ML061560079: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility:
{{#Wiki_filter:ES-301                               Administrative Topics Outline                     Form ES-301-1 Facility:     Callaway                                 Date of Examination:         8/22/2005 Examination Level (circle one):       RO               Operating Test Number:       NRC Administrative Topic             Type                  Describe activity to be performed (see Note)               Code*
Callaway Date of Examination:
JPM: Perform a Shutdown Margin Calculation.
8/22/2005 Examination Level (circle one):
Conduct of Operations             N,R,S K/A: 2.1.32 (3.4)
RO Operating Test Number:
Ability to explain and apply all system limits and precautions JPM: Calculate blended makeup volume and flow to Conduct of Operations             N,R             the RWST.
NRC Administrative Topic (see Note)
K/A: 2.1.25 (2.8)
Type Code* Describe activity to be performed JPM: Perform a Shutdown Margin Calculation.
Ability to obtain and interpret station reference materials such as graphs, nomographs, and tables which contain performance data.
Conduct of Operations N,R,S K/A: 2.1.32 (3.4)   Ability to explain and apply all system limits and precautions JPM: Calculate blended makeup volume and flow to the RWST.
JPM: Determine Tagging Boundaries for Equipment Control                  N, R              Containment Spray Pump.
Conduct of Operations N,R K/A: 2.1.25 (2.8)   Ability to obtain and interpret station reference materials such as graphs, nomographs, and tables which contain performance data. JPM: Determine Tagging Boundaries for Containment Spray Pump.
K/A: 2.2.13 (3.6)
Equipment Control N, R K/A: 2.2.13 (3.6)   Knowledge of tagging and clearance  
Knowledge of tagging and clearance procedures JPM: Determine Stay Time.
Radiation Control                  M, R K/A:  2.3.2 (2.5)
Knowledge of facility ALARA program Emergency Plan NOTE:        All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
*Type Codes & Criteria:        (C)ontrol room (D)irect from bank ( 3 for ROs;  for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams ( 1; randomly selected)
(S)imulator Class(R)oom NUREG-1021, Revision 9


procedures JPM: Determine Stay Time.
ES-301                           Administrative Topics Outline                   Form ES-301-1 TASK  
Radiation Control M, R K/A: 2.3.2 (2.5)  Knowledge of facility ALARA program Emergency Plan NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
*Type Codes & Criteria: (C)ontrol room (D)irect from bank ( 3 for ROs;  for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams ( 1; randomly selected)  (S)imulator Class(R)oom NUREG-1021, Revision 9 ES-301 Administrative Topics Outline Form ES-301-1 TASK  


==SUMMARY==
==SUMMARY==


A1a: Conduct of Operations:
A1a:   Conduct of Operations:
Perform a Shutdown Margin Calculation. The task will require the RO and SRO applicants to perform a Shutdown Margin Calculation for Mode 3 conditions with all rods in. The JPM will be  
Perform a Shutdown Margin Calculation. The task will require the RO and SRO applicants to perform a Shutdown Margin Calculation for Mode 3 conditions with all rods in. The JPM will be a new JPM A1b:    Conduct of Operations:
Calculate blended makeup volume and flow for a makeup to the RWST. The task will require the applicant to determine volume of boric acid required based upon boric acid storage tank concentration, and makeup flow controller settings based upon desired makeup flow. This is a new JPM.
A2:    Equipment Control:
Determine Boundaries for Containment Spray Pump. The RO applicants will be required to determine the isolation boundaries for a Containment Spray Pump that will be removed from service. This is a new JPM.
A3      Radiation Control:
Determine Stay Time. Given several Radiation Work Permits to choose from, survey maps of an area where work is required, and alarming dosimetry, the RO and SRO applicants will be required to determine their allowed stay time prior to reaching the dosimetry alarm setpoint.
This task is modified from a task performed on the 2003 NRC examination NUREG-1021, Revision 9


