety.
h. Technical Specifications.
i. Applicable portions of Title 10, Chapter I, Code of Federal Regulations. ~ ~
2. The results of annual examinations shall be analyzed to determine subjects to be emphasized. Additionally, any reactor problems which de;clop, which would be useful for

,'he operator to'be familiar with, shall be discussed and the underlying theory, Nuclear, Mechanical, and Thermodynamics shall be taught to the depth required.

3. A minimum of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of lecture time will be scheduled for each operating shift. Each shift shall be rotated from their shift schedule to the training shift schedule in order to operating

~

off-shift training. Where a licensee has scored less than provide 80% on a specific category of the annual examination he shall be advised of the lectures at which his attendance is required. The majority of lectures will be given by the Training Department Staff. Where the specialized knowledge or intimate familiarity of a plant staff member or an individual outside the training organization is avail-

~ able or desirable, this individual should give the lecture.

4, A written quiz shall be given -after each lecture segment. A grade

,of less than 80% shall require further study and an additional quiz.

8.1.2 Annual Examination At the end of the lecture series or at yearly intervals a written examination shall be given to all licensees.

Additional Trainin A grade of less than 70% on the annual examination will require that the licensee be placed in an intensive program until the responsible supervisors are satisfied that the licensee is again proficient.

Proficiency shall be demonstrated by successfully passing another written examination. The licensee shall be relieved of duties requiring a license until deemed proficient.

I 8/23/76

~ ~

MINISTRATIVE PROCEDURE 0301, AGE 6 FNSED OPERATOR RE U FICATI ROGRAH

.;4 k 4

The Training Department Staff shall not be required to take the .

Annual Examinations. They shall, however, demonstrate and maintain their proficiency by preparing, conducting, and evaluating training programs designed to maintain or increase licensed operators pro<<

ficiencies during their requalification training.

P 8.1.5 Discussion Sessions

l. Each licensee shall receive retraining on specified Normal, Off-Normal, and Emergency Procedures, discussed at regularly scheduled off-shift sessions. The Nuclear Plant Supervisor in charge of

~

each shift may either lead the discussion or appoint a member of his shift to lead. The control room mock-up may be used to assist in review. For certain procedures a walk-through may be specified.

2. Additional discussion sessions on equipment operation, changes or modifications and specified reportable occurrences may be held as necessary. Leaders for these sessions shall be individuals well versed in the topic;
3. A minimum of 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> shall be scheduled for off-shift discussion

~

. sessions. Every effort shall be made to have licensees attend these discussion sessions. As a minimum each licensee shall be

~

required to review specified Normal, Off-Normal, and Emergency Procedures.

.8.2 On-Shift Trainin 8.2.1. Reactivit Chan es All licensees, within their two year cycle shall perform or direct a minimum of 10 reactivity changes. Simulated reactivity changes at an approved simulator facility are acceptable.

Refer to Figure 2 for detailed instructions.

8.2.2.'rainin Report Training Report Cover Letters shall accompany documents distributed pursuant to Section 7.1 above. Each shift operator should review and initial the Cover Letter acknowledgement section.

8 I

within 14 days of the posting. See Figures 1A and 1B for details.

8.2.3 Performance Evaluations To determine each licensee's understanding of plant equipment, procedures, and his competency, evaluations of his per ormance during oral walk throughs or actual off-normal/emergency situa-tions will be made. A competent individual from the plant st'aff

'is to perform the evaluation. As off-normal/emergency situa-tions occur the Nuclear Plant Supervisor in charge of the shift shall be requested to make evaluations for licensees on his shift. If an evaluation indicates unsatisfactory performance,

,immediate action'hall be taken to upgrade performance by special training sessions followed by a re-evaluation. Refer to Figure 3.

"~

8/23/76

~

ADMINISTRATIVE PROCEDURE 0301,

~lSED OPERATOR RE

~E UALIFICATIOL~OGR4 7

'.2.4 Off-Site Licensee's

1. Each off-site licensee shall participate fully in the Licensed Operator Requalification Program. In addition, each off-site licensee shall stand periodic control room watches in order to maintain his proficiency as a watch stander. The minimum re-quirement is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of watch standing within any three month period;
2. Periods exceeding 4 months without actively performing the functions of a licensed operator shall require a demonstration of competency prior to resuming license activities by passing an oral examination. To th~ extent practicable, the licensee is to stand the watch when major evolutions are taking place.

~

Refer to Figure 4.

~ .

AP0301 8/23/76 Figure lA PAGE 8 TURKEY POINT PLANT ON-SHIFT YEAR: 19 UARTER: LICENSED OPERATORS 1st. JAN-MAR) Q PAGE of 2nd. (APR-JUN) C3, 3rd. (JUL-SEP) Q TRAINING REPORT COVER LETTER 4th. (OCT-DEC) Q WEEK:

Item Identification Number: 1- Plant Change/Modification 2- Reportable Occurrence

.3- FSAR Supplement 4- Operating License Amendment (Techni,cal Specification Change)

S- Operating Procedure Change 6- OTHER ITEMS:

I have reviewed and discussed the data furnished by this cover letter, and have so indicated by initialling below.

