ML15085A229: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML15085A229
| number = ML15085A229
| issue date = 04/02/2015
| issue date = 04/02/2015
| title = 04/16/2015, Agenda for Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the TSTF
| title = Agenda for Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the TSTF
| author name = Honcharik M
| author name = Honcharik M
| author affiliation = NRC/NRR/DPR/PSPB
| author affiliation = NRC/NRR/DPR/PSPB
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:Agenda for TSTF /NRC Meeting April 16, 2015 9:30 a.m. - 4:00 p.m.
{{#Wiki_filter:Agenda for TSTF /NRC Meeting April 16, 2015 9:30 a.m. - 4:00 p.m.
TWFN 10-C02 Enclosure I. Administrative (9:30 a.m. - 9:40 a.m.) (NRC) A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:40 a.m. - 9:50 a.m.) A. Status of Regulatory Issue Summary (RIS) Withdrawing RIS 2005-20 (NRC) B. Other Process Issues BREAK III. Issues with Previously Approved Travelers (10:00 a.m. - 11:15 a.m.) A. NRC Response to TSTF Proposed Resolution of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (NRC) A. NRC Comments on TSTF Draft Letter Clarifying Information Requirements for TSTF-425 Submittals (NRC) B. NRC Status on TSTF Response to Questions on TSTF-412, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable" (NRC) C. Results of NRC Consideration of Travelers that Contain Commitments (NRC)
TWFN 10-C02 I. Administrative (9:30 a.m. - 9:40 a.m.) (NRC)
D. NRC Response to Proposed TSTF-493 Supplement (NRC) IV. Active Traveler Review Status (11:15 a.m. - 12:00 p.m.) A. Discuss Status of All Travelers Currently Under NRC Staff Review (All) 1. TSTF-454, Rev. 2, Extend PCIV Completion Times (NEDC-33046)
A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:40 a.m. - 9:50 a.m.)
: 2. TSTF-529, Rev. 1, Clarify Use and Application Rules 3. TSTF-531, Rev. 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 4. TSTF-537, Rev. 0, Increase CIV Completion Time; Update of TSTF-373
A. Status of Regulatory Issue Summary (RIS) Withdrawing RIS 2005-20 (NRC)
: 5. TSTF-541, Rev. 0, Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed 6. TSTF-542, Rev. 0, Reactor Pressure Vessel Water Inventory Control 7. TSTF-545, Rev. 0, TS Inservice Testing (IST) Program Removal   a) Status of request to extend submittal period under enforcement guidance memorandum (EGM) 2012-01 from 4 months to 12 months. (NRC) 8. TSTF-547, Rev. 0, Clarification of Rod Position Requirements
B. Other Process Issues BREAK III. Issues with Previously Approved Travelers (10:00 a.m. - 11:15 a.m.)
A. NRC Response to TSTF Proposed Resolution of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (NRC)
A. NRC Comments on TSTF Draft Letter Clarifying Information Requirements for TSTF-425 Submittals (NRC)
B. NRC Status on TSTF Response to Questions on TSTF-412, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable" (NRC)
C. Results of NRC Consideration of Travelers that Contain Commitments (NRC)
D. NRC Response to Proposed TSTF-493 Supplement (NRC)
IV. Active Traveler Review Status (11:15 a.m. - 12:00 p.m.)
A. Discuss Status of All Travelers Currently Under NRC Staff Review (All)
: 1. TSTF-454, Rev. 2, Extend PCIV Completion Times (NEDC-33046)
: 2. TSTF-529, Rev. 1, Clarify Use and Application Rules
: 3. TSTF-531, Rev. 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2
: 4. TSTF-537, Rev. 0, Increase CIV Completion Time; Update of TSTF-373
: 5. TSTF-541, Rev. 0, Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed
: 6. TSTF-542, Rev. 0, Reactor Pressure Vessel Water Inventory Control
: 7. TSTF-545, Rev. 0, TS Inservice Testing (IST) Program Removal Enclosure
 
