ML18075A483: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18075A483
| number = ML18075A483
| issue date = 03/06/2018
| issue date = 03/06/2018
| title = 2018/03/06 Seabrook La - Seabrook - March 19 ASR LAR Site Visit Plan
| title = La - Seabrook - March 19 ASR LAR Site Visit Plan
| author name =  
| author name =  
| author affiliation = NRC
| author affiliation = NRC
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 3
| page count = 3
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:1SeabrookLANPEm ResourceFrom:Poole, JustinSent:Tuesday, March 06, 2018 3:41 PMTo:Lehman, Bryce; Thomas, George; Buford, AngelaCc:Wittick, Brian; SeabrookLAHearingFile Resource
{{#Wiki_filter:SeabrookLANPEm Resource From:                                                                                                                                                       Poole, Justin Sent:                                                                                                                                                       Tuesday, March 06, 2018 3:41 PM To:                                                                                                                                                         Lehman, Bryce; Thomas, George; Buford, Angela Cc:                                                                                                                                                         Wittick, Brian; SeabrookLAHearingFile Resource


==Subject:==
==Subject:==
Re: RE: Seabrook - March 19 ASR LAR Site Visit Plan On: 06 March 2018 14:11, "Greene, Joshua" <Joshua.Greene@nexteraenergy.com> wrote: Requested documents have been uploaded to the Reference Portal. Titles: CEB - 150252-CA-02 B ET - 170443-CA-01 Cont - 160268-CA-04 CST - 160268-CA-03 EPC - 160268-CA-11 FSB -160268-CA-09 RHR - 160268-CA-06 Thanks Justin. Josh Greene, PE NextEra Energy Seabrook, LLC Nuclear Engineer Senior - Licensing 603-773-7851   From: Poole, Justin [mailto:Justin.Poole@nrc.gov] Sent: Tuesday, March 06, 2018 11:39 AM To: Greene, Joshua  
Re: RE: Seabrook - March 19 ASR LAR Site Visit Plan On: 06 March 2018 14:11, "Greene, Joshua" <Joshua.Greene@nexteraenergy.com> wrote:
Requested documents have been uploaded to the Reference Portal.
Titles:
CEB - 150252-CA-02 B ET - 170443-CA-01 Cont - 160268-CA-04 CST - 160268-CA-03 EPC - 160268-CA-11 FSB -160268-CA-09 RHR - 160268-CA-06 Thanks Justin.
Josh Greene, PE NextEra Energy Seabrook, LLC Nuclear Engineer Senior - Licensing 603-773-7851 The link ed image cannot be display ed. The file may hav e been mov ed, renamed, or deleted. Verify that the link points to the correct file and location.
From: Poole, Justin [mailto:Justin.Poole@nrc.gov]
Sent: Tuesday, March 06, 2018 11:39 AM To: Greene, Joshua


==Subject:==
==Subject:==
RE: Seabrook - March 19 ASR LAR Site Visit Plan CAUTION - EXTERNAL EMAIL Yes this one...(highlighted below) Thanks. From: Greene, Joshua [mailto:Joshua.Greene@nexteraenergy.com] Sent: Tuesday, March 06, 2018 11:32 AM To: Poole, Justin <Justin.Poole@nrc.gov>  
RE: Seabrook - March 19 ASR LAR Site Visit Plan CAUTION - EXTERNAL EMAIL Yes this one...(highlighted below) Thanks.
From: Greene, Joshua [mailto:Joshua.Greene@nexteraenergy.com]
Sent: Tuesday, March 06, 2018 11:32 AM To: Poole, Justin <Justin.Poole@nrc.gov>


==Subject:==
==Subject:==
[External_Sender] Seabrook - March 19 ASR LAR Site Visit Plan Hi Justin, I'm looking at the site visit plan, it appears your staff requested documents to be uploaded to the electronic reading room (ERR). There have been a couple locations used in the past (e.g. IMS or Reference Portal). Is there a preference on which one? It appears that the Reference Portal under the LAR 16-03 title has been used the most but just want to confirm. I'm waiting on a couple documents from engineering to complete the upload. Thanks, Josh Greene, PE NextEra Energy Seabrook, LLC The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
[External_Sender] Seabrook - March 19 ASR LAR Site Visit Plan Hi Justin, Im looking at the site visit plan, it appears your staff requested documents to be uploaded to the electronic reading room (ERR). There have been a couple locations used in the past (e.g. IMS or Reference Portal). Is there a preference on which one? It appears that the Reference Portal under the LAR 16-03 title has been used the most but just want to confirm. Im waiting on a couple documents from engineering to complete the upload.
2Nuclear Engineer Senior - Licensing 603-773-7851   The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
: Thanks, Josh Greene, PE NextEra Energy Seabrook, LLC 1
Hearing Identifier: Seabrook_LA_NonPublic Email Number: 1421   Mail Envelope Properties   (B45E2478694FE25A86375B71ED82D451A8CA5316)  
 
Nuclear Engineer Senior - Licensing 603-773-7851 The link ed image cannot be display ed. The file may hav e been mov ed, renamed, or deleted. Verify that the link points to the correct file and location.
2
 
Hearing Identifier:     Seabrook_LA_NonPublic Email Number:           1421 Mail Envelope Properties       (B45E2478694FE25A86375B71ED82D451A8CA5316)