a new JPM A1b: Conduct of Operations:
ES-301                              Administrative Topics Outline                      Form ES-301-1 Facility:    Callaway                                  Date of Examination:          8/22/2005 Examination Level (circle one):      SRO              Operating Test Number:        NRC Administrative Topic            Type                  Describe activity to be performed (see Note)              Code*
Calculate blended makeup volume and flow for a makeup to the RWST. The task will require the applicant to determine volume of boric acid required based upon boric acid storage tank concentration, and makeup flow controller settings based upon desired makeup flow. This is a new JPM. A2: Equipment Control:
JPM: Perform A Shutdown Margin Calculation.
Determine Boundaries for Containment Spray Pump. The RO applicants will be required to determine the isolation boundaries for a Containment Spray Pump that will be removed from  
Conduct of Operations             N,R,S K/A: 2.1.32 (3.8)
Ability to explain and apply all system limits and precautions JPM: Calculate blended makeup volume and flow to Conduct of Operations              N,R              the RWST.
K/A:  2.1.25 (3.1)
Ability to obtain and interpret station reference materials such as graphs, nomographs, and tables which contain performance data.
JPM: Review a Tagging Order for approval.
Equipment Control                 N,R K/A: 2.2.13 (3.8)
Knowledge of tagging and clearance procedures JPM: Determine Stay Time.
Radiation Control                  M,R K/A:  2.3.2 (2.9)
Knowledge of facility ALARA program JPM: Upgrade Emergency Classification and make Emergency Plan                    N,R,S            initial Protective Action Recommendation K/A:  2.4.44 (4.0)
Knowledge of emergency plan protective action recommendations NOTE:        All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
*Type Codes & Criteria:        (C)ontrol room (D)irect from bank ( 3 for ROs;  for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams ( 1; randomly selected)
(S)imulator Class(R)oom NUREG-1021, Revision 9


service. This is a new JPM.
ES-301                 Administrative Topics Outline Form ES-301-1 NUREG-1021, Revision 9
A3 Radiation Control:
 
Determine Stay Time. Given several Radiation Work Permits to choose from, survey maps of an area where work is required, and alarming dosimetry, the RO and SRO applicants will be required to determine their allowed stay time prior to reaching the dosimetry alarm setpoint. This task is modified from a task performed on the 2003 NRC examination NUREG-1021, Revision 9 ES-301 Administrative Topics Outline Form ES-301-1 Facility:
ES-301                             Administrative Topics Outline                   Form ES-301-1 TASK  
Callaway  Date of Examination:
8/22/2005 Examination Level (circle one):
SRO Operating Test Number:
NRC  Administrative Topic (see Note)
Type Code* Describe activity to be performed JPM: Perform A Shutdown Margin Calculation.
Conduct of Operations N,R,S K/A: 2.1.32 (3.8)  Ability to explain and apply all  system limits and precautions JPM: Calculate blended makeup volume and flow to the RWST.
Conduct of Operations N,R K/A: 2.1.25 (3.1)  Ability to obtain and interpret station reference materials such as graphs, nomographs, and  tables which contain performance data. JPM: Review a Tagging Order for approval.
Equipment Control N,R K/A: 2.2.13 (3.8)  Knowledge of tagging and clearance procedures JPM: Determine Stay Time.
Radiation Control M,R K/A: 2.3.2 (2.9)  Knowledge of facility ALARA program JPM: Upgrade Emergency Classification and make  initial Protective Action Recommendation Emergency Plan N,R,S K/A: 2.4.44 (4.0)  Knowledge of emergency plan protective action  recommendations NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
*Type Codes & Criteria: (C)ontrol room (D)irect from bank ( 3 for ROs;  for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams ( 1; randomly selected)  (S)imulator Class(R)oom NUREG-1021, Revision 9 ES-301 Administrative Topics Outline Form ES-301-1 NUREG-1021, Revision 9 ES-301 Administrative Topics Outline Form ES-301-1 TASK  


