{{#Wiki_filter:INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 23  STATION: HOPE CREEK SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing TASK NUMBER: 2450040201 JPM NUMBER: NRC-JPM-001 ALTERNATE PATH:   K/A NUMBER:241000A4.19 IMPORTANCE FACTOR:3.5 3.4 APPLICABILITY: RO SRO    RO X   SROX EVALUATION SETTING/METHOD: Simulator/Perform  
{{#Wiki_filter:INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:             HOPE CREEK SYSTEM:             Main Turbine TASK:               Perform Quarterly Turbine Stop Valve Testing TASK NUMBER:         2450040201 JPM NUMBER:         NRC-JPM-001 ALTERNATE PATH:                                   K/A NUMBER:         241000A4.19 IMPORTANCE FACTOR:             3.5             3.4 APPLICABILITY:                                                       RO             SRO RO   X                       SRO      X EVALUATION SETTING/METHOD:         Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-ST.AC-0002(Q), Rev. 36 TOOLS AND EQUIPMENT:  
HC.OP-ST.AC-0002(Q), Rev. 36 TOOLS AND EQUIPMENT:       None VALIDATED JPM COMPLETION TIME:               10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                 N/A JPM SOURCE: New APPROVAL:
 
Author                  Facility Representative          Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
None VALIDATED JPM COMPLETION TIME: 10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A   JPM SOURCE:   New
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                  N/A JPM PERFORMED BY:                                        GRADE:      SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
Page 1 of 23


APPROVAL:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS; 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME: Minutes A C T UAL TIME C RITI CAL COMPLETI ON: N/A  JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 23 NAME:  DATE:  SYSTEM: Main Turbine  
SYSTEM:             Main Turbine TASK:               Perform Quarterly Turbine Stop Valve Testing TASK NUMBER: 2450040201 INITIAL CONDITIONS:
 
: 1. The Plant is operating at 100% power.
TASK: Perform Quarterly Turbine Stop Valve Testing TASK NUMBER: 2450040201 INITIAL CONDITIONS:
: 2. The CRS has informed you that you need to perform the Main Turbine Stop Valve Test
: 1. The Plant is operating at 100% power.
      - (Preferred Method)
: 2. The CRS has informed you that you need to perform the Main Turbine Stop Valve Test - (Preferred Method)
: 3. The testing is required every quarter to prove RPS system is OPERABLE IAW TS Table 4.3.1.1-1 Items 9 and 10
: 3. The testing is required every quarter to prove RPS system is OPERABLE IAW TS Table 4.3.1.1-1 Items 9 and 10
: 4. The System Load Dispatcher has been notified of the Turbine Stop Valve testing.
: 4. The System Load Dispatcher has been notified of the Turbine Stop Valve testing.
: 5. A Thermal scan of all 185 HCU's has been performed and all scram pilot solenoids have been verified energized. INITIATING CUE: Perform HC.OP-ST.AC-0002(Q), Turbine Valve Testing- Quarterly for the Main Turbine Stop valves (Preferred Method).
: 5. A Thermal scan of all 185 HCUs has been performed and all scram pilot solenoids have been verified energized.
Successful Completion Criteria: 1. All critical steps completed.
INITIATING CUE:
Perform HC.OP-ST.AC-0002(Q), Turbine Valve Testing- Quarterly for the Main Turbine Stop valves (Preferred Method).
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time.
: 3. All time-critical steps completed within allotted time.
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.  
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 2 of 23


Page 3 of 23 INITIAL LICENSED OPERATOR EXAMINATION NAM E JOB PERFORMANCE MEASURE DAT ESYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing  
INITIAL LICENSED OPERATOR EXAMINATION               NAME JOB PERFORMANCE MEASURE                       DATE SYSTEM:   Main Turbine TASK:     Perform Quarterly Turbine Stop Valve Testing STEP
#
#   STEP
* STEP NO. STEP (*Denotes a Critical Step) (#Denotes a Sequential Step)
(*Denotes a Critical Step)                                                   EVAL
STANDARD  EVA L S/U Operator obtains and locates procedure HC.OP-ST.AC-0002(Q).
* NO.                                                            STANDARD
Operator obtains the correct procedure. Examiner Note: Provide the operator with a filled out Section 1 of Attachment 1 and N/A all non-applicable steps of HC.OP-ST.AC-0002(Q), Attachment 1.
(#Denotes a Sequential Step)                                                   S/U Operator obtains and locates             Operator obtains the correct procedure.
Operator reviews precautions and limitations.
procedure HC.OP-ST.AC-0002(Q).           Examiner Note: Provide the operator with a filled out Section 1 of Attachment 1 and N/A all non-applicable steps of HC.OP-ST.AC-0002(Q), Attachment 1.
Operator reviews precautions and limitations.
Operator reviews precautions and         Operator reviews precautions and limitations.                            limitations.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied. Examiner Note: Initialing of steps is not critical.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.
Operator determines beginning step of the procedure.
Examiner Note: Initialing of steps is not critical.
Operator determines correct beginning step of procedure to be 5.1.
Operator determines beginning step       Operator determines correct beginning of the procedure.                       step of procedure to be 5.1.
Page 3 of 23


Page 4 of 23 INITIAL LICENSED OPERATOR EXAMINATION NAM E JOB PERFORMANCE MEASURE DAT ESYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing  
INITIAL LICENSED OPERATOR EXAMINATION             NAME JOB PERFORMANCE MEASURE                     DATE SYSTEM:   Main Turbine TASK:     Perform Quarterly Turbine Stop Valve Testing STEP
#
#   STEP
* STEP NO. STEP (*Denotes a Critical Step) (#Denotes a Sequential Step)
(*Denotes a Critical Step)                                                   EVAL
STANDARD  EVA L S/U 5.1.1. IF this is the first subsection of the procedure to be performed, THEN PERFORM the following:
* NO.                                                              STANDARD
A. ENSURE that Section 1.0 of Attachment 1 has been completed AND Regular Surveillance OR Retest is indicated.
(#Denotes a Sequential Step)                                                     S/U 5.1.1. IF this is the first subsection of the     Operator ensures that the provided Att.
B. LOG test start time in the Control Room log(s).
procedure to be performed, THEN             1 has been completed and that Regular PERFORM the following:                     surveillance has been indicated.
Operator ensures that the provided Att.
A. ENSURE that Section 1.0 of               Operator initials the appropriate space Attachment 1 has been                   on the procedure.
1 has been completed and that Regular surveillance has been in dicated. Operator initials the appropriate space on the procedure.
completed AND Regular Surveillance OR Retest is Examiner Cue: The test start time indicated.
Examiner Cue:  The test start time has been logged in the Control Room log(s). Operator initials the appropriate space on the procedure.
has been logged in the Control B. LOG test start time in the Control       Room log(s).
5.1.2 ENSURE all prerequisites of section 2.1 are satisfied.
Room log(s).
Operator ensures that all prerequisites are satisfied.
Operator initials the appropriate space on the procedure.
5.1.2     ENSURE all prerequisites of section         Operator ensures that all prerequisites 2.1 are satisfied.                         are satisfied.
Operator initials the appropriate space on the procedure.
Operator initials the appropriate space on the procedure.
Operator completes Attachment 1, Section 3.0.
Operator completes Attachment 1, Section 3.0.
If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
Page 4 of 23


Page 5 of 23 INITIAL LICENSED OPERATOR EXAMINATION NAM E JOB PERFORMANCE MEASURE DAT ESYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing  
INITIAL LICENSED OPERATOR EXAMINATION           NAME JOB PERFORMANCE MEASURE                 DATE SYSTEM:     Main Turbine TASK:       Perform Quarterly Turbine Stop Valve Testing STEP
#
#   STEP
* STEP NO. STEP (*Denotes a Critical Step) (#Denotes a Sequential Step)
(*Denotes a Critical Step)                                             EVAL
STANDARD  EVA L S/U   5.1.3 START TIME: ___________
* NO.                                                            STANDARD
IF annunciator C5-C2, TCV FAST CLOSURE & MSV TRIP BYPASS, is illuminated, THEN DIRECT I&C to perform Attachment 3 to remove this bypass.:
(#Denotes a Sequential Step)                                               S/U START TIME: ___________
Determines that annunciator C5-C2 is NOT illuminated and N/A's the step.
5.1.3     IF annunciator C5-C2, TCV FAST           Determines that annunciator C5-C2 is CLOSURE & MSV TRIP                       NOT illuminated and N/As the step.
5.1.4 IF the EOC-RPT System is NOT in-service, THEN DIRECT I&C to verify the relay contacts on Table AC-002 (Attachment 5) are open, AND to INITIAL Attachment 2.
BYPASS, is illuminated, THEN DIRECT I&C to perform Attachment 3 to remove this bypass.:
Operator determines that EOC-RPT is IN SERVICE and N/A's this step
5.1.4     IF the EOC-RPT System is NOT in-         Operator determines that EOC-RPT is service,                                 IN SERVICE and N/As this step THEN DIRECT I&C to verify the relay contacts on Table AC-002 (Attachment 5) are open, AND to INITIAL Attachment 2.
* # 5.1.5.A PERFORM the following to bypass the EOC-RPT System:
* 5.1.5.A   PERFORM the following to bypass the     Operator Places the RECIRC PUMP EOC-RPT System:                         TRIP DISABLE SYSTEM A (Panel
A. PLACE the RECIRC PUMP TRIP DISABLE SYSTEM A (Panel 10C609) AND SYSTEM B (Panel 10C611) in BYP position.
#
INITIAL Attachment 2; performer and verifier. Operator Places the RECIRC PUMP TRIP DISABLE SYSTEM A (Panel 10C609)  AND SYSTEM B (Panel 10C611) in BYP position
10C609) AND SYSTEM B (Panel A. PLACE the RECIRC PUMP TRIP           10C611) in BYP position DISABLE SYSTEM A (Panel 10C609) AND SYSTEM B (Panel Examiner Cue: If asked, inform the 10C611) in BYP position.
operator that the Verifier has INITIAL Attachment 2; performer and initialed Attachment 2.
verifier.
Page 5 of 23


Examiner Cue: If asked, inform the operator that the Verifier has initialed Attachment 2.  
INITIAL LICENSED OPERATOR EXAMINATION              NAME JOB PERFORMANCE MEASURE                    DATE SYSTEM:    Main Turbine TASK:      Perform Quarterly Turbine Stop Valve Testing STEP
#    STEP
(*Denotes a Critical Step)                                                  EVAL
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                  S/U 5.1.5.B    ENTER Technical Specification LCO        Operator informs the CRS to enter TS 3.3.4.2,                                  3.3.4.2 and take action in accordance AND TAKE action in accordance            with item e with Action item e.                    Examiner Cue: Respond as the CRS that TS LCO 3.3.4.2 has been entered and actions are being taken in accordance with Action Item e Operator initials the appropriate space on the procedure.
5.1.6      PERFORM the following at the EHC          Operator notes that if Any MSV moves CONTROL PANEL:                            > 20% in Closed direction that he/she will immediately Select Main Stop A.      IF during the performance of      Valve Pair Testing Stop                      Formatted this step any MSV moves > 20% in the Closed direction, THEN IMMEDIATELY SELECT Main Stop Valve Pair Testing Start/Stop Stop                                                    Formatted B          ENSURE that NO RPS Half Scrams are        Operator ENSURES NO RPS half present.                                  scrams are present.
* C          SELECT Tests , MSV Pair Test              Operator Selects Tests , MSV Pair            Formatted Test                                        Formatted
#
Formatted Formatted Page 6 of 23


Page 6 of 23 INITIAL LICENSED OPERATOR EXAMINATION NAM E JOB PERFORMANCE MEASURE DAT ESYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing  
INITIAL LICENSED OPERATOR EXAMINATION           NAME JOB PERFORMANCE MEASURE                 DATE SYSTEM:   Main Turbine TASK:     Perform Quarterly Turbine Stop Valve Testing STEP
#
#   STEP
* STEP NO. STEP (*Denotes a Critical Step) (#Denotes a Sequential Step)
(*Denotes a Critical Step)                                                 EVAL
STANDARD  EVA L S/U 5.1.5.B ENTER Technical Specification LCO 3.3.4.2, AND TAKE action in accordance with Action item "e".
* NO.                                                             STANDARD
Operator informs the CRS to enter TS 3.3.4.2 and take action in accordance with item "e" Examiner Cue:  Respond as the CRS that TS LCO 3.3.4.2 has been entered and actions are being taken in accordance with Action Item "e" Operator initials the appropriate space on the procedure.
(#Denotes a Sequential Step)                                                 S/U D         ENSURE at least three minutes has         Operator ensures at least 3 minutes elapsed since the last MSV                has elapsed since the last MSV reached full open.                        reached full open.
5.1.6 PERFORM the following at the EHC CONTROL PANEL:
EXAMINER CUE: If Operator wants to wait, inform him >3 minutes have elapsed since the last MSV reached full open.
A. IF during the performance of this step any MSV  moves > 20% in the Closed direction, THEN IMMEDIATELY SELECT Main Stop Valve Pair Testing Start/Stop  Stop Operator notes that if Any MSV moves > 20% in Closed direction that he/she will immediately Select  Main Stop Valve Pair Testing  Stop B ENSURE that NO RPS Half Scrams are present. Operator ENSURES NO RPS half scrams are present.
* E
* # C SELECT  Tests  ,  MSV Pair Test  Operator Selects  Tests  ,  MSV Pair Test  Formatted Formatted Formatted Formatted Formatted Formatted Page 7 of 23 INITIAL LICENSED OPERATOR EXAMINATION NAM E JOB PERFORMANCE MEASURE DAT ESYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing
* SELECT the following:MSV #1,         Operator Selects                          Formatted
#
#                Pair Testing Selector, Include
* STEP NO. STEP (*Denotes a Critical Step) (#Denotes a Sequential Step)
* MSV #1, Pair Testing Selector,     Deleted: ¶ Include                             Formatted
STANDARD  EVA L S/U D ENSURE at least three minutes has elapsed since the last MSV reached full open. Operator ensures at least 3 minutes has elapsed since the last MSV reached full open.
* MSV #2, Pair Testing Selector, Include
EXAMINER CUE: If Operator wants to wait, inform him >3 minutes have elapsed since the last MSV reached full open.  
* MSV #2, Pair Testing Selector, Include F         VERIFY Paired is displayed for           Operator verifies that Paired is        Formatted MSV #1 AND MSV #2                         displayed for MSV #1 AND MSV #2           Formatted
* # E SELECT the following:MSV #1, Pair Testing Selector, Include   MSV #2, Pair Testing Selector, Include Operator Selects  MSV #1, Pair Testing Selector, Include     MSV #2, Pair Testing Selector, Include   F VERIFY "Paired" is displayed for MSV #1 AND MSV #2 Operator verifies that "Paired" is displayed for MSV #1 AND MSV #2 * # G SELECT Main Stop Valve Pair Testing Start/Stop Start   Operator SELECTS Main Stop Valve Pair Testing Start/Stop Start Formatted Formatted Formatted Formatted Formatted Formatted Formatted Deleted: ¶ Page 8 of 23 INITIAL LICENSED OPERATOR EXAMINATION NAM E JOB PERFORMANCE MEASURE DAT ESYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing
* G         SELECT Main Stop Valve Pair               Operator SELECTS Main Stop Valve          Formatted
#
#            Testing Start/Stop Start                   Pair Testing Start/Stop Start             Formatted Formatted Page 7 of 23
* STEP NO. STEP (*Denotes a Critical Step) (#Denotes a Sequential Step)
STANDARD  EVA L S/U* # H WHEN MSV 1 AND MSV 2 reach the 90% open position, THEN VERIFY the following  AND RECORD as SAT/UNSAT on Attachment 2:
: 1. RPS TRIP LOGIC A1, NORMAL RESET status light on 10C651 is extinguished.
[TS Table 4.3.1.1-1 Item 9
]  2. Control Room Annunciator C5 B2, MAIN STOP VALVE CLOSURE is energized.  [TS Table 4.3.1.1-1 Item 9, TS Table 4.3.4.2.1-1 Item 1]    3. Control Room Annunciator C3 A2, REACTOR SCRAM TRIP LOGIC A1 is energized. Operator verifies MSV 1 and 2 reach 90% open position and RECORDS SAT on Attachment 2. Operator verifies RPS TRIP LOGIC A1, NORMAL RESET light is extinguished.


EXAMINER CUE: If the Operator has concerns about MSV 1 oscillating, then inform Operator they can assume MSV 1 is at 90% and NOT oscillating.
INITIAL LICENSED OPERATOR EXAMINATION              NAME JOB PERFORMANCE MEASURE                    DATE SYSTEM:    Main Turbine TASK:      Perform Quarterly Turbine Stop Valve Testing STEP
Operator verifies C5 B2, MAIN STOP VALVE CLOSURE and C3 A2, REACTOR SCRAM TRIP LOGIC A1 are both energized.  
#    STEP
* # I SELECT Main Stop Valve Pair Testing Start/Stop  Stop    Operator selects Main Stop Valve Pair Testing Start/Stop Stop  
(*Denotes a Critical Step)                                                  EVAL
* # J SELECT the following: MSV #1, Pair Testing Selector Test OFF    MSV #2, Pair Testing Selector  Test OFF   Operator selects the following:  MSV #1, Pair Testing Selector Test OFF    MSV #2, Pair Testing Selector Test OFF Formatted Formatted Page 9 of 23 INITIAL LICENSED OPERATOR EXAMINATION NAM E JOB PERFORMANCE MEASURE DAT ESYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing
* NO.                                                              STANDARD
#
(#Denotes a Sequential Step)                                                    S/U
* STEP NO. STEP (*Denotes a Critical Step) (#Denotes a Sequential Step)
* H        WHEN MSV 1 AND MSV 2 reach the            Operator verifies MSV 1 and 2 reach 90% open position, THEN VERIFY the        90% open position and RECORDS SAT
STANDARD  EVA L S/U* # K RESET RPS Half Scram. Operator resets the RPS Half Scram  L  ENSURE RPS TRIP LOGIC A1, NORMAL RESET status light on 10C651 is energized AND the following occur:
#
MSV 1, Main Stop Valve  Opens  MSV 2, Main Stop Valve  Opens  Control Room Annunciator C5 B2, MAIN STOP VALVE CLOSURE clears  Control Room Annunciator C3 A2, REACTOR SCRAM TRIP LOGIC A1 clears.
following AND RECORD as                    on Attachment 2.
STOP TIME:  ____________ Operator ensures that RPS TRIP LOGIC A1, NORMAL RESET light is energized and that MSV 1 & 2 Open and annunciators C5-B2 and C3-A2 have cleared.
SAT/UNSAT on Attachment 2:
Operator verifies RPS TRIP LOGIC A1,
: 1. RPS TRIP LOGIC A1, NORMAL            NORMAL RESET light is extinguished.
RESET status light on 10C651 is extinguished.              EXAMINER CUE: If the Operator has
[TS Table 4.3.1.1-1 Item 9]          concerns about MSV 1 oscillating, then inform Operator they can
: 2. Control Room Annunciator C5 B2,      assume MSV 1 is at 90% and NOT MAIN STOP VALVE CLOSURE              oscillating.
is energized. [TS Table 4.3.1.1-1 Item 9, TS Table 4.3.4.2.1-1 Item 1]                                  Operator verifies C5 B2, MAIN STOP VALVE CLOSURE and C3 A2,
: 3. Control Room Annunciator C3        REACTOR SCRAM TRIP LOGIC A1 A2, REACTOR SCRAM TRIP              are both energized.
LOGIC A1 is energized.
* I         SELECT Main Stop Valve Pair               Operator selects Main Stop Valve Pair
#            Testing Start/Stop Stop                    Testing Start/Stop Stop                     Formatted
* J         SELECT the following:                     Operator selects the following:              Formatted
* MSV #1, Pair Testing Selector
* MSV #1, Pair Testing Selector Test
  #
Test OFF                                   OFF
* MSV #2, Pair Testing Selector
* MSV #2, Pair Testing Selector Test OFF                                   Test OFF Page 8 of 23


EXAMINER CUE: Once Operator has ensured that Annunciator C3-A2 has cleared, then inform him that another Operator will complete the rest of this procedure and that this JPM is complete.
INITIAL LICENSED OPERATOR EXAMINATION            NAME JOB PERFORMANCE MEASURE                    DATE SYSTEM:      Main Turbine TASK:        Perform Quarterly Turbine Stop Valve Testing STEP
Terminating Cue: Once Operator has ensured that Annunciator C3-A2 has cleared, then state "This JPM is c
#    STEP
JOB PERFORMANCE MEASURE Page 10 of 23 INITIAL CONDITIONS:
(*Denotes a Critical Step)                                                EVAL
: 1. The Plant is operating at 100% power.
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                  S/U
* K          RESET RPS Half Scram.                    Operator resets the RPS Half Scram
#
L                                                    Operator ensures that RPS TRIP ENSURE RPS TRIP LOGIC A1,                LOGIC A1, NORMAL RESET light is NORMAL RESET status                      energized and that MSV 1 & 2 Open light on 10C651 is energized              and annunciators C5-B2 and C3-A2 AND the following occur:                  have cleared.
* MSV 1, Main Stop Valve Opens EXAMINER CUE: Once Operator has
* MSV 2, Main Stop Valve Opens      ensured that Annunciator C3-A2 has
* Control Room Annunciator C5 B2,    cleared, then inform him that another MAIN STOP                          Operator will complete the rest of VALVE CLOSURE clears              this procedure and that this JPM is complete.
* Control Room Annunciator C3 A2, REACTOR SCRAM TRIP LOGIC A1 clears.
STOP TIME: ____________
Terminating Cue: Once Operator has ensured that Annunciator C3-A2 has cleared, then state "This JPM is c Page 9 of 23
 
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
: 1. The Plant is operating at 100% power.
: 2. The CRS has informed you that you need to perform the Main Turbine Stop Valve Test - (Preferred Method)
: 2. The CRS has informed you that you need to perform the Main Turbine Stop Valve Test - (Preferred Method)
: 3. The testing is required every quarter to prove RPS system is OPERABLE IAW TS Table 4.3.1.1-1 Items 9 and 10
: 3. The testing is required every quarter to prove RPS system is OPERABLE IAW TS Table 4.3.1.1-1 Items 9 and 10
: 4. The System Load Dispatcher has been notified of the Turbine Stop valve testing.
: 4. The System Load Dispatcher has been notified of the Turbine Stop valve testing.
: 5. A Thermal scan of all 185 HCU's has been performed and all scram pilot solenoids have been verified energized. INITIATING CUE: Perform HC.OP-ST.AC-0002(Q), Turbine Valve Testing- Quarterly for the Main Turbine Stop valves (Preferred Method).  
: 5. A Thermal scan of all 185 HCUs has been performed and all scram pilot solenoids have been verified energized.
INITIATING CUE:
Perform HC.OP-ST.AC-0002(Q), Turbine Valve Testing- Quarterly for the Main Turbine Stop valves (Preferred Method).
Page 10 of 23


JOB PERFORMANCE MEASURE Page 11 of 23 SIMULATOR INSTRUCTIONS Reset Simulator to any 100% power IC  
JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset Simulator to any 100% power IC Page 11 of 23


JOB PERFORMANCE MEASURE Page 12 of 23 J W 5.1 ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 1 of 3)  
JOB PERFORMANCE MEASURE ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 1 of 3) 1.0 PRETEST INFORMATION 1.1 Reason for the Test JW 1.1.1    Regular Surveillance _________________________________
INITIALS 1.1.2    Retest/Other ________________________________________
INITIALS 1.1.3    IF not performing the complete test, THEN LIST subsection(s)/valves to be performed, as well as marking N/A on the applicable subsection(s)/valves on the Attachment(s) that will not be performed, OR, that do not require an independent verification IAW NC.NA-AP.ZZ-0005(Q); Station Operating Practices.
5.1
_____________________________________________
SUBSECTION(S) 1.2 Plant Conditions 1
1.2.1    Operational Condition ________________________________
100 1.2.2    Reactor Power Level _________________________________
1137 1.2.3    GMWe ____________________________________________
1.3 Permission to Perform the Test 1.3.1    Permission granted to perform this test.
Mel Gray                                    Today
                                                            / _______________
SM/CRS                        DATE-TIME 1.3.2    Order No. __________________________________________
Page 12 of 23


1.0 PRETEST INFORMATION 1.1 Reason for the Test 1.1.1 Regular Surveillance  _________________________________  INITIALS 1.1.2 Retest/Other________________________________________  INITIALS
JOB PERFORMANCE MEASURE ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 2 of 3) 2.0 POST TEST INFORMATION 2.1 The data acquired during the performance of this test has been reviewed for completeness and compliance with Technical Specification Table 4.3.4.2.1-1 Items 1 and 2, and Table 4.3.1.1-1 Items 9 and 10. This test is considered:
2.1.1     SATISFACTORY (All acceptance criteria is marked SAT)
                                                                / _______________
SM/CRS                          DATE-TIME 2.1.2     UNSATISFACTORY AND IF necessary the T/S ACTION statement has been implemented.
                                                                / _______________
SM/CRS                          DATE-TIME 2.1.4    Order No.
2.1.5    Remarks Page 13 of 23


1.1.3 IF not performing the complete test,  THEN LIST subsection(s)/valves to be performed, as well  as marking N/A on the applicable subsection(s)/valves on  the Attachment(s) that will not be performed, OR, that do not require an independent verification IAW  NC.NA-AP.ZZ-0005(Q); Station Operating Practices. _____________________________________________  SUBSECTION(S) 1.2 Plant Conditions 1.2.1 Operational Condition  ________________________________
JOB PERFORMANCE MEASURE ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 3 of 3) 3.0 PROCEDURE PERFORMER(S) AND VERIFIER(S) 3.1 I have read and understand the steps of this procedure that I am required to perform.
1.2.2 Reactor Power Level  _________________________________
(All Departments)
1.2.3 GMWe____________________________________________
PRINT NAME               SIGNATURE                     INITIALS           DATE/TIME
 
_________________ / ______________________ / ____________ / _____________
1.3 Permission to Perform the Test 1.3.1 Permission granted to perform this test.
_________________ / ______________________ / ____________ / _____________
  /_______________ SM/CRS DATE-TIME 1.3.2 Order No.__________________________________________
100 11137Today Mel Gra y JOB PERFORMANCE MEASURE  Page 13 of 23 ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 2 of 3) 2.0 POST TEST INFORMATION 2.1 The data acquired during the performance of this test has been reviewed for  completeness and compliance with Technical Specification Table 4.3.4.2.1-1 Items 1 and 2, and Table 4.3.1.1-1 Items 9 and 10. This test is considered:
2.1.1 SATISFACTORY (All acceptance criteria is marked SAT)
  /_______________ SM/CRS DATE-TIME 2.1.2 UNSATISFACTORY AND IF necessary the T/S ACTION statement has been implemented. 
  /_______________ SM/CRS DATE-TIME 2.1.4 Order No.
2.1.5 Remarks 
 
JOB PERFORMANCE MEASURE Page 14 of 23 ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 3 of 3) 3.0 PROCEDURE PERFORMER(S) AND VERIFIER(S) 3.1 I have read and understand the steps of this procedure that I am required to perform.   (All Departments)
PRINT NAME SIGNATURE INITIALS DATE/TIME _________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
Line 155: Line 210:
_________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
_________________ / ______________________ / ____________ / _____________
Page 14 of 23


JOB PERFORMANCE MEASURE Page 15 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 1 of 9) 1.0 TEST INFORMATION 1.1 Main Turbine Stop Valve Test - (Preferred Method)
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 1 of 9) 1.0     TEST INFORMATION 1.1   Main Turbine Stop Valve Test - (Preferred Method)
STEP NOMENCLATURE CKT REQUIRED PERF 5.1.4 TABLE AC-002 RELAY CONTACTS OPEN   STEP NOMENCLATURE REQUIRED PERF VERIF 5.1.5.A NORM BYP RECIRC PUMP TRIP DISABLE  SYSTEM A BYP    NORM BYP RECIRC PUMP TRIP DISABLE SYSTEM B BYP    STEP NOMENCLATURE REQUIRED SAT/UNSAT PERF  5.1.6.H.1 RPS TRIP LOGIC A1, NORMAL/RESET STATUS LIGHT EXTINGUISHES
STEP                     NOMENCLATURE                           CKT REQUIRED       PERF 5.1.4           TABLE AC-002 RELAY CONTACTS                         OPEN STEP                     NOMENCLATURE                           REQUIRED     PERF VERIF NORM BYP RECIRC PUMP TRIP DISABLE BYP 5.1.5.A   SYSTEM A NORM BYP RECIRC PUMP TRIP DISABLE BYP SYSTEM B SAT/
* 5.1.6.H.2 ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
STEP                     NOMENCLATURE                           REQUIRED           PERF UNSAT RPS TRIP LOGIC A1, NORMAL/RESET STATUS 5.1.6.H.1                                                      EXTINGUISHES
* 5.1.6.H.3 ANNUNCIATOR C3 A2, REACTOR SCRAM TRIP LOGIC A1 ENERGIZES 5.1.6.Q.1 RPS TRIP LOGIC A2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.H.2                                                          ENERGIZES
* 5.1.6.Q.2 ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* CLOSURE ANNUNCIATOR C3 A2, REACTOR SCRAM TRIP 5.1.6.H.3                                                          ENERGIZES LOGIC A1 RPS TRIP LOGIC A2, NORMAL/RESET STATUS 5.1.6.Q.1                                                      EXTINGUISHES
* 5.1.6.Q.3 ANNUNCIATOR C3 A3, REACTOR SCRAM TRIP LOGIC A2 ENERGIZES 5.1.6.Z.1 RPS TRIP LOGIC B1, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.Q.2                                                          ENERGIZES
* 5.1.6.Z.2 ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* CLOSURE ANNUNCIATOR C3 A3, REACTOR SCRAM TRIP 5.1.6.Q.3                                                          ENERGIZES LOGIC A2 RPS TRIP LOGIC B1, NORMAL/RESET STATUS 5.1.6.Z.1                                                      EXTINGUISHES
* 5.1.6.Z.3 ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP LOGIC B1 ENERGIZES 5.1.6.II.1 RPS TRIP LOGIC B2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.Z.2                                                          ENERGIZES
* 5.1.6.II.2 ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* CLOSURE ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP 5.1.6.Z.3                                                          ENERGIZES LOGIC B1 RPS TRIP LOGIC B2, NORMAL/RESET STATUS 5.1.6.II.1                                                      EXTINGUISHES
* 5.1.6.II.3 ANNUNCIATOR C3 A5, REACTOR SCRAM TRIP LOGIC B2 ENERGIZES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.II.2                                                        ENERGIZES
* The asterisk indicates acceptance criteria - in order to satisfy the requirements      of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
* CLOSURE ANNUNCIATOR C3 A5, REACTOR SCRAM TRIP 5.1.6.II.3                                                        ENERGIZES LOGIC B2
JOB PERFORMANCE MEASURE  Page 16 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 2 of 9) 1.1 Main Turbine Stop Valve Test - (Preferred Method) (Continued)
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
STEP NOMENCLATURE REQUIRED PERF VERIF 5.1.7 RECIRC PUMP TRIP DISABLE SYSTEM A NORMAL    RECIRC PUMP TRIP DISABLE SYSTEM B NORMAL      STEP NOMENCLATURE REQUIRED SAT/ UNSAT PERF  5.1.8.C TURBINE STOP VALVE CLOSURE TEST LAMP DS6A EXTINGUISHES
Page 15 of 23
* 5.1.8.D TURBINE STOP VALVE CLOSURE LOGIC A1 TEST SWITCH NORMAL
* 5.1.8.F TURBINE STOP VALVE CLOSURE TEST LAMP DS8C EXTINGUISHES
* 5.1.8.G TURBINE STOP VALVE CLOSURE LOGIC A2 TEST SWITCH NORMAL
* 5.1.8.I TURBINE STOP VALVE CLOSURE TEST LAMP DS8B EXTINGUISHES
* 5.1.8.J TURBINE STOP VALVE CLOSURE LOGIC B1 TEST SWITCH NORMAL
* 5.1.8.L TURBINE STOP VALVE CLOSURE TEST LAMP DS6B EXTINGUISHES
* 5.1.8.M TURBINE STOP VALVE CLOSURE LOGIC B2 TEST SWITCH NORMAL
* STEP NOMENCLATURE CKT REQUIRED PERF  5.1.9.A TABLE  AC-002  RELAY CONTACTS OPEN
* The asterisk indicates acceptance criteria - in order to satisfy the requirements     of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
JOB PERFORMANCE MEASURE  Page 17 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 3 of 9) 1.1 Main Turbine Stop Valve Test - (Preferred Method) (Continued)
STEP NOMENCLATURE CKT REQUIRED SAT/UNSAT PERF 5.1.9.C TEST POINT C71A-K49A 2B-2C CLOSED
* 5.1.9.D TEST POINT C71A-K49A 2B-2C OPEN
* 5.1.9.F TEST POINT C71A-K49G 2B-2C CLOSED
* 5.1.9.G TEST POINT C71A-K49G 2B-2C OPEN
* 5.1.9.I TEST POINT C71A-K49F 2B-2C CLOSED
* 5.1.9.J TEST POINT C71A-K49F 2B-2C OPEN
* 5.1.9.L TEST POINT C71A-K49D 2B-2C CLOSED
* 5.1.9.M TEST POINT C71A-K49D 2B-2C OPEN
  *
* The asterisk indicates acceptance criteria - in order to satisfy the requirements      of the acceptance criteria, the SAT/UNSAT block must be marked SAT.


JOB PERFORMANCE MEASURE Page 18 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 4 of 9) 1.2 Main Turbine Stop Valve Test - (Alternate Method)
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 2 of 9) 1.1    Main Turbine Stop Valve Test - (Preferred Method) (Continued)
STEP NOMENCLATURE CKT REQUIRED PERF 5.2.4 TABLE AC-002  RELAY CONTACTS OPEN    STEP NOMENCLATURE REQUIRED PERF VERIF 5.2.5.A NORM BYP RECIRC PUMP TRIP DISABLE SYSTEM A BYP    NORM BYP RECIRC PUMP TRIP DISABLE SYSTEM B BYP    STEP NOMENCLATURE REQUIRED SAT/ UNSAT PERF  RPS TRIP LOGIC A1, NORMAL/RESET STATUS LIGHT EXTINGUISHES
STEP                   NOMENCLATURE                         REQUIRED         PERF  VERIF RECIRC PUMP TRIP DISABLE SYSTEM A                   NORMAL 5.1.7 RECIRC PUMP TRIP DISABLE SYSTEM B                   NORMAL SAT/  PERF STEP                   NOMENCLATURE                         REQUIRED UNSAT TURBINE STOP VALVE CLOSURE TEST 5.1.8.C                                                    EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* LAMP DS6A TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.D                                                      NORMAL
* 5.2.8.E ANNUNCIATOR C3 A2, REACTOR SCRAM TRIP LOGIC A1 ENERGIZES RPS TRIP LOGIC A1, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* A1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.1.8.F                                                    EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* LAMP DS8C TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.G                                                      NORMAL
* 5.2.8.N ANNUNCIATOR C3 A2, REACTOR SCRAM TRIP LOGIC A1 ENERGIZES RPS TRIP LOGIC A2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* A2 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.1.8.I                                                  EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* LAMP DS8B TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.J                                                      NORMAL
* 5.2.9.E ANNUNCIATOR C3 A3, REACTOR SCRAM TRIP LOGIC A2 ENERGIZES RPS TRIP LOGIC A2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* B1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.1.8.L                                                    EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* LAMP DS6B TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.M                                                      NORMAL
* 5.2.9.N ANNUNCIATOR C3 A3, REACTOR SCRAM TRIP LOGIC A2 ENERGIZES
* B2 TEST SWITCH STEP                     NOMENCLATURE                           CKT REQUIRED     PERF 5.1.9.A     TABLE AC-002 RELAY CONTACTS                                   OPEN
* The asterisk indicates acceptance criteria - in order to satisfy the requirements      of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
JOB PERFORMANCE MEASURE  Page 19 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 5 of 9) 1.2 Main Turbine Stop Valve Test - (Alternate Method) (Continued)
Page 16 of 23
STEP NOMENCLATURE REQUIRED SAT/UNSAT PERF  RPS TRIP LOGIC B1, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* 5.2.10.E ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP LOGIC B1 ENERGIZES RPS TRIP LOGIC B1, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* 5.2.10.N ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP LOGIC B1 ENERGIZES RPS TRIP LOGIC B2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* 5.2.11.E ANNUNCIATOR C3 A5, REACTOR SCRAM TRIP LOGIC B2 ENERGIZES RPS TRIP LOGIC B2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* ANNUNCIATOR C5 B2 MAIN STOP VALVE CLOSURE ENERGIZES
* 5.2.11.N ANNUNCIATOR C3 A5, REACTOR SCRAM TRIP LOGIC B2 ENERGIZES
* The asterisk indicates acceptance criteria - in order to satisfy the requirements      of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
JOB PERFORMANCE MEASURE  Page 20 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 6 of 9) 1.2 Main Turbine Stop Valve Test  - (Alternate Method) (Continued)
STEP NOMENCLATURE REQUIRED PERF VERIF 5.2.12 RECIRC PUMP TRIP DISABLE SYSTEM A NORM    RECIRC PUMP TRIP DISABLE SYSTEM B NORM      STEP NOMENCLATURE REQUIRED SAT/ UNSAT PERF  5.2.13.C TURBINE STOP VALVE CLOSURE TEST LAMP DS6A EXTINGUISHES
* 5.2.13.D TURBINE STOP VALVE CLOSURE LOGIC A1 TEST SWITCH NORM
* 5.2.13.F TURBINE STOP VALVE CLOSURE TEST LAMP DS8C EXTINGUISHES
* 5.2.13.G TURBINE STOP VALVE CLOSURE LOGIC A2 TEST SWITCH NORM
* 5.2.13.I TURBINE STOP VALVE CLOSURE TEST LAMP DS8B EXTINGUISHES
* 5.2.13.J TURBINE STOP VALVE CLOSURE LOGIC B1 TEST SWITCH NORM
* 5.2.13.L TURBINE STOP VALVE CLOSURE TEST LAMP DS6B EXTINGUISHES
* 5.2.13.M TURBINE STOP VALVE CLOSURE LOGIC B2 TEST SWITCH NORM
* STEP NOMENCLATURE CKT REQUIRED PERF 5.2.14.A TABLE AC-002 RELAY CONTACTS OPEN
* The asterisk indicates acceptance criteria - in order to satisfy the requirements     of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
JOB PERFORMANCE MEASURE  Page 21 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 7 of 9) 1.2 Main Turbine Stop Valve Test - (Alternate Method) (Continued)
STEP NOMENCLATURE CKT REQUIRED SAT/UNSAT PERF 5.2.14.C TEST POINT C71A-K49A 2B-2C CLOSED
* 5.2.14.D TEST POINT C71A-K49A 2B-2C OPEN
* 5.2.14.F TEST POINT C71A-K49G 2B-2C CLOSED
* 5.2.14.G TEST POINT C71A-K49G 2B-2C OPEN
* 5.2.14.I TEST POINT C71A-K49F 2B-2C CLOSED
* 5.2.14.J TEST POINT C71A-K49F 2B-2C OPEN
* 5.2.14.L TEST POINT C71A-K49D 2B-2C CLOSED
* 5.2.14.M TEST POINT C71A-K49D 2B-2C OPEN
  *
* The asterisk indicates acceptance criteria - in order to satisfy the requirements      of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
1.3 Turbine Control Valves Test (CV)
STEP NOMENCLATURE CKT REQUIRED PERF 5.3.4 TABLE  AC-001  RELAY CONTACTS OPEN JOB PERFORMANCE MEASURE  Page 22 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 8 of 9)


1.3 Turbine Control Valves Test (CV) (Continued)
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 3 of 9) 1.1    Main Turbine Stop Valve Test - (Preferred Method) (Continued)
TURBINE CONTROL VALVE #1 STEP NOMENCLATURE REQUIRED SAT/ UNSAT PERF/ DATE 5.3.11.F TURBINE CONTROL VALVE FULLY CLOSED FULL CLOSED INDICATION 5.3.11.G TURB CONTROL VALVE FAST CLOSURE LOGIC A1 TEST LIGHT EXTINGUISHES 5.3.11.H C71-K48A  2B-2C RELAY CLOSED 5.3.11.I.1 RPS TRIP LOGIC A1, NORMAL/RESET STATUS LIGHT EXTINGUISHES 5.3.11.I.2 ANNUNCIATOR C5 A2, TCV FAST CLOSURE ENERGIZES 5.3.11.I.3 ANNUNCIATOR C3 A2 REACTOR SCRAM TRIP LOGIC A1 ENERGIZES TURBINE CONTROL VALVE #2 STEP NOMENCLATURE REQUIRED SAT/ UNSAT PERF/ DATE  5.3.11.F TURBINE CONTROL VALVE FULLY CLOSED FULL CLOSEDINDICATION
STEP               NOMENCLATURE                   CKT REQUIRED         SAT/UNSAT   PERF 5.1.9.C    TEST POINT C71A-K49A 2B-2C                CLOSED
* 5.3.11.G TURB CONTROL VALVE FAST CLOSURE  LOGIC B1 TEST LIGHT EXTINGUISHES
* 5.1.9.D    TEST POINT C71A-K49A 2B-2C                 OPEN
* 5.3.11.H C710K48B  2B-2C RELAY CLOSED
* 5.1.9.F     TEST POINT C71A-K49G 2B-2C                CLOSED
* 5.3.11.I.1 RPS TRIP LOGIC B 1, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* 5.1.9.G     TEST POINT C71A-K49G 2B-2C                  OPEN
* 5.3.11.I.2 ANNUNCIATOR C5 A2, TCV FAST CLOSURE ENERGIZES
* 5.1.9.I    TEST POINT C71A-K49F 2B-2C                 CLOSED
* 5.3.11.I.3 ANNUNCIATOR C3 A4 REACTOR SCRAM TRIP LOGIC B 1 ENERGIZES
* 5.1.9.J    TEST POINT C71A-K49F 2B-2C                  OPEN
* The asterisk indicates acceptance criteria - in order to satisfy the requirements     of the acceptance criteria, the SAT/UNSAT block must be marked SAT.  
* 5.1.9.L    TEST POINT C71A-K49D 2B-2C                CLOSED
* 5.1.9.M    TEST POINT C71A-K49D 2B-2C                  OPEN                              *
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
Page 17 of 23


NOTE :  5.3.11.F OR G must be marked SAT.
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 4 of 9) 1.2  Main Turbine Stop Valve Test - (Alternate Method)
JOB PERFORMANCE MEASURE Page 23 of 23 ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 9 of 9) 1.3 Turbine Control Valves Test (CV) (Continued
STEP                   NOMENCLATURE                           CKT REQUIRED       PERF 5.2.4          TABLE AC-002 RELAY CONTACTS                          OPEN STEP                    NOMENCLATURE                            REQUIRED      PERF  VERIF NORM BYP RECIRC PUMP TRIP DISABLE BYP 5.2.5.A  SYSTEM A NORM BYP RECIRC PUMP TRIP DISABLE BYP SYSTEM B SAT/
) TURBINE CONTROL VALVE #3 STEP NOMENCLATURE REQUIRED SAT/ UNSAT PERF/ DATE  5.3.11.F TURBINE CONTROL VALVE FULLY CLOSED FULL CLOSEDINDICATION
STEP                    NOMENCLATURE                          REQUIRED              PERF UNSAT RPS TRIP LOGIC A1, NORMAL/RESET STATUS EXTINGUISHES
* 5.3.11.G TURB CONTROL VALVE FAST CLOSURE LOGIC B2 TEST LIGHT EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.8.E                                                        ENERGIZES
* 5.3.11.H C71-K48D  2B-2C RELAY CLOSED
* CLOSURE ANNUNCIATOR C3 A2, REACTOR SCRAM ENERGIZES TRIP LOGIC A1 RPS TRIP LOGIC A1, NORMAL/RESET STATUS EXTINGUISHES
* 5.3.11.I.1 RPS TRIP LOGIC B2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.8.N                                                        ENERGIZES
* 5.3.11.I.2 ANNUNCIATOR C5 A2, TCV FAST CLOSURE ENERGIZES
* CLOSURE ANNUNCIATOR C3 A2, REACTOR SCRAM ENERGIZES TRIP LOGIC A1 RPS TRIP LOGIC A2, NORMAL/RESET STATUS EXTINGUISHES
* 5.3.11.I.3 ANNUNCIATOR C3 A5 REACTOR SCRAM TRIP LOGIC B2 ENERGIZES NOTE: 5.3.9 F OR G must be marked SAT.
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.9.E                                                        ENERGIZES
TURBINE CONTROL VALVE #4 STEP NOMENCLATURE REQUIRED SAT/ UNSAT PERF/ DATE  5.3.12.G TURBINE CONTROL VALVE FULLY CLOSED FULL CLOSEDINDICATION
* CLOSURE ANNUNCIATOR C3 A3, REACTOR SCRAM ENERGIZES TRIP LOGIC A2 RPS TRIP LOGIC A2, NORMAL/RESET STATUS EXTINGUISHES
* 5.3.12.H TURB CONTROL VALVE FAST CLOSURE LOGIC A2 TEST LIGHT EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.9.N                                                        ENERGIZES
* 5.3.12.I C71-K48C  2B-2C RELAY CLOSED
* CLOSURE ANNUNCIATOR C3 A3, REACTOR SCRAM ENERGIZES TRIP LOGIC A2
* 5.3.12.J.1 RPS TRIP LOGIC A2, NORMAL/RESET STATUS LIGHT EXTINGUISHES
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
* 5.3.12.J.2 ANNUNCIATOR C5 A2, TCV FAST CLOSURE ENERGIZES
Page 18 of 23
* 5.3.12.J.3 ANNUNCIATOR C3 A3 REACTOR SCRAM TRIP LOGIC A2 ENERGIZES
* The asterisk indicates acceptance criteria - in order to satisfy the requirements     of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
NOTE: 5.3.12 G OR H must be marked SAT.