a)   Status of request to extend submittal period under enforcement guidance memorandum (EGM) 2012-01 from 4 months to 12 months. (NRC)
: 8. TSTF-547, Rev. 0, Clarification of Rod Position Requirements
: 9. TSTF-551, Rev. 0, "Address Transient Secondary Containment Conditions" B. TSTF Traveler Review Priority (TSTF)
: 9. TSTF-551, Rev. 0, "Address Transient Secondary Containment Conditions" B. TSTF Traveler Review Priority (TSTF)
LUNCH V. Technical Issues (1:00 p.m. - 3:30 p.m.) A. Discussion of Improvements to the Reactor Coolant System (RCS) Pressure Boundary Leakage Technical Specifications Requirements (All) B. NRC Response to TSTF Comments on Revision to Inspection Manual Chapter (IMC)-0326, Appendix C.13 (NRC) C. NRC Feedback on Concept of Traveler for Pressurized Water Reactor (PWR) Mode 3 End States (NRC) D. NRC Proposal Regarding Motor Operated Valve (MOV) Surveillance Requirements (SR) with Frequency Controlled by IST Program (NRC) BREAK VI. Future Planning (3:15 p.m. - 3:45 p.m.) A. Future Traveler Submittals (TSTF) 1. TSTF-552, "Diesel Generator Frequency and Voltage Tolerances (WCAP-17308)" (following draft SE issuance) B. Next Meeting (All) 1. July 23, 2015 VII. Designated Time for Public Comments VIII. Closing Remarks (All) IX. Adjourn (4:00 p.m.)}}
LUNCH V. Technical Issues (1:00 p.m. - 3:30 p.m.)
A. Discussion of Improvements to the Reactor Coolant System (RCS) Pressure Boundary Leakage Technical Specifications Requirements (All)
B. NRC Response to TSTF Comments on Revision to Inspection Manual Chapter (IMC)-0326, Appendix C.13 (NRC)
C. NRC Feedback on Concept of Traveler for Pressurized Water Reactor (PWR) Mode 3 End States (NRC)
D. NRC Proposal Regarding Motor Operated Valve (MOV) Surveillance Requirements (SR) with Frequency Controlled by IST Program (NRC)
BREAK VI. Future Planning (3:15 p.m. - 3:45 p.m.)
A. Future Traveler Submittals (TSTF)
: 1. TSTF-552, "Diesel Generator Frequency and Voltage Tolerances (WCAP-17308)"
(following draft SE issuance)
B. Next Meeting (All)
: 1. July 23, 2015 VII. Designated Time for Public Comments VIII. Closing Remarks (All)
IX. Adjourn (4:00 p.m.)}}

Latest revision as of 00:52, 5 December 2019

Agenda for Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the TSTF
ML15085A229
Person / Time
Site: Technical Specifications Task Force
Issue date: 04/02/2015
From: Michelle Honcharik
NRC/NRR/DPR/PSPB
To:
Honcharik, Michelle 415-1774
Shared Package
ML15085A192 List:
References
Download: ML15085A229 (2)


Text

Agenda for TSTF /NRC Meeting April 16, 2015 9:30 a.m. - 4:00 p.m.

TWFN 10-C02 I. Administrative (9:30 a.m. - 9:40 a.m.) (NRC)

A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:40 a.m. - 9:50 a.m.)

A. Status of Regulatory Issue Summary (RIS) Withdrawing RIS 2005-20 (NRC)

B. Other Process Issues BREAK III. Issues with Previously Approved Travelers (10:00 a.m. - 11:15 a.m.)

A. NRC Response to TSTF Proposed Resolution of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (NRC)

A. NRC Comments on TSTF Draft Letter Clarifying Information Requirements for TSTF-425 Submittals (NRC)

B. NRC Status on TSTF Response to Questions on TSTF-412, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable" (NRC)

C. Results of NRC Consideration of Travelers that Contain Commitments (NRC)

D. NRC Response to Proposed TSTF-493 Supplement (NRC)

IV. Active Traveler Review Status (11:15 a.m. - 12:00 p.m.)

A. Discuss Status of All Travelers Currently Under NRC Staff Review (All)

1. TSTF-454, Rev. 2, Extend PCIV Completion Times (NEDC-33046)
2. TSTF-529, Rev. 1, Clarify Use and Application Rules
3. TSTF-531, Rev. 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2
4. TSTF-537, Rev. 0, Increase CIV Completion Time; Update of TSTF-373
5. TSTF-541, Rev. 0, Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed
6. TSTF-542, Rev. 0, Reactor Pressure Vessel Water Inventory Control
7. TSTF-545, Rev. 0, TS Inservice Testing (IST) Program Removal Enclosure

a) Status of request to extend submittal period under enforcement guidance memorandum (EGM) 2012-01 from 4 months to 12 months. (NRC)

8. TSTF-547, Rev. 0, Clarification of Rod Position Requirements
9. TSTF-551, Rev. 0, "Address Transient Secondary Containment Conditions" B. TSTF Traveler Review Priority (TSTF)

LUNCH V. Technical Issues (1:00 p.m. - 3:30 p.m.)

A. Discussion of Improvements to the Reactor Coolant System (RCS) Pressure Boundary Leakage Technical Specifications Requirements (All)

B. NRC Response to TSTF Comments on Revision to Inspection Manual Chapter (IMC)-0326, Appendix C.13 (NRC)

C. NRC Feedback on Concept of Traveler for Pressurized Water Reactor (PWR) Mode 3 End States (NRC)

D. NRC Proposal Regarding Motor Operated Valve (MOV) Surveillance Requirements (SR) with Frequency Controlled by IST Program (NRC)

BREAK VI. Future Planning (3:15 p.m. - 3:45 p.m.)

A. Future Traveler Submittals (TSTF)

1. TSTF-552, "Diesel Generator Frequency and Voltage Tolerances (WCAP-17308)"

(following draft SE issuance)

B. Next Meeting (All)

1. July 23, 2015 VII. Designated Time for Public Comments VIII. Closing Remarks (All)

IX. Adjourn (4:00 p.m.)