==SUMMARY==
==SUMMARY==


A1a: Conduct of Operations:
A1a:   Conduct of Operations:
Perform a Shutdown Margin Calculation. The task will require the RO and SRO applicants to perform a Shutdown Margin Calculation for Mode 3 conditions with all rods in. The JPM will be  
Perform a Shutdown Margin Calculation. The task will require the RO and SRO applicants to perform a Shutdown Margin Calculation for Mode 3 conditions with all rods in. The JPM will be a new JPM A1b:    Conduct of Operations:
Calculate blended makeup volume and flow for a makeup to the RWST. The task will require the applicant to determine volume of boric acid required based upon boric acid storage tank concentration, and makeup flow controller settings based upon desired makeup flow. This is a new JPM.
A2:    Equipment Control:
Review a Tagging Order for approval. The SRO applicants will review a tagging order that contains critical errors. The applicants will be required to determine the errors that exist and recommend correction prior to tagging order approval. This is a new JPM.
A3      Radiation Control:
Determine Stay Time. Given several Radiation Work Permits to choose from, survey maps of an area where work is required, and alarming dosimetry, the RO and SRO applicants will be required to determine their allowed stay time prior to reaching the dosimetry alarm setpoint.
This task is modified from a task performed on the 2003 NRC examination A4:    Emergency Plan:
Upgrade Emergency Classification and make initial PAR. The SRO applicants will be given plant conditions requiring escalation of an emergency classification to a General Area Emergency. The applicants will then make an initial Protective Action Recommendation based upon the existing conditions. This is a new JPM.
NUREG-1021, Revision 9
 
ES-301                              Control Room/In-Plant Systems Outline                      Form ES-301-2 Facility:        Callaway                                          Date of Examination:            8/22/2005 Exam Level (circle one):            RO / SRO(I)                    Operating Test No.:            NRC Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)
Type Code*      Safety System / JPM Title Function 001 Rod Control S1.                                                                                    N,S,A            1 Raise reactor power and block source range high flux trips 006 ECCS S2.                                                                                    N,S,A            2 Isolate SI Accumulators during Post-LOCA cooldown 010 PPCS S3.                                                                                    N,S,A            3 Respond to a Spray Valve failure 003 RCP S4.                                                                                    M,S,A,L          4P Start an RCP 041 Steam Dump S5.                                                                                    D,S,A,P          4S Place Main Steam Dumps in Steam Pressure Mode 103 Containment S6.                                                                                    D,S,P            5 Place Containment H2 Analyzer in service 064 EDG S7.                                                                                      D,S            6 Parallel a DG to an energized bus 029 Containment Purge S8.                                                                                      D,S            8 Reinitiate Containment Purge (Performed by ROs Only)
In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 004 CVCS P1.                                                                                      D,E            1 Borate RCS during cooldown outside the control room 103 Containment P2.                                                                                    D,R,E,P          5 Locally close valves for CIS-B 086 Fire Protection P3.                                                                                      D,E            8 Perform Fire Water System makeup to CST NUREG-1021, Revision 9
 
ES-301                              Control Room/In-Plant Systems Outline                            Form ES-301-2
@          All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                        Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                      4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                    9/8/4 (E)mergency or abnormal in-plant                                                      1/1/1 (L)ow-Power / Shutdown                                                                1/1/1 (N)ew or (M)odified from bank including 1(A)                                          2/2/1 (P)revious 2 exams                                                        3 /  3 /  2 (randomly selected)
(R)CA                                                                                1/1/1 (S)imulator NUREG-1021, Revision 9