==Subject:==
==Subject:==
Re: RE: Seabrook - March 19 ASR LAR Site Visit Plan Sent Date:   3/6/2018 3:40:44 PM Received Date: 3/6/2018 3:40:52 PM From:   Poole, Justin Created By:   Justin.Poole@nrc.gov Recipients:     "Wittick, Brian" <Brian.Wittick@nrc.gov>
Re: RE: Seabrook - March 19 ASR LAR Site Visit Plan Sent Date:               3/6/2018 3:40:44 PM Received Date:           3/6/2018 3:40:52 PM From:                   Poole, Justin Created By:             Justin.Poole@nrc.gov Recipients:
Tracking Status: None "SeabrookLAHearingFile Resource" <SeabrookLAHearingFile.Resource@nrc.gov>
"Wittick, Brian" <Brian.Wittick@nrc.gov>
Tracking Status: None "Lehman, Bryce" <Bryce.Lehman@nrc.gov> Tracking Status: None "Thomas, George" <George.Thomas2@nrc.gov> Tracking Status: None "Buford, Angela" <Angela.Buford@nrc.gov>
Tracking Status: None "SeabrookLAHearingFile Resource" <SeabrookLAHearingFile.Resource@nrc.gov>
Tracking Status: None Post Office:   unknown Files     Size     Date & Time MESSAGE   1603     3/6/2018 3:40:52 PM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Lehman, Bryce" <Bryce.Lehman@nrc.gov>
Tracking Status: None "Thomas, George" <George.Thomas2@nrc.gov>
Tracking Status: None "Buford, Angela" <Angela.Buford@nrc.gov>
Tracking Status: None Post Office:             unknown Files                           Size                   Date & Time MESSAGE                         1603                   3/6/2018 3:40:52 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 12:19, 2 December 2019

La - Seabrook - March 19 ASR LAR Site Visit Plan
ML18075A483
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/06/2018
From:
NRC
To:
Division of Operating Reactor Licensing
References
17-953-02-LA-BD01
Download: ML18075A483 (3)


Text

SeabrookLANPEm Resource From: Poole, Justin Sent: Tuesday, March 06, 2018 3:41 PM To: Lehman, Bryce; Thomas, George; Buford, Angela Cc: Wittick, Brian; SeabrookLAHearingFile Resource

Subject:

Re: RE: Seabrook - March 19 ASR LAR Site Visit Plan On: 06 March 2018 14:11, "Greene, Joshua" <Joshua.Greene@nexteraenergy.com> wrote:

Requested documents have been uploaded to the Reference Portal.

Titles:

CEB - 150252-CA-02 B ET - 170443-CA-01 Cont - 160268-CA-04 CST - 160268-CA-03 EPC - 160268-CA-11 FSB -160268-CA-09 RHR - 160268-CA-06 Thanks Justin.

Josh Greene, PE NextEra Energy Seabrook, LLC Nuclear Engineer Senior - Licensing 603-773-7851 The link ed image cannot be display ed. The file may hav e been mov ed, renamed, or deleted. Verify that the link points to the correct file and location.

From: Poole, Justin tin.Poole@nrc.gov

Sent: Tuesday, March 06, 2018 11:39 AM To: Greene, Joshua

Subject:

RE: Seabrook - March 19 ASR LAR Site Visit Plan CAUTION - EXTERNAL EMAIL Yes this one...(highlighted below) Thanks.

From: Greene, Joshua [1]

Sent: Tuesday, March 06, 2018 11:32 AM To: Poole, Justin <Justin.Poole@nrc.gov>

Subject:

[External_Sender] Seabrook - March 19 ASR LAR Site Visit Plan Hi Justin, Im looking at the site visit plan, it appears your staff requested documents to be uploaded to the electronic reading room (ERR). There have been a couple locations used in the past (e.g. IMS or Reference Portal). Is there a preference on which one? It appears that the Reference Portal under the LAR 16-03 title has been used the most but just want to confirm. Im waiting on a couple documents from engineering to complete the upload.

Thanks, Josh Greene, PE NextEra Energy Seabrook, LLC 1

Nuclear Engineer Senior - Licensing 603-773-7851 The link ed image cannot be display ed. The file may hav e been mov ed, renamed, or deleted. Verify that the link points to the correct file and location.

2

Hearing Identifier: Seabrook_LA_NonPublic Email Number: 1421 Mail Envelope Properties (B45E2478694FE25A86375B71ED82D451A8CA5316)

Subject:

Re: RE: Seabrook - March 19 ASR LAR Site Visit Plan Sent Date: 3/6/2018 3:40:44 PM Received Date: 3/6/2018 3:40:52 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"Wittick, Brian" <Brian.Wittick@nrc.gov>

Tracking Status: None "SeabrookLAHearingFile Resource" <SeabrookLAHearingFile.Resource@nrc.gov>

Tracking Status: None "Lehman, Bryce" <Bryce.Lehman@nrc.gov>

Tracking Status: None "Thomas, George" <George.Thomas2@nrc.gov>

Tracking Status: None "Buford, Angela" <Angela.Buford@nrc.gov>

Tracking Status: None Post Office: unknown Files Size Date & Time MESSAGE 1603 3/6/2018 3:40:52 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: