ML061160475: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:MONITORING WELL STATUS (Wed, Dec 14,2005-1530 hrs)1DX Sample Result (Highest Value)Well Number Location Status Next Step Samples Taken MW-111 Transformer Yard Baseline Sample PT Continue to SampleWeekly 302,000 pCiJ/ (11/04/05)
{{#Wiki_filter:MONITORING WELL STATUS (Wed, Dec 14,2005-1530 hrs) 1DX Well          Location                        Status                      Next                              Samples            Sample Result Number                                                                    Step                              Taken              (Highest Value)
MW-30 MW-31 MW-32 U-2 SFB Drille5lkeep Fully Developed Well Transducer installed Continue drilling Raw Water: Packer test Water: "Developed Well": 399,000 pCi/I (1 1/23/05)600,000 pCi/l (11/24/05)
MW-111       Transformer Yard               Baseline Sample PT               Continue to SampleWeekly                         302,000 pCiJ/ (11/04/05)
Not ready for this sample MOB side walk U-2 SFB Alley Way DrilleIoday Metal magnotometer indication in hole Need Eng Evaluation prior to begin drillingMW-33 MW-34 MW-35 MW-36 MW-37 MW-38 Transformer Yard Transformer Yard Transformer Yard U-2 Turbine Bldg U-2 Turbine Bldg South U-3 Boundary Purging well Well installed Well installed Re-locating drill location Re-locating drill location Well in service Get water sample Sampled water-awaiting results Sampled water-awaiting results Get engineering package out Get engineering package out Continue periodic sampling Note:* We are using the vacuum truck on MW-32 to attempt to clear materiai in weji hole hole tha. may be on Lop of a Intluai objecL. This hole has bccn vacuumed approximately 7' down, but a magnetometer is indir-ating metal is in the vicinity of the probe at the 7'deep level. Will get engineering evaluation prior to drilling for status or determination of metv -< -ition.lnformation In thiS record waS &MO in accordance Nr W of _ I b Ai hmMPUs FOWAwhan MONITORING WELL STATUS (Nov. 28,2005)Im Ibr Number LcEEaiion'-'A'.,LUuS Stev Taken Saiiijle Rn buiR (Hii~hest Value)MW-111 MW-30 Transformer Yard U-2 SFB Baseline Sample Pt Drilled 61' deep Continue to Sample Fully Develop Well Weekly Raw Water: Packer test Water: "Developed Well": 302,000 pCi/l (11/04/05) 399,000 pCi/l (11/23/05) 600,000 pCi/l (11/24/05)
MW-30         U-2 SFB                         Drille5lkeep                     Fully Developed Well           Raw Water:         399,000 pCi/I (11/23/05)
No ready yet for this sample MW-31 MW-32 MW-33 MW-34 MW-35 MW-36 LvI v .0 I MW-38 U-2 SFB Alley way U-2 MOB Sidewalk Transformer Yard Transformer Yard Transformer Yard U-2 Turbine Bldg U- Turbin Bldg: )S.out UI BoundIjUr South U-3 Boundar y No action yet No action yet Vacuumed to bedrock Vacuumed to bedrock Vacuumed to bedrock No action yet Jo act HOn pcve n Jack Hammered pavement Remove pavement Vacuum excavation Drill Well Remove pavement Vacuum excavation Drill well Ready for Drilling Ready for Drilling Ready for Drilling Jack Hammer pavemtent Vacuum excavation Drill Well T tack TAU r .paement Vacuum excavation Drill Well Vacuum excavation Drill Well..}}
Transducer installed          Packer test Water: 600,000 pCi/l (11/24/05)
                                                                                                              "Developed Well":  Not ready for this sample MW-31        MOB side walk                   DrilleIoday                      Continue drilling MW-32                                                                          Need Eng Evaluation prior to U-2 SFB Alley Way               Metal magnotometer indication in hole               begin drilling                                            &eo) --
MW-33        Transformer Yard                Purging well                      Get water sample MW-34        Transformer Yard                Well installed                    Sampled water-awaiting results MW-35        Transformer Yard               Well installed                    Sampled water-awaiting results MW-36        U-2 Turbine Bldg               Re-locating drill location       Get engineering package out MW-37        U-2 Turbine Bldg                Re-locating drill location       Get engineering package out MW-38        South U-3 Boundary              Well in service                  Continue periodic sampling Note:
* We are using the vacuum truck on MW-32 to attempt to clear materiai in weji hole hole tha. may be on Lop of a Intluai objecL. This hole has bccn vacuumed approximately 7' down, but a magnetometer is indir-ating metal is in the vicinity of the probe at the 7'deep level. Will get engineering evaluation prior to drilling for status or determination of metv   -<-ition.lnformation In thiS record waS &MO inaccordance          Nr_W Iof b hmMPUs Ai FOWAwhan
 