INITIAL LICENSED OPERATOR EXAMINATION  JOB PERFORMANCE MEASURE Page 1 of 8 STATION: HOPE CREEK SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service TASK NUMBER:
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 5 of 9) 1.2  Main Turbine Stop Valve Test - (Alternate Method) (Continued)
2080010101 JPM NUMBER:
SAT/
NRC-JPM-002 ALTERNATE PATH: X K/A NUMBER:400000A4.01  IMPORTANCE FACTOR:3.1  3.0 APPLICABILITY: RO  SRO    RO X  SROX EVALUATION SETTING/METHOD:
STEP                    NOMENCLATURE                            REQUIRED          PERF UNSAT RPS TRIP LOGIC B1, NORMAL/RESET STATUS EXTINGUISHES
Simulator/Perform
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.10.E                                                          ENERGIZES
* CLOSURE ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP ENERGIZES LOGIC B1 RPS TRIP LOGIC B1, NORMAL/RESET STATUS EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.10.N                                                          ENERGIZES
* CLOSURE ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP ENERGIZES LOGIC B1 RPS TRIP LOGIC B2, NORMAL/RESET STATUS EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.11.E                                                          ENERGIZES
* CLOSURE ANNUNCIATOR C3 A5, REACTOR SCRAM TRIP ENERGIZES LOGIC B2 RPS TRIP LOGIC B2, NORMAL/RESET STATUS EXTINGUISHES
* LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.11.N                                                          ENERGIZES
* CLOSURE ANNUNCIATOR C3 A5, REACTOR SCRAM TRIP ENERGIZES LOGIC B2
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
Page 19 of 23


==REFERENCES:==
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 6 of 9) 1.2    Main Turbine Stop Valve Test - (Alternate Method) (Continued)
STEP                    NOMENCLATURE                          REQUIRED        PERF  VERIF RECIRC PUMP TRIP DISABLE SYSTEM A                    NORM 5.2.12 RECIRC PUMP TRIP DISABLE SYSTEM B                    NORM SAT/  PERF STEP                  NOMENCLATURE                          REQUIRED UNSAT TURBINE STOP VALVE CLOSURE TEST 5.2.13.C                                                    EXTINGUISHES
* LAMP DS6A TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.D                                                        NORM
* A1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.2.13.F                                                    EXTINGUISHES
* LAMP DS8C TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.G                                                        NORM
* A2 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.2.13.I                                                  EXTINGUISHES
* LAMP DS8B TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.J                                                        NORM
* B1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.2.13.L                                                    EXTINGUISHES
* LAMP DS6B TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.M                                                        NORM
* B2 TEST SWITCH STEP                      NOMENCLATURE                            CKT REQUIRED      PERF 5.2.14.A    TABLE AC-002 RELAY CONTACTS                                  OPEN
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
Page 20 of 23
 
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 7 of 9) 1.2    Main Turbine Stop Valve Test - (Alternate Method) (Continued)
STEP              NOMENCLATURE                    CKT REQUIRED          SAT/UNSAT  PERF 5.2.14.C    TEST POINT C71A-K49A 2B-2C                CLOSED
* 5.2.14.D    TEST POINT C71A-K49A 2B-2C                  OPEN
* 5.2.14.F    TEST POINT C71A-K49G 2B-2C                CLOSED
* 5.2.14.G    TEST POINT C71A-K49G 2B-2C                  OPEN
* 5.2.14.I    TEST POINT C71A-K49F 2B-2C                CLOSED
* 5.2.14.J    TEST POINT C71A-K49F 2B-2C                  OPEN
* 5.2.14.L    TEST POINT C71A-K49D 2B-2C                CLOSED
* 5.2.14.M    TEST POINT C71A-K49D 2B-2C                  OPEN                              *
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
1.3    Turbine Control Valves Test (CV)
STEP                      NOMENCLATURE                            CKT REQUIRED    PERF 5.3.4      TABLE AC-001 RELAY CONTACTS                                  OPEN Page 21 of 23
 
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 8 of 9) 1.3    Turbine Control Valves Test (CV) (Continued)
TURBINE CONTROL VALVE #1 SAT/  PERF/
STEP                  NOMENCLATURE                          REQUIRED UNSAT  DATE FULL CLOSED 5.3.11.F  TURBINE CONTROL VALVE FULLY INDICATION CLOSED TURB CONTROL VALVE FAST CLOSURE 5.3.11.G                                                  EXTINGUISHES LOGIC A1 TEST LIGHT 5.3.11.H  C71-K48A 2B-2C RELAY                                CLOSED 5.3.11.I.1  RPS TRIP LOGIC A1, NORMAL/RESET                EXTINGUISHES STATUS LIGHT 5.3.11.I.2  ANNUNCIATOR C5 A2, TCV FAST                      ENERGIZES CLOSURE ANNUNCIATOR C3 A2 REACTOR SCRAM 5.3.11.I.3                                                    ENERGIZES TRIP LOGIC A1 TURBINE CONTROL VALVE #2 SAT/  PERF/
STEP                  NOMENCLATURE                          REQUIRED UNSAT  DATE FULL CLOSED 5.3.11.F  TURBINE CONTROL VALVE FULLY CLOSED
* INDICATION TURB CONTROL VALVE FAST CLOSURE 5.3.11.G                                                  EXTINGUISHES
* LOGIC B1 TEST LIGHT 5.3.11.H  C710K48B 2B-2C RELAY                                CLOSED
* RPS TRIP LOGIC B 1, NORMAL/RESET 5.3.11.I.1                                                EXTINGUISHES
* STATUS LIGHT 5.3.11.I.2 ANNUNCIATOR C5 A2, TCV FAST CLOSURE                ENERGIZES
* ANNUNCIATOR C3 A4 REACTOR SCRAM 5.3.11.I.3                                                    ENERGIZES TRIP LOGIC B 1
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
NOTE : 5.3.11.F OR G must be marked SAT.
Page 22 of 23
 
JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 9 of 9) 1.3  Turbine Control Valves Test (CV) (Continued)
TURBINE CONTROL VALVE #3 SAT/ PERF/
STEP                  NOMENCLATURE                          REQUIRED UNSAT DATE FULL CLOSED 5.3.11.F  TURBINE CONTROL VALVE FULLY CLOSED
* INDICATION TURB CONTROL VALVE FAST CLOSURE 5.3.11.G                                                  EXTINGUISHES
* LOGIC B2 TEST LIGHT 5.3.11.H  C71-K48D 2B-2C RELAY                                CLOSED
* RPS TRIP LOGIC B2, NORMAL/RESET 5.3.11.I.1                                                EXTINGUISHES
* STATUS LIGHT 5.3.11.I.2 ANNUNCIATOR C5 A2, TCV FAST CLOSURE                ENERGIZES
* ANNUNCIATOR C3 A5 REACTOR SCRAM 5.3.11.I.3                                                    ENERGIZES TRIP LOGIC B2 NOTE: 5.3.9 F OR G must be marked SAT.
TURBINE CONTROL VALVE #4 SAT/ PERF/
STEP                  NOMENCLATURE                          REQUIRED UNSAT DATE FULL CLOSED 5.3.12.G  TURBINE CONTROL VALVE FULLY CLOSED
* INDICATION TURB CONTROL VALVE FAST CLOSURE 5.3.12.H                                                  EXTINGUISHES
* LOGIC A2 TEST LIGHT 5.3.12.I  C71-K48C 2B-2C RELAY                                CLOSED
* RPS TRIP LOGIC A2, NORMAL/RESET 5.3.12.J.1                                                EXTINGUISHES
* STATUS LIGHT 5.3.12.J.2 ANNUNCIATOR C5 A2, TCV FAST CLOSURE                ENERGIZES
* ANNUNCIATOR C3 A3 REACTOR SCRAM 5.3.12.J.3                                                    ENERGIZES TRIP LOGIC A2
* The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.
NOTE: 5.3.12 G OR H must be marked SAT.
Page 23 of 23


HC.OP-SO.ED-0001, Rev. 19 HC.OP-AB.COOL-0003, Rev. 2 TOOLS AND EQUIPMENT:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:          HOPE CREEK SYSTEM:          Reactor Auxiliaries Cooling System TASK:            Place the Reactor Auxiliaries Cooling System In-Service TASK NUMBER:      2080010101 JPM NUMBER:      NRC-JPM-002 ALTERNATE PATH:        X                          K/A NUMBER:          400000A4.01 IMPORTANCE FACTOR:            3.1            3.0 APPLICABILITY:                                                       RO            SRO RO    X                      SRO      X EVALUATION SETTING/METHOD:           Simulator/Perform
None  VALIDATED JPM COMPLETION TIME:
6 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A  JPM SOURCE:  New


APPROVAL:
==REFERENCES:==
Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
HC.OP-SO.ED-0001, Rev. 19 HC.OP-AB.COOL-0003, Rev. 2 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME:                6 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                N/A JPM SOURCE: New APPROVAL:
Author                   Facility Representative           Chief Examiner CAUTION:     No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
ACTUAL JPM COMPLETION TIME:
: 3. Verification of the as left condition by a qualified individual.
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A JPM PERFORMED BY:
ACTUAL JPM COMPLETION TIME:                     Minutes ACTUAL TIME CRITICAL COMPLETION:                   N/A JPM PERFORMED BY:                                       GRADE:     SAT         UNSAT REASON, IF UNSATISFACTORY:
GRADE: SAT UNSAT REASON , IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
EVALUATOR'S SIGNATURE:
Page 1 of 8
 
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION  JOB PERFORMANCE MEASURE  Page 2 of 8 NAME:  DATE:  SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service TASK NUMBER:
SYSTEM:             Reactor Auxiliaries Cooling System TASK:               Place the Reactor Auxiliaries Cooling System In-Service TASK NUMBER: 2080010101 INITIAL CONDITIONS:
2080010101 INITIAL CONDITIONS:
: 1. The Main Generator is synchronized to the grid.
: 1. The Main Generator is synchronized to the grid. 2. The RACS System is in service with the RACS PMP 1AP209 and RACS PMP 1CP209 in operation. 3. RACS PMP 1BP209 is ready for a norma l start. This pump was not isolated and drained.
: 2. The RACS System is in service with the RACS PMP 1AP209 and RACS PMP 1CP209 in operation.
: 3. RACS PMP 1BP209 is ready for a normal start. This pump was not isolated and drained.
INITIATING CUE:
INITIATING CUE:
Swap RACS pumps. Place RACS PMP 1BP209 in service; remove RACS PMP 1CP209 from service.
Swap RACS pumps. Place RACS PMP 1BP209 in service; remove RACS PMP 1CP209 from service.
Successful Completion Criteria: 1. All critical steps completed.
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 8 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service
Page 2 of 8
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  Operator obtains/locates procedure HC.OP-SO.ED-0001.
Operator obtains the correct procedure.
Operator reviews precautions and limitations.
Operator reviews precautions and limitations and initials each precaution and limitation in the space provided in


the procedure.
INITIAL LICENSED OPERATOR EXAMINATION                  NAME:
Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all  
JOB PERFORMANCE MEASURE                          DATE:
 
SYSTEM:    Reactor Auxiliaries Cooling System TASK:      Place the Reactor Auxiliaries Cooling System In-Service STEP                                                                            COMMENTS
are satisfied.
#    STEP
(*Denotes a Critical Step)                                                      EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                        S/U      evaluation)
Operator obtains/locates procedure        Operator obtains the correct procedure.
HC.OP-SO.ED-0001.
Operator reviews precautions and          Operator reviews precautions and limitations.                              limitations and initials each precaution and limitation in the space provided in the procedure.
Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.
Examiner Note: It is not critical to initial the procedure steps.
Examiner Note: It is not critical to initial the procedure steps.
Operator determines beginning step of the procedure.
Operator determines beginning step       Operator determines correct beginning of the procedure.                         step to be 5.3.1 5.3.1     ENSURE all prerequisites have been       Operator reviews prerequisites and satisfied IAW Section 2.3.               initials each prerequisite in the space provided in the procedure.
Operator determines correct beginning step to be 5.3.1 5.3.1 ENSURE all prerequisites have been satisfied IAW Section 2.3.
Operator reviews prerequisites and initials each prerequisite in the space  
 
provided in the procedure.
Examiner Cue: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
Examiner Cue: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
Page 3 of 8


Page 4 of 8 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service  
INITIAL LICENSED OPERATOR EXAMINATION             NAME:
#
JOB PERFORMANCE MEASURE                   DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Reactor Auxiliaries Cooling System TASK:     Place the Reactor Auxiliaries Cooling System In-Service STEP                                                                      COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
(*Denotes a Critical Step)                                               EVAL  (Required for UNSAT
 
* NO.                                                          STANDARD
5.3.2 START TIME:
(#Denotes a Sequential Step)                                                 S/U     evaluation)
ENSURE that one of the following valves are OPEN (10C651A):
START TIME:
ED-HV-2537A(B) HX INLET VLVS.
5.3.2     ENSURE that one of the following         Operator determines the status of ED valves are OPEN (10C651A):               HV-2537A(B) by observing that the Red ED-HV-2537A(B) HX INLET VLVS.            OPEN indicating lights for both valves are illuminated on 10C651A.
 
Operator determines the status of ED HV-2537A(B) by observing that the Red
 
OPEN indicating lights for both valves are illuminated on 10C651A.
The operator then initials the appropriate procedure steps.
The operator then initials the appropriate procedure steps.
5.3.3. OBSERVE the following lights are off for the RACS Pumps going in service: OVLD/PWR FAIL INOP REMOTE Operator observes that the OVLD/PWR FAIL, INOP, and REMOTE lights for the "B" RACS Pump are not illuminated.
5.3.3. OBSERVE the following lights are off     Operator observes that the OVLD/PWR for the RACS Pumps going in service:     FAIL, INOP, and REMOTE lights for the B RACS Pump are not illuminated.
* OVLD/PWR FAIL The operator then initials the
* INOP                             appropriate procedure step.
* REMOTE 5.3.4. For the 1AP209 and/or 1BP209, as        Operator observes the CLOSED light applicable, ENSURE RACS PMP              for BKR 52-42011 is illuminated, and 1AP209 BKR 52-41011, and/or              determines that the B RACS Pump 1BP209 BKR 52-42011 CLOSED is            breaker is closed.
on. (10C650E)
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
5.3.4. For the 1AP209 and/or 1BP209, as applicable, ENSURE RACS PMP 1AP209 BKR 52-41011, and/or
Page 4 of 8


1BP209 BKR 52-42011 CLOSED is  
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                      DATE:
SYSTEM:    Reactor Auxiliaries Cooling System TASK:      Place the Reactor Auxiliaries Cooling System In-Service STEP                                                                        COMMENTS
#    STEP
(*Denotes a Critical Step)                                                    EVAL  (Required for UNSAT
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation) 5.3.5    IF returning a pump to service that        Operator determines to proceed to Step has been isolated and drained,            5.3.6 since, the Initiating Cue states PERFORM the following steps as            that the pump was not isolated and necessary to correct/prevent air          drained.
binding, otherwise, PROCEED to Step 5.3.6 for a normal start of a        The operator then initials the standby pump:                              appropriate procedure step.
#  5.3.6    PRESS REACTOR AUXILIARIES                  Operator presses the B RACS Pump
* COOLING PUMP A (B)(C) START PB            START pushbutton and observes the (10C651A). START comes on.                Red START light illuminates and the OBSERVE AI-6460 (AI-6461)                  Green STOP light goes out. Operator REACTOR AUXILIARIES COOLING                observes AI-6461 is < 180 amps and PUMP A(B)(C) MOT AMPS settles at          settles at the same value as the A and
              < 180 amps AND is approximately the        C RACS pumps amps.
same as the other I/S RACS pumps' motor amps.                                The operator then initials the appropriate procedure step.
#  5.3.7    PRESS REACTOR AUXILIARIES                  Operator presses the C RACS Pump
* COOLING PUMP B(A)(C) STOP PB.              STOP pushbutton and observes the STOP comes on.                            Green STOP light illuminates and the Red START light goes out.
The operator then initials the appropriate procedure steps.
Page 5 of 8


on. (10C650E)
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
Operator observes the CLOSED light for BKR 52-42011 is illuminated, and determines that the "B" RACS Pump
JOB PERFORMANCE MEASURE                      DATE:
SYSTEM:      Reactor Auxiliaries Cooling System TASK:        Place the Reactor Auxiliaries Cooling System In-Service STEP                                                                          COMMENTS
#    STEP
(*Denotes a Critical Step)                                                    EVAL  (Required for UNSAT
* NO.                                                               STANDARD
(#Denotes a Sequential Step)                                                    S/U        evaluation)
AB-      5 seconds after the C RACS pump          Operator diagnoses and announces B COOL      has been secured, the Operator             RACS pump has tripped and refers to
      -0003    observes the following:                    A2-E2. This procedure will direct him to AB.COOL-0003.
Annunciator A2-E2, RACS TROUBLE alarms                            Operator then enters AB.COOL-0003 Section A, RACS Pump has tripped B RACS pump has Tripped
* A.1      PRESS the START P.B. for any              Operator presses the START P.B. for available RACS pump in standby.            the C RACS pump Examiner Cue: C RACS pump does NOT start.
* A.2      IF a second RACS Pump CANNOT              Operator should determine that the Unit be placed in service,                      1 Off-gas train is in service and CLOSE THEN ISOLATE RACS to the out of            HV-7712A service Off-Gas Train as follows:
The Operator should NOT Close HV-
* IF the Common Off-Gas Train        2577.
is in service, THEN CLOSE HV-2577.
* IF Unit 1 Off-Gas Train is in      Examiner Cue: If the Operator service,                            Closes HV-2577 and states he is THEN CLOSE HV-7712A.                complete, terminate the JPM, otherwise give him 1 minute to recognize his mistake and then terminate the JPM. Isolating RACS to the in-service Off-gas Train is failure criteria.
Terminating Cue: Once the Operator has closed HV-7712A then state "This JPM is complete", unless he has also closed HV-2577 then see the Examiner Cue above.
Page 6 of 8


breaker is closed.
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
The operator then initials the appropriate procedure step.
: 1. The Main Generator is synchronized to the grid.
 
: 2. The RACS System is in service with the RACS PMP 1AP209 and RACS PMP 1CP209 in operation.
Page 5 of 8 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service
: 3. RACS PMP 1BP209 is ready for a normal start. This pump was not isolated and drained.
#
INITIATING CUE:
* STEP NO. STEP (*Denotes a Critical Step)
Swap RACS pumps. Place RACS PMP 1BP209 in service; remove RACS PMP 1CP209 from service.
(#Denotes a Sequential Step)
Page 7 of 8
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  5.3.5 IF returning a pump to service that has been isolated and drained, PERFORM the following steps as necessary to correct/prevent air
 
binding, otherwise, PROCEED to Step 5.3.6 for a normal start of a
 
standby pump:
Operator determines to proceed to Step 5.3.6 since, the Initiating Cue states
 
that the pump was not isolated and  
 
drained. The operator then initials the appropriate procedure step.  
  #* 5.3.6 PRESS REACTOR AUXILIARIES COOLING PUMP A (B)(C) START PB
 
(10C651A). START comes on.
 
OBSERVE AI-6460 (AI-6461) REACTOR AUXILIARIES COOLING
 
PUMP A(B)(C) MOT AMPS settles at
 
< 180 amps AND is approximately the same as the other I/S RACS pumps' motor amps.
Operator presses the "B" RACS Pump START pushbutton and observes the
 
Red START light illuminates and the
 
Green STOP light goes out. Operator
 
observes AI-6461 is < 180 amps and
 
settles at the same value as the "A" and
 
"C" RACS pumps' amps.
The operator then initials the appropriate procedure step.
  #* 5.3.7 PRESS REACTOR AUXILIARIES COOLING PUMP B(A)(C) STOP PB.
STOP comes on.
 
Operator presses the "C" RACS Pump STOP pushbutton and observes the Green STOP light illuminates and the
 
Red START light goes out.
The operator then initials the appropriate procedure steps.
 
Page 6 of 8 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  AB-COOL
-0003 5 seconds after the "C" RACS pump has been secured, the Operator
 
observes the following: Annunciator  A2-E2, "RACS TROUBLE" alarms "B" RACS pump has Tripped Operator diagnoses and announces "B" RACS pump has tripped and refers to
 
A2-E2. This procedure will direct him to


AB.COOL-0003.
JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS This JPM can be run in any IC, which has RACS in-service.
Operator then ent ers AB.COOL-0003 Section A, RACS Pump has tripped
To setup:
* A.1 PRESS the START P.B. for any available  RACS pump in standby.
* Ensure the A & C RACS pumps are in-service with the B RACS pump secured and in standby.
Operator presses the START P.B. for the "C" RACS pump Examiner Cue: "C" RACS pump does NOT start.
* Setup simulator to trip B RACS pump 5 seconds after C RACS pump has been secured,
* A.2 IF a second RACS Pump CANNOT be placed in service,
* Once C RACS pump has been secured, C RACS pump trips on re-start Page 8 of 8


THEN ISOLATE RACS to the out of service Off-Gas Train as follows:  IF the Common Off-Gas Train is in service, THEN CLOSE HV-2577. IF Unit 1 Off-Gas Train is in
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE:
: service, THEN CLOSE HV-7712A.
STATION:               Hope Creek SYSTEM:               Reactor Recirculation TASK:                 Perform Scoop Tube Positioner Lock-Up Operation TASK NUMBER:           2020080101 JPM NUMBER:           NRC-JPM-003 ALTERNATE PATH:         X                           K/A NUMBER:           202002 A2.05 IMPORTANCE FACTOR:             3.1           3.1 APPLICABILITY:                                                           RO           SRO RO     X              SRO      X EVALUATION SETTING/METHOD:           Simulator/Perform
Operator should deter mine that the Unit 1 Off-gas train is in service and CLOSE
 
HV-7712A The Operator should NOT Close HV-2577.
Examiner Cue:  If the Operator Closes HV-2577 and states he is
 
complete, terminate the JPM, otherwise give him 1 minute to recognize his mistake and then
 
terminate the JPM. Isolating RACS
 
to the in-service Off-gas Train is failure criteria.
Terminating Cue:  Once the Operator has closed HV-7712A then state "This JPM is complete", unless he has also closed HV-2577 then see the Examiner Cue above.
 
JOB PERFORMANCE MEASURE  Page 7 of 8 INITIAL CONDITIONS: 1. The Main Generator is synchronized to the grid. 2. The RACS System is in service with the RACS PMP 1AP209 and RACS PMP 1CP209 in operation. 3. RACS PMP 1BP209 is ready for a normal start. This pump was not isolated and drained. INITIATING CUE: Swap RACS pumps. Place RACS PMP 1B P209 in service; remove RACS PMP 1CP209 from service.
 
JOB PERFORMANCE MEASURE  Page 8 of 8 SIMULATOR INSTRUCTIONS This JPM can be run in any IC, which has RACS in-service.
To setup:  Ensure the "A & "C RACS pumps are in-s ervice with the "B" RACS pump secured and in standby. Setup simulator to trip "B" RACS pump 5 seconds after "C"  RACS pump has been secured,  Once "C" RACS pump has been secured,  "C" RACS pump tr ips on re-start INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE: Page 1 of 7 STATION: Hope Creek SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Position er Lock-Up Operation TASK NUMBER:
2020080101 JPM NUMBER:
NRC-JPM-003 ALTERNATE PATH: X K/A NUMBER:
202002 A2.05 IMPORTANCE FACTOR: 3.1 3.1 APPLICABILITY: RO SRO   RO X SROX EVALUATION SETTING/METHOD:
Simulator/Perform  


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.BB-0002, Rev 60, HC.OP-AB.RPV-0003, Rev 9 HC.OP-AB.MISC-0002, Rev 4, HC.OP-AB.RPV-0001, Rev 4 TOOLS, EQUIPMENT AND PROCEDURES:
HC.OP-SO.BB-0002, Rev 60, HC.OP-AB.RPV-0003, Rev 9 HC.OP-AB.MISC-0002, Rev 4, HC.OP-AB.RPV-0001, Rev 4 TOOLS, EQUIPMENT AND PROCEDURES:
Annotated copy of HC.SO.BB-0002.
Annotated copy of HC.SO.BB-0002.
VALIDATED JPM COMPLETION TIME:
VALIDATED JPM COMPLETION TIME:               7     Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                 N/A JPM SOURCE: Modified Bank APPROVAL:
7 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
Author                  Facility Representative            Chief Examiner CAUTION:        No plant equipment shall be operated during the performance of a JPM without the following:
N/A   JPM SOURCE: Modified Bank
: 1. Permission from the SM or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                      Minutes JPM PERFORMED BY:                                        GRADE:        SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                                  DATE:
Page 1 of 7


APPROVAL:        Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE:
: 1. Permission from the SM or Unit CRS;
NAME:
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N:            Minutes JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE:  Page 2 of 7 NAME:  DATE:  SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation  
SYSTEM:             Reactor Recirculation TASK:               Perform Scoop Tube Positioner Lock-Up Operation TASK NUMBER: 2020080101 INITIAL CONDITIONS:
 
: 1. The plant was at 77% power when a control signal failure caused the A Reactor Recirc Pump Motor/Generator Scoop Tube to lock-up.
TASK NUMBER:
: 2. The A Reactor Recirc pump was placed in Scoop Tube Positioner Lockup Operation IAW HC.OP-SO.BB-0002.
2020080101 INITIAL CONDITIONS:
: 3. I&C has repaired the control signal failure.
: 1. The plant was at 77% power when a control signal failure caused the 'A' Reactor Recirc Pump Motor/Generator Scoop Tube to lock-up. 2. The 'A' Reactor Recirc pump was placed in Scoop Tube Positioner Lockup Operation IAW HC.OP-SO.BB-0002. 3. I&C has repaired the control signal failure.
INITIATING CUE:
INITIATING CUE: Reset the Scoop Tube lockup on the 'A' Reactor Recirc pump. Maintain Reactor power at present after the scoop tube is reset.
Reset the Scoop Tube lockup on the A Reactor Recirc pump.
Successful Completion Criteria: 1. All critical steps completed.
Maintain Reactor power at present after the scoop tube is reset.
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 7 INITIAL LICENSED OPERATOR EXAMINATION NAME:
Page 2 of 7
JOB PERFORMANCE MEASUREDATE:SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
Operator reviews precautions and limitations.
Operator reviews precautions and limitations.
Examiner Cue:  If excessive time is taken reviewing precautions and limitations, inform operator that all
 
are satisfied.
Operator determines beginning step of the procedure.
Operator determines correct beginning step to be 5.9.1 5.9.1 START TIME:  ENSURE all prerequisites have been satisfied IAW Section 2.9 Operator reviews prerequisites and ensures that they are satisfied IAW
 
section 2.9.
Examiner Cue. If the Operator is taking an excessive am ount of time to review the prer equisites, then inform him that all of the
 
prerequisites are satisfied.
5.9.2 PRESS SIC-621A MAN AND SIC-621B MAN push buttons.
Operator depresse s the SIC-621A and SIC-621B MAN pushbuttons.
Examiner Cue: MAN pushbuttons are already lit, Operator may just verify lights are lit vs. depressing PB's, this is acceptable
  #* 5.9.3 PRESS SIC-620 OUTPUT A(B)
SELECT push button, 


for the Pump that will be reset.
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
Operator presses the SIC-620 OUTPUT A SELECT pushbutton
JOB PERFORMANCE MEASURE                  DATE:
 
SYSTEM:     Reactor Recirculation TASK:       Perform Scoop Tube Positioner Lock-Up Operation STEP                                                                        COMMENTS
Page 4 of 7  INITIAL LICENSED OPERATOR EXAMINATION NAME:
#     STEP
JOB PERFORMANCE MEASUREDATE:SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation  
(*Denotes a Critical Step)                                                 EVAL  (Required for UNSAT
#
* NO.                                                                  STANDARD
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)                                                 S/U     evaluation)
(#Denotes a Sequential Step)
Operator reviews precautions and            Operator reviews precautions and limitations.                                limitations.
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.
#
Operator determines beginning step          Operator determines correct beginning of the procedure.                            step to be 5.9.1 START TIME:                                  Operator reviews prerequisites and ensures that they are satisfied IAW 5.9.1      ENSURE all prerequisites have been          section 2.9.
* 5.9.4 Using Attachment 3, DETERMINE the desired SIC-621A(B) SPEED DEMAND 
satisfied IAW Section 2.9 Examiner Cue. If the Operator is taking an excessive amount of time to review the prerequisites, then inform him that all of the prerequisites are satisfied.
5.9.2      PRESS SIC-621A MAN AND SIC-                  Operator depresses the SIC-621A and 621B MAN push buttons.                      SIC-621B MAN pushbuttons.
Examiner Cue: MAN pushbuttons are already lit, Operator may just verify lights are lit vs. depressing PBs, this is acceptable
#    5.9.3      PRESS SIC-620 OUTPUT A(B)                   Operator presses the SIC-620
* SELECT push button,                          OUTPUT A SELECT pushbutton for the Pump that will be reset.
Page 3 of 7


INITIAL LICENSED OPERATOR EXAMINATION          NAME:
JOB PERFORMANCE MEASURE                DATE:
SYSTEM:    Reactor Recirculation TASK:      Perform Scoop Tube Positioner Lock-Up Operation STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                                  STANDARD
(#Denotes a Sequential Step)                                                S/U      evaluation)
#    5.9.4      Using Attachment 3,                          Operator looks at Attachment 3 and
* DETERMINE the desired SIC-                  determines that SIC-621B SPEED 621A(B) SPEED DEMAND                        DEMAND should be 51-57%
for the actual SPEED indicated on SIC-621A(B).
for the actual SPEED indicated on SIC-621A(B).
Operator looks at Attachment 3 and determines that SIC-621B SPEED DEMAND should be 51-57%
Examiner Cue: The target SPEED DEMAND is 54%. Some leeway has been added for meter readability and interpolation of Attachment 3 data.
Examiner Cue: The target SPEED DEMAND is 54%. Some leeway has been added for meter readability and interpolation of Attachment 3 data.  
#   5.9.5     PRESS SIC-R621A(B) SPD CONT                 Operator depresses the SIC-R621A
  #
* INCREASE OR DECREASE                         SPD CONT INCREASE OR pushbutton as necessary to obtain the       DECREASE pushbutton as necessary desired                                      to obtain desired speed.
* 5.9.5 PRESS SIC-R621A(B) SPD CONT INCREASE OR DECREASE pushbutton as necessary to obtain the  
SIC-621A(B) SPEED DEMAND from Step 5.9.4.                                  Examiner Note: + 2% of the operator determined desired value is acceptable. (i.e. if operator determined 54% was desired, then 53-57% would be acceptable.
#    5.9.6      PRESS SCOOP TUBE TRIP RESET                  Operator presses SCOOP TUBE TRIP
* AND ENSURE SCOOP TUBE LOCK-                  RESET AND ENSURES SCOOP TUBE UP light extinguishes.                      LOCK-UP light extinguishes.
Note: When SCOOP TUBE TRIP RESET is pressed the Recirc pump will runaway and the operator will need to take action IAW AB.RPV-0001 Page 4 of 7


desired SIC-621A(B) SPEED DEMAND from
INITIAL LICENSED OPERATOR EXAMINATION                  NAME:
JOB PERFORMANCE MEASURE                          DATE:
SYSTEM:    Reactor Recirculation TASK:      Perform Scoop Tube Positioner Lock-Up Operation STEP                                                                              COMMENTS
#    STEP
(*Denotes a Critical Step)                                                        EVAL  (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                          S/U      evaluation)
* AB.        A. Operator takes Immediate                Operator observes Recirc pump speed
#    RPV-        Operator Actions of AB.RPV-0001          increasing 0001        for Single Reactor Recirc Pump            Operator presses Pump A SCOOP runaway Imm.                                                  TUBE TRIP pushbutton.
Actions
* PRESS the SCOOP TUBE                  Examiner Note: Scoop tube may TRIP Pushbutton for the affected Recirc Pump                have already tripped. If Scoop tube Controller.                          is already tripped, it is not critical to push the SCOOP TUBE TRIP pb.
AB.        B. PLACE BOTH Recirc Pump                  Operator places Both Recirc Pump RPV-        individual controllers in MANUAL.        individual controlled in MANUAL 0001                                                  Examiner Note: SIC-R621A and B are Imm.                                                  already in MAN, this step is not Actions                                                critical.
* AB.        C. REDUCE the NON-affected                  Operator reduces Reactor power back
#    RPV-        Reactor Recirc                            to pre-transient value using the B 0001        Pump Speed to Reduce Power to            Recirc pump Imm.
Pre-Transient Actions value.
Examiner Note: When the operator STOP TIME:
has reduced power back to the pre-transient value terminate the JPM.
Terminating Cue: When Operator reduces power back to pre-transient value then state "This JPM is complete" Page 5 of 7


Step 5.9.4.
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
Operator depresse s the SIC-R621A SPD CONT INCREASE OR
: 1. The plant was at 77% power when a control signal failure caused the A Reactor Recirc Pump Motor/Generator Scoop Tube to lock-up.
 
: 2. The A Reactor Recirc pump was placed in Scoop Tube Positioner Lockup Operation IAW HC.OP-SO.BB-0002.
DECREASE pushbutton as necessary
: 3. I&C has repaired the control signal failure.
 
INITIATING CUE:
to obtain desired speed.
Reset the Scoop Tube lockup on the A Reactor Recirc pump.
Examiner Note: + 2% of the operator determined desired value is acceptable.  (i.e. if operator determined 54% was desired, then 53-57% would be acceptable.
Maintain Reactor power at present after the scoop tube is reset.
  #* 5.9.6 PRESS  SCOOP TUBE TRIP RESET AND ENSURE SCOOP TUBE LOCK-UP light extinguishes.
Page 6 of 7
Operator presses SCOOP TUBE TRIP RESET AND ENSURES SCOOP TUBE LOCK-UP light extinguishes.
Note: When SCOOP TUBE TRIP RESET is pressed the Recirc pump will runaway and the operator will
 
need to take action IAW AB.RPV-
 
0001 Page 5 of 7  INITIAL LICENSED OPERATOR EXAMINATION NAME:
JOB PERFORMANCE MEASUREDATE:SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
*# AB. RPV-0001 Imm. Actions A. Operator takes Immediate Operator Actions of AB.RPV-0001
 
for Single Reactor Recirc Pump
 
runaway  PRESS the SCOOP TUBE TRIP Pushbutton for the
 
affected Recirc Pump Controller.
Operator observes Recirc pump speed increasing Operator presses Pump A SCOOP TUBE TRIP pushbutton. Examiner Note:  Scoop tube may have already tripped. If Scoop tube is already tripped, it is not critical to push the SCOOP TUBE TRIP pb.
AB. RPV-0001 Imm. Actions B. PLACE BOTH Recirc Pump individual controllers in MANUAL. Operator places Both Recirc Pump individual controlled in MANUAL Examiner Note: SIC-R621A and B are already in MAN, this step is not
 
critical.
  *# AB. RPV-0001 Imm. Actions C. REDUCE the NON-affected Reactor Recirc 
 
Pump Speed to Reduce Power to
 
Pre-Transient 
 
value. Operator reduces Reactor power back to pre-transient value using the "B"
 
Recirc pump STOP TIME:
Examiner Note:
When the operator has reduced power back to the pre-
 
transient value terminate the JPM.
Terminating Cue:  When Operator reduces power back to pre-transient value then state "This JPM is complete" JOB PERFORMANCE MEASURE Page 6 of 7 INITIAL CONDITIONS:
: 1. The plant was at 77% power when a control signal failure caused the 'A' Reactor Recirc Pump Motor/Generator Scoop Tube to lock-up. 2. The 'A' Reactor Recirc pump was placed in Scoop Tube Positioner Lockup Operation IAW HC.OP-SO.BB-0002. 3. I&C has repaired the control signal failure. INITIATING CUE: Reset the Scoop Tube lockup on the 'A' Reactor Recirc pump. Maintain Reactor power at present after the scoop tube is reset.  


ATTACHMENT 4 JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)
ATTACHMENT 4 JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)
Page 7 of 7 I. INITIAL CONDITIONS:
I.       INITIAL CONDITIONS:
I.C. Initial   INITIALIZE the simulator to 79% power, MOL.
I.C.
REDUCE Reactor Recirc Pump speeds to 55% (It is critical that "A" Recirc pump speed is 55%).
Initial INITIALIZE the simulator to 79% power, MOL.
REDUCE Reactor Recirc Pump speeds to 55% (It is critical that A Recirc pump speed is 55%).
PRESS the REACTOR RECIRCULATION PUMP A TRIPS SCOOP TUBE TRIP pushbutton.
PRESS the REACTOR RECIRCULATION PUMP A TRIPS SCOOP TUBE TRIP pushbutton.
PLACE SIC-R621A AND SIC-R621B in Manual.
PLACE SIC-R621A AND SIC-R621B in Manual.
REDUCE SIC-R621A Demand Output by 4% AND allow SIC-R621A SPEED DEMAND to saturate low.
REDUCE SIC-R621A Demand Output by 4% AND allow SIC-R621A SPEED DEMAND to saturate low.
ENSURE SIC R620 MAST CONT OUTPUT A SELECT is selected.
ENSURE SIC R620 MAST CONT OUTPUT A SELECT is selected.
PREP FOR TRAINING (i.e., RM11 set points, procedures, bezel covers)
PREP FOR TRAINING (i.e., RM11 set points, procedures, bezel covers)
Initial Description INITIAL a copy of HC.OP-SO.BB-0002 up to step 5.9.1 for the 'A' Reactor Recirc Pump.
Initial Description INITIAL a copy of HC.OP-SO.BB-0002 up to step 5.9.1 for the A Reactor Recirc Pump.
COMPLETE Attachment 2 "Simulator Ready-for-Training/Examination Checklist" of NC.TQ-DG.ZZ-0002(Z).
COMPLETE Attachment 2 Simulator Ready-for-Training/Examination Checklist of NC.TQ-DG.ZZ-0002(Z).
EVENT TRIGGERS:
EVENT TRIGGERS:
Initial ET # Description 1 EVENT ACTION: COMMAND: PURPOSE: Rr:k5(1)>= 1.0 // "A" Recirc Scoop Tube Trip Reset Triggers "A" Recirc Runaway 2 EVENT ACTION: COMMAND: PURPOSE:       MALFUNCTION  
Initial   ET # Description EVENT ACTION: Rr:k5(1)>= 1.0 // A Recirc Scoop Tube Trip Reset 1          COMMAND:
PURPOSE: Triggers A Recirc Runaway EVENT ACTION:
2          COMMAND:
PURPOSE:
MALFUNCTION  


==SUMMARY==
==SUMMARY==
Initial Description Delay Ramp Trigger Init Val Final Val RR08A "A" Recirc Pump Runaway ET-1 INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 1 of 10 STATION: HOPE CREEK SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment TASK NUMBER:
2620010101 JPM NUMBER:
NRC-JPM-004 ALTERNATE PATH: X K/A NUMBER:
262001 A4.01  IMPORTANCE FACTOR:3.4  3.7 APPLICABILITY: RO  SRO  RO X SROX EVALUATION SETTING/METHOD:
Simulator/Perform


==REFERENCES:==
Initial Description                              Delay        Ramp      Trigger  Init Val  Final Val RR08A A Recirc Pump Runaway                                      ET-1 Page 7 of 7
HC.OP-SO.PB-0001(Q), Rev. 20 TOOLS AND EQUIPMENT:


None VALIDATED JPM COMPLETION TIME:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:          HOPE CREEK SYSTEM:          Class 1E Power TASK:            Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment TASK NUMBER:      2620010101 JPM NUMBER:       NRC-JPM-004 ALTERNATE PATH:       X                            K/A NUMBER:        262001 A4.01 IMPORTANCE FACTOR:            3.4            3.7 APPLICABILITY:                                                        RO            SRO RO    X                SRO      X EVALUATION SETTING/METHOD:           Simulator/Perform
10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A   JPM SOURCE:   New


APPROVAL:
==REFERENCES:==
Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
HC.OP-SO.PB-0001(Q), Rev. 20 TOOLS AND EQUIPMENT:        None VALIDATED JPM COMPLETION TIME:                10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                  N/A JPM SOURCE: New APPROVAL:
Author                   Facility Representative           Chief Examiner CAUTION:       No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
ACTUAL JPM COMPLETION TIME:
: 3. Verification of the as left condition by a qualified individual.
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A JPM PERFORMED BY:
ACTUAL JPM COMPLETION TIME:                       Minutes ACTUAL TIME CRITICAL COMPLETION:                   N/A JPM PERFORMED BY:                                         GRADE:     SAT         UNSAT REASON, IF UNSATISFACTORY:
GRADE: SAT UNSAT REASON , IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
EVALUATOR'S SIGNATURE:
Page 1 of 10
 
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 10 NAME:  DATE:  SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment TASK NUMBER:
SYSTEM:             Class 1E Power TASK:               Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment TASK NUMBER: 2620010101 INITIAL CONDITIONS:
2620010101 INITIAL CONDITIONS:
: 1. The plant is operating at 100% power when the Relay department calls informing you that they are performing relay testing and requests you to swap 10A404 from the Normal Feeder breaker to the Alternate Feeder breaker.
: 1. The plant is operating at 100% power w hen the Relay department calls informing you that they are performing relay testing and requests you to swap 10A404 from the Normal Feeder breaker to t he Alternate Feeder breaker.
INITIATING CUE:
INITIATING CUE:
You have been directed by the CRS to shi ft power to Switchgear 10A404 from Station Service Transformer 1BX501 to Station Se rvice Transformer 1AX501 IAW HC.OP-SO.PB-0001. Successful Completion Criteria: 1. All critical steps completed.
You have been directed by the CRS to shift power to Switchgear 10A404 from Station Service Transformer 1BX501 to Station Service Transformer 1AX501 IAW HC.OP-SO.PB-0001.
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment
Page 2 of 10
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  Operator obtains/locates procedure HC.OP-SO.PB-0001.
Operator locates t he proper procedure.
Operator reviews Precautions and Limitations.
Operator reviews Precautions and Limitations and initials each Precaution
 
and Limitation in the space provided in
 
the procedure.
Examiner Cue:  If excessive time is taken reviewing Precautions and
 
Limitations, inform operator that all


are satisfied.
INITIAL LICENSED OPERATOR EXAMINATION                  NAME:
Examiner Note: It is not critical to initial the procedure steps, nor complete  
JOB PERFORMANCE MEASURE                          DATE:
.
SYSTEM:    Class 1E Power TASK:      Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP                                                                            COMMENTS
Operator determines beginning step of the procedure.
#    STEP
Operator determines correct beginning step to be 5.6.1 5.6.1 ENSURE all prerequisites have been satisfied IAW Section 2.6. Operator reviews Prerequisites and initials each Prerequisite in the space  
(*Denotes a Critical Step)                                                      EVAL  (Required for UNSAT
 
* NO.                                                            STANDARD
provided in the procedure.
(#Denotes a Sequential Step)                                                      S/U      evaluation)
Operator obtains/locates procedure        Operator locates the proper procedure.
HC.OP-SO.PB-0001.
Operator reviews Precautions and          Operator reviews Precautions and Limitations.                              Limitations and initials each Precaution and Limitation in the space provided in the procedure.
Examiner Cue: If excessive time is taken reviewing Precautions and Limitations, inform operator that all are satisfied.
Examiner Note: It is not critical to initial the procedure steps, nor complete Attachment 1.
Operator determines beginning step       Operator determines correct beginning of the procedure.                         step to be 5.6.1 5.6.1     ENSURE all prerequisites have been       Operator reviews Prerequisites and satisfied IAW Section 2.6.               initials each Prerequisite in the space provided in the procedure.
Examiner Cue: If excessive time is taken reviewing Prerequisites, inform operator that all are satisfied.
Examiner Cue: If excessive time is taken reviewing Prerequisites, inform operator that all are satisfied.
Page 3 of 10


Page 4 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment  
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
#
JOB PERFORMANCE MEASURE                 DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:     Class 1E Power TASK:       Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP                                                                    COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation) 5.6.2 START TIME:
(*Denotes a Critical Step)                                               EVAL  (Required for UNSAT
A. ENSURE Bus Voltage is adjusted to the higher band required for the  
* NO.                                                            STANDARD
 
(#Denotes a Sequential Step)                                                 S/U     evaluation)
Bus alignment prior to transfer.  
START TIME:                                Operator obtains a copy of DL.ZZ-0003 Attachment 3, page 4 of 5 and checks 5.6.2     A. ENSURE Bus Voltage is adjusted         CRIDS points for 1E Bus voltage.
 
to the higher band required for the   Operator notes bus voltage is LOW.
(REFER TO HC.OP-DL.ZZ-0002(3)(Q), Control Console  
Bus alignment prior to transfer.
 
(REFER TO HC.OP-DL.ZZ-                 Examiner Cue: If asked by Operator 0002(3)(Q), Control Console           act as the CRS and direct him t raise Log(s))                                bus voltage to acceptable limits.
Log(s)) Operator obtains a copy of DL.ZZ-0003  , page 4 of 5 and checks CRIDS points for 1E Bus voltage. 
 
Operator notes bus voltage is LOW. Examiner Cue:  If asked by Operator act as the CRS and direct him t raise  
 
bus voltage to acceptable limits.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
SO.MC-0001 Sec 5.23 Adjusting 13.8Kv to 4.16Kv Transformer 1AX501 (1BX501, 1CX501, 1DX501, 1AX503, 1BX503)
SO.MC     Adjusting 13.8Kv to 4.16Kv                 Operator refers to procedure SO.MC-
Load Tap Operator refers to procedure SO.MC-0001 for adjusting transformer 1AX501
    -0001      Transformer 1AX501 (1BX501,               0001 for adjusting transformer 1AX501 1CX501, 1DX501, 1AX503, 1BX503)            (1BX501)
 
Sec        Load Tap 5.23                                                  EXAMINER CUE: It is NOT required for the operator to refer to this procedure as long as he/she successfully completes the required actions.
(1BX501) EXAMINER CUE: It is NOT required for the operator to refer to this procedure as long as he/she successfully completes the required  
5.23.1. PLACE the load tap changer in manual       Operator ensures Station Service A          control as follows:                       Transformer Tap Changer Control XFMR 15-1AX501 and 1BX501 ENSURE (STATION SERVICE                   CONTROL ROOM Lights are ON TRANSFORMER TAP                           EXAMINER CUE: Operator may only CHANGER CONTROL)-XFMR 15-                 ensure one of the above lights is ON 1AX501 (1BX501,                           currently and then come back and 1CX501, 1DX501, 1AX503, 1BX503)           do the other light later.
 
actions. 5.23.1.A PLACE the load tap changer in manual control as follows:
ENSURE (STATION SERVICE TRANSFORMER TAP CHANGER CONTROL)-XFMR 15-  
 
1AX501 (1BX501,
 
1CX501, 1DX501, 1AX503, 1BX503)
CONTROL ROOM light is ON.
CONTROL ROOM light is ON.
Operator ensures Station Service Transformer Tap Changer Control
Page 4 of 10
 
XFMR 15-1AX501 and 1BX501 CONTROL ROOM Lights are ON EXAMINER CUE:  Operator may only ensure one of the above lights is ON currently and then come back and
 
do the other light later.
 
Page 5 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* B. PRESS (XFMR 15)- 1AX501 (1BX501, 1CX501, 1DX501, 
 
1AX503, 1BX503) - MAN PB.
Operator depresses the 1AX501 and 1BX501 MAN PB's EXAMINER CUE:  Operator may only depress one of the above MAN PB's initially and then come back and


depress the other PB later.
INITIAL LICENSED OPERATOR EXAMINATION            NAME:
* C. As desired, PRESS (XFMR 15)-
JOB PERFORMANCE MEASURE                    DATE:
1AX501 (1BX501, 1CX501, 1AX503, 1BX503) - INCREASE OR DECREASE PB.
SYSTEM:    Class 1E Power TASK:      Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP                                                                    COMMENTS
Operator depresses the PB's as required to raise bus voltage to  
#    STEP
 
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
acceptable limits and then returns to  
* NO.                                                             STANDARD
 
(#Denotes a Sequential Step)                                                S/U      evaluation)
SO.PB-0001. EXAMINER CUE: Critical part of this task is that when the Operator is  
* B.         PRESS (XFMR 15)- 1AX501                   Operator depresses the 1AX501 and (1BX501, 1CX501, 1DX501,                  1BX501 MAN PBs 1AX503, 1BX503) - MAN PB.
 
EXAMINER CUE: Operator may only depress one of the above MAN PBs initially and then come back and depress the other PB later.
finished adjusting voltage, voltage is within the acceptable range of  
* C.        As desired, PRESS (XFMR 15)-              Operator depresses the PBs as 1AX501 (1BX501, 1CX501, 1AX503,          required to raise bus voltage to 1BX503) - INCREASE OR                    acceptable limits and then returns to DECREASE PB.                              SO.PB-0001.
 
EXAMINER CUE: Critical part of this task is that when the Operator is finished adjusting voltage, voltage is within the acceptable range of DL.ZZ-0003 (4236 - 4370V).
DL.ZZ-0003 (4236 - 4370V).
5.6.3.A   B. SHIFT breaker alignment on the         Operator notes that AUTO CLOSE desired Class 1E 4160V busses         BLOCK PB backlight is OFF (listed in Table PB-002, Section 5.4) as follows:                     The operator then initials the appropriate procedure step.
5.6.3.A B.
* ENSURE that the Alternate (Normal) AUTO CLOSE BLOCK PB backlight is OFF. [CD-056H]
SHIFT breaker alignment on the desired Class 1E 4160V busses (listed in Table PB-002, Section  
Page 5 of 10
 
5.4) as follows: ENSURE that the Alternate (Normal) AUTO CLOSE
 
BLOCK PB backlight is
 
OFF. [CD-056H]  Operator notes that AUTO CLOSE BLOCK PB backlight is OFF The operator then initials the appropriate procedure step.  
 
Page 6 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  5.6.3.B C. IF the Alternate (Normal) AUTO CLOSE BLOCK PB backlight is
 
ON, THEN PRESS the Alternate (Normal) AUTO CLOSE BLOCK  
 
AND VERIFY that the PB backlight is OFF.
[CD-056H] Operator verifies PB backlight is OFF.
The operator then initials the appropriate procedure step.
  * # 5.6.3.C D.
PRESS Normal (Alternate) AUTO CLOSE BLOCK
 
AND VERIFY that the PB backlight is OFF.
Operator presses Normal AUTO CLOSE BLOCK PB and verifies


INITIAL LICENSED OPERATOR EXAMINATION            NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Class 1E Power TASK:      Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP                                                                    COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                S/U      evaluation) 5.6.3.B    C. IF the Alternate (Normal) AUTO        Operator verifies PB backlight is OFF.
CLOSE BLOCK PB backlight is ON,                                  The operator then initials the THEN PRESS the Alternate              appropriate procedure step.
(Normal) AUTO CLOSE BLOCK AND VERIFY that the PB backlight is OFF. [CD-056H]
* 5.6.3.C    D. PRESS Normal (Alternate) AUTO          Operator presses Normal AUTO
#                CLOSE BLOCK                          CLOSE BLOCK PB and verifies AND VERIFY that the PB                backlight is OFF.
backlight is OFF.
backlight is OFF.
The operator then initials the appropriate procedure step.  
The operator then initials the appropriate procedure step.
  * # 5.6.3.D E.
* 5.6.3.D   E. PRESS CLOSE PB on Alternate           Operator Presses Close PB on
PRESS CLOSE PB on Alternate (Normal) FEED BRKR. Operator Presses Close PB on Alternate FEED BRKR The operator then initials the appropriate procedure step.
#                (Normal) FEED BRKR.                   Alternate FEED BRKR The operator then initials the appropriate procedure step.
F. ENSURE that the Alternate (Normal) FEED BRKR closes  
F. ENSURE that the Alternate             Operator Observes that Alternate FEED (Normal) FEED BRKR closes             BRKR closes AND that the Normal AND that the Normal (Alternate)      FEED BRKR trips FEED BRKR trips.
The operator then initials the appropriate procedure step.
Page 6 of 10


AND that the Normal (Alternate) FEED BRKR trips.
INITIAL LICENSED OPERATOR EXAMINATION          NAME:
Operator Observes t hat Alternate FEED BRKR closes AND that the Normal FEED BRKR trips The operator then initials the appropriate procedure step.  
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:    Class 1E Power TASK:      Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP                                                                    COMMENTS
#    STEP
(*Denotes a Critical Step)                                              EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                S/U      evaluation)
G. When buses swap a slow transfer        Operators observes trip of D SW occurs vs. the expected fast          pump and Annunciators E3-E2, A1-C3 transfer. The following actions        and enters one of the following occur:                                procedures;
* Annunciator E3-E2, 4.16KV SYS
* ARP for E3-E2 INCOMING BRKR MALF illuminates
* ARP for A1-C3
* Annunciator A1-C3, SSWS
* AB-COOL-0001 INTAKE D TROUBLE illuminates        Examiner Cue: If the Operator
* D SW pump trips                     directly enters AB-COOL-0001, direct the Operator as the CRS to respond to Control Room Annunciators and the CRS will evaluate the AB.
Page 7 of 10


Page 7 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment  
INITIAL LICENSED OPERATOR EXAMINATION                 NAME:
#
JOB PERFORMANCE MEASURE                       DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:     Class 1E Power TASK:       Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP                                                                              COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)   G. When  buses swap a slow transfer occurs vs. the expected fast transfer. The following actions
(*Denotes a Critical Step)                                                     EVAL      (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                     S/U         evaluation)
* E3-E2      H. As a result of a slow transfer, a      Operator determines that a Slow PSIS signal will be generated,        transfer took place and a PSIS signal Step 2        therefore manually start the          was generated and the B pump failed following loads from the Control      to Auto start on low flow and starts the Room as required by SM/CRS.            D Service Water Pump A. Service Water Pump          Examiner Cue: If asked to direct actions as CRS direct Operator to start the D Service Water Pump Other acceptable actions would be to enter ARP A1-C3 and start the B Service Water pump Critical Task is to return the Service Water system to a stable condition by starting either the B or D Service Water pumps.
Terminating Cue: Once the operator has started either the B or D service water pumps then state "This JPM is complete".
Page 8 of 10


occur: Annunciator E3-E2, 4.16KV SYS INCOMING BRKR MALF
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
 
: 1. The plant is operating at 100% power when the Relay department calls informing you that they are performing relay testing and requests you to swap 10A404 from the Normal Feeder breaker to the Alternate Feeder breaker.
illuminates Annunciator A1-C3, SSWS INTAKE "D" TROUBLE illuminates "D" SW pump trips Operators observes trip of "D" SW pump and Annunciators E3-E2, A1-C3
INITIATING CUE:
 
You have been directed by the CRS to shift power to Switchgear 10A404 from Station Service Transformer 1BX501 to Station Service Transformer 1AX501 IAW HC.OP-SO.PB-0001.
and enters one of the following procedures;  ARP for E3-E2  ARP for A1-C3  AB-COOL-0001 Examiner Cue:  If the Operator directly enters AB-COOL-0001, direct
Page 9 of 10
 
the Operator as the CRS to respond
 
to Control Room Annunciators and the CRS will evaluate the AB.  
 
Page 8 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* E3-E2 Step 2 H. As a result of a slow transfer, a PSIS signal will be generated, therefore manually start the
 
following loads from the Control


Room as required by SM/CRS. A. Service Water Pump Operator determines that a Slow transfer took place and a PSIS signal was generated and the "B" pump failed
JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset simulator to IC-2 or any at power IC.
 
Ensure D Service Water pump is in service.
to Auto start on low flow and starts the "D" Service Water Pump Examiner Cue:  If asked to direct actions as CRS direct Operator to
Complete Attachment 3 of HC.OP-DL.ZZ-0003, Control Room 2-hour readings page 4 of 5 Ensure Tap Changers in AUTO Ensure 2 Class 1E busses are on each SST MALFUNCTION  
 
start the "D" Service Water Pump Other acceptable actions would be to enter ARP A1-C3 and start the "B"
 
Service Water pump Critical Task is to return the Service Water system to a stable condition by starting either the B or D Service Water pumps.
Terminating Cue:
Once the operator has started either the "B" or "D" service water pumps then state "This JPM is complete".
 
JOB PERFORMANCE MEASURE  Page 9 of 10 INITIAL CONDITIONS: 1. The plant is operating at 100% power w hen the Relay department calls informing you that they are performing relay testing and requests you to swap 10A404 from the Normal Feeder breaker to t he Alternate Feeder breaker.
INITIATING CUE: You have been directed by the CRS to shift power to Swit chgear 10A404 from Station Service Transformer 1BX501 to St ation Service Transformer 1AX501 IAW HC.OP-SO.PB-0001.
 
JOB PERFORMANCE MEASURE Page 10 of 10 SIMULATOR INSTRUCTIONS Reset simulator to IC-2 or any at power IC.
Ensure "D" Service Water pump is in service.
Complete Attachment 3 of HC.OP-DL.ZZ-0003, Control Room 2-hour readings page 4 of 5  
 
Ensure Tap Changers in AUTO  
 
Ensure 2 Class 1E busses are on each SST MALFUNCTION  


==SUMMARY==
==SUMMARY==
:
:
Initial Description Dela yRampRemote/EventInitialFinal
Initial Description                                     Delay  Ramp  Remote/Event Initial Final
_____ 1. CW14B SERVICE WATER PUMP BP502 FAIL TO A   None/None
_____ 1. CW14B SERVICE WATER PUMP BP502 FAIL TO A                           None/None
_____ 2. CW05D Service water pump DP502 trip   None/ 2
_____ 2. CW05D Service water pump DP502 trip                                 None/ 2
_____ 3. CW14D Service Water Pump DP502 fail to auto Start   None/None
_____ 3. CW14D Service Water Pump DP502 fail to auto Start                 None/None
_____ 4. AN-E6C2 CRYWOLF ANN E6C2 DIESEL AREA HVAC None/1
_____ 4. AN-E6C2 CRYWOLF ANN E6C2 DIESEL AREA HVAC                           None/1
_____ 5. AN-E3E2 CRYWOLF ANN E3E2 4.16 KV SYS INC   None/1 I/O OVERRIDE
_____ 5. AN-E3E2 CRYWOLF ANN E3E2 4.16 KV SYS INC                             None/1 I/O OVERRIDE  


==SUMMARY==
==SUMMARY==
:
:
Initial Description Dela yRampRemote/EventInitialFinal
Initial Description                                     Delay  Ramp  Remote/Event Initial Final
_____ 1. 1A172 E OVLO DVH401 RUNNING SWGR RM 5417   None/1 OFF OFF
_____ 1. 1A172 E OVLO DVH401 RUNNING SWGR RM 5417                             None/1   OFF     OFF
_____ 2. 1A172 F OVLO DVH401 STOPPED SWGR RM 5417   None/1 OFF ON EVENT TRIGGERS:
_____ 2. 1A172 F OVLO DVH401 STOPPED SWGR RM 5417                             None/1   OFF     ON EVENT TRIGGERS:
Initial Description
Initial Description
___ 1. EVENT ACTION:COMMAND:
___ 1. EVENT ACTION: Cw:s52d5 <=0.0 COMMAND:      Dmf cw05d PURPOSE:
PURPOSE: Cw:s52d5 <=0.0 Dmf cw05d
___ 2. EVENT ACTION: Ed:bk8>=1.0 COMMAND:
___ 2. EVENT ACTION:
PURPOSE:      When OHA E3-E2 alarms then insert CRIDS pt D4560 to 1.0 Page 10 of 10
COMMAND:
PURPOSE: Ed:bk8>=1.0  
 
When OHA E3-E2 alarms then insert CRIDS pt D4560 to 1.0  


INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 10 STATION: HOPE CREEK SYSTEM: Containment Integrity TASK: Resetting Isolation Systems TASK NUMBER:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:             HOPE CREEK SYSTEM:             Containment Integrity TASK:               Resetting Isolation Systems TASK NUMBER:         2230020101 JPM NUMBER:         NRC-JPM-005 ALTERNATE PATH:                                   K/A NUMBER:         223000A4.03 IMPORTANCE FACTOR:           3.6             3.6 APPLICABILITY:                                                       RO             SRO RO   X                       SRO      X EVALUATION SETTING/METHOD:         Simulator/Perform
2230020101 JPM NUMBER:
NRC-JPM-005 ALTERNATE PATH: K/A NUMBER:223000A4.03 IMPORTANCE FACTOR:3.6 3.6 APPLICABILITY: RO SRO    RO X SROX EVALUATION SETTING/METHOD:
Simulator/Perform  


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.SM-0001(Q), Rev. 14 TOOLS AND EQUIPMENT:        None VALIDATED JPM COMPLETION TIME:              (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                N/A JPM SOURCE: New APPROVAL:
Author                  Facility Representative          Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                  N/A JPM PERFORMED BY:                                        GRADE:      SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
Page 1 of 10


HC.OP-SO.SM-0001(Q), Rev. 14 TOOLS AND EQUIPMENT:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
 
None VALIDATED JPM COMPLETION TIME: (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A  JPM SOURCE:  New
 
APPROVAL:        Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A  JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 10 NAME:  DATE:  SYSTEM: Containment Integrity TASK: Resetting Isolation Systems TASK NUMBER:
SYSTEM:             Containment Integrity TASK:               Resetting Isolation Systems TASK NUMBER: 2230020101 INITIAL CONDITIONS:
2230020101 INITIAL CONDITIONS:
: 1. Hope Creek is recovering from a Scram due to loss of all RFPs at 100% power.
: 1. Hope Creek is recovering from a Scram due to loss of all RFP's at 100% power. 2. RPV level dropped to -130" before HPCI initiated and recovered level. 3. The Crew is in AB.ZZ-0000 and has reac hed step S-9 "IF Conditions permit THEN RESET isolations 4. You have been directed by the CRS to RESET the Isolations INITIATING CUE:
: 2. RPV level dropped to -130 before HPCI initiated and recovered level.
RESET isolations IAW HC.OP-SO.SM-0001 Successful Completion Criteria: 1. All critical steps completed.
: 3. The Crew is in AB.ZZ-0000 and has reached step S-9 IF Conditions permit THEN RESET isolations
: 4. You have been directed by the CRS to RESET the Isolations INITIATING CUE:
RESET isolations IAW HC.OP-SO.SM-0001 Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
Page 2 of 10
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  Operator determines that he needs to perform HC.OP-SO.SM-0001 section 5.3 in order to reset the isolations.
Examiner Cue:  Once the operator has correctly determined which
 
procedure to use, provide the operator with a copy of procedure


HC.OP-SO.SM-0001(Q).
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
Operator reviews precautions and limitations.
JOB PERFORMANCE MEASURE                    DATE:
Operator reviews precautions and limitations.
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                        COMMENTS
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all  
#    STEP
 
(*Denotes a Critical Step)                                                    EVAL  (Required for UNSAT
are satisfied.
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                      S/U      evaluation)
Operator determines that he needs to          Examiner Cue: Once the operator perform HC.OP-SO.SM-0001 section              has correctly determined which 5.3 in order to reset the isolations.        procedure to use, provide the operator with a copy of procedure HC.OP-SO.SM-0001(Q).
Operator reviews precautions and             Operator reviews precautions and limitations.                                  limitations.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.
Examiner Note: Initialing the following steps is not critical.
Examiner Note: Initialing the following steps is not critical.
5.3.1 ENSURE that all prerequisites have been satisfied IAW
5.3.1   ENSURE that all prerequisites have been       Operator ensures that the prerequisites satisfied IAW                     are satisfied:
 
Section 2.3 of this procedure.
Section 2.3 of this procedure.
Operator initials the step.
START TIME: ___________
START TIME: ___________
Operator ensures that the prerequisites are satisfied:
5.3.2   To reset the Nuclear Steam Supply             Operator determines that NSSSS Shutoff System,                               needs to be reset.
Operator initials the step.
5.3.2 To reset the Nuclear Steam Supply Shutoff System,
 
PERFORM the following:
PERFORM the following:
Operator determines that NSSSS needs to be reset.
Page 3 of 10
 
Page 4 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* 5.3.2 A ENSURE the following MSIV control switches in CLOSE:
HVF028A  OUTBD MSIV A  HVF028B  OUTBD MSIV B  HVF028C  OUTBD MSIV C  HVF028D  OUTBD MSIV D  HVF022A  INBD MSIV A    HVF022B  INBD MSIV B    HVF022C  INBD MSIV C    HVF022D  INBD MSIV D Operator Places ALL the MSIV Control Switches in CLOSE B. ENSURE conditions causing the Isolation have been corrected.
Operator checks t hat ALL isolation signals have cleared
  * # C. IF vacuum is > 21.5 inches Hg. Abs.
THEN PLACE DIVISION 1 and 2 and 3 and 4 CONDENSER LOW
 
VACUUM BYPASS Switches to BYP (Control Room Panels 10C609 and
 
10C611 Operator determines that vacuum is LOW places DIVISION 1, 2, 3 and 4 CONDENSER LOW VACUUM
 
BYPASS Switches to BYP


Page 5 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems  
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
#
JOB PERFORMANCE MEASURE                 DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Containment Integrity TASK:     Resetting Isolation Systems STEP                                                                  COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
(*Denotes a Critical Step)                                               EVAL  (Required for UNSAT
* # D. PRESS the following PBs:
* NO.                                                          STANDARD
: 1. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP
(#Denotes a Sequential Step)                                               S/U     evaluation)
* 5.3.2    ENSURE the following MSIV control        Operator Places ALL the MSIV Control switches in CLOSE:                 Switches in CLOSE A
* HVF028A OUTBD MSIV A
* HVF028B OUTBD MSIV B
* HVF028C OUTBD MSIV C
* HVF028D OUTBD MSIV D
* HVF022A INBD MSIV A
* HVF022B INBD MSIV B
* HVF022C INBD MSIV C
* HVF022D INBD MSIV D B.      ENSURE conditions causing the            Operator checks that ALL isolation Isolation have been corrected.            signals have cleared
* C.      IF vacuum is > 21.5 inches Hg. Abs.
THEN PLACE DIVISION 1 and 2 and          Operator determines that vacuum is
  #          3 and 4 CONDENSER LOW                    LOW places DIVISION 1, 2, 3 and 4 VACUUM BYPASS Switches to BYP            CONDENSER LOW VACUUM (Control Room Panels 10C609 and          BYPASS Switches to BYP 10C611 Page 4 of 10


LOGIC A RESET. MSIV TRIP LOGIC TRIPPED goes off.
INITIAL LICENSED OPERATOR EXAMINATION        NAME:
: 2. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP  
JOB PERFORMANCE MEASURE                DATE:
 
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                COMMENTS
LOGIC B RESET. MSIV TRIP LOGIC TRIPPED goes off.
#    STEP
(*Denotes a Critical Step)                                            EVAL  (Required for UNSAT
* NO.                                                          STANDARD
(#Denotes a Sequential Step)                                            S/U      evaluation)
* D.      PRESS the following PBs:                Operator depresses the appropriate PBs
#              1. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC A RESET. MSIV TRIP LOGIC TRIPPED goes off.
: 2. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC B RESET. MSIV TRIP LOGIC TRIPPED goes off.
: 3. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC C RESET. MSIV TRIP LOGIC TRIPPED goes off.
: 3. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC C RESET. MSIV TRIP LOGIC TRIPPED goes off.
: 4. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP  
: 4. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC D RESET. MSIV TRIP LOGIC TRIPPED goes off.
 
5.3.3   To reset the Containment Isolation       Operator determines Containment System, PERFORM the following:           Isolation needs to be reset.
LOGIC D RESET. MSIV TRIP LOGIC TRIPPED goes off.
Page 5 of 10
Operator depresses the appropriate PB's    5.3.3 To reset the Containment Isolation System, PERFORM the following:
Operator determines Containment Isolation needs to be reset.  
 
Page 6 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* B. PRESS the following PBs:
: 1. CNTMT ISLN MAN INITIATION CHANNEL A
 
RESET. TRIPPED goes off.
: 2. CNTMT ISLN MAN INITIATION CHANNEL B
 
RESET. TRIPPED goes off.
: 3. CNTMT ISLN MAN INITIATION CHANNEL C
 
RESET. TRIPPED goes off
: 4. CNTMT ISLN MAN INITIATION CHANNEL D RESET. TRIPPED goes off Operator depresses the appropriate PB's    5.3.4 To reset the Core Spray Isolation Signals, PERFORM the following:


INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                      DATE:
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation)
* B.      PRESS the following PBs:                  Operator depresses the appropriate
: 1. CNTMT ISLN MAN                  PBs INITIATION CHANNEL A RESET. TRIPPED goes off.
: 2. CNTMT ISLN MAN INITIATION CHANNEL B RESET. TRIPPED goes off.
: 3. CNTMT ISLN MAN INITIATION CHANNEL C RESET. TRIPPED goes off
: 4. CNTMT ISLN MAN INITIATION CHANNEL D RESET. TRIPPED goes off 5.3.4    To reset the Core Spray Isolation Signals, PERFORM the following:
Operator determines that Core Spray Isolation signal is present and that initiating condition has been corrected.
A. ENSURE conditions causing Core Spray Initiation have been corrected.
A. ENSURE conditions causing Core Spray Initiation have been corrected.
Operator determines that Core Spray Isolation signal is present and that initiating condition has been corrected.
Page 6 of 10


Page 7 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems  
INITIAL LICENSED OPERATOR EXAMINATION               NAME:
#
JOB PERFORMANCE MEASURE                     DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Containment Integrity TASK:     Resetting Isolation Systems STEP                                                                        COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
(*Denotes a Critical Step)                                                     EVAL  (Required for UNSAT
* # B. PRESS the following PBs:
* NO.                                                              STANDARD
: 1. LOOP A INITIATION RESET. A INIT AND SEALED IN goes off.
(#Denotes a Sequential Step)                                                     S/U     evaluation)
: 2. LOOP B INITIATION RESET.
* B.       PRESS the following PBs:
B INIT AND SEALED IN goes off.
#          1. LOOP A INITIATION RESET.
: 3. LOOP C INITIATION RESET.
A INIT AND SEALED IN goes off.
: 2. LOOP B INITIATION RESET.             Operator depresses the LOOP A, B, C B INIT AND SEALED IN goes off.       and D INITIATION RESET PBs and verifies A, B, C, and D INIT AND
: 3. LOOP C INITIATION RESET.              SEALED IN lights go off.
C INIT AND SEALED IN goes off.
C INIT AND SEALED IN goes off.
: 4. LOOP D INITIATION RESET. D INIT AND SEALED IN goes  
: 4. LOOP D INITIATION RESET.
 
D INIT AND SEALED IN goes off.
off. Operator depresses the LOOP A, B, C and D INITIATION RESET PB's and
5.3.5   To reset the RHR Isolation signals, PERFORM the following:
 
Operator determines that RHR Isolation signal is present and that A. ENSURE conditions causing             initiating condition has been corrected.
verifies A, B, C, and D INIT AND
LPCI Initiation have been corrected.
 
Page 7 of 10
SEALED IN lights go off.
5.3.5 To reset the RHR Isolation signals, PERFORM the following:
A. ENSURE conditions causing LPCI Initiation have


been corrected.
INITIAL LICENSED OPERATOR EXAMINATION                 NAME:
Operator determines that RHR  Isolation signal is present and that initiating condition has been corrected.
JOB PERFORMANCE MEASURE                       DATE:
 
SYSTEM:     Containment Integrity TASK:       Resetting Isolation Systems STEP                                                                              COMMENTS
Page 8 of 10 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems  
#   STEP
#
(*Denotes a Critical Step)                                                   EVAL      (Required for UNSAT
* STEP NO. STEP (*Denotes a Critical Step)
* NO.                                                            STANDARD
(#Denotes a Sequential Step)
(#Denotes a Sequential Step)                                                     S/U           evaluation)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* PRESS the following PBs:                 Operator depresses the LOOP A, B, C and D INITIATION RESET PBs and
* PRESS the following PBs:
: 1. LOOP A INITIATION RESET.           verifies A, B, C, and D INIT AND A INIT AND SEALED IN goes off. SEALED IN lights go off.
: 1. LOOP A INITIATION RESET. A INIT AND SEALED IN goes off.
: 2. LOOP B INITIATION RESET.
: 2. LOOP B INITIATION RESET.
B INIT AND SEALED IN goes off.
B INIT AND SEALED IN goes off.
: 3. LOOP C INITIATION RESET.
: 3. LOOP C INITIATION RESET.
C INIT AND SEALED IN goes off.
C INIT AND SEALED IN goes off.
: 4. LOOP D INITIATION RESET. D INIT AND SEALED IN goes  
: 4. LOOP D INITIATION RESET.
 
D INIT AND SEALED IN goes off 5.3.6     To reset HPCI Isolation Signals,         Operator determines that HPCI PERFORM the following:                   Isolation signal is NOT present 5.3.7     To reset RCIC Isolation Signals,         Operator determines that RCIC PERFORM the following:                   Isolation signal is NOT present STOP TIME: ____________
off Operator depresses the LOOP A, B, C and D INITIATION RESET PB's and
Terminating Cue: Once the Operator has determined that the RCIC Isolation signal is NOT present, then state "This JPM is complete" Page 8 of 10
 
verifies A, B, C, and D INIT AND
 
SEALED IN lights go off.
5.3.6 To reset HPCI Isolation Signals, PERFORM the following:
Operator determines that HPCI Isolation signal is NOT present 5.3.7 To reset RCIC Isolation Signals, PERFORM the following:
STOP TIME: ____________
Operator determines that RCIC Isolation signal is NOT present Terminating Cue:
Once the Operator has determined that the RCIC Isolation signal is NOT present , then state "This JPM is complete" JOB PERFORMANCE MEASURE  Page 9 of 10 INITIAL CONDITIONS: 1. Hope Creek is recovering from a Scra m due to loss of all RFP's at 100% power. 2. RPV level dropped to -130" before HPCI initiated and recovered level. 3. The Crew is in AB.ZZ-0000 and has reac hed step S-9 "IF Conditions permit THEN RESET isolations 4. You have been directed by the CRS to RESET the Isolations INITIATING CUE: RESET isolations IAW HC.OP-SO.SM-0001 JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS  Page 10 of 10
 
Reset to an  100% IC


Trip all 3 RFP's and let level drop to -130"
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
: 1. Hope Creek is recovering from a Scram due to loss of all RFPs at 100% power.
: 2. RPV level dropped to -130 before HPCI initiated and recovered level.
: 3. The Crew is in AB.ZZ-0000 and has reached step S-9 IF Conditions permit THEN RESET isolations
: 4. You have been directed by the CRS to RESET the Isolations INITIATING CUE:
RESET isolations IAW HC.OP-SO.SM-0001 Page 9 of 10


Return Level and Pressure to normal and stabilize the plant.  
JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to an 100% IC Trip all 3 RFPs and let level drop to -130 Return Level and Pressure to normal and stabilize the plant.
Page 10 of 10


INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 9 STATION: HOPE CREEK SYSTEM: Reactor Water Level Inventory Control TASK: Feeding the Reactor Vessel with the Condensate System TASK NUMBER:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:             HOPE CREEK SYSTEM:             Reactor Water Level Inventory Control TASK:               Feeding the Reactor Vessel with the Condensate System TASK NUMBER:         2590020101 JPM NUMBER:         NRC-JPM-006 ALTERNATE PATH:                                   K/A NUMBER:           259002A4.01 IMPORTANCE FACTOR:             3.8             3.6 APPLICABILITY:                                                       RO             SRO RO   X                       SRO      X EVALUATION SETTING/METHOD:         Simulator/Perform
2590020101 JPM NUMBER:
NRC-JPM-006 ALTERNATE PATH: K/A NUMBER:259002A4.01 IMPORTANCE FACTOR:3.8 3.6 APPLICABILITY: RO SRO    RO X SROX EVALUATION SETTING/METHOD:
Simulator/Perform  


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.AE-0001(Q), Rev. 43 TOOLS AND EQUIPMENT:        None VALIDATED JPM COMPLETION TIME:              (20) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                N/A JPM SOURCE: New APPROVAL:
Author                  Facility Representative            Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                  N/A JPM PERFORMED BY:                                      GRADE:      SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
Page 1 of 9


HC.OP-SO.AE-0001(Q), Rev. 43 TOOLS AND EQUIPMENT:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
 
None VALIDATED JPM COMPLETION TIME:
(20) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A  JPM SOURCE:  New
 
APPROVAL:        Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A  JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 9 NAME:  DATE:  SYSTEM: Reactor Water Level Inventory Control TASK: Feeding the Reactor Vessel with the Condensate System TASK NUMBER:
SYSTEM:             Reactor Water Level Inventory Control TASK:               Feeding the Reactor Vessel with the Condensate System TASK NUMBER: 2590020101 INITIAL CONDITIONS:
2590020101 INITIAL CONDITIONS:
: 1. Hope Creek is starting up from a refueling outage.
: 1. Hope Creek is starting up from a refueling outage. 2. The plant is currently in IOP-2 at step 5.1.2.T, LINEUP the startup level control valves to feed the Reactor Vessel IAW HC.OP-SO.
: 2. The plant is currently in IOP-2 at step 5.1.2.T, LINEUP the startup level control valves to feed the Reactor Vessel IAW HC.OP-SO.AE-0001(Q), Feedwater System Operation.
AE-0001(Q), Feedwater S ystem Operation. 3. The CRS has decided to terminate l ong path flow and feed the RPV using the Condensate system Startup Level Cont rol Valves IAW HC.OP-SO.AE-0001(Q),
: 3. The CRS has decided to terminate long path flow and feed the RPV using the Condensate system Startup Level Control Valves IAW HC.OP-SO.AE-0001(Q),
Feedwater System Operation. 4. You have been directed to perform this task.  
Feedwater System Operation.
 
: 4. You have been directed to perform this task.
INITIATING CUE: Feed the Reactor Vessel with the Condensate System IAW HC.OP-SO.AE-0001 Successful Completion Criteria: 1. All critical steps completed.
INITIATING CUE:
Feed the Reactor Vessel with the Condensate System IAW HC.OP-SO.AE-0001 Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from St artup Valves to Master Level Control
Page 2 of 9
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  Operator obtains a copy of HC.OP-SO.AE-0001 and determines he/she
 
needs to perform section 5.1 Examiner Cue:  Once the operator has located the procedure, provide the operator with a copy of
 
procedure HC.OP-SO.AE-0001(Q).
Operator reviews precautions and limitations.
Operator reviews precautions and limitations.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all


are satisfied.
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Reactor Water Level Inventory Control TASK:      Swapping FW Level Control from Startup Valves to Master Level Control STEP                                                                        COMMENTS
#    STEP
(*Denotes a Critical Step)                                                    EVAL  (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                      S/U      evaluation)
Operator obtains a copy of HC.OP-            Examiner Cue: Once the operator SO.AE-0001 and determines he/she              has located the procedure, provide needs to perform section 5.1                  the operator with a copy of procedure HC.OP-SO.AE-0001(Q).
Operator reviews precautions and              Operator reviews precautions and limitations.                                  limitations.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.
Examiner Note: Initialing the following steps is not critical.
Examiner Note: Initialing the following steps is not critical.
5.1.1 ENSURE that all prerequisites have been satisfied IAW Section 2.1 of this procedure.
5.1.1   ENSURE that all prerequisites have been       Operator ensures that the prerequisites satisfied IAW Section 2.1 of       are satisfied:
this procedure.
Operator initials the step.
START TIME: ___________
START TIME: ___________
Operator ensures that the prerequisites are satisfied:
5.1.2. TERMINATE long path flow to the               Operator observes the START UP A        Main Condenser as follows:                   LEVEL CONTROLLER A/M and verifies M is illuminated.
Operator initials the step.
A. PRESS the START UP LEVEL CONTROLLER A/M push-button              Examiner Note: M should already be illuminated. If Operator only as required to place controller in      verifies M is illuminated, this is manual ("M" (manual) light              acceptable.
5.1.2.A TERMINATE long path flow to the Main Condenser as follows:
illuminated).
A. PRESS the START UP LEVEL CONTROLLER A/M push-button as required to place controller in manual ("M" (manual) light illuminated).
Page 3 of 9
Operator observes the START UP LEVEL CONTROLLER A/M and verifies
 
"M" is illuminated. Examiner Note: "M" should already be illuminated. If Operator only verifies "M" is illuminated, this is acceptable.
 
Page 4 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from St artup Valves to Master Level Control
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  5.1.2.B B. PRESS STARTUP LEVEL CONTROLLER  "SEL" (select) push-button as necessary to select the "DMND" column.
Operator verifies "DMND" is selected on the STARTUP LEVEL CONTROLLER 
  * # 5.1.2.C C.      LOWER STARTUP LEVEL CONTROLLER "DMND" 
 
using the DEC push-button to
 
0%. Operator Lowers STARTUP LEVEL CONTROLLER "DMND" using the DEC
 
PB to 0%.
  * # 5.1.3 CLOSE  HV-3626, FW SUPPLY FLUSHING LINE OUTBD MOV Operator closes HV-3626
  * # 5.1.4 CLOSE  HV-3625, FW SUPPLY FLUSHING LINE INBD MOV. Operator closes HV-3625
  * # 5.1.5 RAISE STARTUP LEVEL CONTROLLER "DMND" to open  HV-
 
1754, S/U LVL BYP VLV, approximately 20% using the INC
 
push-button AND MONITOR Computer Points  A3245  AND A3246 -RPV Feedwater line press.
Operator raises STARTUP LEVEL CONTROLLER "DMND" to open HV-
 
1754 ~ 20% using the INC push-button.
Operator monitors computer points A3245 and A3246
 
Page 5 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from St artup Valves to Master Level Control
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  5.1.6 WHEN Feedwater line press > 100 psig, THEN DISPATCH an Equipment Operator to vent Feedwater line 
 
high points at valves  1-AE-V082, 1-AE-
 
V083,  1-AE-V084,  1-AE-V085, 1-AE-V086,  and 1-AE-V087  UNTIL a solid stream of water issues.
(Local)  Operator dispatches an NEO to vent FW line high points. EXAMINER CUE: Inform Operator that NEO reports that the High point
 
vent valves AE-V082, 83, 84, 85, 86, and 87 have been vented until a solid stream of water issues.
  * # 5.1.7 LOWER STARTUP LEVEL CONTROLLER "DMND" to 0%. 
 
using the DEC push-button.
Operator lowers STARTUP LEVEL CONTROLLER "DMND" to 0% (or
 
<0%) using the DEC push-button.
  * # 5.1.8 OPEN  HV-F032A, FW SPLY LINE A INLET CHK VLV AND  HV-F032B, FW SPLY LINE B INLET CHK VLV. Operator opens HV-F032A and F032B
  * # 5.1.9 Intermittently PRESS START UP LEVEL CONTROLLER "DMND" INCREASE OR DECREASE push-buttons as required 
 
to attain desired stable Reactor Vessel level as directed by Integrated 
 
Operating Procedure.
Operator depresses the START UP LEVEL CONTROLLER  "DMND" INCREASE OR DECREASE PB's as required to attain stable RPV level. Examiner Cue:  Ask Operator what current level is and have Operator
 
match setpoint to current level.
 
Page 6 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from St artup Valves to Master Level Control
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* # 5.1.10.A WHEN desired stable Reactor Vessel level is attained, THEN PLACE START UP LEVEL CONTROLLER in AUTO as follows:
A. On MASTER LEVEL CONTROLLER 
 
PRESS "SEL" (select) push-button as necessary to select SPT (level setpoint).
EXAMINER CUE: If asked by the Operator the CRS wants to maintain RPV level at +30-39" Narrow Range.
 
Operator depresses the SEL PB on the MASTER LEVEL CONTROLLER until
 
SPT is selected.
  * # 5.1.10.B B. On MASTER LEVEL CONTROLLER, PRESS LVL SPT INC OR DECR push-button's as required to 
 
establish the desired REACTOR Level Setpoint Operator depresse s the LVL SPT INC or DECR PB's as necessary to
 
establish RPV level ~34.2" (or Match
 
setpoint to current level)


Page 7 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from St artup Valves to Master Level Control  
INITIAL LICENSED OPERATOR EXAMINATION             NAME:
#
JOB PERFORMANCE MEASURE                 DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Reactor Water Level Inventory Control TASK:     Swapping FW Level Control from Startup Valves to Master Level Control STEP                                                                        COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
(*Denotes a Critical Step)                                                   EVAL  (Required for UNSAT
* C. On MASTER LEVEL CONTROLLER, PRESS "SEL" push-button as necessary to
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                     S/U     evaluation) 5.1.2. B. PRESS STARTUP LEVEL                  Operator verifies DMND is selected B              CONTROLLER "SEL" (select)             on the STARTUP LEVEL push-button as necessary to select    CONTROLLER the "DMND" column.
* 5.1.2. C. LOWER STARTUP LEVEL                  Operator Lowers STARTUP LEVEL C              CONTROLLER "DMND"                    CONTROLLER "DMND" using the DEC
#                  using the DEC push-button to          PB to 0%.
0%.
* 5.1.3    CLOSE HV-3626, FW SUPPLY FLUSHING LINE OUTBD MOV                      Operator closes HV-3626
#
* 5.1.4    CLOSE HV-3625, FW SUPPLY                    Operator closes HV-3625 FLUSHING LINE INBD MOV.
  #
* 5.1.5    RAISE STARTUP LEVEL                          Operator raises STARTUP LEVEL CONTROLLER "DMND" to open HV-                CONTROLLER "DMND" to open HV-
#          1754, S/U LVL BYP VLV,                      1754 ~ 20% using the INC push-button.
approximately 20% using the INC push-button AND MONITOR                      Operator monitors computer points Computer Points A3245 AND                    A3245 and A3246 A3246 -RPV Feedwater line press.
Page 4 of 9


select LEVEL ERROR. Level
INITIAL LICENSED OPERATOR EXAMINATION            NAME:
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:    Reactor Water Level Inventory Control TASK:      Swapping FW Level Control from Startup Valves to Master Level Control STEP                                                                    COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation) 5.1.6    WHEN Feedwater line press > 100 psig,      Operator dispatches an NEO to vent THEN DISPATCH an Equipment                FW line high points.
Operator to vent Feedwater line high points at valves 1-AE-V082, 1-AE-    EXAMINER CUE: Inform Operator V083, 1-AE-V084, 1-AE-V085,                that NEO reports that the High point vent valves AE-V082, 83, 84, 85, 86, 1-AE-V086, and 1-AE-V087 UNTIL a          and 87 have been vented until a solid solid stream of water issues.              stream of water issues.
(Local)
* 5.1.7    LOWER STARTUP LEVEL                       Operator lowers STARTUP LEVEL CONTROLLER "DMND" to 0%.                   CONTROLLER "DMND" to 0% (or
#          using the DEC push-button.                <0%) using the DEC push-button.
* 5.1.8    OPEN HV-F032A, FW SPLY LINE A              Operator opens HV-F032A and F032B INLET CHK VLV AND HV-F032B,
#          FW SPLY LINE B INLET CHK VLV.
* 5.1.9    Intermittently PRESS START UP              Operator depresses the START UP LEVEL CONTROLLER                          LEVEL CONTROLLER "DMND"
#          "DMND" INCREASE OR DECREASE                INCREASE OR DECREASE PBs as push-buttons as required                  required to attain stable RPV level.
to attain desired stable Reactor Vessel level as directed by Integrated    Examiner Cue: Ask Operator what Operating Procedure.                      current level is and have Operator match setpoint to current level.
Page 5 of 9


Error should be 0 (Zero) (IF required, REPEAT Steps 5.1.10.A & B UNTIL level error is 0 (Zero). Operator depresses SEL PB's as necessary to select LEVEL ERROR on MASTER LEVEL CONTROLLER.
INITIAL LICENSED OPERATOR EXAMINATION          NAME:
Operator adjusts R PV level until Level Error is 0.  
JOB PERFORMANCE MEASURE                  DATE:
  * #  D. PRESS the A/M push-button on STARTUP LEVEL CONTROLLER ("A" auto light
SYSTEM:    Reactor Water Level Inventory Control TASK:      Swapping FW Level Control from Startup Valves to Master Level Control STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                   EVAL  (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation)
* 5.1.10. WHEN desired stable Reactor Vessel            EXAMINER CUE: If asked by the A         level is attained, THEN PLACE START            Operator the CRS wants to maintain
#            UP LEVEL CONTROLLER in AUTO                    RPV level at +30-39 Narrow Range.
as follows:
A. On MASTER LEVEL                        Operator depresses the SEL PB on the CONTROLLER                              MASTER LEVEL CONTROLLER until PRESS "SEL" (select) push-button        SPT is selected.
as necessary to select SPT (level setpoint).
* 5.1.10. B. On MASTER LEVEL                        Operator depresses the LVL SPT INC B                CONTROLLER, PRESS LVL                  or DECR PBs as necessary to
#                  SPT INC OR DECR push-                   establish RPV level ~34.2 (or Match button's as required to                setpoint to current level) establish the desired REACTOR Level Setpoint Page 6 of 9


INITIAL LICENSED OPERATOR EXAMINATION            NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:      Reactor Water Level Inventory Control TASK:        Swapping FW Level Control from Startup Valves to Master Level Control STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
* C. On MASTER LEVEL                    Operator depresses SEL PBs as CONTROLLER, PRESS "SEL"            necessary to select LEVEL ERROR on
#                  push-button as necessary to        MASTER LEVEL CONTROLLER.
select LEVEL ERROR. Level Error should be 0 (Zero) (IF        Operator adjusts RPV level until Level required, REPEAT Steps              Error is 0.
5.1.10.A & B UNTIL level error is 0 (Zero).
* D. PRESS the A/M push-button on        Operator depresses A/M PB on STARTUP LEVEL                      STARTUP LEVEL CONTROLLER until
#                  CONTROLLER ("A" auto light          A light should be illuminated.
should be illuminated).
should be illuminated).
Operator depresses A/M PB on STARTUP LEVEL CONTROLLER until
Terminating Cue: Once the Operator has depressed the A/M PB, then state "This JPM is complete" Page 7 of 9


"A" light should be illuminated.
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
Terminating Cue:
: 1. Hope Creek is starting up from a refueling outage.
Once the Operator has depressed the A/
: 2. The plant is currently in IOP-2 at step 5.1.2.T, LINEUP the startup level control valves to feed the Reactor Vessel IAW HC.OP-SO.AE-0001(Q), Feedwater System Operation.
M PB, then state "This JPM is complete" JOB PERFORMANCE MEASURE Page 8 of 9 INITIAL CONDITIONS: 1. Hope Creek is starting up from a refueling outage. 2. The plant is currently in IOP-2 at step 5.1.2.T, LINEUP the startup level control valves to feed the Reactor Vessel IAW HC.OP-SO.AE-0001(Q), Feedwater System Operation. 3. The CRS has decided to terminate long path flow and feed the RPV using the Condensate system Startup Level Cont rol Valves IAW HC.OP-SO.AE-0001(Q), Feedwater System Operation. 4. You have been directed to perform this task INITIATING CUE: Feed the Reactor Vessel with the Condensate System IAW HC.OP-SO.AE-0001  
: 3. The CRS has decided to terminate long path flow and feed the RPV using the Condensate system Startup Level Control Valves IAW HC.OP-SO.AE-0001(Q),
Feedwater System Operation.
: 4. You have been directed to perform this task INITIATING CUE:
Feed the Reactor Vessel with the Condensate System IAW HC.OP-SO.AE-0001 Page 8 of 9


JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Page 9 of 9 Reset to a low power IC  
JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to a low power IC Ensure IOP 2 is marked up to step 5.1.2.T Page 9 of 9


Ensure IOP 2 is marked up to step 5.1.2.T
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:         HOPE CREEK SYSTEM:           Standby Liquid Control System TASK:             Initiate SLC System Manually TASK NUMBER:     2110030101 JPM NUMBER:       NRC-JPM-007 ALTERNATE PATH:         X                         K/A NUMBER:         211000A4.08 IMPORTANCE FACTOR:             4.2             4.2 APPLICABILITY:                                                       RO             SRO RO     X                    SRO      X EVALUATION SETTING/METHOD:         Simulator/Perform
 
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 7 STATION: HOPE CREEK SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually TASK NUMBER:
2110030101 JPM NUMBER:
NRC-JPM-007 ALTERNATE PATH: X K/A NUMBER:211000A4.08 IMPORTANCE FACTOR:4.2 4.2 APPLICABILITY: RO SRO   RO X SROX EVALUATION SETTING/METHOD:
Simulator/Perform


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.BH-0001, Revision 9 TOOLS AND EQUIPMENT:  
HC.OP-SO.BH-0001, Revision 9 TOOLS AND EQUIPMENT:         None VALIDATED JPM COMPLETION TIME:              (5) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                N/A JPM SOURCE: Bank APPROVAL:
Author                  Facility Representative          Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                  N/A JPM PERFORMED BY:                                        GRADE:      SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
Page 1 of 7


None VALIDATED JPM COMPLETION TIME: (5) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
N/A  JPM SOURCE:  Bank
 
APPROVAL:
Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A  JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION  JOB PERFORMANCE MEASURE  Page 2 of 7 NAME:  DATE:  SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually TASK NUMBER:
SYSTEM:               Standby Liquid Control System TASK:                 Initiate SLC System Manually TASK NUMBER: 2110030101 INITIAL CONDITIONS:
2110030101 INITIAL CONDITIONS:
: 1. A full core ATWS has occurred.
: 1. A full core ATWS has occurred. 2. The Main turbine is on line.
: 2. The Main turbine is on line.
: 3. Reactor Power is > 4%
: 3. Reactor Power is > 4%
: 4. The Reactor Recirc Pumps are tripped.
: 4. The Reactor Recirc Pumps are tripped.
: 5. HC.OP-E0.ZZ-0101A, ATWS-RPV Control, is being executed. 6. The CRS has directed you to Initiate SL C and Verify RWCU system Isolates per step RC/Q-7 of EOP-0101A.
: 5. HC.OP-E0.ZZ-0101A, ATWS-RPV Control, is being executed.
INITIATING CUE: Initiate SLC and verify RWCU isolates.
: 6. The CRS has directed you to Initiate SLC and Verify RWCU system Isolates per step RC/Q-7 of EOP-0101A.
Successful Completion Criteria: 1. All critical steps completed.
INITIATING CUE:
Initiate SLC and verify RWCU isolates.
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 7 OPERATOR TRAINING PROGRAM NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually
Page 2 of 7
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  Operator obtains/locates procedure HC.OP-SO.BH-0001.
Operator reviews precautions and limitations.
Operator reviews precautions and limitations and initials each precaution and limitation in the space provided in
 
the procedure.
Examiner Cue:  If excessive time is taken reviewing precautions and limitations, inform operator that all


are satisfied.
OPERATOR TRAINING PROGRAM                        NAME:
Examiner Note: It is not critical to initial the procedure step, nor complete in this and subsequent  
JOB PERFORMANCE MEASURE                        DATE:
 
SYSTEM:    Standby Liquid Control System TASK:      Initiate SLC System Manually STEP                                                                          COMMENTS
steps. Operator determines beginning step of the procedure.
#    STEP
Operator determines correct beginning step to be 5.3.1.
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* 5.3.1 START TIME:
* NO.                                                          STANDARD
PLACE both PUMP & SQUIB VLV - OFF/ON keylock switches to ON. Operator places both PUMP & SQUIB VLV - OFF/ON keylock switches to ON.
(#Denotes a Sequential Step)                                                    S/U      evaluation)
Operator obtains/locates procedure HC.OP-SO.BH-0001.
Operator reviews precautions and      Operator reviews precautions and limitations.                          limitations and initials each precaution and limitation in the space provided in the procedure.
Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.
Examiner Note: It is not critical to initial the procedure step, nor complete Attachment 1 in this and subsequent steps.
Operator determines beginning step     Operator determines correct beginning of the procedure.                     step to be 5.3.1.
START TIME:                           Operator places both PUMP & SQUIB VLV - OFF/ON keylock switches to ON.
* 5.3.1      PLACE both PUMP & SQUIB VLV -
OFF/ON keylock switches to ON.        The operator then initials the appropriate procedure step.
* 5.3.2      PRESS both PUMP & SQUIB VLV -          Operator depresses both PUMP &
AP208 AND BP208 START push            SQUIB VLV - AP208 AND BP208 buttons.                              START pushbuttons.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
* 5.3.2 PRESS both PUMP & SQUIB VLV -
Page 3 of 7
AP208 AND BP208 START push buttons. Operator depresses both PUMP &
SQUIB VLV - AP208 AND BP208 START pushbuttons.
The operator then initials the appropriate procedure step.


Page 4 of 7 OPERATOR TRAINING PROGRAM NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually  
OPERATOR TRAINING PROGRAM                   NAME:
#
JOB PERFORMANCE MEASURE                   DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Standby Liquid Control System TASK:     Initiate SLC System Manually STEP                                                                    COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation) 5.3.3 VERIFY the following: A. Both PUMP & SQUIB VLV - AP208 and BP208 START lights  
(*Denotes a Critical Step)                                             EVAL  (Required for UNSAT
 
* NO.                                                          STANDARD
come ON. Operator verifies that both PUMP &
(#Denotes a Sequential Step)                                               S/U     evaluation) 5.3.3     VERIFY the following:                 Operator verifies that both PUMP &
SQUIB VLV - AP208 and BP208 START lights come on.
SQUIB VLV - AP208 and BP208 A. Both PUMP & SQUIB VLV -             START lights come on.
AP208 and BP208 START lights come ON.                           The operator then initials the appropriate procedure step.
B. Both SQUIB VALVE CONTINUITY        Operator verifies that both SQUIB lights are OFF.                    VALVE CONTINUITY lights are off.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
B. Both SQUIB VALVE CONTINUITY lights are OFF.
C. SLC SQUIB VLV LOSS OF              Operator verifies that SLC SQUIB VLV CONTINUITY is ON. (10C800C1)      LOSS OF CONTINUITY annunciator is on. (10C800C1)
Operator verifies that both SQUIB VALVE CONTINUITY lights are off.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
C. SLC SQUIB VLV LOSS OF CONTINUITY is ON. (10C800C1)
D. Both STANDBY LIQUID                Operator observes both STANDBY CONTROL PUMP PRESSURE              LIQUID CONTROL PUMP PRESSURE indicators show pump discharge    indicators show pump discharge pressure greater than reactor      pressure greater than reactor pressure.
Operator verifies that SLC SQUIB VLV LOSS OF CONTINUITY annunciator is
pressure.
 
on. (10C800C1)
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
D. Both STANDBY LIQUID CONTROL PUMP PRESSURE indicators show pump discharge
Page 4 of 7
 
pressure greater than reactor
 
pressure.
Operator observes both STANDBY LIQUID CONTROL PUMP PRESSURE indicators show pump discharge
 
pressure greater than reactor pressure.
The operator then initials the appropriate procedure step.
 
Page 5 of 7 OPERATOR TRAINING PROGRAM NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* E. The following Reactor Water Cleanup Isolation Valves close: 1. BG-HV-F001, PMP SUCT CONT INBD 2. BG-HV-F004, PMP SUCT CONT OUTBD Operator recognize s that the 1-BG-HVF001 and 1-BG-HVF004 have failed
 
to close and closes the valves.
EXAMINER CUE: If the Operator asks you for direction, tell him to perform
 
the actions that need to be
 
performed. Operator closes HVF001 and HVF004 by depressing the CLOSE pushbutton


for each valve, and observes that both valves close.
OPERATOR TRAINING PROGRAM                      NAME:
JOB PERFORMANCE MEASURE                      DATE:
SYSTEM:      Standby Liquid Control System TASK:        Initiate SLC System Manually STEP                                                                            COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL    (Required for UNSAT
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                    S/U            evaluation)
* E. The following Reactor Water          Operator recognizes that the 1-BG-Cleanup Isolation Valves close:    HVF001 and 1-BG-HVF004 have failed to close and closes the valves.
: 1. BG-HV-F001, PMP SUCT CONT INBD                        EXAMINER CUE: If the Operator asks you for direction, tell him to perform
: 2. BG-HV-F004, PMP SUCT            the actions that need to be CONT OUTBD                      performed.
Operator closes HVF001 and HVF004 by depressing the CLOSE pushbutton for each valve, and observes that both valves close.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
F. SLC TANK LVL indicator is decreasing.
F. SLC TANK LVL indicator is           Operator observes SLC TANK LVL decreasing.                        indicator is decreasing.
Operator observes SLC TANK LVL indicator is decreasing.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
G. NEUTRON MONITORING recorders indicate decreasing  
G. NEUTRON MONITORING                   Operator observes NEUTRON recorders indicate decreasing       MONITORING recorders indicate reactor power.                      decreasing reactor power.
STOP TIME: ___________                  The operator then initials the appropriate procedure step.
EXAMINER CUE: Once Operator has verified decreasing Reactor power, then terminate the JPM Terminating Cue: Once the Operator has verified that reactor power is decreasing then state "This JPM is complete".
Page 5 of 7


reactor power.
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
STOP TIME: ___________
: 1. A full core ATWS has occurred.
Operator observes NEUTRON MONITORING recorders indicate
: 2. The Main turbine is on line.
 
decreasing reactor power.
The operator then initials the appropriate procedure step.
EXAMINER CUE: Once Operator has verified decreasing Reactor power, then
 
terminate the JPM Terminating Cue:
Once the Operator has verified th at reactor power is decreasing then state "This JPM is complete".
 
JOB PERFORMANCE MEASURE Page 6 of 7 INITIAL CONDITIONS: 1. A full core ATWS has occurred. 2. The Main turbine is on line.
: 3. Reactor Power is > 4%
: 3. Reactor Power is > 4%
: 4. The Reactor Recirc Pumps are tripped.
: 4. The Reactor Recirc Pumps are tripped.
: 5. HC.OP-E0.ZZ-0101A, ATWS-RPV Control, is being executed. 6. The CRS has directed you to Initiate SLC and Verify RWCU system Isolates per step RC/Q-7 of EOP-0101A.. INITIATING CUE: Initiate SLC and verify RWCU isolates.
: 5. HC.OP-E0.ZZ-0101A, ATWS-RPV Control, is being executed.
JOB PERFORMANCE MEASURE  Page 7 of 7 SIMULATOR INSTRUCTIONS Reset simulator to a 100% power IC.
: 6. The CRS has directed you to Initiate SLC and Verify RWCU system Isolates per step RC/Q-7 of EOP-0101A..
Insert malfunctions.
INITIATING CUE:
 
Initiate SLC and verify RWCU isolates.
Lock the mode switch in Shutdown.
Page 6 of 7


Take actions IAW EOP-101A so that the ne xt appropriate step is to initiate SLC.
JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset simulator to a 100% power IC.
Insert malfunctions.
Lock the mode switch in Shutdown.
Take actions IAW EOP-101A so that the next appropriate step is to initiate SLC.
MALFUNCTION  
MALFUNCTION  


==SUMMARY==
==SUMMARY==
:
:
Initial Description Dela yRampRemote/EventInitialFinal
Initial Description                                     Delay Ramp  Remote/Event Initial Final
______ 1. RP06 Half Core ATWS-Left side
______ 1. RP06 Half Core ATWS-Left side
______ 2. RP07 Half Core ATWS-Right side
______ 2. RP07 Half Core ATWS-Right side
______ 3. CU11A RWCU VLVS F001 failure to auto close
______ 3. CU11A RWCU VLVS F001 failure to auto close
______ 4. CU11B RWCU VLVS F004 failure to auto close
______ 4. CU11B RWCU VLVS F004 failure to auto close Page 7 of 7


INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 9 STATION: HOPE CREEK SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:         HOPE CREEK SYSTEM:           Filtration, Recirculation and Ventilation System (FRVS)
TASK: Manually Place FRVS In Service TASK NUMBER:
TASK:             Manually Place FRVS In Service TASK NUMBER:     2610030101 JPM NUMBER:       NRC-JPM-008 ALTERNATE PATH:                                     K/A NUMBER:         290001A4.10 IMPORTANCE FACTOR:           3.4             3.3 APPLICABILITY:                                                         RO             SRO RO   X                 SRO EVALUATION SETTING/METHOD:           Simulator / Perform
2610030101 JPM NUMBER:
NRC-JPM-008 ALTERNATE PATH: K/A NUMBER:290001A4.10 IMPORTANCE FACTOR:3.4 3.3 APPLICABILITY: RO SRO   RO X SRO EVALUATION SETTING/METHOD:
Simulator / Perform  


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.GU-0001, Rev. 22 TOOLS AND EQUIPMENT:
VALIDATED JPM COMPLETION TIME:                  9 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                    N/A JPM SOURCE: Bank APPROVAL:
Author                    Facility Representative          Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                        Minutes ACTUAL TIME CRITICAL COMPLETION:                    N/A JPM PERFORMED                                              GRADE:      SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                              DATE:
Page 1 of 9


HC.OP-SO.GU-0001, Rev. 22 TOOLS AND EQUIPMENT:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
 
VALIDATED JPM COMPLETION TIME:
9 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A  JPM SOURCE:  Bank
 
APPROVAL:
Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A  JPM PERFORMED GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 9 NAME:  DATE:  SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
SYSTEM:             Filtration, Recirculation and Ventilation System (FRVS)
TASK: Manually Place FRVS In Service TASK NUMBER:
TASK:               Manually Place FRVS In Service TASK NUMBER: 2610030101 INITIAL CONDITIONS:
2610030101 INITIAL CONDITIONS:
: 1. The plant is operating at 100% power.
: 1. The plant is operating at 100% power. 2. Heating steam has been lost to the power block. 3. Outside air temperature is <32 F. 4. To prevent freezing the heating coils, Rx Building ventilation must be removed from service. 5. FRVS is in standby.
: 2. Heating steam has been lost to the power block.
: 6. Radiation Protection has been no tified that FRVS will be placed in service.
: 3. Outside air temperature is <32&deg;F.
: 4. To prevent freezing the heating coils, Rx Building ventilation must be removed from service.
: 5. FRVS is in standby.
: 6. Radiation Protection has been notified that FRVS will be placed in service.
INITIATING CUE:
INITIATING CUE:
Manually place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 FRVS Vent Fan.
Manually place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 FRVS Vent Fan.
Successful Completion Criteria: 1. All critical steps completed.
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
Page 2 of 9
TASK: Manually Place FRVS In Service
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  Operator obtains/locates procedure HC.OP-SO.GU-0001.
Operator locates t he proper procedure.
Operator reviews Precautions and Limitations.
Operator reviews precautions and limitations and initials each Precaution and Limitation in the space provided in
 
the procedure.
Examiner Cue:  If excessive time is taken reviewing Precautions and
 
Limitations, inform operator that all


are satisfied.
INITIAL LICENSED OPERATOR EXAMINATION                    NAME:
JOB PERFORMANCE MEASURE                          DATE:
SYSTEM:    Filtration, Recirculation and Ventilation System (FRVS)
TASK:      Manually Place FRVS In Service STEP                                                                            COMMENTS
#    STEP
(*Denotes a Critical Step)                                                        EVAL  (Required for UNSAT
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                        S/U      evaluation)
Operator obtains/locates procedure        Operator locates the proper procedure.
HC.OP-SO.GU-0001.
Operator reviews Precautions and          Operator reviews precautions and Limitations.                              limitations and initials each Precaution and Limitation in the space provided in the procedure.
Examiner Cue: If excessive time is taken reviewing Precautions and Limitations, inform operator that all are satisfied.
Examiner Note: It is not critical to initial Atttachment 1 or the procedure steps.
Examiner Note: It is not critical to initial Atttachment 1 or the procedure steps.
Operator determines beginning step of the procedure.
Operator determines beginning step         Operator determines correct beginning of the procedure.                         step to be 5.3.1.
Operator determines correct beginning step to be 5.3.1.
5.3.1     ENSURE that all prerequisites have         Operator reviews Prerequisites, been satisfied IAW Section 2.3.           completes Section 2 of Attachment 1, and initials each Prerequisite in the space provided in the procedure.
5.3.1 ENSURE that all prerequisites have been satisfied IAW Section 2.3. Operator reviews Prerequisites, completes Section 2 of Attachment 1, and initials each Prerequisite in the  
 
space provided in the procedure.
Examiner Cue: If excessive time is taken reviewing Prerequisites, inform operator that all are satisfied.
Examiner Cue: If excessive time is taken reviewing Prerequisites, inform operator that all are satisfied.
Page 3 of 9


Page 4 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
INITIAL LICENSED OPERATOR EXAMINATION             NAME:
TASK: Manually Place FRVS In Service  
JOB PERFORMANCE MEASURE                   DATE:
#
SYSTEM:   Filtration, Recirculation and Ventilation System (FRVS)
* STEP NO. STEP (*Denotes a Critical Step)
TASK:     Manually Place FRVS In Service STEP                                                                      COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation) 5.3.2 START TIME:
(*Denotes a Critical Step)                                                 EVAL  (Required for UNSAT
VERIFY AUTO Mode for the following FRVS Recirculation Fans:  FRVS Recirculation Fan AV213  FRVS Recirculation Fan BV213  FRVS Recirculation Fan CV213  FRVS Recirculation Fan DV213  FRVS Recirculation Fan EV213  FRVS Recirculation Fan FV213 Operator observes that the AUTO indicator is illuminated and the LOCKOUT indicator is extinguished for the following FRVS Recirculation Fans: FRVS RECIRCULATION FAN AV213 FRVS RECIRCULATION FAN BV213 FRVS RECIRCULATION FAN CV213 FRVS RECIRCULATION FAN DV213 FRVS RECIRCULATION FAN EV213 FRVS RECIRCULATION FAN FV213 The operator then initials the appropriate procedure steps.  
* NO.                                                                STANDARD
  #* 5.3.3 START 1 FRVS Vent Fan as follows: A. Momentarily PRESS the MAN push-button for A(B)V206 FRVS  
(#Denotes a Sequential Step)                                                   S/U     evaluation)
 
START TIME:
Vent Fan.
5.3.2     VERIFY AUTO Mode for the following         Operator observes that the AUTO FRVS Recirculation Fans:                  indicator is illuminated and the LOCKOUT indicator is extinguished for
Operator depresses the MAN PB for AV206 FRVS Vent fan and observes
* FRVS Recirculation Fan AV213          the following FRVS Recirculation Fans:
 
* FRVS Recirculation Fan BV213          FRVS RECIRCULATION FAN AV213 FRVS RECIRCULATION FAN BV213
the MAN indicator is illuminated.
* FRVS Recirculation Fan CV213          FRVS RECIRCULATION FAN CV213 FRVS RECIRCULATION FAN DV213
The operator then initials the appropriate procedure step.
* FRVS Recirculation Fan DV213          FRVS RECIRCULATION FAN EV213
B. OBSERVE alarm BOP SAFETY SYS OUT OF SVCE.
* FRVS Recirculation Fan EV213          FRVS RECIRCULATION FAN FV213 The operator then initials the
Operator observes annunciator D1-A4 alarm state and acknowledges alarm.
* FRVS Recirculation Fan FV213          appropriate procedure steps.
The operator then initials the appropriate procedure step.
# 5.3.3     START 1 FRVS Vent Fan as follows:         Operator depresses the MAN PB for
 
* AV206 FRVS Vent fan and observes A. Momentarily PRESS the MAN               the MAN indicator is illuminated.
Page 5 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
push-button for A(B)V206 FRVS Vent Fan.                             The operator then initials the appropriate procedure step.
TASK: Manually Place FRVS In Service
B. OBSERVE alarm BOP SAFETY               Operator observes annunciator D1-A4 SYS OUT OF SVCE.                      alarm state and acknowledges alarm.
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
#*  C. Momentarily PRESS the A(B)V206 START push-button for A(B)V206
 
FRVS Vent Fan.
Operator depresse s the AV206 START PB and observes the AV206 START indicator is illuminated and the STOP indicator is extinguished.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
D. OBSERVE an indicated flow of approximately 9000 cfm on FR-9426A(B) for the running
Page 4 of 9


FRVS Vent Fan.
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
Operator observes FR-9426A for indication of flow (10C650E)
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Filtration, Recirculation and Ventilation System (FRVS)
TASK:      Manually Place FRVS In Service STEP                                                                        COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                                 STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation)
#            C. Momentarily PRESS the A(B)V206          Operator depresses the AV206 START
* START push-button for A(B)V206        PB and observes the AV206 START FRVS Vent Fan.                        indicator is illuminated and the STOP indicator is extinguished.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
  #E. PRESS the AUTO LEAD PB for the inservice FRVS Vent Fan AND INITIAL Attachment 1. Operator depresses AV206 AUTO LEAD PB and observes the AUTO LEAD indicator is illuminated.
D. OBSERVE an indicated flow of            Operator observes FR-9426A for approximately 9000 cfm on              indication of flow (10C650E)
FR-9426A(B) for the running FRVS Vent Fan.                        The operator then initials the appropriate procedure step.
#             E. PRESS the AUTO LEAD PB for             Operator depresses AV206 AUTO
* the inservice FRVS Vent Fan AND       LEAD PB and observes the AUTO INITIAL Attachment 1.                  LEAD indicator is illuminated.
The operator then initials Attachment 1 and the appropriate procedure step.
The operator then initials Attachment 1 and the appropriate procedure step.
F. PRESS the AUTO PB for the out of service FRVS Vent Fan AND INITIAL Attachment 1. Operator depresses BV206 AUTO PB and observes the AUTO indicator is illuminated.
F. PRESS the AUTO PB for the out           Operator depresses BV206 AUTO PB of service FRVS Vent Fan AND           and observes the AUTO indicator is INITIAL Attachment 1.                  illuminated.
The operator then initials Attachment 1 and the appropriate procedure step.
The operator then initials Attachment 1 and the appropriate procedure step.
Page 5 of 9


Page 6 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
INITIAL LICENSED OPERATOR EXAMINATION             NAME:
TASK: Manually Place FRVS In Service  
JOB PERFORMANCE MEASURE                   DATE:
#
SYSTEM:   Filtration, Recirculation and Ventilation System (FRVS)
* STEP NO. STEP (*Denotes a Critical Step)
TASK:     Manually Place FRVS In Service STEP                                                                      COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation) 5.3.4 PERFORM the following to remove the Reactor Building Ventilation
(*Denotes a Critical Step)                                                 EVAL  (Required for UNSAT
 
* NO.                                                                STANDARD
System from service:
(#Denotes a Sequential Step)                                                   S/U     evaluation) 5.3.4     PERFORM the following to remove           EXAMINER NOTE: Step 5.3.4.A is the Reactor Building Ventilation          performed at local Aux. Bldg. HVAC System from service:                      Panel 10C382.
A. PERFORM the following at Aux Building HVAC Panel 10C382: EXAMINER NOTE:
A. PERFORM the following at Aux            Operator directs the Building Operator Building HVAC Panel 10C382:            to remove RBVS in accordance with Step 5.3.4.
Step 5.3.4.A is performed at local Aux. Bldg. HVAC Panel 10C382. Operator directs the Building Operator to remove RBVS in accordance with  
EXAMINER CUE: Report as Equipment Operator that Reactor Building Ventilation is secured.
 