INITIALS/DATE INITIALS/DATE NOTE TO LICENSEE:

PLEASE REVIEW MD ACKNOWLEDGE THE CHANGES IDENTIFIED ON THIS GOVT LETTER WITHIN 14 DAYS.

AFTER THIS TRAINING REPORT IS POSTED.

V JVJ. Oi tD/ I 0

~ ~ ~ ,. Figure 13 PAGE 9 TURKEY POINT PLANT OFF-SHIFT - YEAR: 19

'UARTER:

1st. PAGE of Q (JAN-MAR) Q 2nd. (APR- JUN) Cl 3rd. (JUL-SEP) C3 LICENSED OPERATORS 4th. (OCT-DEC) Q TRAINING REPORT COVER LETTER WEEK: (1-13)

Item Identification Number: 1- Plant Change/Modification 2- Reportable Occurrence 3- FSAR Supplement 4- Operating License Amendment (Technical Specification Change) 5- Operating Procedure Change 6- OTHER ITEMS:

I have reviewed and discussed the data furnished by this cover letter, and have so indicated by initialling below.

INITIAL/DATE

~ .

oncet or

~~ FLORIDA POWER AND LIGHT COWi ANY I RKEY POINT UNITS 3 AND 4 AP 0801 8/23/76:.

LOG OF REACTIVITY CHANGES Figure 2 PAGE 10 Your two year cycl'e begins 6

Name .

Position ends INSTRUCTIONS

1. During your two year cycle 'perform (as OP), direct (as SOP) and record on this log a combination of at least ten reactivity changes, with no more than four of a specific type shown in 4. below.
2. Sixty days Prior to the end of cycle Present this log to the Training Supervisor for review.
3. Simulated reactivity changes at designated facilities are acceptable. Take a blank copy of this log with you when reporting to a simulator.
4. Examples of acceptable reactivity changes:
a. Startup to criticality, pull to Nuclear Heat.
b. Unit Shutdow , No~1 or. Trip, from po ."r.=
c. Manual Control of Steam Generator 3.eve1s during unit Startup.
d. Boration or Dilution.

- 'e. Manipulator crane operation during refueling.

f. Load change >10% rods on manual, during startup or shutdown.
g. Load change >10% following xenon with auto rod control and'oration/dilution for a minimum of four hours.

Reactivity change performed - give sufficient de- Signed by PTP Supv tail to describe operation, draw line to separate or s" mulator ins-DATE each change. tructor.

~ .

6 FLORIDA POWERS%. LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 PERFORMANCE EVALUATION OFF-NORMAL & EMERGENCY PROCEDURES Sheet AP 0>>>

3

-,~ of 8/23/76 .'igure PAGE 11

.Name Two Year Cycle Begins Position Ends INSTRUCTIONS

1. During the two year cycle, the Training Supervisor will'.
a. Appoint competent examiners to conduct oral evaluations for simulated conditions.
b. Request the shift supervisor to prepare an evaluation of performance during actual'ff-normal/emergency conditions.
c. he Training Coordinator shall be responsible for completion, within the two year cycle of evaluations as listed.

Mandatory: OP 20001, 20002, 20003, 20005, 20006, 0208.1, 1008.2, 1008.3, 1508.2, 5108.1, 5508.1 and Annunciator, List At least ten targets p'icked at rand'om.

At least six: OP 1008 4y 1008 6 '1108 lg 1208 2y 1608

~ ~ ~ lj 2608 ly 2608 2y 3108 2 ~ 3108 ly 3408 lp 10308 1,

~

11108.1, 11208.1, 12108, 12208, 12308, 15608.1, 16008.1, 16008.2 Make Comments Under Columns as Pertinent, Add Any Other Comments Required OP !t KNOWS ANN. KNOWS KNOWS IMMEDIATE DISPLAYS KNOW-HOW, TALK THRU ENTIRE KNOWS PASS DATE, TO BE AUTO ACTIONS OPERATOR IN DOING ACTUAL PROCEDURE DISPLAYS 'ELATED FAIL-EXAMINER EXPECTED AND REASONS ACTIONS AND OR SIMULATED CONTR01 UNDERSTANDING TECH RE-EXAM SIGN FOR REASONS FOR ACTIONS SPECS REQUIRED

~ ~

6 VM J FLORIDA POWE ' j.) LIGHT COMPANY .~-; gure 4-TURKEY POINI NITS 3 AND 4 23/7,6 OFF'ITE LICENSED PERSONNEL - LOG OF ON MATCH DUTY IN CONTROL ROOM.

PAGE 12 t

[ INSTRUCTIONS: 1. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> within any 3 month period is recommended. Over 4 months without watch time - suspension until g

competency is demonstrated.

2. Document date, time start end, evolutions directed/performed, sign.
3. Make entry in shift personnel record book kept in control room to document on watch duty.

YEAR 19 NAME Jan. or July. Feb. or Aug. Mar. or Sept. ~

Apr. or Oct. May or Nov. June or Dec.

I

~ ~

I 4