ML061160014: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/04/2006
| issue date = 05/04/2006
| title = Tech Spec Pages for Amendment 350 Replacement of Reactor Building Emergency Sump Suction Inlet Trash Racks and Screens with Strainers
| title = Tech Spec Pages for Amendment 350 Replacement of Reactor Building Emergency Sump Suction Inlet Trash Racks and Screens with Strainers
| author name = Olshan L N
| author name = Olshan L
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name =  
| addressee name =  
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:HPI 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
{{#Wiki_filter:HPI 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify each HPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing Program required developed head.SR 3.5.2.4 Verify each HPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.SR 3.5.2.5 Verify each HPI pump starts automatically on 18 months an actual or simulated actuation signal.SR 3.5.2.6 Verify, by visual inspection, each HPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers show no evidence of structural distress or abnormal corrosion.
SURVEILLANCE                                   FREQUENCY SR 3.5.2.3       Verify each HPI pump's developed head at the     In accordance with the test flow point is greater than or equal to the Inservice Testing Program required developed head.
SR 3.5.2.7 Cycle each HPI discharge crossover valve and 18 months LPI-HPI flow path discharge valve.I O C O NEE U NIT S 1, 2, & 3 3.5.2-5 AmendmentNos.
SR 3.5.2.4       Verify each HPI automatic valve in the flow     18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
348/350/350 I
SR 3.5.2.5       Verify each HPI pump starts automatically on     18 months an actual or simulated actuation signal.
LPI 3.5.3 SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.6       Verify, by visual inspection, each HPI train     18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers show no evidence of structural distress or                                   I abnormal corrosion.
SURVEILLANCE FREQUENCY SR 3.5.3.2 -------------------
SR 3.5.2.7       Cycle each HPI discharge crossover valve and     18 months LPI-HPI flow path discharge valve.
NOTE ----------
O C O NEE U NITS 1,2,& 3                       3.5.2-5               AmendmentNos. 348/350/350   I
Not applicable to operating LPI pump(s).Vent each LPI pump casing. 31 days SR 3.5.3.3 Verify each LPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing required developed head. Program SR 3.5.3.4 Verify each LPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.SR 3.5.3.5 Verify each LPI pump starts automatically on 18 months an actual or simulated actuation signal.SR 3.5.3.6 Verify, by visual inspection, each LPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers show no evidence of structural distress or abnormal corrosion.
 
I OCONEE UNITS 1, 2, & 3 3.5.3-3-AmendmentNos.
LPI 3.5.3 SURVEILLANCE REQUIREMENTS         (continued)
348/350/350 I}}
SURVEILLANCE                                   FREQUENCY SR 3.5.3.2   ------------------- NOTE       ----------
Not applicable to operating LPI pump(s).
Vent each LPI pump casing.                       31 days SR 3.5.3.3   Verify each LPI pump's developed head at the     In accordance with the test flow point is greater than or equal to the   Inservice Testing required developed head.                         Program SR 3.5.3.4   Verify each LPI automatic valve in the flow       18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.5.3.5   Verify each LPI pump starts automatically on     18 months an actual or simulated actuation signal.
SR 3.5.3.6   Verify, by visual inspection, each LPI train     18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers I
show no evidence of structural distress or abnormal corrosion.
OCONEE UNITS 1, 2, & 3               3.5.3             AmendmentNos. 348/350/350       I}}

Latest revision as of 20:28, 23 November 2019

Tech Spec Pages for Amendment 350 Replacement of Reactor Building Emergency Sump Suction Inlet Trash Racks and Screens with Strainers
ML061160014
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/04/2006
From: Olshan L
Plant Licensing Branch III-2
To:
bxt1
Shared Package
ML061150507 List:
References
TAC MC8127
Download: ML061160014 (2)


Text

HPI 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify each HPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing Program required developed head.

SR 3.5.2.4 Verify each HPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.5.2.5 Verify each HPI pump starts automatically on 18 months an actual or simulated actuation signal.

SR 3.5.2.6 Verify, by visual inspection, each HPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers show no evidence of structural distress or I abnormal corrosion.

SR 3.5.2.7 Cycle each HPI discharge crossover valve and 18 months LPI-HPI flow path discharge valve.

O C O NEE U NITS 1,2,& 3 3.5.2-5 AmendmentNos. 348/350/350 I

LPI 3.5.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.3.2 ------------------- NOTE ----------

Not applicable to operating LPI pump(s).

Vent each LPI pump casing. 31 days SR 3.5.3.3 Verify each LPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing required developed head. Program SR 3.5.3.4 Verify each LPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.5.3.5 Verify each LPI pump starts automatically on 18 months an actual or simulated actuation signal.

SR 3.5.3.6 Verify, by visual inspection, each LPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers I

show no evidence of structural distress or abnormal corrosion.

OCONEE UNITS 1, 2, & 3 3.5.3 AmendmentNos. 348/350/350 I