ML073130042: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML073130042
| number = ML073130042
| issue date = 11/08/2007
| issue date = 11/08/2007
| title = 2007/11/08 - Pilgrim - Hearing File Update Supplement 15
| title = Pilgrim - Hearing File Update Supplement 15
| author name = Sexton K
| author name = Sexton K
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC

Revision as of 10:22, 7 December 2019

Pilgrim - Hearing File Update Supplement 15
ML073130042
Person / Time
Site: Pilgrim
Issue date: 11/08/2007
From: Sexton K
NRC/OGC
To: Abramson P, Cole R, Austin Young
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-293-LR, ASLBP 06-848-02-LR, RAS 14638
Download: ML073130042 (15)


Text

November 8, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Administrative Judges:

The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff has no updates to its privilege log required by 10 C.F.R. § 2.336(b)(5) at this time; however, the Staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached

R. Cole P. Abramson A. Young are the Affidavit of Perry Buckberg, as required by 10 C.F.R. § 2.336(c), and the three documents contained in the hearing file, due to technical issues associated with ability of the public to access ADAMS.

Sincerely,

/RA/

Kimberly A. Sexton Counsel for the NRC Staff

Enclosures:

Hearing File Index Affidavit of Perry Buckberg 2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs cc: Attached Service List

ATTACHMENT 1: PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 15- November 8, 2007 Accession Number Document Date Title/Description:

15-01 ML073100225 10/16/2007 2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 15-02 ML073100229 10/17/2007 2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 15-03 ML073100226 10/17/2007 2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs

November 8, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)

I, Perry Buckberg, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Original Signed By/

______________________

Perry Buckberg Executed in Rockville, MD this 8th day of November, 2007

From: "Sanchez, Edward" <esanch1@entergy.com>

To: "Perry Buckberg" <PHB1@nrc.gov>

Date: 10/16/2007 10:01:26 AM

Subject:

Replacement page 3/4.2-17

Perry, Pilgrim inadvertently issued an incorrect page 3/4.2-17 into our controlled Tech Specs when they were updated for License Amendment 200.

I entered the condition into Pilgrim's corrective action program and have already had Document Control correct the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's version was correct - it was the version on the CD I sent you that was incorrect.

Thanks, Ed Sanchez Pilgrim Licensing

Hearing Identifier: PilgrimRenewalNonPublic Email Number: 81 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000003.1.12FEF1.1)

Subject:

Replacement page 3/4.2-17 Creation Date: 10/16/2007 10:01:26 AM From: "Sanchez, Edward" <esanch1@entergy.com>

Created By: esanch1@entergy.com Recipients "Perry Buckberg" <PHB1@nrc.gov>

Post Office Route TWGWPO03.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 563 10/16/2007 10:01:26 AM Scan001.PDF 25948 11/6/2007 10:36:06 AM Mime.822 38472 11/6/2007 10:36:06 AM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed

Subject:

No Security: Standard

From: Perry Buckberg To: "Steve Bethay" <sbethay@entergy.com>

Date: 10/17/2007 8:07:51 AM

Subject:

Pilgrim License Conditions cc: "Edward Sanchez" <esanch1@entergy.com>,"James Kim"

<JSK@nrc.gov>,"Louise Lund" <LXL@nrc.gov>,"Susan Uttal" <SLU@nrc.gov>

Steve, Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.
Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax: (301)415-3031 phb1@nrc.gov G. The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prior Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section. H. The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. I. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H. J. On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that will confirm that the neutron fluence for the lower intermediate shell axial welds, at the inner surface of the RV, will not reach the limiting value of 3.37 x 1018 n/cm2 (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).

Hearing Identifier: PilgrimRenewalNonPublic Email Number: 85 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000009.1.143A99.1)

Subject:

Pilgrim License Conditions Creation Date: 10/17/2007 8:07:51 AM From: Perry Buckberg Created By: PHB1@nrc.gov Recipients "Edward Sanchez" <esanch1@entergy.com>

"James Kim" <JSK@nrc.gov>

"Louise Lund" <LXL@nrc.gov>

"Susan Uttal" <SLU@nrc.gov>

"Steve Bethay" <sbethay@entergy.com>

Post Office Route TWGWPO03.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 2345 10/17/2007 8:07:51 AM TEXT.htm 5087 11/6/2007 10:36:06 AM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed

Subject:

No Security: Standard

Page 1 of 1 Steve, Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.

Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax: (301)415-3031 phb1@nrc.gov G. The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prior Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

H. The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

I. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

J. On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that will confirm that the neutron fluence for the lower intermediate shell axial welds, at the 18 2 inner surface of the RV, will not reach the limiting value of 3.37 x 10 n/cm (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).

file://c:\EMailCapture\PilgrimRenewalNonPublic\85\attch1.htm 11/6/2007

From: "Sanchez, Edward" <esanch1@entergy.com>

To: "Perry Buckberg" <PHB1@nrc.gov>,"James Kim" <JSK@nrc.gov>

Date: 10/17/2007 10:52:59 AM

Subject:

Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs Perry and Jim, Pilgrim TS Section 3/4.4 Standby Liquid Control System was amended by License Amendment 169, which overhauled and consolidated the section resulting in pages 3/4.4-3, 3/4.4-4, and 3/4.4-5 being removed. That is why there are only TS pages 3/4.4-1 and 3/4.4-2 for that section. Also note that License Amendment 170 later made a change to a portion of TS page 3/4.4-1. Therefore last amendment affecting page 3/4.4-1 is LA 170 and last amendment affecting page 3/4.4-2 is LA 169.

Pilgrim TS Section 3/4.8 and TS Section 7/8 were amended by License Amendmat 177. LA 177 relocated TS pages 3/4.8-3 through 20 and Section 7/8 pages 1-17 to the Pilgrim Offsite Dose Calculation Manual.

Therefore, with respect to theses sections I am confident that the CD I sent you containing the Pilgrim controlled copy of Tech Specs is correct.

Please let me know if you need additional information.

Ed Sanchez Pilgrim Licensing


Original Message-----

From: Sanchez, Edward Sent: Tuesday, October 16, 2007 10:01 AM To: 'Perry Buckberg'

Subject:

Replacement page 3/4.2-17

Perry, Pilgrim inadvertently issued an incorrect page 3/4.2-17 into our controlled Tech Specs when they were updated for License Amendment 200.

I entered the condition into Pilgrim's corrective action program and have already had Document Control correct the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's

version was correct - it was the version on the CD I sent you that was incorrect.

Thanks, Ed Sanchez Pilgrim Licensing

Hearing Identifier: PilgrimRenewalNonPublic Email Number: 82 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000002.1.F2037.1)

Subject:

Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs Creation Date: 10/17/2007 10:52:59 AM From: "Sanchez, Edward" <esanch1@entergy.com>

Created By: esanch1@entergy.com Recipients "Perry Buckberg" <PHB1@nrc.gov>

"James Kim" <JSK@nrc.gov>

Post Office Route TWGWPO03.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 1679 10/17/2007 10:52:59 AM Mime.822 3962 11/6/2007 10:36:06 AM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed

Subject:

No Security: Standard

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station) ) ASLBP No. 06-848-02-LR

)

CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S.

Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 8th day of November, 2007.

Administrative Judge* Administrative Judge*

Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: rfc1@nrc.gov E-mail: pba@nrc.gov Administrative Judge* Office of Commission Appellate

  • Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov E-mail: amy@nrc.gov Office of the Secretary*

Sheila Slocum Hollis** Attn: Rulemaking and Adjudications Staff Duane Morris LLP Mail Stop: O-16C1 1667 K Street, NW, Suite 700 U.S. Nuclear Regulatory Commission Washington, DC 20006 Washington, DC 20555-0001 E-mail: sshollis@duanemorris.com E-mail: hearingdocket@nrc.gov

Atomic Safety and Licensing Board* Terence A. Burke, Esq.**

Mail Stop: T-3 F23 Entergy Nuclear U.S. Nuclear Regulatory Commission 1340 Echelon Parkway Washington, DC 20555-0001 Mail Stop: M-ECH-62 Jackson, MS 39213 Mary Lampert**

Pilgrim Watch David R. Lewis, Esq.**

148 Washington Street Paul A. Gaukler, Esq.

Duxbury, MA 02332 Pillsbury, Winthrop, Shaw, Pittman, LLP E-mail: mary.lampert@comcast.net 2300 N Street, NW Washington, DC 20037-1137 Chief Kevin M. Nord** E-mail: david.lewis@pillsburylaw.com Fire Chief & Director Duxbury Emergency paul.gaukler@pillsburylaw.com Management Agency 668 Tremont Street Town Manager**

Duxbury, MA 02332 Town of Plymouth E-mail: nord@town.duxbury.ma.us 11 Lincoln St.

Fax: 781-934-6530 Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us

/RA/

Kimberly A. Sexton Counsel for the NRC Staff