Step 5.3.4. EXAMINER CUE: Report as Equipment Operator that Reactor  
 
Building Ventilation is secured.
The operator then initials the appropriate procedure steps.
The operator then initials the appropriate procedure steps.
* B. CLOSE the following dampers at Panel 10C651E:  HD9370A, REACTOR BLDG OUTBD SPLY Operator depresse s the CLOSE PB for HD9370A and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.
* B. CLOSE the following dampers at         Operator depresses the CLOSE PB for Panel 10C651E:                        HD9370A and observes the CLOSE indicator is illuminated and the OPEN
The operator then initials the appropriate procedure step.
* HD9370A, REACTOR BLDG              indicator is extinguished.
* HD9414A, REACTOR BLDG INBD EXCH Operator depresse s the CLOSE PB for HD9414A and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.
OUTBD SPLY The operator then initials the appropriate procedure step.
*
* HD9414A, REACTOR BLDG               Operator depresses the CLOSE PB for INBD EXCH                          HD9414A and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
Page 6 of 9


Page 7 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
INITIAL LICENSED OPERATOR EXAMINATION               NAME:
TASK: Manually Place FRVS In Service  
JOB PERFORMANCE MEASURE                     DATE:
#
SYSTEM:   Filtration, Recirculation and Ventilation System (FRVS)
* STEP NO. STEP (*Denotes a Critical Step)
TASK:     Manually Place FRVS In Service STEP                                                                        COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
(*Denotes a Critical Step)                                                   EVAL  (Required for UNSAT
* HD9370B, REACTOR BLDG INBD SPLY Operator depresse s the CLOSE PB for HD9370B and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                     S/U     evaluation)
*
* HD9370B, REACTOR BLDG             Operator depresses the CLOSE PB for INBD SPLY                          HD9370B and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
* HD9414B, REACTOR BLDG OUTBD EXCH Operator depresse s the CLOSE PB for HD9414B and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.
*
* HD9414B, REACTOR BLDG             Operator depresses the CLOSE PB for OUTBD EXCH                        HD9414B and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
* 5.3.5 START 4 FRVS Recirculation Fans as follows:
5.3.5     START 4 FRVS Recirculation Fans           One at a time, the Operator depresses as follows:                               the START PB for A, B, C, and D recirc fans and observes the START indicator A. MOMENTARILY PRESS                       is illuminated and the STOP indicator is
A. MOMENTARILY PRESS A(B,C,D,E,F)V213 START PB for  
* A(B,C,D,E,F)V213 START PB for         extinguished.
 
the desired fans.
the desired fans.
One at a time, the Operator depresses the START PB for A, B, C, and D recirc
fans and observes the START indicator is illuminated and the STOP indicator is extinguished.
The operator then initials the appropriate procedure steps.
The operator then initials the appropriate procedure steps.
B. OBSERVE an indicated flow of approximately 30,000 cfm on FR-
B. OBSERVE an indicated flow of           After the starting each recirc fan, the approximately 30,000 cfm on FR-       Operator observes that each recirc fan 9377 for each of the running fans. started indicates 30,000 CFM, on FR-9377 A(B, C, D)
 
9377 for each of the running fans.
After the starting eac h recirc fan, the Operator observes that each recirc fan
 
started indicates 30,000 CFM, on FR-
 
9377 A(B, C, D)
The operator then initials the appropriate procedure step.
 
Page 8 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)
TASK: Manually Place FRVS In Service
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  C. MONITOR the following:  PDR-9377 FRVS DIFF PRESS for indication of < 6.0" W.G. for each operating Air Filter Unit Operator observes that each PDR-9377A (B, C, D) indicates <
6.0" W.G.
for each operating Air Filter unit.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
PDR-9425A(B) FRVS-VENT System Filter D/P < 3.0" W.G.
Page 7 of 9
Operator observes that each PDR-9425A, FRVS-VENT System Filter D/P


< 3.0" W.G.
INITIAL LICENSED OPERATOR EXAMINATION            NAME:
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:      Filtration, Recirculation and Ventilation System (FRVS)
TASK:        Manually Place FRVS In Service STEP                                                                          COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL    (Required for UNSAT
* NO.                                                                  STANDARD
(#Denotes a Sequential Step)                                                  S/U        evaluation)
C. MONITOR the following:                  Operator observes that each PDR-9377A (B, C, D) indicates < 6.0" W.G.
* PDR-9377 FRVS DIFF PRESS            for each operating Air Filter unit.
for indication of < 6.0" W.G. for each operating Air Filter Unit      The operator then initials the appropriate procedure step.
* PDR-9425A(B) FRVS-VENT              Operator observes that each PDR-System Filter D/P < 3.0" W.G.        9425A, FRVS-VENT System Filter D/P
                                                            < 3.0" W.G.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
5.3.6 PERFORM independent verification that the system is aligned IAW  
5.3.6       PERFORM independent verification           Operator requests an independent that the system is aligned IAW             verification of the system alignment.
. STOP TIME:
Attachment 1.
 
STOP TIME:
Operator reques ts an independent verification of the system alignment.
Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete".
Terminating Cue:
Page 8 of 9
Repeat back message from the operator on the status of the JPM, and t hen state "This JPM is complete".


JOB PERFORMANCE MEASURE Page 9 of 9 INITIAL CONDITIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
: 1. The plant is operating at 100% power.
: 1. The plant is operating at 100% power.
: 2. Heating steam has been lost to the power block.
: 2. Heating steam has been lost to the power block.
: 3. Outside air temperature is <32 F. 4. To prevent freezing the heating coils, Rx Building ventilation must be removed from service.
: 3. Outside air temperature is <32&deg;F.
: 4. To prevent freezing the heating coils, Rx Building ventilation must be removed from service.
: 5. FRVS is in standby.
: 5. FRVS is in standby.
: 6. Radiation Protection has been notified that FRVS will be placed in service. INITIATING CUE: Manually place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 FRVS Vent Fan.  
: 6. Radiation Protection has been notified that FRVS will be placed in service.
INITIATING CUE:
Manually place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 FRVS Vent Fan.
Page 9 of 9


INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 13 STATION: HOPE CREEK SYSTEM: Reactor Pressure Control TASK: Establish Control from Ou tside the Control Room TASK NUMBER:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:             HOPE CREEK SYSTEM:             Reactor Pressure Control TASK:               Establish Control from Outside the Control Room TASK NUMBER:         2390010101 JPM NUMBER:         NRC-JPM-009 ALTERNATE PATH:                                   K/A NUMBER:         259002 A2.03 IMPORTANCE FACTOR:             4.0             4.2 APPLICABILITY:                                                       RO             SRO RO   X                       SRO      X EVALUATION SETTING/METHOD:         Plant /Simulate
2390010101 JPM NUMBER:
NRC-JPM-009 ALTERNATE PATH: K/A NUMBER:
259002 A2.03 IMPORTANCE FACTOR:4.0 4.2 APPLICABILITY: RO SRO    RO X SROX EVALUATION SETTING/METHOD:
Plant /Simulate  


==REFERENCES:==
==REFERENCES:==
HC.OP-IO.ZZ-0008(Q), Rev. 21 TOOLS AND EQUIPMENT:        Key to TSC VALIDATED JPM COMPLETION TIME:              (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                  N/A JPM SOURCE: New APPROVAL:
Author                  Facility Representative          Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                  N/A JPM PERFORMED BY:                                        GRADE:      SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
Page 1 of 13


HC.OP-IO.ZZ-0008(Q), Rev. 21 TOOLS AND EQUIPMENT:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
 
Key to TSC VALIDATED JPM COMPLETION TIME: (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A  JPM SOURCE:  New
 
APPROVAL:        Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A  JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 13 NAME:  DATE:  SYSTEM: Reactor Pressure Control TASK: Establish Control from Ou tside the Control Room TASK NUMBER:
SYSTEM:             Reactor Pressure Control TASK:               Establish Control from Outside the Control Room TASK NUMBER: 2390010101 INITIAL CONDITIONS:
2390010101 INITIAL CONDITIONS:
: 1. A fire in the Control Room has forced a Control Room Evacuation
: 1. A fire in the Control Room has forced a Control Room Evacuation 2. NO actions were performed in th e Control Room prior to evacuation 3. The Plant is still at 100% power and t he turbine is still tied to the grid. 4. The CRS has directed you to Establish Control of the plant from Outside of the Control.
: 2. NO actions were performed in the Control Room prior to evacuation
: 3. The Plant is still at 100% power and the turbine is still tied to the grid.
: 4. The CRS has directed you to Establish Control of the plant from Outside of the Control.
INITIATING CUE:
INITIATING CUE:
Establish Control of the Plant from Outsi de of the Control Room IAW with HC.OP-IO.ZZ-0008   Successful Completion Criteria: 1. All critical steps completed.
Establish Control of the Plant from Outside of the Control Room IAW with HC.OP-IO.ZZ-0008 Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
 
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 3 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
Page 2 of 13
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  Operator obtains a copy of HC.OP-IO.ZZ-0008 and determines he/she
 
needs to perform section 5.1 Examiner Cue:  Once the operator has located the procedure, provide the operator with a copy of
 
procedure HC.OP-IO.ZZ-0008(Q).
Operator reviews precautions and limitations.
Operator reviews precautions and limitations.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all


are satisfied.
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                        COMMENTS
#    STEP
(*Denotes a Critical Step)                                                    EVAL  (Required for UNSAT
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                      S/U      evaluation)
Operator obtains a copy of HC.OP-            Examiner Cue: Once the operator IO.ZZ-0008 and determines he/she            has located the procedure, provide needs to perform section 5.1                the operator with a copy of procedure HC.OP-IO.ZZ-0008(Q).
Operator reviews precautions and            Operator reviews precautions and limitations.                                limitations.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.
Examiner Note: Initialing the following steps is not critical.
Examiner Note: Initialing the following steps is not critical.
5.1.1 ENSURE that all prerequisites have been satisfied IAW Section 2.0 of this procedure.
5.1.1   ENSURE that all prerequisites have been     Operator ensures that the prerequisites satisfied IAW Section 2.0 of     are satisfied:
this procedure.
Operator initials the step.
START TIME: ___________
START TIME: ___________
Operator ensures that the prerequisites are satisfied:
Page 3 of 13
Operator initials the step.
 
Page 4 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* # 5.1.2 IF the Reactor was NOT scrammed prior to Control Room evacuation, THEN OPEN the following circuit breakers:  CB2A, CB3A, CB5A, CB7A AND CB8A (RPS PWR DIST PNL A 10C410). CB2B, CB3B, CB5B, CB7B AND CB8B (RPS PWR DIST PNL B 10C411).
Operator goes to the RPS cabinets  and simulates opening the following
 
circuit breakers  CB2A, CB3A, CB5A, CB7A AND CB8A (RPS PWR DIST PNL A 10C410). CB2B, CB3B, CB5B, CB7B AND CB8B (RPS PWR DIST PNL B 10C411).
Examiner Cue:  Once the Operator makes it to the cabinets, show the
 
operator a picture of the inside of the cabinet and ask him which breakers he/she would open. Then inform
 
them that that breaker is open.
5.1.3 IF the Rx scram was NOT verified prior to evacuating the Control Room, THEN VERIFY Rods Full In. (SPDS/CRIDS (TSC) 
 
OR RMCS Activity Control Cards OR other). Operator verifies Rods Full In using SPDS/CRID in the TSC or RMCS
 
activity control cards Examiner Cue:  Once the Operator shows you where he/she would verify the Rx scrammed, then inform
 
he/she that the reactor is scrammed.
5.1.4 MONITOR the RSP System indications AND CHECK specifically for the following:
Operator locates RSP indications
 
Page 5 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  A REACTOR VESSEL PRESSURE PR-7853D  (905 - 1045 psig)
Operator observes RSP RPV pressure and verifies it is 905-1045 psig Examiner Cue:  Once the Operator shows you where he/she would verify reactor pressure, inform them
 
that reactor pressure is ~1005 psig
 
and stable.
  * # B REACTOR VESSEL LEVEL  LR-7854. Between 12.5" and 54".
IF the rate of rise of RPV level indicates HPCI is injecting AND the Control Room is unmanned, PERFORM the following:
 
PRIOR to exceeding the high level trip (level 8) 


OR when HPCI is no longer required, TRIP HPCI IAW Attachment 8.  
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation)
* 5.1.2    IF the Reactor was NOT scrammed            Operator goes to the RPS cabinets prior to Control Room evacuation,          and simulates opening the following
#          THEN OPEN the following circuit            circuit breakers breakers:
* CB2A, CB3A, CB5A, CB7A
* CB2A, CB3A, CB5A, CB7A                    AND CB8A (RPS PWR DIST AND CB8A (RPS PWR DIST                    PNL A 10C410).
PNL A 10C410).
* CB2B, CB3B, CB5B, CB7B
* CB2B, CB3B, CB5B, CB7B                    AND CB8B (RPS PWR DIST AND CB8B (RPS PWR DIST                    PNL B 10C411).
PNL B 10C411).
Examiner Cue: Once the Operator makes it to the cabinets, show the operator a picture of the inside of the cabinet and ask him which breakers he/she would open. Then inform them that that breaker is open.
5.1.3    IF the Rx scram was NOT verified prior    Operator verifies Rods Full In using to evacuating the Control Room,            SPDS/CRID in the TSC or RMCS THEN VERIFY Rods Full In.                  activity control cards (SPDS/CRIDS (TSC)
OR RMCS Activity Control Cards OR         Examiner Cue: Once the Operator shows you where he/she would other).                                    verify the Rx scrammed, then inform he/she that the reactor is scrammed.
5.1.4    MONITOR the RSP System indications        Operator locates RSP indications AND CHECK specifically for the following:
Page 4 of 13


INITIAL LICENSED OPERATOR EXAMINATION                NAME:
JOB PERFORMANCE MEASURE                      DATE:
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                          COMMENTS
#    STEP
(*Denotes a Critical Step)                                                        EVAL  (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                          S/U      evaluation)
A        REACTOR VESSEL PRESSURE                      Operator observes RSP RPV pressure PR-7853D (905 - 1045 psig)                    and verifies it is 905-1045 psig Examiner Cue: Once the Operator shows you where he/she would verify reactor pressure, inform them that reactor pressure is ~1005 psig and stable.
* B        REACTOR VESSEL LEVEL LR-7854.                Operator observes RSP RPV level and
* Between 12.5 and 54.                    notes that RPV level is rising
#
Examiner Cue: Once the Operator IF the rate of rise of RPV level indicates    shows you where he/she would verify reactor water level, inform HPCI is injecting AND the Control Room        them that Reactor water level is unmanned, PERFORM the following:          appears to have dropped to -40 and it is now at -20 and rising at PRIOR to exceeding the high level trip        ~10/min (level 8)
Operator should be able to determine OR when HPCI is no longer required,          that HPCI is injecting and it is no longer TRIP HPCI IAW Attachment 8.                  required. Operator should go to Attachment 8 and TRIP HPCI.
TIME RPV Level Checked: __________
TIME RPV Level Checked: __________
Operator observes RSP RPV level and notes that RPV level is rising Examiner Cue:  Once the Operator shows you where he/she would verify reactor water level, inform them that Reactor water level
Operator may continue with procedure OR go directly to Attachment 8.
 
Operator needs to trip HPCI prior to RPV level reaching Level 8 Page 5 of 13
appears to have dropped to -40" and it is now at -20" and rising at
 
~10"/min Operator should be able to determine that HPCI is injecting and it is no longer
 
required. Operat or should go to  and TRIP HPCI.
Operator may cont inue with procedure OR go directly to Attachment 8.
 
Operator needs to trip HPCI prior to RPV level reaching Level 8  
 
Page 6 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* Att. 8 8.1  OPEN the following circuit breaker at Class 1E 125VDC Distribution Panel 1AD417:  Circuit Breaker 10, HPCI RELAY VERT BD 10C620. 


Time Breaker Opened: __________
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
Operator proceeds to 125VDC Dist. Pnl 1AD417 and simulates opening Circuit  
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                          STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
* Att. 8
* OPEN the following circuit breaker at  Operator proceeds to 125VDC Dist. Pnl Class 1E 125VDC Distribution Panel    1AD417 and simulates opening Circuit


===8.1 1AD417===
Breaker 10.
Breaker 10.
Examiner Cue: Once the Operator makes it to the cabinets, show the  
Examiner Cue: Once the Operator Circuit Breaker 10, HPCI RELAY        makes it to the cabinets, show the VERT BD 10C620.                        operator a picture of the inside of the cabinet and ask him which breakers Time Breaker Opened: __________          he/she would open. Then inform them that that breaker is open.
 
5.1.4
operator a picture of the inside of the cabinet and ask him which breakers he/she would open. Then inform  
* RCIC System status                     Operator points to appropriate
 
* PSV-F013F,H,M SRV status               indicators C-F
them that that breaker is open.
* SUPPRESSION CHAMBER Examiner Cue: As the operator WATER TR-3647J                         points at the appropriate indicators
5.1.4 C - F  RCIC System status PSV-F013F,H,M SRV status   SUPPRESSION CHAMBER WATER TR-3647J DIESEL GENERATOR 1A(B,C,D)G400 TRIP/CLOSED
* DIESEL GENERATOR                       inform him/her:
 
1A(B,C,D)G400 TRIP/CLOSED
Operator points to appropriate indicators Examiner Cue:  As the operator points at the approp riate indicators inform him/her:  RCIC Status - RCIC is running and injecting at 400 gpm SRV status - all indicate closed Suppression Chamber Water temp - 78&deg;F rising slowly (~1&deg;F/ 5  
* RCIC Status - RCIC is running and injecting at 400 gpm
 
* SRV status - all indicate closed
minutes) Diesel Generators - all off 5.1.5 ENSURE the following RSP Switches have been PLACED in EMER: Operator places RSP switches in EMER Page 7 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
* Suppression Chamber Water temp - 78&deg;F rising slowly (~1&deg;F/ 5 minutes)
#
* Diesel Generators - all off 5.1.5   ENSURE the following RSP Switches         Operator places RSP switches in have been PLACED in EMER:                 EMER Page 6 of 13
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* A. CH "A" TRANSFER, AND OBSERVE the following valves have Auto


ClosedBC-HV-F021A RHR LOOP A INBD CONT SPRAY MOV. BC-HV-F006A  A RHR PMP SUCT FROM RECIRC LOOP B ISLN MOV. Operator simulates placing CH "A" TRANSFER switch to EMER Operator Observes valves have Auto Closed Examiner Cue: As the operator points at the approp riate indicators inform him/her:
INITIAL LICENSED OPERATOR EXAMINATION          NAME:
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:    Containment Integrity TASK:     Resetting Isolation Systems STEP                                                                    COMMENTS
  #    STEP
(*Denotes a Critical Step)                                                EVAL (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
* A.       CH "A" TRANSFER, AND OBSERVE                Operator simulates placing CH A the following valves have Auto        TRANSFER switch to EMER Closed:                              Operator Observes valves have Auto
* BC-HV-F021A RHR LOOP A INBD              Closed CONT SPRAY MOV.                          Examiner Cue: As the operator
* BC-HV-F006A A RHR PMP                    points at the appropriate indicators SUCT FROM RECIRC                        inform him/her:
LOOP B ISLN MOV.
* F021A and F006A have auto closed
* F021A and F006A have auto closed
* B. CH "C" TRANSFER, AND OBSERVE the following have Auto Opened: HD-9370A, REACTOR BUILDING SUPPLY DAMPER. HD-9414A, REACTOR BUILDING EXHAUST DAMPER Operator simulates placing CH "C" TRANSFER switch to EMER Operator Observes valves have Auto Opened Examiner Cue: As the operator points at the approp riate indicators inform him/her:
* B.       CH "C" TRANSFER, AND OBSERVE               Operator simulates placing CH C the following have Auto Opened:       TRANSFER switch to EMER
* HD-9370A and HD-9414A have auto opened Page 8 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
* HD-9370A, REACTOR                   Operator Observes valves have Auto BUILDING SUPPLY DAMPER.             Opened
#
* HD-9414A, REACTOR                   Examiner Cue: As the operator points at the appropriate indicators BUILDING EXHAUST                    inform him/her:
* STEP NO. STEP (*Denotes a Critical Step)
DAMPER
(#Denotes a Sequential Step)
* HD-9370A and HD-9414A have auto opened Page 7 of 13
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* C.1 CH "B" TRANSFER, AND OBSERVE the following:
The following valves have Auto Closed:  BC-HV-F016B, RHR LP B CONT SPRY VLV. BC-HV-F017B, LPCI INJECTION VALVE. BC-HV-F021B, RHR LP B CONT SPRY VLV. BC-HV-F027B, RHR LP B SUP POOL SPRY VLV. BD-HV-F022, RCIC TEST BYP CST VLV. Operator simulates placing CH "B" TRANSFER switch to EMER Operator Observes valves have Auto Closed Examiner Cue:  As the operator points at the approp riate indicators inform him/her:
* F016B, F017B, F021B, F027B and F022 have auto closed C.2 The following valves have Auto Opened:  BD-HV-F012, RCIC PMP DISCH MOV  FC- HV-F059, RCIC EXH ISLN MOV  FC-HV-F060, RCIC VAC PMP DSCH ISLN MOV  FC-HV-F062, RCIC EXH VAC BKR INBD ISLN VLV  HV-2520B, RHR PMP B CLG WTR SUP VLV Operator Observes valves have Auto Opened Examiner Cue:  As the operator points at the approp riate indicators inform him/her:
* F012, F059, F021B, F060, F062 and HV-2520B have auto opened


Page 9 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems  
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
#
JOB PERFORMANCE MEASURE                 DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Containment Integrity TASK:     Resetting Isolation Systems STEP                                                                    COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation) C.3 The RCIC Jockey Pump BP-228 has auto-started Operator observes RCIC Jockey Pump has auto-started Examiner Cue: As the operator points at the approp riate indicators inform him/her: RCIC Jockey Pump has auto started.
(*Denotes a Critical Step)                                               EVAL  (Required for UNSAT
C.4 RCIC Turbine alarms are enabled at the RSP (may not be ON)
* NO.                                                          STANDARD
Operator observes RCIC alarms are enabled.
(#Denotes a Sequential Step)                                                 S/U     evaluation)
* D.1 CH "D" TRANSFER, AND OBSERVE the following:
* C.1      CH "B" TRANSFER,                          Operator simulates placing CH B AND OBSERVE the following:          TRANSFER switch to EMER The following valves have Auto Closed:    Operator Observes valves have Auto
: 1. The following have Auto Opened:  BC-HV-F004D, RHR PUMP D SUPP POOL SUCT MOV. FC-HV-F084, RCIC EXH VAC BKR INBD ISLN MOV. HD-9370B, REACTOR BLDG SUPPLY DAMPER. HD-9414B, REACTOR BLDG EXHAUST DAMPER Operator places CH "D" transfer switch in EMER Operator observes F004D, F084, HD9370B and HD-9414B are open Examiner Cue: As the operator points at the approp riate indicators inform him/her that the valves have  
* BC-HV-F016B, RHR LP B CONT              Closed SPRY VLV.
Examiner Cue: As the operator
* BC-HV-F017B, LPCI INJECTION              points at the appropriate indicators VALVE.                                  inform him/her:
* BC-HV-F021B, RHR LP B CONT SPRY VLV.
* F016B, F017B, F021B, F027B and F022 have auto closed
* BC-HV-F027B, RHR LP B SUP POOL SPRY VLV.
* BD-HV-F022, RCIC TEST BYP CST VLV.
C.2      The following valves have Auto Opened:    Operator Observes valves have Auto
* BD-HV-F012, RCIC PMP DISCH              Opened MOV                                    Examiner Cue: As the operator
* FC- HV-F059, RCIC EXH ISLN              points at the appropriate indicators MOV                                    inform him/her:
* FC-HV-F060, RCIC VAC PMP
* F012, F059, F021B, F060, F062 and DSCH ISLN MOV                          HV-2520B have auto opened
* FC-HV-F062, RCIC EXH VAC BKR INBD ISLN VLV
* HV-2520B, RHR PMP B CLG WTR SUP VLV Page 8 of 13


auto opened.
INITIAL LICENSED OPERATOR EXAMINATION            NAME:
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                    COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                          STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
C.3      The RCIC Jockey Pump BP-228 has          Operator observes RCIC Jockey Pump auto-started                        has auto-started Examiner Cue: As the operator points at the appropriate indicators inform him/her:
RCIC Jockey Pump has auto started.
C.4      RCIC Turbine alarms are enabled at the    Operator observes RCIC alarms are RSP (may not be ON)                enabled.
* D.1      CH "D" TRANSFER,                          Operator places CH D transfer switch AND OBSERVE the following:          in EMER
: 1. The following have Auto Opened:        Operator observes F004D, F084, HD9370B and HD-9414B are open
* BC-HV-F004D, RHR PUMP D SUPP POOL SUCT MOV.                        Examiner Cue: As the operator points at the appropriate indicators
* FC-HV-F084, RCIC EXH VAC BKR          inform him/her that the valves have INBD ISLN MOV.                        auto opened.
* HD-9370B, REACTOR BLDG SUPPLY DAMPER.
* HD-9414B, REACTOR BLDG EXHAUST DAMPER Page 9 of 13


Page 10 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems  
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
#
JOB PERFORMANCE MEASURE                 DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Containment Integrity TASK:     Resetting Isolation Systems STEP                                                                    COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation) D.2 The following have Auto Closed: FC-HV-F004, VACUUM TANK CONDENSATE PUMP DISCHARGE TO CRW (Fails Closed). BC- HV-F010B, RHR LOOP D TEST RET MOV. FC-HV-F025 STEAM TRAP DRAIN VLV Operator observes appropriate valves have auto closed.
(*Denotes a Critical Step)                                               EVAL  (Required for UNSAT
Examiner Cue: As the operator points at the approp riate indicators inform him/her the valves have auto
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                 S/U     evaluation)
D.2     The following have Auto Closed:           Operator observes appropriate valves
* FC-HV-F004, VACUUM TANK                 have auto closed.
CONDENSATE PUMP                         Examiner Cue: As the operator DISCHARGE TO CRW (Fails                 points at the appropriate indicators Closed).                               inform him/her the valves have auto closed.
* BC- HV-F010B, RHR LOOP D TEST RET MOV.
* FC-HV-F025 STEAM TRAP DRAIN VLV D.3      RHR Jockey Pump DP228 has started          Operator observes RHR Jockey pump has started Examiner Cue: As the operator points at the appropriate indicators inform him/her RHR jockey pump DP228 has started.
* E        CHANNEL "NON-1E" TRANSFER,                Operator places NON-1E Transfer AND OBSERVE HV-F031B, Reactor              switch to EMER Recirculation Pump BP201s Discharge      Operator should be aware that Recirc Valve has Closed.                          pump will trip Examiner Cue: As the operator points at the appropriate indicators inform him/her BP201s discharge valve has closed.
Page 10 of 13


closed. D.3 RHR Jockey Pump DP228 has started Operator observes RHR Jockey pump has started Examiner Cue: As the operator points at the approp riate indicators inform him/her RHR jockey pump
INITIAL LICENSED OPERATOR EXAMINATION          NAME:
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:    Containment Integrity TASK:      Resetting Isolation Systems STEP                                                                  COMMENTS
#    STEP
(*Denotes a Critical Step)                                              EVAL  (Required for UNSAT
* NO.                                                        STANDARD
(#Denotes a Sequential Step)                                              S/U      evaluation)
* F.      PMP BP202 XFR - B RHR PUMP              Operator place PMP BP202XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her BP202XFR switch is in EMER
* G.      PMP BP502 XFR - B SERV WTR PUMP          Operator place PMP BP502XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her BP502XFR switch is in EMER
* H.       PMP DP502 XFR - D SERV WTR              Operator place PMP DP502XFR switch PUMP                                    to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her DP502XFR switch is in EMER
* I.       PMP BP210 XFR - B SACS PUMP              Operator place PMP BP210XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her BP210XFR switch is in EMER Page 11 of 13


DP228 has started.
INITIAL LICENSED OPERATOR EXAMINATION          NAME:
* E CHANNEL "NON-1E" TRANSFER, AND OBSERVE HV-F031B, Reactor Recirculation Pump BP201's Discharge
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:        Containment Integrity TASK:          Resetting Isolation Systems STEP                                                                        COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL    (Required for UNSAT
* NO.                                                                   STANDARD
(#Denotes a Sequential Step)                                                    S/U        evaluation)
* J.          PMP DP210 XFR - D SACS PUMP                  Operator place PMP DP210XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her DP210XFR switch is in EMER
* K.          MOTOR BK400 TRANS                            Operator place BK TRANS switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her MOTOR BK400 TRANS switch is in EMER
* L.          MOTOR BK403 TRANS                            Operator places MOTOR BK403 switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her MOTOR BK403 switch is in EMER 5.1.6      IF emergency takeover is successful,         Operator informs Shift Manager that notify the Shift Manager                emergency takeover has been that control has been established      successful.
from the Remote Shutdown Panel Terminating Cue: Once the Operator has informed the Shift Manager that control has been established from the Remote Shutdown Panel, then state "This JPM is complete" Page 12 of 13


Valve has Closed. Operator places NON-1E Transfer switch to EMER Operator should be aware that Recirc pump will trip Examiner Cue:  As the operator points at the approp riate indicators inform him/her BP201's discharge
JOB PERFORMANCE MEASURE INSTRUCTIONS INITIAL CONDITIONS:
 
: 1. A fire in the Control Room has forced a Control Room Evacuation
valve has closed.
: 2. NO actions were performed in the Control Room prior to evacuation
 
: 3. The Plant is still at 100% power and the turbine is still tied to the grid.
Page 11 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
: 4. The CRS has directed you to Establish Control of the plant from Outside of the Control Room.
#
INITIATING CUE:
* STEP NO. STEP (*Denotes a Critical Step)
Establish Control of the Plant from Outside of the Control Room IAW with HC.OP-IO.ZZ-0008 Page 13 of 13
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* F. PMP BP202 XFR - B RHR PUMP Operator place PMP BP202XFR switch to EMER Examiner Cue:  As the operator points at the approp riate indicators inform him/her BP202XFR switch is
 
in EMER
* G. PMP BP502 XFR - B SERV WTR PUMP Operator place PMP BP502XFR switch to EMER Examiner Cue:  As the operator points at the approp riate indicators inform him/her BP502XFR switch is
 
in EMER
* H. PMP DP502 XFR - D SERV WTR PUMP Operator place PMP DP502XFR switch to EMER Examiner Cue:  As the operator points at the approp riate indicators inform him/her DP502XFR switch is
 
in EMER
* I. PMP BP210 XFR - B SACS PUMP Operator place PMP BP210XFR switch to EMER Examiner Cue:  As the operator points at the approp riate indicators inform him/her BP210XFR switch is
 
in EMER Page 12 of 13 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Containment Integrity TASK: Resetting Isolation Systems
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* J. PMP DP210 XFR - D SACS PUMP Operator place PMP DP210XFR switch to EMER Examiner Cue:  As the operator points at the approp riate indicators inform him/her DP210XFR switch is
 
in EMER
* K. MOTOR BK400 TRANS Operator place BK TRANS switch to EMER Examiner Cue:  As the operator points at the approp riate indicators inform him/her MOTOR BK400 TRANS switch is in EMER
* L. MOTOR BK403 TRANS Operator places MOTOR BK403 switch to EMER Examiner Cue:  As the operator points at the approp riate indicators inform him/her MOTOR BK403 switch is in EMER 5.1.6 IF emergency takeover is successful, notify the Shift Manager that control has been established from the Remote Shutdown Panel Operator informs Shift Manager that emergency takeover has been
 
successful.
Terminating Cue:
Once the Operator has informed the Shift Manager that control has been es tablished from the Remote Shutdown Panel, then state "This JPM is complete" JOB PERFORMANCE MEASURE INSTRUCTIONS Page 13 of 13 INITIAL CONDITIONS: 1. A fire in the Control Room has forced a Control Room Evacuation 2. NO actions were performed in th e Control Room prior to evacuation 3. The Plant is still at 100% power and t he turbine is still tied to the grid. 4. The CRS has directed you to Establish Control of the plant from Outside of the Control Room. INITIATING CUE:
Establish Control of the Plant from Outs ide of the Control Room IAW with HC.OP-IO.ZZ-0008  


INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 9 STATION: HOPE CREEK SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available TASK NUMBER:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:             HOPE CREEK SYSTEM:             Electrical TASK:               Placing Inverter and Rectifier Sections in Service with Backup AC Available TASK NUMBER:         2620020101 JPM NUMBER:         NRC-JPM-010 ALTERNATE PATH:                                   K/A NUMBER:           262002A4.01 IMPORTANCE FACTOR:             2.8             3.1 APPLICABILITY:                                                         RO             SRO RO   X                       SRO      X EVALUATION SETTING/METHOD:         Plant /Simulate
2620020101 JPM NUMBER:
NRC-JPM-010 ALTERNATE PATH: K/A NUMBER:262002A4.01 IMPORTANCE FACTOR:2.8 3.1 APPLICABILITY: RO SRO    RO X SROX EVALUATION SETTING/METHOD:
Plant /Simulate  


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.PN-0001(Q), Rev. 15 TOOLS AND EQUIPMENT:        None VALIDATED JPM COMPLETION TIME:              (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                  N/A JPM SOURCE: New APPROVAL:
Author                  Facility Representative            Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                  N/A JPM PERFORMED BY:                                        GRADE:        SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                              DATE:
Page 1 of 9


HC.OP-SO.PN-0001(Q), Rev. 15 TOOLS AND EQUIPMENT:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
 
None VALIDATED JPM COMPLETION TIME: (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A  JPM SOURCE:  New
 
APPROVAL:        Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A  JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 9 NAME:  DATE:  SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sect ions in Service with Backup AC Available TASK NUMBER:
SYSTEM:             Electrical TASK:               Placing Inverter and Rectifier Sections in Service with Backup AC Available TASK NUMBER: 2390010101 INITIAL CONDITIONS:
2390010101 INITIAL CONDITIONS:
: 1. Hope Creek is at 100%
: 1. Hope Creek is at 100%
: 2. UPS 1AD481's inverter blew a fuse and power to the 120VAC Distribution panel 1AJ481swapped over to its Backup AC power. 3. An NEO has removed the Inverter and Rectifier sections from service IAW section 5.2 of HC.OP-SO.PN-0001, 120 VAC Electrical Distribution. 4. Electrical Maintenance has replaced the fuse and is ready for 120VAC Distribution panel 1AJ481 to be returned to its normal power source. 5. You have been directed to return 120 VAC Distribution panel 1AJ481 to it's normal power supply in accordance with HC.OP-SO.PN-0001 INITIATING CUE:
: 2. UPS 1AD481s inverter blew a fuse and power to the 120VAC Distribution panel 1AJ481swapped over to its Backup AC power.
: 3. An NEO has removed the Inverter and Rectifier sections from service IAW section 5.2 of HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.
: 4. Electrical Maintenance has replaced the fuse and is ready for 120VAC Distribution panel 1AJ481 to be returned to its normal power source.
: 5. You have been directed to return 120 VAC Distribution panel 1AJ481 to its normal power supply in accordance with HC.OP-SO.PN-0001 INITIATING CUE:
Place the Inverter and Rectifier Sections of 120 VAC UPS 1AD481 in-Service with Backup AC Available IAW HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.
Place the Inverter and Rectifier Sections of 120 VAC UPS 1AD481 in-Service with Backup AC Available IAW HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.
Successful Completion Criteria: 1. All critical steps completed.
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 2 of 9


Page 3 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available  
INITIAL LICENSED OPERATOR EXAMINATION             NAME:
#
JOB PERFORMANCE MEASURE                     DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Electrical TASK:     Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP                                                                        COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)   Operator obtains a copy of HC.OP-SO.PN-0001 and determines he/she  
(*Denotes a Critical Step)                                                   EVAL  (Required for UNSAT
 
* NO.                                                                STANDARD
needs to perform section 5.3 Examiner Cue:  Once the operator has located the procedure, provide the operator with a copy of  
(#Denotes a Sequential Step)                                                     S/U     evaluation)
 
Operator obtains a copy of HC.OP-           Examiner Cue: Once the operator SO.PN-0001 and determines he/she             has located the procedure, provide needs to perform section 5.3                 the operator with a copy of procedure HC.OP-SO.PN-0001(Q).
procedure HC.OP-SO.PN-0001(Q).
Remind Operator NO controls are to be operated. Just point to a control switch and explain how you would operate it.
Remind Operator NO controls are to be operated. Just point to a control switch and explain how you would  
Operator reviews precautions and             Operator reviews precautions and limitations.                                limitations.
 
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.
operate it.
Operator reviews precautions and limitations.
Operator reviews precautions and limitations.
Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all  
 
are satisfied.
Examiner Note: Initialing the following steps is not critical.
Examiner Note: Initialing the following steps is not critical.
5.3.1 ENSURE that all prerequisites have been satisfied IAW Section 2.3 of this procedure.
5.3.1     ENSURE that all prerequisites have been     Operator ensures that the prerequisites satisfied IAW Section 2.3 of     are satisfied:
this procedure.
Operator initials the step.
START TIME: ___________
START TIME: ___________
Operator ensures that the prerequisites are satisfied:
Page 3 of 9
Operator initials the step.


Page 4 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available  
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
#
JOB PERFORMANCE MEASURE                 DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Electrical TASK:     Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP                                                                  COMMENTS
(#Denotes a Sequential Step)
#   STEP
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
(*Denotes a Critical Step)                                               EVAL  (Required for UNSAT
* # 5.3.2 PLACE the RECTIFIER AC INPUT BKR-CB201 in the ON position.
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                 S/U     evaluation)
* 5.3.2     PLACE the RECTIFIER AC INPUT               Operator goes to the UPS 1AD481 and BKR-CB201 in the ON position.              simulates placing CB-201 in the ON
#                                                      position.
A. OBSERVE the following:
A. OBSERVE the following:
: 1. LOSS OF ALTERNATE SOURCE light illuminates.
Operator observes Loss of Alternate Source light and Loss of Synchronism
: 2. LOSS OF SYNCRONISM light illuminates Operator goes to the UPS 1AD481 and simulates placing CB-201 in the ON  
: 1. LOSS OF ALTERNATE               lights illuminate SOURCE light illuminates.
: 2. LOSS OF SYNCRONISM light         Examiner Cue: Once the Operator illuminates                     makes it to the cabinets, Have him/her indicate which breaker they would operate and then inform them that that breaker is in the ON position.
After each step the Operator should Record the component and initial on Attachment 1. This is not critical.
* 5.3.3    PLACE the RECTIFIER AUCTIONEER            Operator simulates placing CB-21 in DC OUTPUT BKR-CB21 in the ON              the ON position
#            position
* 5.3.4    PLACE the RECTIFIER ALTERNATE              Operator simulates placing CB-20 in DC INPUT BKR-CB20 in the ON               the ON position
#            position.
Examiner Cue: Loss of Alternate
* OBSERVE that the LOSS OF          Source Light extinguishes ALTERNATE SOURCE light extinguishes.
Page 4 of 9


position.
INITIAL LICENSED OPERATOR EXAMINATION          NAME:
Operator observes Loss of Alternate Source light and Loss of Synchronism
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:    Electrical TASK:      Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation)
* 5.3.5    PLACE the Static Inverter DC FILTER CHARGE SWITCH in the
#  A.        ON position AND PERFORM the following:                    Operator simulates placing Static OBSERVE the following:                        Inverter DC Filter CHARGE SWITCH in the ON position.
: 1. DC FILTER CHARGED light               Examiner Cue: DC FILTER comes illuminates after a several    CHARGED, LOSS OF INVERTER second time delay.                    OUTPUT and ON INTERNAL
: 2. LOSS OF INVERTER OUTPUT                FREQUENCY REFERENCE lights all light illuminates                    Illuminate.
: 3. ON INTERNAL FREQUENCY REFERENCE light illuminates.
B.        VERIFY DC INPUT, DC Voltmeter                Operator Verifies DC Voltmeter reads reads  125VDC                                ~125VDC Examiner Cue: Voltage is reading 128VDC Page 5 of 9


lights illuminate Examiner Cue: Once the Operator makes it to the cabinets, Have him/her indicate which breaker they would operate and then inform them
INITIAL LICENSED OPERATOR EXAMINATION            NAME:
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:    Electrical TASK:      Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation) 5.3.6    WHEN a 15-minute warm-up period for          Examiner Note: Using Time Static Inverter Logic has elapsed,            compression inform the operator THEN PLACE the Inverter TEST Toggle          that the 15 minute warm-up period Switch in the UP position                    has passed, also once Operator has AND VERIFY that all 4 LED lights are          pointed to the Inverter, show him a illuminated.                                  picture of the inside of the cabinet and let him point out where the Test Toggle Switch is.
Operator simulates placing Inverter TEST toggle switch in the UP position Examiner Cue: All 4 LED lights are illuminated.
* 5.3.7    PLACE the Inverter TEST Toggle                Operator simulates putting Inverter Switch in the DOWN position AND              TEST toggle switch in the DOWN
#            PERFORM the following:                        position A. VERIFY all 4 LED lights                Examiner Cue: All 4 LED lights are off.
extinguish.
B.      IF any LED lights remain illuminated, THEN REPEAT Steps 5.3.6 AND 5.3.7.
* 5.3.8    PLACE the STATIC INVERTER DC Operator simulates placing CB101 in INPUT BKR-CB101 in the ON position.
#                                                          ON position
* OBSERVE that the LOSS OF INVERTER OUTPUT                      Examiner Cue: Loss of Inverter light extinguishes.                  Output light extinguishes Page 6 of 9


that that breaker is in the ON
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
 
JOB PERFORMANCE MEASURE                   DATE:
position. After each step the Operator should Record the component and initial on  . This is not critical.
SYSTEM:   Electrical TASK:     Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP                                                                      COMMENTS
  * # 5.3.3 PLACE the RECTIFIER AUCTIONEER  DC OUTPUT BKR-CB21 in the ON
#   STEP
 
(*Denotes a Critical Step)                                                   EVAL (Required for UNSAT
position Operator simulates placing CB-21 in the ON position
* NO.                                                               STANDARD
  * # 5.3.4 PLACE the RECTIFIER ALTERNATE DC INPUT BKR-CB20 in the ON
(#Denotes a Sequential Step)                                                   S/U     evaluation)
 
* 5.3.9    PLACE the INVERTER AC OUTPUT                 Operator simulates placing CB10 in ON BKR-CB10 in the ON position.                 position
position. OBSERVE that the LOSS OF ALTERNATE SOURCE light extinguishes. Operator simulates placing CB-20 in the ON position Examiner Cue:  Loss of Alternate Source Light extinguishes
#
 
* 5.3.10   PLACE the following ISOLATE Toggle           Operator simulates placing ISOLATE Switches in the ON [right position]         Toggle switches in the ON position
Page 5 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available  
#            AND OBSERVE the noted light response:                                   Examiner Cue: SYNC Monitor light illuminates A. ISOLATE INV OUTPUT                     Loss of Synchronism, Sync Monitor (SYNC MONITOR light                   and On Internal Frequency illuminates)                           Reference all illuminate.
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD EVAL S/U COMMENTS (Required for UNSAT evaluation)
* # 5.3.5 A. PLACE the Static Inverter  DC FILTER CHARGE SWITCH in the
 
ON position
 
AND PERFORM the following:
OBSERVE the following:
: 1. DC FILTER CHARGED light comes illuminates after a several second time delay.
: 2. LOSS OF INVERTER OUTPUT light illuminates
: 3. ON INTERNAL FREQUENCY REFERENCE light illuminates. Operator simulates placing Static Inverter DC Filter CHARGE SWITCH in
 
the ON position.
Examiner Cue: DC FILTER CHARGED, LOSS OF INVERTER
 
OUTPUT and ON INTERNAL FREQUENCY REFERENCE lights all Illuminate. B. VERIFY DC INPUT, DC Voltmeter reads  125VDC Operator Verifies DC Voltmeter reads
~125VDC Examiner Cue: Voltage is reading 128VDC Page 6 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation) 5.3.6 WHEN a 15-minute warm-up period for Static Inverter Logic has elapsed, THEN PLACE the Inverter TEST Toggle Switch in the UP position 
 
AND VERIFY that all 4 LED lights are illuminated.
Examiner Note: Using Time compression inform the operator that the 15 minute warm-up period
 
has passed, also once Operator has pointed to the Inverter, show him a
 
picture of the insi de of the cabinet and let him point out where the Test Toggle Switch is. Operator simulates placing Inverter TEST toggle switch in the UP position Examiner Cue: All 4 LED lights are illuminated.
  * # 5.3.7 PLACE the Inverter TEST Toggle Switch in the DOWN position AND PERFORM the following: 
 
A. VERIFY all 4 LED lights extinguish. B. IF any LED lights remain illuminated, THEN REPEAT Steps 5.3.6 AND 5.3.7. Operator simulates putting Inverter TEST toggle switch in the DOWN
 
position Examiner Cue: All 4 LED lights are off.  * # 5.3.8 PLACE the STATIC INVERTER DC INPUT BKR-CB101 in the ON position. OBSERVE that the LOSS OF INVERTER OUTPUT  
 
light extinguishes. Operator simulates placing CB101 in ON position Examiner Cue: Loss of Inverter Output light extinguishes
 
Page 7 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* # 5.3.9 PLACE the INVERTER AC OUTPUT BKR-CB10 in the ON position. Operator simulates placing CB10 in ON position   * # 5.3.10 PLACE the following ISOLATE Toggle Switches in the ON [right position]  
 
AND OBSERVE the noted light response:
A. ISOLATE INV OUTPUT (SYNC MONITOR light illuminates)
B. ISOLATE SYNC SOURCE (The following lights extinguish:)
B. ISOLATE SYNC SOURCE (The following lights extinguish:)
LOSS OF SYNCRONISM   SYNC MONITOR ON INTERNAL FREQUENCY REFERENCE Operator simulates placing ISOLATE Toggle switches in the ON position Examiner Cue: SYNC Monitor light illuminates Loss of Synchronism, Sync Monitor and On Internal Frequency Reference all illuminate.
* LOSS OF SYNCRONISM
  * # 5.3.11 PLACE the MAN BYPASS Control Switch in the BYP TO ALT position. Operator simulates placing MAN BYPASS switch in the BYP to ALT  
* SYNC MONITOR
* ON INTERNAL FREQUENCY REFERENCE
* 5.3.11   PLACE the MAN BYPASS Control                 Operator simulates placing MAN Switch in the BYP TO ALT position.           BYPASS switch in the BYP to ALT
#                                                        position.
5.3.12    VERIFY the amber LOAD ON                    Operator verifies amber LOAD ON BACKUP light is illuminated                  BACKUP light is illuminated.
AND the clear SYNC MONITOR light is extinguished                                Examiner Cue: LOAD ON BACKUP light is illuminated and SYNC MONITOR light is extinguished.
Page 7 of 9


position.
INITIAL LICENSED OPERATOR EXAMINATION            NAME:
5.3.12 VERIFY the amber LOAD ON BACKUP light is illuminated
JOB PERFORMANCE MEASURE                  DATE:
SYSTEM:      Electrical TASK:        Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP                                                                    COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                                STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
* 5.3.13    PLACE the MAN BYPASS Control              Operator simulates placing MAN Switch in NORM.                     BYPASS in NORM
#
* 5.3.14    PLACE the TEST Toggle Switch in            Operator places TEST toggle switch to NORMAL [center position]                  the NORMAL position AND OBSERVE the following:
Examiner Cue: Green PREF POS light is illuminated.
* Green PREF POS light is illuminated.                      LOAD ON BACKUP SOURCE light extinguishes.
* LOAD ON BACKUP SOURCE light extinguishes.
STOP TIME _________
Terminating Cue: Once the Operator has placed the TEST Toggle Switch in NORMAL and observed the proper indication, then state, "This JPM is complete" Page 8 of 9


AND the clear SYNC MONITOR light is extinguished Operator verifies amber LOAD ON BACKUP light is illuminated.
JOB PERFORMANCE MEASURE INSTRUCTIONS INITIAL CONDITIONS:
Examiner Cue: LOAD ON BACKUP light is illuminated and SYNC
: 1. Hope Creek is at 100%
 
: 2. UPS 1AD481s inverter blew a fuse and power to the 120VAC Distribution panel 1AJ481swapped over to its Backup AC power.
MONITOR light is extinguished.
: 3. An NEO has removed the Inverter and Rectifier sections from service IAW section 5.2 of HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.
 