MONITORING WELL STATUS (Nov. 28,2005)
ImIbr      LcEEaiion
                                  '-'A
                                  '.,LUuS                                                           Saiiijle Rn buiR Number                                                      Stev                  Taken              (Hii~hest Value)
MW-111     Transformer Yard       Baseline Sample Pt       Continue to Sample     Weekly             302,000 pCi/l (11/04/05)
MW-30      U-2 SFB                Drilled 61' deep        Fully Develop Well    Raw Water:        399,000 pCi/l (11/23/05)
Packer test Water: 600,000 pCi/l (11/24/05)
                                                                                  "Developed Well":  No ready yet for this sample MW-31       U-2 SFB Alley way     No action yet           Remove pavement Vacuum excavation Drill Well MW-32      U-2 MOB Sidewalk        No action yet          Remove pavement Vacuum excavation Drill well MW-33      Transformer Yard        Vacuumed to bedrock    Ready for Drilling MW-34      Transformer Yard        Vacuumed to bedrock    Ready for Drilling MW-35      Transformer Yard        Vacuumed to bedrock    Ready for Drilling MW-36      U-2 Turbine Bldg        No action yet          Jack Hammer pavemtent Vacuum excavation Drill Well LvI v .0 I U-  Turbin S.out      Bldg:
                          )
UI BoundIjUr      Jo act HOn      pcve n  T tack TAU . r paement
                                                                                    ..
Vacuum excavation Drill Well MW-38      South U-3 Boundar y      Jack Hammered pavement  Vacuum excavation Drill Well}}

Revision as of 20:25, 23 November 2019

Monitoring Well Status
ML061160475
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/14/2005
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0081
Download: ML061160475 (2)


Text

MONITORING WELL STATUS (Wed, Dec 14,2005-1530 hrs) 1DX Well Location Status Next Samples Sample Result Number Step Taken (Highest Value)

MW-111 Transformer Yard Baseline Sample PT Continue to SampleWeekly 302,000 pCiJ/ (11/04/05)

MW-30 U-2 SFB Drille5lkeep Fully Developed Well Raw Water: 399,000 pCi/I (11/23/05)

Transducer installed Packer test Water: 600,000 pCi/l (11/24/05)

"Developed Well": Not ready for this sample MW-31 MOB side walk DrilleIoday Continue drilling MW-32 Need Eng Evaluation prior to U-2 SFB Alley Way Metal magnotometer indication in hole begin drilling &eo) --

MW-33 Transformer Yard Purging well Get water sample MW-34 Transformer Yard Well installed Sampled water-awaiting results MW-35 Transformer Yard Well installed Sampled water-awaiting results MW-36 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-37 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-38 South U-3 Boundary Well in service Continue periodic sampling Note:

  • We are using the vacuum truck on MW-32 to attempt to clear materiai in weji hole hole tha. may be on Lop of a Intluai objecL. This hole has bccn vacuumed approximately 7' down, but a magnetometer is indir-ating metal is in the vicinity of the probe at the 7'deep level. Will get engineering evaluation prior to drilling for status or determination of metv -<-ition.lnformation In thiS record waS &MO inaccordance Nr_W Iof b hmMPUs Ai FOWAwhan

MONITORING WELL STATUS (Nov. 28,2005)

ImIbr LcEEaiion

'-'A

'.,LUuS Saiiijle Rn buiR Number Stev Taken (Hii~hest Value)

MW-111 Transformer Yard Baseline Sample Pt Continue to Sample Weekly 302,000 pCi/l (11/04/05)

MW-30 U-2 SFB Drilled 61' deep Fully Develop Well Raw Water: 399,000 pCi/l (11/23/05)

Packer test Water: 600,000 pCi/l (11/24/05)

"Developed Well": No ready yet for this sample MW-31 U-2 SFB Alley way No action yet Remove pavement Vacuum excavation Drill Well MW-32 U-2 MOB Sidewalk No action yet Remove pavement Vacuum excavation Drill well MW-33 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-34 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-35 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-36 U-2 Turbine Bldg No action yet Jack Hammer pavemtent Vacuum excavation Drill Well LvI v .0 I U- Turbin S.out Bldg:

)

UI BoundIjUr Jo act HOn pcve n T tack TAU . r paement

..

Vacuum excavation Drill Well MW-38 South U-3 Boundar y Jack Hammered pavement Vacuum excavation Drill Well