: 4. Electrical Maintenance has replaced the fuse and is ready for 120VAC Distribution panel 1AJ481 to be returned to its normal power source.
Page 8 of 9 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available
: 5. You have been directed to return 120 VAC Distribution panel 1AJ481 to its normal power supply in accordance with HC.OP-SO.PN-0001 INITIATING CUE:
#
Place the Inverter and Rectifier Sections of 120 VAC UPS 1AD481 in-Service with Backup AC Available IAW HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.
* STEP NO. STEP (*Denotes a Critical Step)
Page 9 of 9
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
* # 5.3.13 PLACE the MAN BYPASS Control Switch in NORM. Operator simulates placing MAN BYPASS in NORM
* 5.3.14 PLACE the TEST Toggle Switch in NORMAL [center position]
 
AND OBSERVE the following:
Green PREF POS light is illuminated. LOAD ON BACKUP SOURCE light extinguishes. STOP TIME _________
 
Operator places TEST toggle switch to the NORMAL position Examiner Cue: Green PREF POS light is illuminated.
LOAD ON BACKUP SOURCE light extinguishes.
Terminating Cue:  Once the Operator has placed the TEST Toggle Switch in NORMAL and observed the proper indication, then state, "This JPM is complete" JOB PERFORMANCE MEASURE INSTRUCTIONS Page 9 of 9 INITIAL CONDITIONS: 1. Hope Creek is at 100% 2. UPS 1AD481's inverter blew a fuse and power to the 120VAC Distribution panel 1AJ481swapped over to its Backup AC power. 3. An NEO has removed the Inverter and Rectifier sections from service IAW section 5.2 of HC.OP-SO.PN-0001, 120 VAC Electrical Distribution. 4. Electrical Maintenance has replaced t he fuse and is ready for 120VAC Distribution panel 1AJ481 to be returned to its normal power source. 5. You have been directed to return 120 VAC Distribution panel 1AJ481 to it's normal power supply in accordance with HC.OP-SO.PN-0001  
 
INITIATING CUE:
Place the Inverter and Rectifier Sections of 120 VAC UPS 1AD481 in-Service with Backup AC Available IAW HC.OP-SO.PN-0001, 120 VAC Electri cal Distribution.


INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE Page 1 of 12 STATION: HOPE CREEK SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION:             HOPE CREEK SYSTEM:             Control Rod Drive Hydraulics TASK:               Isolate a CRD HCU During Reactor Operation [Hydraulically]
TASK NUMBER:
TASK NUMBER:         2010110104 JPM NUMBER:         NRC-JPM-011 ALTERNATE PATH:                                   K/A NUMBER:         201003A2.10 IMPORTANCE FACTOR:           3.0             3.4 APPLICABILITY:                                                       RO             SRO RO   X                       SRO      X EVALUATION SETTING/METHOD:           Reactor Bldg/Simulate
2010110104 JPM NUMBER:
NRC-JPM-011 ALTERNATE PATH: K/A NUMBER:201003A2.10 IMPORTANCE FACTOR:3.0 3.4 APPLICABILITY: RO SRO    RO X SROX EVALUATION SETTING/METHOD: Reactor Bldg/Simulate  


==REFERENCES:==
==REFERENCES:==
HC.OP-SO.BF-0002, Rev. 25 TOOLS AND EQUIPMENT:        Tool to remove cap from Instrument Block Connection P62.
Torque wrench set at 200 inch pounds VALIDATED JPM COMPLETION TIME:                11 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:                N/A JPM SOURCE: Bank APPROVAL:
Author                  Facility Representative          Chief Examiner CAUTION:      No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
: 3. Verification of the as left condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:                      Minutes ACTUAL TIME CRITICAL COMPLETION:                  N/A JPM PERFORMED BY:                                        GRADE:      SAT        UNSAT REASON, IF UNSATISFACTORY:
EVALUATORS SIGNATURE:                                            DATE:
Page 1 of 12


HC.OP-SO.BF-0002, Rev. 25 TOOLS AND EQUIPMENT:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:
 
Tool to remove cap from Inst rument Block Connection P62.
Torque wrench set at 200 inch pounds VALIDATED JPM COMPLETION TIME:
11 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:
N/A  JPM SOURCE:  Bank
 
APPROVAL:
Author  Facility Representative  Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:
: 1. Permission from the OS or Unit CRS;
: 2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions). 3. Verification of the "as left" condition by a qualified individual.
ACTUAL JPM COMPLETION TIME:
Minutes A C T UAL TIME C RITI C AL CO MPLETI O N: N/A  JPM PERFORMED BY:
GRADE:  SAT  UNSAT REASON , IF UNSATISFACTORY:
EVALUATOR'S SIGNATURE:
DATE:
DATE:
INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE  Page 2 of 12 NAME:  DATE:  SYSTEM: Control Rod Drive Hydraulics  
SYSTEM:             Control Rod Drive Hydraulics TASK:               Isolate a CRD HCU During Reactor Operation [Hydraulically]
 
TASK NUMBER: 2010110104 INITIAL CONDITIONS:
TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]
TASK NUMBER:
2010110104 INITIAL CONDITIONS:
: 1. The Reactor is operating at 18% power.
: 1. The Reactor is operating at 18% power.
: 2. Control Rod 38-07 has failed a scram time test and is fully inserted at this time.
: 2. Control Rod 38-07 has failed a scram time test and is fully inserted at this time.
INITIATING CUE:
INITIATING CUE:
Hydraulically isolate the HCU for Control Rod 38-07. DO NOT electrically disarm the HCU. Maintain cooling water flow to the CRD mechanism.
Hydraulically isolate the HCU for Control Rod 38-07. DO NOT electrically disarm the HCU.
Successful Completion Criteria: 1. All critical steps completed.
Maintain cooling water flow to the CRD mechanism.
Successful Completion Criteria:
: 1. All critical steps completed.
: 2. All sequential steps completed in order.
: 2. All sequential steps completed in order.
: 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may ex ceed the validated time if satisfactory progress is being made.  
: 3. All time-critical steps completed within allotted time.
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Page 2 of 12


Page 3 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]  
INITIAL LICENSED OPERATOR EXAMINATION                   NAME:
#
JOB PERFORMANCE MEASURE                         DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:   Control Rod Drive Hydraulics TASK:     Isolate a CRD HCU During Reactor Operation [Hydraulically]
(#Denotes a Sequential Step)
STEP                                                                            COMMENTS
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)   Operator obtains/locates procedure HC.OP-SO.BF-0002.
#   STEP
Operator obtains the correct procedure.
(*Denotes a Critical Step)                                                     EVAL  (Required for UNSAT
Operator reviews precautions and limitations.
* NO.                                                            STANDARD
Operator reviews precautions and limitations.
(#Denotes a Sequential Step)                                                       S/U     evaluation)
Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all  
Operator obtains/locates procedure       Operator obtains the correct procedure.
HC.OP-SO.BF-0002.
Operator reviews precautions and         Operator reviews precautions and limitations.                              limitations.
Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.
The operator initials the appropriate procedure steps.
Examiner Note: It is not critical to initial the procedure step, nor complete Attachment 1 in this and subsequent steps.
4.0      EQUIPMENT REQUIRED
* Tool to remove cap from              Operator obtains required tools.
Instrument Block Connection P6.      (Torque wrench set at 200 inch pounds.)
* Calibrated torque wrench with the appropriate range to read the        Examiner Note: Operator may reference value of 20 to 100% of      demonstrate ability to locate range.                                required tools. Tools are kept in a locked toolbox. If unable to open, state that the tools have been acquired.
Operator determines beginning step        Operator determines correct beginning of the procedure.                        step to be 5.1.1.
Page 3 of 12


are satisfied.
INITIAL LICENSED OPERATOR EXAMINATION                NAME:
The operator initia ls the appropriate procedure steps.
JOB PERFORMANCE MEASURE                      DATE:
Examiner Note: It is not critical to initial the procedure step, nor complete in this and subsequent
SYSTEM:    Control Rod Drive Hydraulics TASK:      Isolate a CRD HCU During Reactor Operation [Hydraulically]
STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                    S/U      evaluation) 5.1.1    ENSURE all prerequisites of Section      Operator ensures prerequisites have 2.1 are satisfied.                      been satisfied, completes Attachment 1, and initials each prerequisites in the spaces provided in the procedure.
Examiner Cue: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
#            START TIME:
* 5.1.2    PERFORM the following for                The Operator rotates 1BF-V101 applicable CRD HCU:                      handwheel in the clockwise direction until handwheel/stem motion stops and A. CLOSE following CRD HCU              valve has reached its closed seat.
Isolation valves:
Examiner Cue: The stem of the
: 1. 1-BF-V101, Insert Riser Vlv      valve you indicated is lowering, the valve handwheel comes to a hard stop.
The operator then initials the appropriate procedure step.
Page 4 of 12


steps. 4.0 EQUIPMENT REQUIRED Tool to remove cap from Instrument Block Connection P6. Calibrated torque wrench with the appropriate range to read the
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Control Rod Drive Hydraulics TASK:      Isolate a CRD HCU During Reactor Operation [Hydraulically]
STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                          STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
#                2. 1-BF-V102, Withdraw Riser        The Operator rotates 1BF-V102
* Isln Vlv AND INITIAL              handwheel in the clockwise direction Attachment 1.                     until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.
The operator then initials Attachment 1 and the appropriate procedure step.
#                3. 1-BF-V113, Chg Wtr Riser Isln    The Operator rotates 1BF-V113
* Vlv AND INITIAL Attachment        handwheel in the clockwise direction
: 1.                                until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.
The operator then initials Attachment 1 and the appropriate procedure step.
Page 5 of 12


reference value of 20 to 100% of
INITIAL LICENSED OPERATOR EXAMINATION           NAME:
 
JOB PERFORMANCE MEASURE                   DATE:
range. Operator obtains required tools.  (Torque wrench set at 200 inch
SYSTEM:   Control Rod Drive Hydraulics TASK:     Isolate a CRD HCU During Reactor Operation [Hydraulically]
 
STEP                                                                      COMMENTS
pounds.) Examiner Note:  Operator may demonstrate ability to locate
#   STEP
 
(*Denotes a Critical Step)                                               EVAL (Required for UNSAT
required tools. Tools are kept in a
* NO.                                                         STANDARD
 
(#Denotes a Sequential Step)                                               S/U     evaluation)
locked toolbox. If unable to open, state that the tools have been
B. PERFORM the following to              The Operator rotates 1BF-V111 discharge HCU Gas Accumulator:      handwheel in the clockwise direction until handwheel/stem motion stops and
 
: 1. CLOSE 1-BF-V111, Gas              valve has reached its closed seat.
acquired. Operator determines beginning step of the procedure.
Accum Chrg Vlv.
Operator determines correct beginning step to be 5.1.1.
Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.
 
The operator then initials the appropriate procedure step.
Page 4 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]  
: 2. Slowly UNCAP Instrument           The Operator uncaps Instrument Block Block Conn P6.                    Conn P6.
#
Examiner Cue: The cap has been removed from the location identified.
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD EVAL S/U COMMENTS (Required for UNSAT evaluation)  5.1.1 ENSURE all prerequisites of Section 2.1 are satisfied. Operator ensures prerequisites have been satisfied, completes Attachment
 
1, and initials each prerequisites in the
 
spaces provided in the procedure.
Examiner Cue:  If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.
        #*  5.1.2 START TIME:
PERFORM the following for applicable CRD HCU:
A. CLOSE following CRD HCU Isolation valves: 1. 1-BF-V101, Insert Riser Vlv The Operator rotates 1BF-V101 handwheel in the clockwise direction
 
until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue:  The stem of the valve you indicated is lowering, the valve handwheel comes to a hard
 
stop. The operator then initials the appropriate procedure step.
 
Page 5 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
#*  2. 1-BF-V102, Withdraw Riser Isln Vlv AND INITIAL Attachment 1.
The Operator rotates 1BF-V102 handwheel in the clockwise direction  
 
until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard
 
stop. The operator then initials Attachment 1 and the appropriate procedure step.
  #*  3. 1-BF-V113, Chg Wtr Riser Isln Vlv AND INITIAL Attachment
: 1. The Operator rotates 1BF-V113 handwheel in the clockwise direction
 
until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue:  The stem of the valve you indicated is lowering, the valve handwheel comes to a hard
 
stop. The operator then initials Attachment 1 and the appropriate procedure step.
 
Page 6 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  B. PERFORM the following to discharge HCU Gas Accumulator:
: 1. CLOSE 1-BF-V111, Gas Accum Chrg Vlv.
The Operator rotates 1BF-V111 handwheel in the clockwise direction
 
until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard  
 
stop. The operator then initials the appropriate procedure step.
: 2. Slowly UNCAP Instrument Block Conn P6.
The Operator uncaps Instrument Block Conn P6. Examiner Cue: The cap has been removed from the location identified.
Note - P6 is the cap on the Front of the Instrument Block not the back.
Note - P6 is the cap on the Front of the Instrument Block not the back.
The operator then initials the appropriate procedure step.  
The operator then initials the appropriate procedure step.
 
Page 6 of 12
Page 7 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  3. Throttle OPEN 1-BF-V111, Gas Accum Chrg Vlv. Operator slowly rotates 1BF-V111 in the counterclockwise direction and
 
observes decreasing accumulator gas
 
pressure on PI-131. Examiner Cue:  The handwheel of the valve you indicated is rotating counterclockwise, gas can be heard escaping from the P6 connection. 


INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Control Rod Drive Hydraulics TASK:      Isolate a CRD HCU During Reactor Operation [Hydraulically]
STEP                                                                      COMMENTS
#    STEP
(*Denotes a Critical Step)                                                EVAL  (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
: 3. Throttle OPEN 1-BF-V111,          Operator slowly rotates 1BF-V111 in Gas Accum Chrg Vlv.              the counterclockwise direction and observes decreasing accumulator gas pressure on PI-131.
Examiner Cue: The handwheel of the valve you indicated is rotating counterclockwise, gas can be heard escaping from the P6 connection.
PI-131 indication is lowering.
PI-131 indication is lowering.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
: 4. WHEN PI-131, N 2 Accumulator Press, is 0 psig, THEN fully OPEN 1-BF-V111, Gas Accum Chrg. Vlv AND INITIAL Attachment 1.
: 4. WHEN PI-131, N2                  Examiner Cue: PI-131 indicates 0 Accumulator Press, is 0 psig,     psig.
Examiner Cue:  PI-131 indicates 0 psig. Operator rotates 1BF-V111 handwheel in the counterclockwise direction until handwheel/stem motion stops and  
THEN fully OPEN 1-BF-V111, Gas Accum Chrg. Vlv AND           Operator rotates 1BF-V111 handwheel INITIAL Attachment 1.            in the counterclockwise direction until handwheel/stem motion stops and valve is fully open.
Examiner Cue: The stem of the valve you indicated is rising, the valve handwheel come to a hard stop.
The operator then initials the appropriate procedure step.
Page 7 of 12


valve is fully open.
INITIAL LICENSED OPERATOR EXAMINATION               NAME:
Examiner Cue:  The stem of the valve you indicated is rising, the valve handwheel come to a hard
JOB PERFORMANCE MEASURE                       DATE:
 
SYSTEM:   Control Rod Drive Hydraulics TASK:     Isolate a CRD HCU During Reactor Operation [Hydraulically]
stop. The operator then initials the appropriate procedure step.
STEP                                                                        COMMENTS
 
#   STEP
Page 8 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]  
(*Denotes a Critical Step)                                                   EVAL  (Required for UNSAT
#
* NO.                                                          STANDARD
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)                                                   S/U     evaluation)
(#Denotes a Sequential Step)
: 5. CAP Instrument Block             Operator threads cap on P6 connection Connection P6 AND INITIAL        and rotates cap in clockwise direction Attachment 1.                    using appropriate wrench.
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)   5. CAP Instrument Block Connection P6 AND INITIAL Attachment 1.
Examiner Cue: The P6 cap is rotating in the clockwise direction.
Operator threads c ap on P6 connection and rotates cap in clockwise direction using appropriate wrench.
The operator then initials the appropriate procedure step.
Examiner Cue: The P6 cap is rotating in the clockwise direction.
: 6. TORQUE P6 cap to 175 (150 -      Using torque wrench, operator rotates 200) in-lb.                      P6 cap in clockwise direction until torque wrench clicks indicating that inch pounds have been reached.
Examiner Cue: The torque wrench is rotating clockwise, the torque wrench clicks.
The operator then initials the appropriate procedure step.
The operator then initials the appropriate procedure step.
: 6. TORQUE P6 cap to 175 (150 -
Page 8 of 12
200) in-lb.
Using torque wrench, operator rotates P6 cap in clockwise direction until


torque wrench clicks indicating that inch
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Control Rod Drive Hydraulics TASK:      Isolate a CRD HCU During Reactor Operation [Hydraulically]
STEP                                                                        COMMENTS
#    STEP
(*Denotes a Critical Step)                                                    EVAL  (Required for UNSAT
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                      S/U      evaluation)
#            C. PERFORM the following to
* hydraulically isolate Directional Control Valves SV-121, SV-122,          The Operator rotates 1BF-V103 SV-123, AND SV-120 from Drive            handwheel in the clockwise direction AND Exhaust Water Headers:              until handwheel/stem motion stops and valve has reached its closed seat.
: 1. CLOSE 1-BF-V103, Drv Wtr Riser Vlv AND INITIAL                Examiner Cue: The stem of the Attachment 1.                        valve you indicated is lowering, the valve handwheel comes to a hard stop.
The operator then initials Attachment 1 and the appropriate procedure step.
#                2. CLOSE 1-BF-V105, Exh Wtr              The Operator rotates 1BF-V105
* Riser Vlv AND INITIAL                handwheel in the clockwise direction Attachment 1.                        until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.
The operator then initials Attachment 1 and the appropriate procedure step.
Page 9 of 12


pounds have been reached. Examiner Cue:  The torque wrench is rotating clockwise, the torque wrench clicks.
INITIAL LICENSED OPERATOR EXAMINATION              NAME:
The operator then initials the appropriate procedure step.  
JOB PERFORMANCE MEASURE                    DATE:
SYSTEM:    Control Rod Drive Hydraulics TASK:      Isolate a CRD HCU During Reactor Operation [Hydraulically]
STEP                                                                        COMMENTS
#    STEP
(*Denotes a Critical Step)                                                  EVAL  (Required for UNSAT
* NO.                                                              STANDARD
(#Denotes a Sequential Step)                                                  S/U      evaluation)
#            D. OPEN 1-BF-V101, Insert Riser Vlv      The Operator rotates 1BF-V101
* AND INITIAL Attachment 1.            handwheel in the counterclockwise direction until handwheel/stem motion stops and valve has reached its open seat.
Examiner Cue: The stem of the valve you indicated is rising, the valve handwheel comes to a hard stop.
The operator then initials Attachment 1 and the appropriate procedure step.
  #            E. CLOSE 1-BF-V112, Scram Dsch            The Operator rotates 1BF-V112
* Riser Vlv AND INITIAL                handwheel in the clockwise direction Attachment 1.                        until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.
The operator then initials Attachment 1 and the appropriate procedure step.
F. OBSERVE appropriate CRD                Operator relocates to the 1-BF-TRS-temperature periodically on CRD      R018 RECORDER and observes the TEMPERATURE 1-BF-TRS-R018            temperature for Rod 38-07.
RECORDER.
Examiner Cue: The indicator identified indicates 195F.
Page 10 of 12


Page 9 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME: JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]  
INITIAL LICENSED OPERATOR EXAMINATION             NAME:
#
JOB PERFORMANCE MEASURE                     DATE:
* STEP NO. STEP (*Denotes a Critical Step)
SYSTEM:     Control Rod Drive Hydraulics TASK:       Isolate a CRD HCU During Reactor Operation [Hydraulically]
(#Denotes a Sequential Step)
STEP                                                                            COMMENTS
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  
#   STEP
#*  C. PERFORM the following to hydraulically isolate Directional
(*Denotes a Critical Step)                                                 EVAL      (Required for UNSAT
* NO.                                                            STANDARD
(#Denotes a Sequential Step)                                                   S/U         evaluation) 5.1.3      PERFORM independent verification          Operator submits the procedure for an that the system is aligned IAW            independent verification.
Attachment 1.
STOP TIME:
Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete".
Page 11 of 12


Control Valves SV-121, SV-122, SV-123, AND SV-120 from Drive AND Exhaust Water Headers:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
: 1. CLOSE 1-BF-V103, Drv Wtr Riser Vlv AND INITIAL Attachment 1.
: 1. The Reactor is operating at 18% power.
The Operator rotates 1BF-V103 handwheel in the clockwise direction
: 2. Control Rod 38-07 has failed a scram time test and is fully inserted at this time.
 
INITIATING CUE:
until handwheel/stem motion stops and valve has reached its closed seat.
Hydraulically isolate the HCU for Control Rod 38-07. DO NOT electrically disarm the HCU. Maintain cooling water flow to the CRD mechanism.
Examiner Cue:  The stem of the valve you indicated is lowering, the valve handwheel comes to a hard
Page 12 of 12}}
 
stop. The operator then initials Attachment 1 and the appropriate procedure step.
  #*  2. CLOSE 1-BF-V105, Exh Wtr Riser Vlv AND INITIAL Attachment 1.
The Operator rotates 1BF-V105 handwheel in the clockwise direction
 
until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue:  The stem of the valve you indicated is lowering, the valve handwheel comes to a hard
 
stop. The operator then initials Attachment 1 and the appropriate procedure step.
 
Page 10 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)
#*  D. OPEN 1-BF-V101, Insert Riser Vlv AND INITIAL Attachment 1.
The Operator rotates 1BF-V101 handwheel in the counterclockwise
 
direction until handwheel/stem motion
 
stops and valve has reached its open
 
seat. Examiner Cue: The stem of the valve you indicated is rising, the valve handwheel comes to a hard
 
stop. The operator then initials Attachment 1 and the appropriate procedure step.
  #*  E. CLOSE 1-BF-V112, Scram Dsch Riser Vlv AND INITIAL Attachment 1.
The Operator rotates 1BF-V112 handwheel in the clockwise direction
 
until handwheel/stem motion stops and valve has reached its closed seat.
Examiner Cue:  The stem of the valve you indicated is lowering, the valve handwheel comes to a hard
 
stop. The operator then initials Attachment 1 and the appropriate procedure step.
F. OBSERVE appropriate CRD temperature periodically on CRD
 
TEMPERATURE 1-BF-TRS-R018 RECORDER.
Operator relocates to the 1-BF-TRS-R018 RECORDER and observes the
 
temperature for Rod 38-07.
Examiner Cue:  The indicator identified indicates 195F.
 
Page 11 of 12 INITIAL LICENSED OPERATOR EXAMINATION NAME:  JOB PERFORMANCE MEASURE DATE: SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]
#
* STEP NO. STEP (*Denotes a Critical Step)
(#Denotes a Sequential Step)
STANDARD  EVAL S/U COMMENTS (Required for UNSAT evaluation)  5.1.3 PERFORM independent verification that the system is aligned IAW
. STOP TIME:
 
Operator submits t he procedure for an independent verification.
Terminating Cue:
Repeat back message from the operator on the status of the JPM, and t hen state "This JPM is complete".
 
JOB PERFORMANCE MEASURE  Page 12 of 12 INITIAL CONDITIONS: 1. The Reactor is operating at 18% power. 2. Control Rod 38-07 has failed a scram time test and is fully inserted at this time. INITIATING CUE: Hydraulically isolate the HCU for Control Rod 38-07. DO NOT electrically disarm the HCU. Maintain cooling water flow to the CRD mechanism.}}

Revision as of 23:38, 23 November 2019

Final - Section B Operating Exam (Folder 3)
ML053570237
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/28/2005
From: Suzanne Dennis
Operations Branch I
To: Reid J
Public Service Enterprise Group
Conte R
References
50-354/05-301 50-354/05-301
Download: ML053570237 (117)


Text

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing TASK NUMBER: 2450040201 JPM NUMBER: NRC-JPM-001 ALTERNATE PATH: K/A NUMBER: 241000A4.19 IMPORTANCE FACTOR: 3.5 3.4 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-ST.AC-0002(Q), Rev. 36 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME: 10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: New APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 23

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing TASK NUMBER: 2450040201 INITIAL CONDITIONS:

1. The Plant is operating at 100% power.
2. The CRS has informed you that you need to perform the Main Turbine Stop Valve Test

- (Preferred Method)

3. The testing is required every quarter to prove RPS system is OPERABLE IAW TS Table 4.3.1.1-1 Items 9 and 10
4. The System Load Dispatcher has been notified of the Turbine Stop Valve testing.
5. A Thermal scan of all 185 HCUs has been performed and all scram pilot solenoids have been verified energized.

INITIATING CUE:

Perform HC.OP-ST.AC-0002(Q), Turbine Valve Testing- Quarterly for the Main Turbine Stop valves (Preferred Method).

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 23

INITIAL LICENSED OPERATOR EXAMINATION NAME JOB PERFORMANCE MEASURE DATE SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing STEP

  1. STEP

(*Denotes a Critical Step) EVAL

  • NO. STANDARD

(#Denotes a Sequential Step) S/U Operator obtains and locates Operator obtains the correct procedure.

procedure HC.OP-ST.AC-0002(Q). Examiner Note: Provide the operator with a filled out Section 1 of Attachment 1 and N/A all non-applicable steps of HC.OP-ST.AC-0002(Q), Attachment 1.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.

Examiner Note: Initialing of steps is not critical.

Operator determines beginning step Operator determines correct beginning of the procedure. step of procedure to be 5.1.

Page 3 of 23

INITIAL LICENSED OPERATOR EXAMINATION NAME JOB PERFORMANCE MEASURE DATE SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing STEP

  1. STEP

(*Denotes a Critical Step) EVAL

  • NO. STANDARD

(#Denotes a Sequential Step) S/U 5.1.1. IF this is the first subsection of the Operator ensures that the provided Att.

procedure to be performed, THEN 1 has been completed and that Regular PERFORM the following: surveillance has been indicated.

A. ENSURE that Section 1.0 of Operator initials the appropriate space Attachment 1 has been on the procedure.

completed AND Regular Surveillance OR Retest is Examiner Cue: The test start time indicated.

has been logged in the Control B. LOG test start time in the Control Room log(s).

Room log(s).

Operator initials the appropriate space on the procedure.

5.1.2 ENSURE all prerequisites of section Operator ensures that all prerequisites 2.1 are satisfied. are satisfied.

Operator initials the appropriate space on the procedure.

Operator completes Attachment 1, Section 3.0.

If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.

Page 4 of 23

INITIAL LICENSED OPERATOR EXAMINATION NAME JOB PERFORMANCE MEASURE DATE SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing STEP

  1. STEP

(*Denotes a Critical Step) EVAL

  • NO. STANDARD

(#Denotes a Sequential Step) S/U START TIME: ___________

5.1.3 IF annunciator C5-C2, TCV FAST Determines that annunciator C5-C2 is CLOSURE & MSV TRIP NOT illuminated and N/As the step.

BYPASS, is illuminated, THEN DIRECT I&C to perform Attachment 3 to remove this bypass.:

5.1.4 IF the EOC-RPT System is NOT in- Operator determines that EOC-RPT is service, IN SERVICE and N/As this step THEN DIRECT I&C to verify the relay contacts on Table AC-002 (Attachment 5) are open, AND to INITIAL Attachment 2.

  • 5.1.5.A PERFORM the following to bypass the Operator Places the RECIRC PUMP EOC-RPT System: TRIP DISABLE SYSTEM A (Panel

10C609) AND SYSTEM B (Panel A. PLACE the RECIRC PUMP TRIP 10C611) in BYP position DISABLE SYSTEM A (Panel 10C609) AND SYSTEM B (Panel Examiner Cue: If asked, inform the 10C611) in BYP position.

operator that the Verifier has INITIAL Attachment 2; performer and initialed Attachment 2.

verifier.

Page 5 of 23

INITIAL LICENSED OPERATOR EXAMINATION NAME JOB PERFORMANCE MEASURE DATE SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing STEP

  1. STEP

(*Denotes a Critical Step) EVAL

  • NO. STANDARD

(#Denotes a Sequential Step) S/U 5.1.5.B ENTER Technical Specification LCO Operator informs the CRS to enter TS 3.3.4.2, 3.3.4.2 and take action in accordance AND TAKE action in accordance with item e with Action item e. Examiner Cue: Respond as the CRS that TS LCO 3.3.4.2 has been entered and actions are being taken in accordance with Action Item e Operator initials the appropriate space on the procedure.

5.1.6 PERFORM the following at the EHC Operator notes that if Any MSV moves CONTROL PANEL: > 20% in Closed direction that he/she will immediately Select Main Stop A. IF during the performance of Valve Pair Testing Stop Formatted this step any MSV moves > 20% in the Closed direction, THEN IMMEDIATELY SELECT Main Stop Valve Pair Testing Start/Stop Stop Formatted B ENSURE that NO RPS Half Scrams are Operator ENSURES NO RPS half present. scrams are present.

  • C SELECT Tests , MSV Pair Test Operator Selects Tests , MSV Pair Formatted Test Formatted

Formatted Formatted Page 6 of 23

INITIAL LICENSED OPERATOR EXAMINATION NAME JOB PERFORMANCE MEASURE DATE SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing STEP

  1. STEP

(*Denotes a Critical Step) EVAL

  • NO. STANDARD

(#Denotes a Sequential Step) S/U D ENSURE at least three minutes has Operator ensures at least 3 minutes elapsed since the last MSV has elapsed since the last MSV reached full open. reached full open.

EXAMINER CUE: If Operator wants to wait, inform him >3 minutes have elapsed since the last MSV reached full open.

  • E
  • SELECT the following:MSV #1, Operator Selects Formatted
  1. Pair Testing Selector, Include
  • MSV #1, Pair Testing Selector, Deleted: ¶ Include Formatted
  • MSV #2, Pair Testing Selector, Include
  • MSV #2, Pair Testing Selector, Include F VERIFY Paired is displayed for Operator verifies that Paired is Formatted MSV #1 AND MSV #2 displayed for MSV #1 AND MSV #2 Formatted
  • G SELECT Main Stop Valve Pair Operator SELECTS Main Stop Valve Formatted
  1. Testing Start/Stop Start Pair Testing Start/Stop Start Formatted Formatted Page 7 of 23

INITIAL LICENSED OPERATOR EXAMINATION NAME JOB PERFORMANCE MEASURE DATE SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing STEP

  1. STEP

(*Denotes a Critical Step) EVAL

  • NO. STANDARD

(#Denotes a Sequential Step) S/U

  • H WHEN MSV 1 AND MSV 2 reach the Operator verifies MSV 1 and 2 reach 90% open position, THEN VERIFY the 90% open position and RECORDS SAT

following AND RECORD as on Attachment 2.

SAT/UNSAT on Attachment 2:

Operator verifies RPS TRIP LOGIC A1,

1. RPS TRIP LOGIC A1, NORMAL NORMAL RESET light is extinguished.

RESET status light on 10C651 is extinguished. EXAMINER CUE: If the Operator has

[TS Table 4.3.1.1-1 Item 9] concerns about MSV 1 oscillating, then inform Operator they can

2. Control Room Annunciator C5 B2, assume MSV 1 is at 90% and NOT MAIN STOP VALVE CLOSURE oscillating.

is energized. [TS Table 4.3.1.1-1 Item 9, TS Table 4.3.4.2.1-1 Item 1] Operator verifies C5 B2, MAIN STOP VALVE CLOSURE and C3 A2,

3. Control Room Annunciator C3 REACTOR SCRAM TRIP LOGIC A1 A2, REACTOR SCRAM TRIP are both energized.

LOGIC A1 is energized.

  • I SELECT Main Stop Valve Pair Operator selects Main Stop Valve Pair
  1. Testing Start/Stop Stop Testing Start/Stop Stop Formatted
  • J SELECT the following: Operator selects the following: Formatted
  • MSV #1, Pair Testing Selector
  • MSV #1, Pair Testing Selector Test

Test OFF OFF

  • MSV #2, Pair Testing Selector
  • MSV #2, Pair Testing Selector Test OFF Test OFF Page 8 of 23

INITIAL LICENSED OPERATOR EXAMINATION NAME JOB PERFORMANCE MEASURE DATE SYSTEM: Main Turbine TASK: Perform Quarterly Turbine Stop Valve Testing STEP

  1. STEP

(*Denotes a Critical Step) EVAL

  • NO. STANDARD

(#Denotes a Sequential Step) S/U

L Operator ensures that RPS TRIP ENSURE RPS TRIP LOGIC A1, LOGIC A1, NORMAL RESET light is NORMAL RESET status energized and that MSV 1 & 2 Open light on 10C651 is energized and annunciators C5-B2 and C3-A2 AND the following occur: have cleared.

  • MSV 1, Main Stop Valve Opens EXAMINER CUE: Once Operator has
  • MSV 2, Main Stop Valve Opens ensured that Annunciator C3-A2 has
  • Control Room Annunciator C5 B2, cleared, then inform him that another MAIN STOP Operator will complete the rest of VALVE CLOSURE clears this procedure and that this JPM is complete.

STOP TIME: ____________

Terminating Cue: Once Operator has ensured that Annunciator C3-A2 has cleared, then state "This JPM is c Page 9 of 23

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Plant is operating at 100% power.
2. The CRS has informed you that you need to perform the Main Turbine Stop Valve Test - (Preferred Method)
3. The testing is required every quarter to prove RPS system is OPERABLE IAW TS Table 4.3.1.1-1 Items 9 and 10
4. The System Load Dispatcher has been notified of the Turbine Stop valve testing.
5. A Thermal scan of all 185 HCUs has been performed and all scram pilot solenoids have been verified energized.

INITIATING CUE:

Perform HC.OP-ST.AC-0002(Q), Turbine Valve Testing- Quarterly for the Main Turbine Stop valves (Preferred Method).

Page 10 of 23

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset Simulator to any 100% power IC Page 11 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 1 of 3) 1.0 PRETEST INFORMATION 1.1 Reason for the Test JW 1.1.1 Regular Surveillance _________________________________

INITIALS 1.1.2 Retest/Other ________________________________________

INITIALS 1.1.3 IF not performing the complete test, THEN LIST subsection(s)/valves to be performed, as well as marking N/A on the applicable subsection(s)/valves on the Attachment(s) that will not be performed, OR, that do not require an independent verification IAW NC.NA-AP.ZZ-0005(Q); Station Operating Practices.

5.1

_____________________________________________

SUBSECTION(S) 1.2 Plant Conditions 1

1.2.1 Operational Condition ________________________________

100 1.2.2 Reactor Power Level _________________________________

1137 1.2.3 GMWe ____________________________________________

1.3 Permission to Perform the Test 1.3.1 Permission granted to perform this test.

Mel Gray Today

/ _______________

SM/CRS DATE-TIME 1.3.2 Order No. __________________________________________

Page 12 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 2 of 3) 2.0 POST TEST INFORMATION 2.1 The data acquired during the performance of this test has been reviewed for completeness and compliance with Technical Specification Table 4.3.4.2.1-1 Items 1 and 2, and Table 4.3.1.1-1 Items 9 and 10. This test is considered:

2.1.1 SATISFACTORY (All acceptance criteria is marked SAT)

/ _______________

SM/CRS DATE-TIME 2.1.2 UNSATISFACTORY AND IF necessary the T/S ACTION statement has been implemented.

/ _______________

SM/CRS DATE-TIME 2.1.4 Order No.

2.1.5 Remarks Page 13 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 1 SM/CRS DATA AND SIGNATURE SHEET TURBINE VALVE TESTING - QUARTERLY (Page 3 of 3) 3.0 PROCEDURE PERFORMER(S) AND VERIFIER(S) 3.1 I have read and understand the steps of this procedure that I am required to perform.

(All Departments)

PRINT NAME SIGNATURE INITIALS DATE/TIME

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

_________________ / ______________________ / ____________ / _____________

Page 14 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 1 of 9) 1.0 TEST INFORMATION 1.1 Main Turbine Stop Valve Test - (Preferred Method)

STEP NOMENCLATURE CKT REQUIRED PERF 5.1.4 TABLE AC-002 RELAY CONTACTS OPEN STEP NOMENCLATURE REQUIRED PERF VERIF NORM BYP RECIRC PUMP TRIP DISABLE BYP 5.1.5.A SYSTEM A NORM BYP RECIRC PUMP TRIP DISABLE BYP SYSTEM B SAT/

STEP NOMENCLATURE REQUIRED PERF UNSAT RPS TRIP LOGIC A1, NORMAL/RESET STATUS 5.1.6.H.1 EXTINGUISHES

  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.H.2 ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A2, REACTOR SCRAM TRIP 5.1.6.H.3 ENERGIZES LOGIC A1 RPS TRIP LOGIC A2, NORMAL/RESET STATUS 5.1.6.Q.1 EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.Q.2 ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A3, REACTOR SCRAM TRIP 5.1.6.Q.3 ENERGIZES LOGIC A2 RPS TRIP LOGIC B1, NORMAL/RESET STATUS 5.1.6.Z.1 EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.Z.2 ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP 5.1.6.Z.3 ENERGIZES LOGIC B1 RPS TRIP LOGIC B2, NORMAL/RESET STATUS 5.1.6.II.1 EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.1.6.II.2 ENERGIZES
  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

Page 15 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 2 of 9) 1.1 Main Turbine Stop Valve Test - (Preferred Method) (Continued)

STEP NOMENCLATURE REQUIRED PERF VERIF RECIRC PUMP TRIP DISABLE SYSTEM A NORMAL 5.1.7 RECIRC PUMP TRIP DISABLE SYSTEM B NORMAL SAT/ PERF STEP NOMENCLATURE REQUIRED UNSAT TURBINE STOP VALVE CLOSURE TEST 5.1.8.C EXTINGUISHES

  • LAMP DS6A TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.D NORMAL
  • A1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.1.8.F EXTINGUISHES
  • LAMP DS8C TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.G NORMAL
  • A2 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.1.8.I EXTINGUISHES
  • LAMP DS8B TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.J NORMAL
  • B1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.1.8.L EXTINGUISHES
  • LAMP DS6B TURBINE STOP VALVE CLOSURE LOGIC 5.1.8.M NORMAL
  • B2 TEST SWITCH STEP NOMENCLATURE CKT REQUIRED PERF 5.1.9.A TABLE AC-002 RELAY CONTACTS OPEN
  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

Page 16 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 3 of 9) 1.1 Main Turbine Stop Valve Test - (Preferred Method) (Continued)

STEP NOMENCLATURE CKT REQUIRED SAT/UNSAT PERF 5.1.9.C TEST POINT C71A-K49A 2B-2C CLOSED

  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

Page 17 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 4 of 9) 1.2 Main Turbine Stop Valve Test - (Alternate Method)

STEP NOMENCLATURE CKT REQUIRED PERF 5.2.4 TABLE AC-002 RELAY CONTACTS OPEN STEP NOMENCLATURE REQUIRED PERF VERIF NORM BYP RECIRC PUMP TRIP DISABLE BYP 5.2.5.A SYSTEM A NORM BYP RECIRC PUMP TRIP DISABLE BYP SYSTEM B SAT/

STEP NOMENCLATURE REQUIRED PERF UNSAT RPS TRIP LOGIC A1, NORMAL/RESET STATUS EXTINGUISHES

  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.8.E ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A2, REACTOR SCRAM ENERGIZES TRIP LOGIC A1 RPS TRIP LOGIC A1, NORMAL/RESET STATUS EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.8.N ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A2, REACTOR SCRAM ENERGIZES TRIP LOGIC A1 RPS TRIP LOGIC A2, NORMAL/RESET STATUS EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.9.E ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A3, REACTOR SCRAM ENERGIZES TRIP LOGIC A2 RPS TRIP LOGIC A2, NORMAL/RESET STATUS EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.9.N ENERGIZES
  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

Page 18 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 5 of 9) 1.2 Main Turbine Stop Valve Test - (Alternate Method) (Continued)

SAT/

STEP NOMENCLATURE REQUIRED PERF UNSAT RPS TRIP LOGIC B1, NORMAL/RESET STATUS EXTINGUISHES

  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.10.E ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP ENERGIZES LOGIC B1 RPS TRIP LOGIC B1, NORMAL/RESET STATUS EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.10.N ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A4, REACTOR SCRAM TRIP ENERGIZES LOGIC B1 RPS TRIP LOGIC B2, NORMAL/RESET STATUS EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.11.E ENERGIZES
  • CLOSURE ANNUNCIATOR C3 A5, REACTOR SCRAM TRIP ENERGIZES LOGIC B2 RPS TRIP LOGIC B2, NORMAL/RESET STATUS EXTINGUISHES
  • LIGHT ANNUNCIATOR C5 B2 MAIN STOP VALVE 5.2.11.N ENERGIZES
  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

Page 19 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 6 of 9) 1.2 Main Turbine Stop Valve Test - (Alternate Method) (Continued)

STEP NOMENCLATURE REQUIRED PERF VERIF RECIRC PUMP TRIP DISABLE SYSTEM A NORM 5.2.12 RECIRC PUMP TRIP DISABLE SYSTEM B NORM SAT/ PERF STEP NOMENCLATURE REQUIRED UNSAT TURBINE STOP VALVE CLOSURE TEST 5.2.13.C EXTINGUISHES

  • LAMP DS6A TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.D NORM
  • A1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.2.13.F EXTINGUISHES
  • LAMP DS8C TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.G NORM
  • A2 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.2.13.I EXTINGUISHES
  • LAMP DS8B TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.J NORM
  • B1 TEST SWITCH TURBINE STOP VALVE CLOSURE TEST 5.2.13.L EXTINGUISHES
  • LAMP DS6B TURBINE STOP VALVE CLOSURE LOGIC 5.2.13.M NORM
  • B2 TEST SWITCH STEP NOMENCLATURE CKT REQUIRED PERF 5.2.14.A TABLE AC-002 RELAY CONTACTS OPEN
  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

Page 20 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 7 of 9) 1.2 Main Turbine Stop Valve Test - (Alternate Method) (Continued)

STEP NOMENCLATURE CKT REQUIRED SAT/UNSAT PERF 5.2.14.C TEST POINT C71A-K49A 2B-2C CLOSED

  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

1.3 Turbine Control Valves Test (CV)

STEP NOMENCLATURE CKT REQUIRED PERF 5.3.4 TABLE AC-001 RELAY CONTACTS OPEN Page 21 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 8 of 9) 1.3 Turbine Control Valves Test (CV) (Continued)

TURBINE CONTROL VALVE #1 SAT/ PERF/

STEP NOMENCLATURE REQUIRED UNSAT DATE FULL CLOSED 5.3.11.F TURBINE CONTROL VALVE FULLY INDICATION CLOSED TURB CONTROL VALVE FAST CLOSURE 5.3.11.G EXTINGUISHES LOGIC A1 TEST LIGHT 5.3.11.H C71-K48A 2B-2C RELAY CLOSED 5.3.11.I.1 RPS TRIP LOGIC A1, NORMAL/RESET EXTINGUISHES STATUS LIGHT 5.3.11.I.2 ANNUNCIATOR C5 A2, TCV FAST ENERGIZES CLOSURE ANNUNCIATOR C3 A2 REACTOR SCRAM 5.3.11.I.3 ENERGIZES TRIP LOGIC A1 TURBINE CONTROL VALVE #2 SAT/ PERF/

STEP NOMENCLATURE REQUIRED UNSAT DATE FULL CLOSED 5.3.11.F TURBINE CONTROL VALVE FULLY CLOSED

  • INDICATION TURB CONTROL VALVE FAST CLOSURE 5.3.11.G EXTINGUISHES
  • LOGIC B1 TEST LIGHT 5.3.11.H C710K48B 2B-2C RELAY CLOSED
  • RPS TRIP LOGIC B 1, NORMAL/RESET 5.3.11.I.1 EXTINGUISHES
  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

NOTE : 5.3.11.F OR G must be marked SAT.

Page 22 of 23

JOB PERFORMANCE MEASURE ATTACHMENT 2 CONTROL ROOM DATA SHEET TURBINE VALVE TESTING - QUARTERLY (Page 9 of 9) 1.3 Turbine Control Valves Test (CV) (Continued)

TURBINE CONTROL VALVE #3 SAT/ PERF/

STEP NOMENCLATURE REQUIRED UNSAT DATE FULL CLOSED 5.3.11.F TURBINE CONTROL VALVE FULLY CLOSED

  • INDICATION TURB CONTROL VALVE FAST CLOSURE 5.3.11.G EXTINGUISHES
  • LOGIC B2 TEST LIGHT 5.3.11.H C71-K48D 2B-2C RELAY CLOSED
  • RPS TRIP LOGIC B2, NORMAL/RESET 5.3.11.I.1 EXTINGUISHES
  • ANNUNCIATOR C3 A5 REACTOR SCRAM 5.3.11.I.3 ENERGIZES TRIP LOGIC B2 NOTE: 5.3.9 F OR G must be marked SAT.

TURBINE CONTROL VALVE #4 SAT/ PERF/

STEP NOMENCLATURE REQUIRED UNSAT DATE FULL CLOSED 5.3.12.G TURBINE CONTROL VALVE FULLY CLOSED

  • INDICATION TURB CONTROL VALVE FAST CLOSURE 5.3.12.H EXTINGUISHES
  • LOGIC A2 TEST LIGHT 5.3.12.I C71-K48C 2B-2C RELAY CLOSED
  • RPS TRIP LOGIC A2, NORMAL/RESET 5.3.12.J.1 EXTINGUISHES
  • The asterisk indicates acceptance criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

NOTE: 5.3.12 G OR H must be marked SAT.

Page 23 of 23

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service TASK NUMBER: 2080010101 JPM NUMBER: NRC-JPM-002 ALTERNATE PATH: X K/A NUMBER: 400000A4.01 IMPORTANCE FACTOR: 3.1 3.0 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.ED-0001, Rev. 19 HC.OP-AB.COOL-0003, Rev. 2 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME: 6 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: New APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 8

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service TASK NUMBER: 2080010101 INITIAL CONDITIONS:

1. The Main Generator is synchronized to the grid.
2. The RACS System is in service with the RACS PMP 1AP209 and RACS PMP 1CP209 in operation.
3. RACS PMP 1BP209 is ready for a normal start. This pump was not isolated and drained.

INITIATING CUE:

Swap RACS pumps. Place RACS PMP 1BP209 in service; remove RACS PMP 1CP209 from service.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 8

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains/locates procedure Operator obtains the correct procedure.

HC.OP-SO.ED-0001.

Operator reviews precautions and Operator reviews precautions and limitations. limitations and initials each precaution and limitation in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Examiner Note: It is not critical to initial the procedure steps.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.3.1 5.3.1 ENSURE all prerequisites have been Operator reviews prerequisites and satisfied IAW Section 2.3. initials each prerequisite in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.

Page 3 of 8

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

START TIME:

5.3.2 ENSURE that one of the following Operator determines the status of ED valves are OPEN (10C651A): HV-2537A(B) by observing that the Red ED-HV-2537A(B) HX INLET VLVS. OPEN indicating lights for both valves are illuminated on 10C651A.

The operator then initials the appropriate procedure steps.

5.3.3. OBSERVE the following lights are off Operator observes that the OVLD/PWR for the RACS Pumps going in service: FAIL, INOP, and REMOTE lights for the B RACS Pump are not illuminated.

  • OVLD/PWR FAIL The operator then initials the
  • INOP appropriate procedure step.
  • REMOTE 5.3.4. For the 1AP209 and/or 1BP209, as Operator observes the CLOSED light applicable, ENSURE RACS PMP for BKR 52-42011 is illuminated, and 1AP209 BKR 52-41011, and/or determines that the B RACS Pump 1BP209 BKR 52-42011 CLOSED is breaker is closed.

on. (10C650E)

The operator then initials the appropriate procedure step.

Page 4 of 8

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.3.5 IF returning a pump to service that Operator determines to proceed to Step has been isolated and drained, 5.3.6 since, the Initiating Cue states PERFORM the following steps as that the pump was not isolated and necessary to correct/prevent air drained.

binding, otherwise, PROCEED to Step 5.3.6 for a normal start of a The operator then initials the standby pump: appropriate procedure step.

  1. 5.3.6 PRESS REACTOR AUXILIARIES Operator presses the B RACS Pump
  • COOLING PUMP A (B)(C) START PB START pushbutton and observes the (10C651A). START comes on. Red START light illuminates and the OBSERVE AI-6460 (AI-6461) Green STOP light goes out. Operator REACTOR AUXILIARIES COOLING observes AI-6461 is < 180 amps and PUMP A(B)(C) MOT AMPS settles at settles at the same value as the A and

< 180 amps AND is approximately the C RACS pumps amps.

same as the other I/S RACS pumps' motor amps. The operator then initials the appropriate procedure step.

  1. 5.3.7 PRESS REACTOR AUXILIARIES Operator presses the C RACS Pump
  • COOLING PUMP B(A)(C) STOP PB. STOP pushbutton and observes the STOP comes on. Green STOP light illuminates and the Red START light goes out.

The operator then initials the appropriate procedure steps.

Page 5 of 8

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Auxiliaries Cooling System TASK: Place the Reactor Auxiliaries Cooling System In-Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

AB- 5 seconds after the C RACS pump Operator diagnoses and announces B COOL has been secured, the Operator RACS pump has tripped and refers to

-0003 observes the following: A2-E2. This procedure will direct him to AB.COOL-0003.

Annunciator A2-E2, RACS TROUBLE alarms Operator then enters AB.COOL-0003 Section A, RACS Pump has tripped B RACS pump has Tripped

  • A.1 PRESS the START P.B. for any Operator presses the START P.B. for available RACS pump in standby. the C RACS pump Examiner Cue: C RACS pump does NOT start.
  • A.2 IF a second RACS Pump CANNOT Operator should determine that the Unit be placed in service, 1 Off-gas train is in service and CLOSE THEN ISOLATE RACS to the out of HV-7712A service Off-Gas Train as follows:

The Operator should NOT Close HV-

  • IF the Common Off-Gas Train 2577.

is in service, THEN CLOSE HV-2577.

  • IF Unit 1 Off-Gas Train is in Examiner Cue: If the Operator service, Closes HV-2577 and states he is THEN CLOSE HV-7712A. complete, terminate the JPM, otherwise give him 1 minute to recognize his mistake and then terminate the JPM. Isolating RACS to the in-service Off-gas Train is failure criteria.

Terminating Cue: Once the Operator has closed HV-7712A then state "This JPM is complete", unless he has also closed HV-2577 then see the Examiner Cue above.

Page 6 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Main Generator is synchronized to the grid.
2. The RACS System is in service with the RACS PMP 1AP209 and RACS PMP 1CP209 in operation.
3. RACS PMP 1BP209 is ready for a normal start. This pump was not isolated and drained.

INITIATING CUE:

Swap RACS pumps. Place RACS PMP 1BP209 in service; remove RACS PMP 1CP209 from service.

Page 7 of 8

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS This JPM can be run in any IC, which has RACS in-service.

To setup:

  • Ensure the A & C RACS pumps are in-service with the B RACS pump secured and in standby.
  • Setup simulator to trip B RACS pump 5 seconds after C RACS pump has been secured,
  • Once C RACS pump has been secured, C RACS pump trips on re-start Page 8 of 8

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE:

STATION: Hope Creek SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation TASK NUMBER: 2020080101 JPM NUMBER: NRC-JPM-003 ALTERNATE PATH: X K/A NUMBER: 202002 A2.05 IMPORTANCE FACTOR: 3.1 3.1 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.BB-0002, Rev 60, HC.OP-AB.RPV-0003, Rev 9 HC.OP-AB.MISC-0002, Rev 4, HC.OP-AB.RPV-0001, Rev 4 TOOLS, EQUIPMENT AND PROCEDURES:

Annotated copy of HC.SO.BB-0002.

VALIDATED JPM COMPLETION TIME: 7 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: Modified Bank APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the SM or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: Minutes JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 7

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE:

NAME:

DATE:

SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation TASK NUMBER: 2020080101 INITIAL CONDITIONS:

1. The plant was at 77% power when a control signal failure caused the A Reactor Recirc Pump Motor/Generator Scoop Tube to lock-up.
2. The A Reactor Recirc pump was placed in Scoop Tube Positioner Lockup Operation IAW HC.OP-SO.BB-0002.
3. I&C has repaired the control signal failure.

INITIATING CUE:

Reset the Scoop Tube lockup on the A Reactor Recirc pump.

Maintain Reactor power at present after the scoop tube is reset.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 7

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.9.1 START TIME: Operator reviews prerequisites and ensures that they are satisfied IAW 5.9.1 ENSURE all prerequisites have been section 2.9.

satisfied IAW Section 2.9 Examiner Cue. If the Operator is taking an excessive amount of time to review the prerequisites, then inform him that all of the prerequisites are satisfied.

5.9.2 PRESS SIC-621A MAN AND SIC- Operator depresses the SIC-621A and 621B MAN push buttons. SIC-621B MAN pushbuttons.

Examiner Cue: MAN pushbuttons are already lit, Operator may just verify lights are lit vs. depressing PBs, this is acceptable

  1. 5.9.3 PRESS SIC-620 OUTPUT A(B) Operator presses the SIC-620
  • SELECT push button, OUTPUT A SELECT pushbutton for the Pump that will be reset.

Page 3 of 7

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  1. 5.9.4 Using Attachment 3, Operator looks at Attachment 3 and
  • DETERMINE the desired SIC- determines that SIC-621B SPEED 621A(B) SPEED DEMAND DEMAND should be 51-57%

for the actual SPEED indicated on SIC-621A(B).

Examiner Cue: The target SPEED DEMAND is 54%. Some leeway has been added for meter readability and interpolation of Attachment 3 data.

  1. 5.9.5 PRESS SIC-R621A(B) SPD CONT Operator depresses the SIC-R621A
  • INCREASE OR DECREASE SPD CONT INCREASE OR pushbutton as necessary to obtain the DECREASE pushbutton as necessary desired to obtain desired speed.

SIC-621A(B) SPEED DEMAND from Step 5.9.4. Examiner Note: + 2% of the operator determined desired value is acceptable. (i.e. if operator determined 54% was desired, then 53-57% would be acceptable.

  1. 5.9.6 PRESS SCOOP TUBE TRIP RESET Operator presses SCOOP TUBE TRIP
  • AND ENSURE SCOOP TUBE LOCK- RESET AND ENSURES SCOOP TUBE UP light extinguishes. LOCK-UP light extinguishes.

Note: When SCOOP TUBE TRIP RESET is pressed the Recirc pump will runaway and the operator will need to take action IAW AB.RPV-0001 Page 4 of 7

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Recirculation TASK: Perform Scoop Tube Positioner Lock-Up Operation STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • AB. A. Operator takes Immediate Operator observes Recirc pump speed
  1. RPV- Operator Actions of AB.RPV-0001 increasing 0001 for Single Reactor Recirc Pump Operator presses Pump A SCOOP runaway Imm. TUBE TRIP pushbutton.

Actions

  • PRESS the SCOOP TUBE Examiner Note: Scoop tube may TRIP Pushbutton for the affected Recirc Pump have already tripped. If Scoop tube Controller. is already tripped, it is not critical to push the SCOOP TUBE TRIP pb.

AB. B. PLACE BOTH Recirc Pump Operator places Both Recirc Pump RPV- individual controllers in MANUAL. individual controlled in MANUAL 0001 Examiner Note: SIC-R621A and B are Imm. already in MAN, this step is not Actions critical.

  • AB. C. REDUCE the NON-affected Operator reduces Reactor power back
  1. RPV- Reactor Recirc to pre-transient value using the B 0001 Pump Speed to Reduce Power to Recirc pump Imm.

Pre-Transient Actions value.

Examiner Note: When the operator STOP TIME:

has reduced power back to the pre-transient value terminate the JPM.

Terminating Cue: When Operator reduces power back to pre-transient value then state "This JPM is complete" Page 5 of 7

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant was at 77% power when a control signal failure caused the A Reactor Recirc Pump Motor/Generator Scoop Tube to lock-up.
2. The A Reactor Recirc pump was placed in Scoop Tube Positioner Lockup Operation IAW HC.OP-SO.BB-0002.
3. I&C has repaired the control signal failure.

INITIATING CUE:

Reset the Scoop Tube lockup on the A Reactor Recirc pump.

Maintain Reactor power at present after the scoop tube is reset.

Page 6 of 7

ATTACHMENT 4 JOB PERFORMANCE MEASURE JPM/SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

I. INITIAL CONDITIONS:

I.C.

Initial INITIALIZE the simulator to 79% power, MOL.

REDUCE Reactor Recirc Pump speeds to 55% (It is critical that A Recirc pump speed is 55%).

PRESS the REACTOR RECIRCULATION PUMP A TRIPS SCOOP TUBE TRIP pushbutton.

PLACE SIC-R621A AND SIC-R621B in Manual.

REDUCE SIC-R621A Demand Output by 4% AND allow SIC-R621A SPEED DEMAND to saturate low.

ENSURE SIC R620 MAST CONT OUTPUT A SELECT is selected.

PREP FOR TRAINING (i.e., RM11 set points, procedures, bezel covers)

Initial Description INITIAL a copy of HC.OP-SO.BB-0002 up to step 5.9.1 for the A Reactor Recirc Pump.

COMPLETE Attachment 2 Simulator Ready-for-Training/Examination Checklist of NC.TQ-DG.ZZ-0002(Z).

EVENT TRIGGERS:

Initial ET # Description EVENT ACTION: Rr:k5(1)>= 1.0 // A Recirc Scoop Tube Trip Reset 1 COMMAND:

PURPOSE: Triggers A Recirc Runaway EVENT ACTION:

2 COMMAND:

PURPOSE:

MALFUNCTION

SUMMARY

Initial Description Delay Ramp Trigger Init Val Final Val RR08A A Recirc Pump Runaway ET-1 Page 7 of 7

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment TASK NUMBER: 2620010101 JPM NUMBER: NRC-JPM-004 ALTERNATE PATH: X K/A NUMBER: 262001 A4.01 IMPORTANCE FACTOR: 3.4 3.7 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.PB-0001(Q), Rev. 20 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME: 10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: New APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 10

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment TASK NUMBER: 2620010101 INITIAL CONDITIONS:

1. The plant is operating at 100% power when the Relay department calls informing you that they are performing relay testing and requests you to swap 10A404 from the Normal Feeder breaker to the Alternate Feeder breaker.

INITIATING CUE:

You have been directed by the CRS to shift power to Switchgear 10A404 from Station Service Transformer 1BX501 to Station Service Transformer 1AX501 IAW HC.OP-SO.PB-0001.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains/locates procedure Operator locates the proper procedure.

HC.OP-SO.PB-0001.

Operator reviews Precautions and Operator reviews Precautions and Limitations. Limitations and initials each Precaution and Limitation in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing Precautions and Limitations, inform operator that all are satisfied.

Examiner Note: It is not critical to initial the procedure steps, nor complete Attachment 1.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.6.1 5.6.1 ENSURE all prerequisites have been Operator reviews Prerequisites and satisfied IAW Section 2.6. initials each Prerequisite in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing Prerequisites, inform operator that all are satisfied.

Page 3 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

START TIME: Operator obtains a copy of DL.ZZ-0003 Attachment 3, page 4 of 5 and checks 5.6.2 A. ENSURE Bus Voltage is adjusted CRIDS points for 1E Bus voltage.

to the higher band required for the Operator notes bus voltage is LOW.

Bus alignment prior to transfer.

(REFER TO HC.OP-DL.ZZ- Examiner Cue: If asked by Operator 0002(3)(Q), Control Console act as the CRS and direct him t raise Log(s)) bus voltage to acceptable limits.

The operator then initials the appropriate procedure step.

SO.MC Adjusting 13.8Kv to 4.16Kv Operator refers to procedure SO.MC-

-0001 Transformer 1AX501 (1BX501, 0001 for adjusting transformer 1AX501 1CX501, 1DX501, 1AX503, 1BX503) (1BX501)

Sec Load Tap 5.23 EXAMINER CUE: It is NOT required for the operator to refer to this procedure as long as he/she successfully completes the required actions.

5.23.1. PLACE the load tap changer in manual Operator ensures Station Service A control as follows: Transformer Tap Changer Control XFMR 15-1AX501 and 1BX501 ENSURE (STATION SERVICE CONTROL ROOM Lights are ON TRANSFORMER TAP EXAMINER CUE: Operator may only CHANGER CONTROL)-XFMR 15- ensure one of the above lights is ON 1AX501 (1BX501, currently and then come back and 1CX501, 1DX501, 1AX503, 1BX503) do the other light later.

CONTROL ROOM light is ON.

Page 4 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • B. PRESS (XFMR 15)- 1AX501 Operator depresses the 1AX501 and (1BX501, 1CX501, 1DX501, 1BX501 MAN PBs 1AX503, 1BX503) - MAN PB.

EXAMINER CUE: Operator may only depress one of the above MAN PBs initially and then come back and depress the other PB later.

  • C. As desired, PRESS (XFMR 15)- Operator depresses the PBs as 1AX501 (1BX501, 1CX501, 1AX503, required to raise bus voltage to 1BX503) - INCREASE OR acceptable limits and then returns to DECREASE PB. SO.PB-0001.

EXAMINER CUE: Critical part of this task is that when the Operator is finished adjusting voltage, voltage is within the acceptable range of DL.ZZ-0003 (4236 - 4370V).

5.6.3.A B. SHIFT breaker alignment on the Operator notes that AUTO CLOSE desired Class 1E 4160V busses BLOCK PB backlight is OFF (listed in Table PB-002, Section 5.4) as follows: The operator then initials the appropriate procedure step.

  • ENSURE that the Alternate (Normal) AUTO CLOSE BLOCK PB backlight is OFF. [CD-056H]

Page 5 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.6.3.B C. IF the Alternate (Normal) AUTO Operator verifies PB backlight is OFF.

CLOSE BLOCK PB backlight is ON, The operator then initials the THEN PRESS the Alternate appropriate procedure step.

(Normal) AUTO CLOSE BLOCK AND VERIFY that the PB backlight is OFF. [CD-056H]

  • 5.6.3.C D. PRESS Normal (Alternate) AUTO Operator presses Normal AUTO
  1. CLOSE BLOCK CLOSE BLOCK PB and verifies AND VERIFY that the PB backlight is OFF.

backlight is OFF.

The operator then initials the appropriate procedure step.

  • 5.6.3.D E. PRESS CLOSE PB on Alternate Operator Presses Close PB on
  1. (Normal) FEED BRKR. Alternate FEED BRKR The operator then initials the appropriate procedure step.

F. ENSURE that the Alternate Operator Observes that Alternate FEED (Normal) FEED BRKR closes BRKR closes AND that the Normal AND that the Normal (Alternate) FEED BRKR trips FEED BRKR trips.

The operator then initials the appropriate procedure step.

Page 6 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

G. When buses swap a slow transfer Operators observes trip of D SW occurs vs. the expected fast pump and Annunciators E3-E2, A1-C3 transfer. The following actions and enters one of the following occur: procedures;

  • ARP for E3-E2 INCOMING BRKR MALF illuminates
  • AB-COOL-0001 INTAKE D TROUBLE illuminates Examiner Cue: If the Operator
  • D SW pump trips directly enters AB-COOL-0001, direct the Operator as the CRS to respond to Control Room Annunciators and the CRS will evaluate the AB.

Page 7 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Class 1E Power TASK: Shift Class 1E 4.16Kv Bus to an Alternate Feeder Breaker Alignment STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • E3-E2 H. As a result of a slow transfer, a Operator determines that a Slow PSIS signal will be generated, transfer took place and a PSIS signal Step 2 therefore manually start the was generated and the B pump failed following loads from the Control to Auto start on low flow and starts the Room as required by SM/CRS. D Service Water Pump A. Service Water Pump Examiner Cue: If asked to direct actions as CRS direct Operator to start the D Service Water Pump Other acceptable actions would be to enter ARP A1-C3 and start the B Service Water pump Critical Task is to return the Service Water system to a stable condition by starting either the B or D Service Water pumps.

Terminating Cue: Once the operator has started either the B or D service water pumps then state "This JPM is complete".

Page 8 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is operating at 100% power when the Relay department calls informing you that they are performing relay testing and requests you to swap 10A404 from the Normal Feeder breaker to the Alternate Feeder breaker.

INITIATING CUE:

You have been directed by the CRS to shift power to Switchgear 10A404 from Station Service Transformer 1BX501 to Station Service Transformer 1AX501 IAW HC.OP-SO.PB-0001.

Page 9 of 10

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset simulator to IC-2 or any at power IC.

Ensure D Service Water pump is in service.

Complete Attachment 3 of HC.OP-DL.ZZ-0003, Control Room 2-hour readings page 4 of 5 Ensure Tap Changers in AUTO Ensure 2 Class 1E busses are on each SST MALFUNCTION

SUMMARY

Initial Description Delay Ramp Remote/Event Initial Final

_____ 1. CW14B SERVICE WATER PUMP BP502 FAIL TO A None/None

_____ 2. CW05D Service water pump DP502 trip None/ 2

_____ 3. CW14D Service Water Pump DP502 fail to auto Start None/None

_____ 4. AN-E6C2 CRYWOLF ANN E6C2 DIESEL AREA HVAC None/1

_____ 5. AN-E3E2 CRYWOLF ANN E3E2 4.16 KV SYS INC None/1 I/O OVERRIDE

SUMMARY

Initial Description Delay Ramp Remote/Event Initial Final

_____ 1. 1A172 E OVLO DVH401 RUNNING SWGR RM 5417 None/1 OFF OFF

_____ 2. 1A172 F OVLO DVH401 STOPPED SWGR RM 5417 None/1 OFF ON EVENT TRIGGERS:

Initial Description

___ 1. EVENT ACTION: Cw:s52d5 <=0.0 COMMAND: Dmf cw05d PURPOSE:

___ 2. EVENT ACTION: Ed:bk8>=1.0 COMMAND:

PURPOSE: When OHA E3-E2 alarms then insert CRIDS pt D4560 to 1.0 Page 10 of 10

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Containment Integrity TASK: Resetting Isolation Systems TASK NUMBER: 2230020101 JPM NUMBER: NRC-JPM-005 ALTERNATE PATH: K/A NUMBER: 223000A4.03 IMPORTANCE FACTOR: 3.6 3.6 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.SM-0001(Q), Rev. 14 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME: (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: New APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 10

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems TASK NUMBER: 2230020101 INITIAL CONDITIONS:

1. Hope Creek is recovering from a Scram due to loss of all RFPs at 100% power.
2. RPV level dropped to -130 before HPCI initiated and recovered level.
3. The Crew is in AB.ZZ-0000 and has reached step S-9 IF Conditions permit THEN RESET isolations
4. You have been directed by the CRS to RESET the Isolations INITIATING CUE:

RESET isolations IAW HC.OP-SO.SM-0001 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator determines that he needs to Examiner Cue: Once the operator perform HC.OP-SO.SM-0001 section has correctly determined which 5.3 in order to reset the isolations. procedure to use, provide the operator with a copy of procedure HC.OP-SO.SM-0001(Q).

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.

Examiner Note: Initialing the following steps is not critical.

5.3.1 ENSURE that all prerequisites have been Operator ensures that the prerequisites satisfied IAW are satisfied:

Section 2.3 of this procedure.

Operator initials the step.

START TIME: ___________

5.3.2 To reset the Nuclear Steam Supply Operator determines that NSSSS Shutoff System, needs to be reset.

PERFORM the following:

Page 3 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • 5.3.2 ENSURE the following MSIV control Operator Places ALL the MSIV Control switches in CLOSE: Switches in CLOSE A
  • HVF022D INBD MSIV D B. ENSURE conditions causing the Operator checks that ALL isolation Isolation have been corrected. signals have cleared
  • C. IF vacuum is > 21.5 inches Hg. Abs.

THEN PLACE DIVISION 1 and 2 and Operator determines that vacuum is

  1. 3 and 4 CONDENSER LOW LOW places DIVISION 1, 2, 3 and 4 VACUUM BYPASS Switches to BYP CONDENSER LOW VACUUM (Control Room Panels 10C609 and BYPASS Switches to BYP 10C611 Page 4 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • D. PRESS the following PBs: Operator depresses the appropriate PBs
  1. 1. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC A RESET. MSIV TRIP LOGIC TRIPPED goes off.
2. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC B RESET. MSIV TRIP LOGIC TRIPPED goes off.
3. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC C RESET. MSIV TRIP LOGIC TRIPPED goes off.
4. NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC D RESET. MSIV TRIP LOGIC TRIPPED goes off.

5.3.3 To reset the Containment Isolation Operator determines Containment System, PERFORM the following: Isolation needs to be reset.

Page 5 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • B. PRESS the following PBs: Operator depresses the appropriate
1. CNTMT ISLN MAN PBs INITIATION CHANNEL A RESET. TRIPPED goes off.
2. CNTMT ISLN MAN INITIATION CHANNEL B RESET. TRIPPED goes off.
3. CNTMT ISLN MAN INITIATION CHANNEL C RESET. TRIPPED goes off
4. CNTMT ISLN MAN INITIATION CHANNEL D RESET. TRIPPED goes off 5.3.4 To reset the Core Spray Isolation Signals, PERFORM the following:

Operator determines that Core Spray Isolation signal is present and that initiating condition has been corrected.

A. ENSURE conditions causing Core Spray Initiation have been corrected.

Page 6 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • B. PRESS the following PBs:
  1. 1. LOOP A INITIATION RESET.

A INIT AND SEALED IN goes off.

2. LOOP B INITIATION RESET. Operator depresses the LOOP A, B, C B INIT AND SEALED IN goes off. and D INITIATION RESET PBs and verifies A, B, C, and D INIT AND
3. LOOP C INITIATION RESET. SEALED IN lights go off.

C INIT AND SEALED IN goes off.

4. LOOP D INITIATION RESET.

D INIT AND SEALED IN goes off.

5.3.5 To reset the RHR Isolation signals, PERFORM the following:

Operator determines that RHR Isolation signal is present and that A. ENSURE conditions causing initiating condition has been corrected.

LPCI Initiation have been corrected.

Page 7 of 10

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • PRESS the following PBs: Operator depresses the LOOP A, B, C and D INITIATION RESET PBs and
1. LOOP A INITIATION RESET. verifies A, B, C, and D INIT AND A INIT AND SEALED IN goes off. SEALED IN lights go off.
2. LOOP B INITIATION RESET.

B INIT AND SEALED IN goes off.

3. LOOP C INITIATION RESET.

C INIT AND SEALED IN goes off.

4. LOOP D INITIATION RESET.

D INIT AND SEALED IN goes off 5.3.6 To reset HPCI Isolation Signals, Operator determines that HPCI PERFORM the following: Isolation signal is NOT present 5.3.7 To reset RCIC Isolation Signals, Operator determines that RCIC PERFORM the following: Isolation signal is NOT present STOP TIME: ____________

Terminating Cue: Once the Operator has determined that the RCIC Isolation signal is NOT present, then state "This JPM is complete" Page 8 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. Hope Creek is recovering from a Scram due to loss of all RFPs at 100% power.
2. RPV level dropped to -130 before HPCI initiated and recovered level.
3. The Crew is in AB.ZZ-0000 and has reached step S-9 IF Conditions permit THEN RESET isolations
4. You have been directed by the CRS to RESET the Isolations INITIATING CUE:

RESET isolations IAW HC.OP-SO.SM-0001 Page 9 of 10

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to an 100% IC Trip all 3 RFPs and let level drop to -130 Return Level and Pressure to normal and stabilize the plant.

Page 10 of 10

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Reactor Water Level Inventory Control TASK: Feeding the Reactor Vessel with the Condensate System TASK NUMBER: 2590020101 JPM NUMBER: NRC-JPM-006 ALTERNATE PATH: K/A NUMBER: 259002A4.01 IMPORTANCE FACTOR: 3.8 3.6 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.AE-0001(Q), Rev. 43 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME: (20) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: New APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 9

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Reactor Water Level Inventory Control TASK: Feeding the Reactor Vessel with the Condensate System TASK NUMBER: 2590020101 INITIAL CONDITIONS:

1. Hope Creek is starting up from a refueling outage.
2. The plant is currently in IOP-2 at step 5.1.2.T, LINEUP the startup level control valves to feed the Reactor Vessel IAW HC.OP-SO.AE-0001(Q), Feedwater System Operation.
3. The CRS has decided to terminate long path flow and feed the RPV using the Condensate system Startup Level Control Valves IAW HC.OP-SO.AE-0001(Q),

Feedwater System Operation.

4. You have been directed to perform this task.

INITIATING CUE:

Feed the Reactor Vessel with the Condensate System IAW HC.OP-SO.AE-0001 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from Startup Valves to Master Level Control STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains a copy of HC.OP- Examiner Cue: Once the operator SO.AE-0001 and determines he/she has located the procedure, provide needs to perform section 5.1 the operator with a copy of procedure HC.OP-SO.AE-0001(Q).

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.

Examiner Note: Initialing the following steps is not critical.

5.1.1 ENSURE that all prerequisites have been Operator ensures that the prerequisites satisfied IAW Section 2.1 of are satisfied:

this procedure.

Operator initials the step.

START TIME: ___________

5.1.2. TERMINATE long path flow to the Operator observes the START UP A Main Condenser as follows: LEVEL CONTROLLER A/M and verifies M is illuminated.

A. PRESS the START UP LEVEL CONTROLLER A/M push-button Examiner Note: M should already be illuminated. If Operator only as required to place controller in verifies M is illuminated, this is manual ("M" (manual) light acceptable.

illuminated).

Page 3 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from Startup Valves to Master Level Control STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.1.2. B. PRESS STARTUP LEVEL Operator verifies DMND is selected B CONTROLLER "SEL" (select) on the STARTUP LEVEL push-button as necessary to select CONTROLLER the "DMND" column.

  • 5.1.2. C. LOWER STARTUP LEVEL Operator Lowers STARTUP LEVEL C CONTROLLER "DMND" CONTROLLER "DMND" using the DEC
  1. using the DEC push-button to PB to 0%.

0%.

  • 5.1.3 CLOSE HV-3626, FW SUPPLY FLUSHING LINE OUTBD MOV Operator closes HV-3626
  • 5.1.4 CLOSE HV-3625, FW SUPPLY Operator closes HV-3625 FLUSHING LINE INBD MOV.
  • 5.1.5 RAISE STARTUP LEVEL Operator raises STARTUP LEVEL CONTROLLER "DMND" to open HV- CONTROLLER "DMND" to open HV-
  1. 1754, S/U LVL BYP VLV, 1754 ~ 20% using the INC push-button.

approximately 20% using the INC push-button AND MONITOR Operator monitors computer points Computer Points A3245 AND A3245 and A3246 A3246 -RPV Feedwater line press.

Page 4 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from Startup Valves to Master Level Control STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.1.6 WHEN Feedwater line press > 100 psig, Operator dispatches an NEO to vent THEN DISPATCH an Equipment FW line high points.

Operator to vent Feedwater line high points at valves 1-AE-V082, 1-AE- EXAMINER CUE: Inform Operator V083, 1-AE-V084, 1-AE-V085, that NEO reports that the High point vent valves AE-V082, 83, 84, 85, 86, 1-AE-V086, and 1-AE-V087 UNTIL a and 87 have been vented until a solid solid stream of water issues. stream of water issues.

(Local)

  • 5.1.7 LOWER STARTUP LEVEL Operator lowers STARTUP LEVEL CONTROLLER "DMND" to 0%. CONTROLLER "DMND" to 0% (or
  1. using the DEC push-button. <0%) using the DEC push-button.
  • 5.1.8 OPEN HV-F032A, FW SPLY LINE A Operator opens HV-F032A and F032B INLET CHK VLV AND HV-F032B,
  1. FW SPLY LINE B INLET CHK VLV.
  • 5.1.9 Intermittently PRESS START UP Operator depresses the START UP LEVEL CONTROLLER LEVEL CONTROLLER "DMND"
  1. "DMND" INCREASE OR DECREASE INCREASE OR DECREASE PBs as push-buttons as required required to attain stable RPV level.

to attain desired stable Reactor Vessel level as directed by Integrated Examiner Cue: Ask Operator what Operating Procedure. current level is and have Operator match setpoint to current level.

Page 5 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from Startup Valves to Master Level Control STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • 5.1.10. WHEN desired stable Reactor Vessel EXAMINER CUE: If asked by the A level is attained, THEN PLACE START Operator the CRS wants to maintain
  1. UP LEVEL CONTROLLER in AUTO RPV level at +30-39 Narrow Range.

as follows:

A. On MASTER LEVEL Operator depresses the SEL PB on the CONTROLLER MASTER LEVEL CONTROLLER until PRESS "SEL" (select) push-button SPT is selected.

as necessary to select SPT (level setpoint).

  • 5.1.10. B. On MASTER LEVEL Operator depresses the LVL SPT INC B CONTROLLER, PRESS LVL or DECR PBs as necessary to
  1. SPT INC OR DECR push- establish RPV level ~34.2 (or Match button's as required to setpoint to current level) establish the desired REACTOR Level Setpoint Page 6 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Water Level Inventory Control TASK: Swapping FW Level Control from Startup Valves to Master Level Control STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • C. On MASTER LEVEL Operator depresses SEL PBs as CONTROLLER, PRESS "SEL" necessary to select LEVEL ERROR on
  1. push-button as necessary to MASTER LEVEL CONTROLLER.

select LEVEL ERROR. Level Error should be 0 (Zero) (IF Operator adjusts RPV level until Level required, REPEAT Steps Error is 0.

5.1.10.A & B UNTIL level error is 0 (Zero).

  • D. PRESS the A/M push-button on Operator depresses A/M PB on STARTUP LEVEL STARTUP LEVEL CONTROLLER until
  1. CONTROLLER ("A" auto light A light should be illuminated.

should be illuminated).

Terminating Cue: Once the Operator has depressed the A/M PB, then state "This JPM is complete" Page 7 of 9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. Hope Creek is starting up from a refueling outage.
2. The plant is currently in IOP-2 at step 5.1.2.T, LINEUP the startup level control valves to feed the Reactor Vessel IAW HC.OP-SO.AE-0001(Q), Feedwater System Operation.
3. The CRS has decided to terminate long path flow and feed the RPV using the Condensate system Startup Level Control Valves IAW HC.OP-SO.AE-0001(Q),

Feedwater System Operation.

4. You have been directed to perform this task INITIATING CUE:

Feed the Reactor Vessel with the Condensate System IAW HC.OP-SO.AE-0001 Page 8 of 9

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to a low power IC Ensure IOP 2 is marked up to step 5.1.2.T Page 9 of 9

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually TASK NUMBER: 2110030101 JPM NUMBER: NRC-JPM-007 ALTERNATE PATH: X K/A NUMBER: 211000A4.08 IMPORTANCE FACTOR: 4.2 4.2 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.BH-0001, Revision 9 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME: (5) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: Bank APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 7

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually TASK NUMBER: 2110030101 INITIAL CONDITIONS:

1. A full core ATWS has occurred.
2. The Main turbine is on line.
3. Reactor Power is > 4%
4. The Reactor Recirc Pumps are tripped.
5. HC.OP-E0.ZZ-0101A, ATWS-RPV Control, is being executed.
6. The CRS has directed you to Initiate SLC and Verify RWCU system Isolates per step RC/Q-7 of EOP-0101A.

INITIATING CUE:

Initiate SLC and verify RWCU isolates.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 7

OPERATOR TRAINING PROGRAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains/locates procedure HC.OP-SO.BH-0001.

Operator reviews precautions and Operator reviews precautions and limitations. limitations and initials each precaution and limitation in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Examiner Note: It is not critical to initial the procedure step, nor complete Attachment 1 in this and subsequent steps.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.3.1.

START TIME: Operator places both PUMP & SQUIB VLV - OFF/ON keylock switches to ON.

OFF/ON keylock switches to ON. The operator then initials the appropriate procedure step.

  • 5.3.2 PRESS both PUMP & SQUIB VLV - Operator depresses both PUMP &

AP208 AND BP208 START push SQUIB VLV - AP208 AND BP208 buttons. START pushbuttons.

The operator then initials the appropriate procedure step.

Page 3 of 7

OPERATOR TRAINING PROGRAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.3.3 VERIFY the following: Operator verifies that both PUMP &

SQUIB VLV - AP208 and BP208 A. Both PUMP & SQUIB VLV - START lights come on.

AP208 and BP208 START lights come ON. The operator then initials the appropriate procedure step.

B. Both SQUIB VALVE CONTINUITY Operator verifies that both SQUIB lights are OFF. VALVE CONTINUITY lights are off.

The operator then initials the appropriate procedure step.

C. SLC SQUIB VLV LOSS OF Operator verifies that SLC SQUIB VLV CONTINUITY is ON. (10C800C1) LOSS OF CONTINUITY annunciator is on. (10C800C1)

The operator then initials the appropriate procedure step.

D. Both STANDBY LIQUID Operator observes both STANDBY CONTROL PUMP PRESSURE LIQUID CONTROL PUMP PRESSURE indicators show pump discharge indicators show pump discharge pressure greater than reactor pressure greater than reactor pressure.

pressure.

The operator then initials the appropriate procedure step.

Page 4 of 7

OPERATOR TRAINING PROGRAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Standby Liquid Control System TASK: Initiate SLC System Manually STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • E. The following Reactor Water Operator recognizes that the 1-BG-Cleanup Isolation Valves close: HVF001 and 1-BG-HVF004 have failed to close and closes the valves.
1. BG-HV-F001, PMP SUCT CONT INBD EXAMINER CUE: If the Operator asks you for direction, tell him to perform
2. BG-HV-F004, PMP SUCT the actions that need to be CONT OUTBD performed.

Operator closes HVF001 and HVF004 by depressing the CLOSE pushbutton for each valve, and observes that both valves close.

The operator then initials the appropriate procedure step.

F. SLC TANK LVL indicator is Operator observes SLC TANK LVL decreasing. indicator is decreasing.

The operator then initials the appropriate procedure step.

G. NEUTRON MONITORING Operator observes NEUTRON recorders indicate decreasing MONITORING recorders indicate reactor power. decreasing reactor power.

STOP TIME: ___________ The operator then initials the appropriate procedure step.

EXAMINER CUE: Once Operator has verified decreasing Reactor power, then terminate the JPM Terminating Cue: Once the Operator has verified that reactor power is decreasing then state "This JPM is complete".

Page 5 of 7

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. A full core ATWS has occurred.
2. The Main turbine is on line.
3. Reactor Power is > 4%
4. The Reactor Recirc Pumps are tripped.
5. HC.OP-E0.ZZ-0101A, ATWS-RPV Control, is being executed.
6. The CRS has directed you to Initiate SLC and Verify RWCU system Isolates per step RC/Q-7 of EOP-0101A..

INITIATING CUE:

Initiate SLC and verify RWCU isolates.

Page 6 of 7

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset simulator to a 100% power IC.

Insert malfunctions.

Lock the mode switch in Shutdown.

Take actions IAW EOP-101A so that the next appropriate step is to initiate SLC.

MALFUNCTION

SUMMARY

Initial Description Delay Ramp Remote/Event Initial Final

______ 1. RP06 Half Core ATWS-Left side

______ 2. RP07 Half Core ATWS-Right side

______ 3. CU11A RWCU VLVS F001 failure to auto close

______ 4. CU11B RWCU VLVS F004 failure to auto close Page 7 of 7

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service TASK NUMBER: 2610030101 JPM NUMBER: NRC-JPM-008 ALTERNATE PATH: K/A NUMBER: 290001A4.10 IMPORTANCE FACTOR: 3.4 3.3 APPLICABILITY: RO SRO RO X SRO EVALUATION SETTING/METHOD: Simulator / Perform

REFERENCES:

HC.OP-SO.GU-0001, Rev. 22 TOOLS AND EQUIPMENT:

VALIDATED JPM COMPLETION TIME: 9 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: Bank APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 9

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service TASK NUMBER: 2610030101 INITIAL CONDITIONS:

1. The plant is operating at 100% power.
2. Heating steam has been lost to the power block.
3. Outside air temperature is <32°F.
4. To prevent freezing the heating coils, Rx Building ventilation must be removed from service.
5. FRVS is in standby.
6. Radiation Protection has been notified that FRVS will be placed in service.

INITIATING CUE:

Manually place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 FRVS Vent Fan.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains/locates procedure Operator locates the proper procedure.

HC.OP-SO.GU-0001.

Operator reviews Precautions and Operator reviews precautions and Limitations. limitations and initials each Precaution and Limitation in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing Precautions and Limitations, inform operator that all are satisfied.

Examiner Note: It is not critical to initial Atttachment 1 or the procedure steps.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.3.1.

5.3.1 ENSURE that all prerequisites have Operator reviews Prerequisites, been satisfied IAW Section 2.3. completes Section 2 of Attachment 1, and initials each Prerequisite in the space provided in the procedure.

Examiner Cue: If excessive time is taken reviewing Prerequisites, inform operator that all are satisfied.

Page 3 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

START TIME:

5.3.2 VERIFY AUTO Mode for the following Operator observes that the AUTO FRVS Recirculation Fans: indicator is illuminated and the LOCKOUT indicator is extinguished for

  • FRVS Recirculation Fan AV213 the following FRVS Recirculation Fans:
  • FRVS Recirculation Fan BV213 FRVS RECIRCULATION FAN AV213 FRVS RECIRCULATION FAN BV213
  • FRVS Recirculation Fan CV213 FRVS RECIRCULATION FAN CV213 FRVS RECIRCULATION FAN DV213
  • FRVS Recirculation Fan DV213 FRVS RECIRCULATION FAN EV213
  • FRVS Recirculation Fan EV213 FRVS RECIRCULATION FAN FV213 The operator then initials the
  • FRVS Recirculation Fan FV213 appropriate procedure steps.
  1. 5.3.3 START 1 FRVS Vent Fan as follows: Operator depresses the MAN PB for
  • AV206 FRVS Vent fan and observes A. Momentarily PRESS the MAN the MAN indicator is illuminated.

push-button for A(B)V206 FRVS Vent Fan. The operator then initials the appropriate procedure step.

B. OBSERVE alarm BOP SAFETY Operator observes annunciator D1-A4 SYS OUT OF SVCE. alarm state and acknowledges alarm.

The operator then initials the appropriate procedure step.

Page 4 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  1. C. Momentarily PRESS the A(B)V206 Operator depresses the AV206 START
  • START push-button for A(B)V206 PB and observes the AV206 START FRVS Vent Fan. indicator is illuminated and the STOP indicator is extinguished.

The operator then initials the appropriate procedure step.

D. OBSERVE an indicated flow of Operator observes FR-9426A for approximately 9000 cfm on indication of flow (10C650E)

FR-9426A(B) for the running FRVS Vent Fan. The operator then initials the appropriate procedure step.

  1. E. PRESS the AUTO LEAD PB for Operator depresses AV206 AUTO
  • the inservice FRVS Vent Fan AND LEAD PB and observes the AUTO INITIAL Attachment 1. LEAD indicator is illuminated.

The operator then initials Attachment 1 and the appropriate procedure step.

F. PRESS the AUTO PB for the out Operator depresses BV206 AUTO PB of service FRVS Vent Fan AND and observes the AUTO indicator is INITIAL Attachment 1. illuminated.

The operator then initials Attachment 1 and the appropriate procedure step.

Page 5 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.3.4 PERFORM the following to remove EXAMINER NOTE: Step 5.3.4.A is the Reactor Building Ventilation performed at local Aux. Bldg. HVAC System from service: Panel 10C382.

A. PERFORM the following at Aux Operator directs the Building Operator Building HVAC Panel 10C382: to remove RBVS in accordance with Step 5.3.4.

EXAMINER CUE: Report as Equipment Operator that Reactor Building Ventilation is secured.

The operator then initials the appropriate procedure steps.

  • B. CLOSE the following dampers at Operator depresses the CLOSE PB for Panel 10C651E: HD9370A and observes the CLOSE indicator is illuminated and the OPEN
  • HD9370A, REACTOR BLDG indicator is extinguished.

OUTBD SPLY The operator then initials the appropriate procedure step.

  • HD9414A, REACTOR BLDG Operator depresses the CLOSE PB for INBD EXCH HD9414A and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.

The operator then initials the appropriate procedure step.

Page 6 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • HD9370B, REACTOR BLDG Operator depresses the CLOSE PB for INBD SPLY HD9370B and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.

The operator then initials the appropriate procedure step.

  • HD9414B, REACTOR BLDG Operator depresses the CLOSE PB for OUTBD EXCH HD9414B and observes the CLOSE indicator is illuminated and the OPEN indicator is extinguished.

The operator then initials the appropriate procedure step.

5.3.5 START 4 FRVS Recirculation Fans One at a time, the Operator depresses as follows: the START PB for A, B, C, and D recirc fans and observes the START indicator A. MOMENTARILY PRESS is illuminated and the STOP indicator is

  • A(B,C,D,E,F)V213 START PB for extinguished.

the desired fans.

The operator then initials the appropriate procedure steps.

B. OBSERVE an indicated flow of After the starting each recirc fan, the approximately 30,000 cfm on FR- Operator observes that each recirc fan 9377 for each of the running fans. started indicates 30,000 CFM, on FR-9377 A(B, C, D)

The operator then initials the appropriate procedure step.

Page 7 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Filtration, Recirculation and Ventilation System (FRVS)

TASK: Manually Place FRVS In Service STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

C. MONITOR the following: Operator observes that each PDR-9377A (B, C, D) indicates < 6.0" W.G.

  • PDR-9377 FRVS DIFF PRESS for each operating Air Filter unit.

for indication of < 6.0" W.G. for each operating Air Filter Unit The operator then initials the appropriate procedure step.

  • PDR-9425A(B) FRVS-VENT Operator observes that each PDR-System Filter D/P < 3.0" W.G. 9425A, FRVS-VENT System Filter D/P

< 3.0" W.G.

The operator then initials the appropriate procedure step.

5.3.6 PERFORM independent verification Operator requests an independent that the system is aligned IAW verification of the system alignment.

Attachment 1.

STOP TIME:

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete".

Page 8 of 9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is operating at 100% power.
2. Heating steam has been lost to the power block.
3. Outside air temperature is <32°F.
4. To prevent freezing the heating coils, Rx Building ventilation must be removed from service.
5. FRVS is in standby.
6. Radiation Protection has been notified that FRVS will be placed in service.

INITIATING CUE:

Manually place FRVS in service using the A, B, C & DV213 FRVS Recirculation Fans, and the AV206 FRVS Vent Fan.

Page 9 of 9

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Reactor Pressure Control TASK: Establish Control from Outside the Control Room TASK NUMBER: 2390010101 JPM NUMBER: NRC-JPM-009 ALTERNATE PATH: K/A NUMBER: 259002 A2.03 IMPORTANCE FACTOR: 4.0 4.2 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Plant /Simulate

REFERENCES:

HC.OP-IO.ZZ-0008(Q), Rev. 21 TOOLS AND EQUIPMENT: Key to TSC VALIDATED JPM COMPLETION TIME: (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: New APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 13

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Reactor Pressure Control TASK: Establish Control from Outside the Control Room TASK NUMBER: 2390010101 INITIAL CONDITIONS:

1. A fire in the Control Room has forced a Control Room Evacuation
2. NO actions were performed in the Control Room prior to evacuation
3. The Plant is still at 100% power and the turbine is still tied to the grid.
4. The CRS has directed you to Establish Control of the plant from Outside of the Control.

INITIATING CUE:

Establish Control of the Plant from Outside of the Control Room IAW with HC.OP-IO.ZZ-0008 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains a copy of HC.OP- Examiner Cue: Once the operator IO.ZZ-0008 and determines he/she has located the procedure, provide needs to perform section 5.1 the operator with a copy of procedure HC.OP-IO.ZZ-0008(Q).

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.

Examiner Note: Initialing the following steps is not critical.

5.1.1 ENSURE that all prerequisites have been Operator ensures that the prerequisites satisfied IAW Section 2.0 of are satisfied:

this procedure.

Operator initials the step.

START TIME: ___________

Page 3 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • 5.1.2 IF the Reactor was NOT scrammed Operator goes to the RPS cabinets prior to Control Room evacuation, and simulates opening the following
  1. THEN OPEN the following circuit circuit breakers breakers:
  • CB2A, CB3A, CB5A, CB7A
  • CB2A, CB3A, CB5A, CB7A AND CB8A (RPS PWR DIST AND CB8A (RPS PWR DIST PNL A 10C410).

PNL A 10C410).

  • CB2B, CB3B, CB5B, CB7B
  • CB2B, CB3B, CB5B, CB7B AND CB8B (RPS PWR DIST AND CB8B (RPS PWR DIST PNL B 10C411).

PNL B 10C411).

Examiner Cue: Once the Operator makes it to the cabinets, show the operator a picture of the inside of the cabinet and ask him which breakers he/she would open. Then inform them that that breaker is open.

5.1.3 IF the Rx scram was NOT verified prior Operator verifies Rods Full In using to evacuating the Control Room, SPDS/CRID in the TSC or RMCS THEN VERIFY Rods Full In. activity control cards (SPDS/CRIDS (TSC)

OR RMCS Activity Control Cards OR Examiner Cue: Once the Operator shows you where he/she would other). verify the Rx scrammed, then inform he/she that the reactor is scrammed.

5.1.4 MONITOR the RSP System indications Operator locates RSP indications AND CHECK specifically for the following:

Page 4 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

A REACTOR VESSEL PRESSURE Operator observes RSP RPV pressure PR-7853D (905 - 1045 psig) and verifies it is 905-1045 psig Examiner Cue: Once the Operator shows you where he/she would verify reactor pressure, inform them that reactor pressure is ~1005 psig and stable.

  • B REACTOR VESSEL LEVEL LR-7854. Operator observes RSP RPV level and
  • Between 12.5 and 54. notes that RPV level is rising

Examiner Cue: Once the Operator IF the rate of rise of RPV level indicates shows you where he/she would verify reactor water level, inform HPCI is injecting AND the Control Room them that Reactor water level is unmanned, PERFORM the following: appears to have dropped to -40 and it is now at -20 and rising at PRIOR to exceeding the high level trip ~10/min (level 8)

Operator should be able to determine OR when HPCI is no longer required, that HPCI is injecting and it is no longer TRIP HPCI IAW Attachment 8. required. Operator should go to Attachment 8 and TRIP HPCI.

TIME RPV Level Checked: __________

Operator may continue with procedure OR go directly to Attachment 8.

Operator needs to trip HPCI prior to RPV level reaching Level 8 Page 5 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • Att. 8
  • OPEN the following circuit breaker at Operator proceeds to 125VDC Dist. Pnl Class 1E 125VDC Distribution Panel 1AD417 and simulates opening Circuit

8.1 1AD417

Breaker 10.

Examiner Cue: Once the Operator Circuit Breaker 10, HPCI RELAY makes it to the cabinets, show the VERT BD 10C620. operator a picture of the inside of the cabinet and ask him which breakers Time Breaker Opened: __________ he/she would open. Then inform them that that breaker is open.

5.1.4

  • RCIC System status Operator points to appropriate
  • PSV-F013F,H,M SRV status indicators C-F
  • SUPPRESSION CHAMBER Examiner Cue: As the operator WATER TR-3647J points at the appropriate indicators
  • DIESEL GENERATOR inform him/her:

1A(B,C,D)G400 TRIP/CLOSED

  • RCIC Status - RCIC is running and injecting at 400 gpm
  • SRV status - all indicate closed
  • Suppression Chamber Water temp - 78°F rising slowly (~1°F/ 5 minutes)
  • Diesel Generators - all off 5.1.5 ENSURE the following RSP Switches Operator places RSP switches in have been PLACED in EMER: EMER Page 6 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • A. CH "A" TRANSFER, AND OBSERVE Operator simulates placing CH A the following valves have Auto TRANSFER switch to EMER Closed: Operator Observes valves have Auto
  • BC-HV-F021A RHR LOOP A INBD Closed CONT SPRAY MOV. Examiner Cue: As the operator
  • BC-HV-F006A A RHR PMP points at the appropriate indicators SUCT FROM RECIRC inform him/her:

LOOP B ISLN MOV.

  • F021A and F006A have auto closed
  • B. CH "C" TRANSFER, AND OBSERVE Operator simulates placing CH C the following have Auto Opened: TRANSFER switch to EMER
  • HD-9370A, REACTOR Operator Observes valves have Auto BUILDING SUPPLY DAMPER. Opened
  • HD-9414A, REACTOR Examiner Cue: As the operator points at the appropriate indicators BUILDING EXHAUST inform him/her:

DAMPER

  • HD-9370A and HD-9414A have auto opened Page 7 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • C.1 CH "B" TRANSFER, Operator simulates placing CH B AND OBSERVE the following: TRANSFER switch to EMER The following valves have Auto Closed: Operator Observes valves have Auto
  • BC-HV-F016B, RHR LP B CONT Closed SPRY VLV.

Examiner Cue: As the operator

  • BC-HV-F017B, LPCI INJECTION points at the appropriate indicators VALVE. inform him/her:
  • F016B, F017B, F021B, F027B and F022 have auto closed
  • BC-HV-F027B, RHR LP B SUP POOL SPRY VLV.

C.2 The following valves have Auto Opened: Operator Observes valves have Auto

  • BD-HV-F012, RCIC PMP DISCH Opened MOV Examiner Cue: As the operator
  • FC- HV-F059, RCIC EXH ISLN points at the appropriate indicators MOV inform him/her:
  • F012, F059, F021B, F060, F062 and DSCH ISLN MOV HV-2520B have auto opened
  • HV-2520B, RHR PMP B CLG WTR SUP VLV Page 8 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

C.3 The RCIC Jockey Pump BP-228 has Operator observes RCIC Jockey Pump auto-started has auto-started Examiner Cue: As the operator points at the appropriate indicators inform him/her:

RCIC Jockey Pump has auto started.

C.4 RCIC Turbine alarms are enabled at the Operator observes RCIC alarms are RSP (may not be ON) enabled.

  • D.1 CH "D" TRANSFER, Operator places CH D transfer switch AND OBSERVE the following: in EMER
1. The following have Auto Opened: Operator observes F004D, F084, HD9370B and HD-9414B are open
  • BC-HV-F004D, RHR PUMP D SUPP POOL SUCT MOV. Examiner Cue: As the operator points at the appropriate indicators
  • HD-9370B, REACTOR BLDG SUPPLY DAMPER.
  • HD-9414B, REACTOR BLDG EXHAUST DAMPER Page 9 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

D.2 The following have Auto Closed: Operator observes appropriate valves

CONDENSATE PUMP Examiner Cue: As the operator DISCHARGE TO CRW (Fails points at the appropriate indicators Closed). inform him/her the valves have auto closed.

  • FC-HV-F025 STEAM TRAP DRAIN VLV D.3 RHR Jockey Pump DP228 has started Operator observes RHR Jockey pump has started Examiner Cue: As the operator points at the appropriate indicators inform him/her RHR jockey pump DP228 has started.
  • E CHANNEL "NON-1E" TRANSFER, Operator places NON-1E Transfer AND OBSERVE HV-F031B, Reactor switch to EMER Recirculation Pump BP201s Discharge Operator should be aware that Recirc Valve has Closed. pump will trip Examiner Cue: As the operator points at the appropriate indicators inform him/her BP201s discharge valve has closed.

Page 10 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • F. PMP BP202 XFR - B RHR PUMP Operator place PMP BP202XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her BP202XFR switch is in EMER
  • G. PMP BP502 XFR - B SERV WTR PUMP Operator place PMP BP502XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her BP502XFR switch is in EMER
  • H. PMP DP502 XFR - D SERV WTR Operator place PMP DP502XFR switch PUMP to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her DP502XFR switch is in EMER
  • I. PMP BP210 XFR - B SACS PUMP Operator place PMP BP210XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her BP210XFR switch is in EMER Page 11 of 13

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Integrity TASK: Resetting Isolation Systems STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • J. PMP DP210 XFR - D SACS PUMP Operator place PMP DP210XFR switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her DP210XFR switch is in EMER
  • K. MOTOR BK400 TRANS Operator place BK TRANS switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her MOTOR BK400 TRANS switch is in EMER
  • L. MOTOR BK403 TRANS Operator places MOTOR BK403 switch to EMER Examiner Cue: As the operator points at the appropriate indicators inform him/her MOTOR BK403 switch is in EMER 5.1.6 IF emergency takeover is successful, Operator informs Shift Manager that notify the Shift Manager emergency takeover has been that control has been established successful.

from the Remote Shutdown Panel Terminating Cue: Once the Operator has informed the Shift Manager that control has been established from the Remote Shutdown Panel, then state "This JPM is complete" Page 12 of 13

JOB PERFORMANCE MEASURE INSTRUCTIONS INITIAL CONDITIONS:

1. A fire in the Control Room has forced a Control Room Evacuation
2. NO actions were performed in the Control Room prior to evacuation
3. The Plant is still at 100% power and the turbine is still tied to the grid.
4. The CRS has directed you to Establish Control of the plant from Outside of the Control Room.

INITIATING CUE:

Establish Control of the Plant from Outside of the Control Room IAW with HC.OP-IO.ZZ-0008 Page 13 of 13

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available TASK NUMBER: 2620020101 JPM NUMBER: NRC-JPM-010 ALTERNATE PATH: K/A NUMBER: 262002A4.01 IMPORTANCE FACTOR: 2.8 3.1 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Plant /Simulate

REFERENCES:

HC.OP-SO.PN-0001(Q), Rev. 15 TOOLS AND EQUIPMENT: None VALIDATED JPM COMPLETION TIME: (8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: New APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 9

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available TASK NUMBER: 2390010101 INITIAL CONDITIONS:

1. Hope Creek is at 100%
2. UPS 1AD481s inverter blew a fuse and power to the 120VAC Distribution panel 1AJ481swapped over to its Backup AC power.
3. An NEO has removed the Inverter and Rectifier sections from service IAW section 5.2 of HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.
4. Electrical Maintenance has replaced the fuse and is ready for 120VAC Distribution panel 1AJ481 to be returned to its normal power source.
5. You have been directed to return 120 VAC Distribution panel 1AJ481 to its normal power supply in accordance with HC.OP-SO.PN-0001 INITIATING CUE:

Place the Inverter and Rectifier Sections of 120 VAC UPS 1AD481 in-Service with Backup AC Available IAW HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains a copy of HC.OP- Examiner Cue: Once the operator SO.PN-0001 and determines he/she has located the procedure, provide needs to perform section 5.3 the operator with a copy of procedure HC.OP-SO.PN-0001(Q).

Remind Operator NO controls are to be operated. Just point to a control switch and explain how you would operate it.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.

Examiner Note: Initialing the following steps is not critical.

5.3.1 ENSURE that all prerequisites have been Operator ensures that the prerequisites satisfied IAW Section 2.3 of are satisfied:

this procedure.

Operator initials the step.

START TIME: ___________

Page 3 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • 5.3.2 PLACE the RECTIFIER AC INPUT Operator goes to the UPS 1AD481 and BKR-CB201 in the ON position. simulates placing CB-201 in the ON
  1. position.

A. OBSERVE the following:

Operator observes Loss of Alternate Source light and Loss of Synchronism

1. LOSS OF ALTERNATE lights illuminate SOURCE light illuminates.
2. LOSS OF SYNCRONISM light Examiner Cue: Once the Operator illuminates makes it to the cabinets, Have him/her indicate which breaker they would operate and then inform them that that breaker is in the ON position.

After each step the Operator should Record the component and initial on Attachment 1. This is not critical.

  • 5.3.3 PLACE the RECTIFIER AUCTIONEER Operator simulates placing CB-21 in DC OUTPUT BKR-CB21 in the ON the ON position
  1. position
  • 5.3.4 PLACE the RECTIFIER ALTERNATE Operator simulates placing CB-20 in DC INPUT BKR-CB20 in the ON the ON position
  1. position.

Examiner Cue: Loss of Alternate

  • OBSERVE that the LOSS OF Source Light extinguishes ALTERNATE SOURCE light extinguishes.

Page 4 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • 5.3.5 PLACE the Static Inverter DC FILTER CHARGE SWITCH in the
  1. A. ON position AND PERFORM the following: Operator simulates placing Static OBSERVE the following: Inverter DC Filter CHARGE SWITCH in the ON position.
1. DC FILTER CHARGED light Examiner Cue: DC FILTER comes illuminates after a several CHARGED, LOSS OF INVERTER second time delay. OUTPUT and ON INTERNAL
2. LOSS OF INVERTER OUTPUT FREQUENCY REFERENCE lights all light illuminates Illuminate.
3. ON INTERNAL FREQUENCY REFERENCE light illuminates.

B. VERIFY DC INPUT, DC Voltmeter Operator Verifies DC Voltmeter reads reads 125VDC ~125VDC Examiner Cue: Voltage is reading 128VDC Page 5 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.3.6 WHEN a 15-minute warm-up period for Examiner Note: Using Time Static Inverter Logic has elapsed, compression inform the operator THEN PLACE the Inverter TEST Toggle that the 15 minute warm-up period Switch in the UP position has passed, also once Operator has AND VERIFY that all 4 LED lights are pointed to the Inverter, show him a illuminated. picture of the inside of the cabinet and let him point out where the Test Toggle Switch is.

Operator simulates placing Inverter TEST toggle switch in the UP position Examiner Cue: All 4 LED lights are illuminated.

  • 5.3.7 PLACE the Inverter TEST Toggle Operator simulates putting Inverter Switch in the DOWN position AND TEST toggle switch in the DOWN
  1. PERFORM the following: position A. VERIFY all 4 LED lights Examiner Cue: All 4 LED lights are off.

extinguish.

B. IF any LED lights remain illuminated, THEN REPEAT Steps 5.3.6 AND 5.3.7.

  • 5.3.8 PLACE the STATIC INVERTER DC Operator simulates placing CB101 in INPUT BKR-CB101 in the ON position.
  1. ON position
  • OBSERVE that the LOSS OF INVERTER OUTPUT Examiner Cue: Loss of Inverter light extinguishes. Output light extinguishes Page 6 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • 5.3.9 PLACE the INVERTER AC OUTPUT Operator simulates placing CB10 in ON BKR-CB10 in the ON position. position
  • 5.3.10 PLACE the following ISOLATE Toggle Operator simulates placing ISOLATE Switches in the ON [right position] Toggle switches in the ON position
  1. AND OBSERVE the noted light response: Examiner Cue: SYNC Monitor light illuminates A. ISOLATE INV OUTPUT Loss of Synchronism, Sync Monitor (SYNC MONITOR light and On Internal Frequency illuminates) Reference all illuminate.

B. ISOLATE SYNC SOURCE (The following lights extinguish:)

  • LOSS OF SYNCRONISM
  • SYNC MONITOR
  • ON INTERNAL FREQUENCY REFERENCE
  • 5.3.11 PLACE the MAN BYPASS Control Operator simulates placing MAN Switch in the BYP TO ALT position. BYPASS switch in the BYP to ALT
  1. position.

5.3.12 VERIFY the amber LOAD ON Operator verifies amber LOAD ON BACKUP light is illuminated BACKUP light is illuminated.

AND the clear SYNC MONITOR light is extinguished Examiner Cue: LOAD ON BACKUP light is illuminated and SYNC MONITOR light is extinguished.

Page 7 of 9

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Electrical TASK: Placing Inverter and Rectifier Sections in Service with Backup AC Available STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  • 5.3.13 PLACE the MAN BYPASS Control Operator simulates placing MAN Switch in NORM. BYPASS in NORM
  • 5.3.14 PLACE the TEST Toggle Switch in Operator places TEST toggle switch to NORMAL [center position] the NORMAL position AND OBSERVE the following:

Examiner Cue: Green PREF POS light is illuminated.

  • Green PREF POS light is illuminated. LOAD ON BACKUP SOURCE light extinguishes.
  • LOAD ON BACKUP SOURCE light extinguishes.

STOP TIME _________

Terminating Cue: Once the Operator has placed the TEST Toggle Switch in NORMAL and observed the proper indication, then state, "This JPM is complete" Page 8 of 9

JOB PERFORMANCE MEASURE INSTRUCTIONS INITIAL CONDITIONS:

1. Hope Creek is at 100%
2. UPS 1AD481s inverter blew a fuse and power to the 120VAC Distribution panel 1AJ481swapped over to its Backup AC power.
3. An NEO has removed the Inverter and Rectifier sections from service IAW section 5.2 of HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.
4. Electrical Maintenance has replaced the fuse and is ready for 120VAC Distribution panel 1AJ481 to be returned to its normal power source.
5. You have been directed to return 120 VAC Distribution panel 1AJ481 to its normal power supply in accordance with HC.OP-SO.PN-0001 INITIATING CUE:

Place the Inverter and Rectifier Sections of 120 VAC UPS 1AD481 in-Service with Backup AC Available IAW HC.OP-SO.PN-0001, 120 VAC Electrical Distribution.

Page 9 of 9

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE STATION: HOPE CREEK SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

TASK NUMBER: 2010110104 JPM NUMBER: NRC-JPM-011 ALTERNATE PATH: K/A NUMBER: 201003A2.10 IMPORTANCE FACTOR: 3.0 3.4 APPLICABILITY: RO SRO RO X SRO X EVALUATION SETTING/METHOD: Reactor Bldg/Simulate

REFERENCES:

HC.OP-SO.BF-0002, Rev. 25 TOOLS AND EQUIPMENT: Tool to remove cap from Instrument Block Connection P62.

Torque wrench set at 200 inch pounds VALIDATED JPM COMPLETION TIME: 11 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A JPM SOURCE: Bank APPROVAL:

Author Facility Representative Chief Examiner CAUTION: No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the as left condition by a qualified individual.

ACTUAL JPM COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION: N/A JPM PERFORMED BY: GRADE: SAT UNSAT REASON, IF UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

Page 1 of 12

INITIAL LICENSED OPERATOR EXAMINATION JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

TASK NUMBER: 2010110104 INITIAL CONDITIONS:

1. The Reactor is operating at 18% power.
2. Control Rod 38-07 has failed a scram time test and is fully inserted at this time.

INITIATING CUE:

Hydraulically isolate the HCU for Control Rod 38-07. DO NOT electrically disarm the HCU.

Maintain cooling water flow to the CRD mechanism.

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Page 2 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

Operator obtains/locates procedure Operator obtains the correct procedure.

HC.OP-SO.BF-0002.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

Examiner Cue: If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

The operator initials the appropriate procedure steps.

Examiner Note: It is not critical to initial the procedure step, nor complete Attachment 1 in this and subsequent steps.

4.0 EQUIPMENT REQUIRED

  • Tool to remove cap from Operator obtains required tools.

Instrument Block Connection P6. (Torque wrench set at 200 inch pounds.)

  • Calibrated torque wrench with the appropriate range to read the Examiner Note: Operator may reference value of 20 to 100% of demonstrate ability to locate range. required tools. Tools are kept in a locked toolbox. If unable to open, state that the tools have been acquired.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.1.1.

Page 3 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.1.1 ENSURE all prerequisites of Section Operator ensures prerequisites have 2.1 are satisfied. been satisfied, completes Attachment 1, and initials each prerequisites in the spaces provided in the procedure.

Examiner Cue: If excessive time is taken reviewing prerequisites, inform operator that all are satisfied.

  1. START TIME:
  • 5.1.2 PERFORM the following for The Operator rotates 1BF-V101 applicable CRD HCU: handwheel in the clockwise direction until handwheel/stem motion stops and A. CLOSE following CRD HCU valve has reached its closed seat.

Isolation valves:

Examiner Cue: The stem of the

1. 1-BF-V101, Insert Riser Vlv valve you indicated is lowering, the valve handwheel comes to a hard stop.

The operator then initials the appropriate procedure step.

Page 4 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  1. 2. 1-BF-V102, Withdraw Riser The Operator rotates 1BF-V102
  • Isln Vlv AND INITIAL handwheel in the clockwise direction Attachment 1. until handwheel/stem motion stops and valve has reached its closed seat.

Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.

The operator then initials Attachment 1 and the appropriate procedure step.

  1. 3. 1-BF-V113, Chg Wtr Riser Isln The Operator rotates 1BF-V113
  • Vlv AND INITIAL Attachment handwheel in the clockwise direction
1. until handwheel/stem motion stops and valve has reached its closed seat.

Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.

The operator then initials Attachment 1 and the appropriate procedure step.

Page 5 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

B. PERFORM the following to The Operator rotates 1BF-V111 discharge HCU Gas Accumulator: handwheel in the clockwise direction until handwheel/stem motion stops and

1. CLOSE 1-BF-V111, Gas valve has reached its closed seat.

Accum Chrg Vlv.

Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.

The operator then initials the appropriate procedure step.

2. Slowly UNCAP Instrument The Operator uncaps Instrument Block Block Conn P6. Conn P6.

Examiner Cue: The cap has been removed from the location identified.

Note - P6 is the cap on the Front of the Instrument Block not the back.

The operator then initials the appropriate procedure step.

Page 6 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

3. Throttle OPEN 1-BF-V111, Operator slowly rotates 1BF-V111 in Gas Accum Chrg Vlv. the counterclockwise direction and observes decreasing accumulator gas pressure on PI-131.

Examiner Cue: The handwheel of the valve you indicated is rotating counterclockwise, gas can be heard escaping from the P6 connection.

PI-131 indication is lowering.

The operator then initials the appropriate procedure step.

4. WHEN PI-131, N2 Examiner Cue: PI-131 indicates 0 Accumulator Press, is 0 psig, psig.

THEN fully OPEN 1-BF-V111, Gas Accum Chrg. Vlv AND Operator rotates 1BF-V111 handwheel INITIAL Attachment 1. in the counterclockwise direction until handwheel/stem motion stops and valve is fully open.

Examiner Cue: The stem of the valve you indicated is rising, the valve handwheel come to a hard stop.

The operator then initials the appropriate procedure step.

Page 7 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

5. CAP Instrument Block Operator threads cap on P6 connection Connection P6 AND INITIAL and rotates cap in clockwise direction Attachment 1. using appropriate wrench.

Examiner Cue: The P6 cap is rotating in the clockwise direction.

The operator then initials the appropriate procedure step.

6. TORQUE P6 cap to 175 (150 - Using torque wrench, operator rotates 200) in-lb. P6 cap in clockwise direction until torque wrench clicks indicating that inch pounds have been reached.

Examiner Cue: The torque wrench is rotating clockwise, the torque wrench clicks.

The operator then initials the appropriate procedure step.

Page 8 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  1. C. PERFORM the following to
  • hydraulically isolate Directional Control Valves SV-121, SV-122, The Operator rotates 1BF-V103 SV-123, AND SV-120 from Drive handwheel in the clockwise direction AND Exhaust Water Headers: until handwheel/stem motion stops and valve has reached its closed seat.
1. CLOSE 1-BF-V103, Drv Wtr Riser Vlv AND INITIAL Examiner Cue: The stem of the Attachment 1. valve you indicated is lowering, the valve handwheel comes to a hard stop.

The operator then initials Attachment 1 and the appropriate procedure step.

  1. 2. CLOSE 1-BF-V105, Exh Wtr The Operator rotates 1BF-V105
  • Riser Vlv AND INITIAL handwheel in the clockwise direction Attachment 1. until handwheel/stem motion stops and valve has reached its closed seat.

Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.

The operator then initials Attachment 1 and the appropriate procedure step.

Page 9 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation)

  1. D. OPEN 1-BF-V101, Insert Riser Vlv The Operator rotates 1BF-V101
  • AND INITIAL Attachment 1. handwheel in the counterclockwise direction until handwheel/stem motion stops and valve has reached its open seat.

Examiner Cue: The stem of the valve you indicated is rising, the valve handwheel comes to a hard stop.

The operator then initials Attachment 1 and the appropriate procedure step.

  1. E. CLOSE 1-BF-V112, Scram Dsch The Operator rotates 1BF-V112
  • Riser Vlv AND INITIAL handwheel in the clockwise direction Attachment 1. until handwheel/stem motion stops and valve has reached its closed seat.

Examiner Cue: The stem of the valve you indicated is lowering, the valve handwheel comes to a hard stop.

The operator then initials Attachment 1 and the appropriate procedure step.

F. OBSERVE appropriate CRD Operator relocates to the 1-BF-TRS-temperature periodically on CRD R018 RECORDER and observes the TEMPERATURE 1-BF-TRS-R018 temperature for Rod 38-07.

RECORDER.

Examiner Cue: The indicator identified indicates 195F.

Page 10 of 12

INITIAL LICENSED OPERATOR EXAMINATION NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod Drive Hydraulics TASK: Isolate a CRD HCU During Reactor Operation [Hydraulically]

STEP COMMENTS

  1. STEP

(*Denotes a Critical Step) EVAL (Required for UNSAT

  • NO. STANDARD

(#Denotes a Sequential Step) S/U evaluation) 5.1.3 PERFORM independent verification Operator submits the procedure for an that the system is aligned IAW independent verification.

Attachment 1.

STOP TIME:

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete".

Page 11 of 12

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Reactor is operating at 18% power.
2. Control Rod 38-07 has failed a scram time test and is fully inserted at this time.

INITIATING CUE:

Hydraulically isolate the HCU for Control Rod 38-07. DO NOT electrically disarm the HCU. Maintain cooling water flow to the CRD mechanism.

Page 12 of 12