a new JPM A1b: Conduct of Operations:
ES-301                             Control Room/In-Plant Systems Outline                             Form ES-301-2 Task Summary A. Task is to raise reactor power during a reactor startup, and block the Source Range High Flux trips when P-6 is energized. After Source Range High Flux trips are blocked, the alternate path of this task requires the applicant to trip the reactor due to a rod control failure (Continuous Rod Withdrawal). This is a new JPM.
Calculate blended makeup volume and flow for a makeup to the RWST. The task will require the applicant to determine volume of boric acid required based upon boric acid storage tank concentration, and makeup flow controller settings based upon desired makeup flow. This is a new JPM. A2: Equipment Control:
KA 001 A2.11 (4.4/4.7)
Review a Tagging Order for approval. The SRO applicants will review a tagging order that contains critical errors. The applicants will be required to determine the errors that exist and recommend correction prior to tagging order approval. This is a new JPM.
B. During a Post-LOCA cooldown in ES-1.2, the applicants will be required to isoloate the SI Accumulators.
A3 Radiation Control:
The alternate path of this task is that one accumulator isolation valve will not close, requiring the applicant to vent the component. This is a new JPM.
Determine Stay Time. Given several Radiation Work Permits to choose from, survey maps of an area where work is required, and alarming dosimetry, the RO and SRO applicants will be required to determine their allowed stay time prior to reaching the dosimetry alarm setpoint. This task is modified from a task performed on the 2003 NRC examination A4: Emergency Plan:
KA A4.02 (4.0/3.8)
Upgrade Emergency Classification and make initial PAR. The SRO applicants will be given plant conditions requiring escalation of an emergency classification to a General Area Emergency. The applicants will then make an initial Protective Action Recommendation based upon the existing conditions. This is a new JPM. NUREG-1021, Revision 9 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Callaway  Date of Examination: 8/22/2005 Exam Level (circle one):
C. The applicant will be performing action in ES-0.1 to stabilize plant parameters. The alternate path of this task is to determine that RCS pressure is not responding as required, correctly identify a partially failed open Main Spray valve, trip associated RCPs, and energize pressurizer heaters. This is a new JPM.
RO / SRO(I)
KA 010 A2.02 (3.9/3.9)
Operating Test No.:
D. The applicant will be required to start an RCP. The alternate path of this task is that an RCP will parameter will trend outside of operating limits and require the RCP to be tripped. This is a modified bank JPM.
NRC Control Room Systems
KA 003 A2.02 (3.7/3.9)
@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function S1. 001 Rod Control Raise reactor power and block source range high flux trips N,S,A 1 S2. 006 ECCS Isolate SI Accumulators during Post-LOCA cooldown N,S,A 2 S3. 010 PPCS Respond to a Spray Valve failure N,S,A 3 S4. 003 RCP Start an RCP M,S,A,L 4P S5. 041 Steam Dump Place Main Steam Dumps in Steam Pressure Mode D,S,A,P 4S S6. 103 Containment Place Containment H2 Analyzer in service D,S,P 5 S7. 064 EDG Parallel a DG to an energized bus D,S 6 S8. 029 Containment Purge Reinitiate Containment Purge (Performed by ROs Only)
E. The task is to place Steam Dumps in the Steam Pressure Mode. The alternate path of this task will be that an input failure results in the steam dumps failing open and causing an RCS cooldown, requiring the applicant to close the valves. This is a bank JPM that was performed on the 2004 NRC exam.
D,S 8 In-Plant Systems
KA 041 A4.08 (3.0/3.1)
@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
F. The task is to place the Containment H2 Analyzer in service from the control room. This is a bank JPM that was performed on the 2004 NRC exam.
P1. 004 CVCS Borate RCS during cooldown outside the control room D,E 1 P2. 103 Containment Locally close valves for CIS-B D,R,E,P 5 P3. 086 Fire Protection Perform Fire Water System makeup to CST D,E 8 NUREG-1021, Revision 9 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
KA 028 A4.03 (3.1/3.3)
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
G. The applicant will start and parallel a diesel generator to an energized emergency bus. This is a bank JPM.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank  9 /  8 /  4 (E)mergency or abnormal in-plant  1 /  1 /  1 (L)ow-Power / Shutdown  1 /  1 /  1 (N)ew or (M)odified from bank including 1(A)  2 /  2 /  1 (P)revious 2 exams  3 /  3 /  2 (randomly selected) (R)CA  1 /  1 /  1 (S)imulator NUREG-1021, Revision 9 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Task Summary NUREG-1021, Revision 9 A. Task is to raise reactor power dur ing a reactor startup, and block the Source Range High Flux trips when P-6 is energized. After Source Range High Flux trips are blocked, the alternate path of this task requires the applicant to trip the reactor due to a rod control failure (Continuous Rod Withdrawal). This is a new JPM. KA 001 A2.11 (4.4/4.7)
KA 064 A4.01 (4.0/4.3)
B. During a Post-LOCA cooldown in ES-1.2, the applicants will be required to isoloate the SI Accumulators. The alternate path of this task is that one accumulator isolation valve will not close, requiring the applicant to vent the component. This is a new JPM. KA A4.02 (4.0/3.8)
H. The applicant will reinitiate a containment mini-purge that was stopped earlier. This task is ONLY performed by RO applicants. This is a bank JPM.
C. The applicant will be performing action in ES-0.1 to stabilize plant parameters. The alternate path of this task is to determine that RCS pressure is not responding as required, correctly identify a partially failed open Main Spray valve, trip associated RCPs, and energize pressurizer heaters. This is a new JPM. KA 010 A2.02 (3.9/3.9)
KA 029 A2.03 (2.7/3.1)
D. The applicant will be required to start an RCP. The alternate path of this task is that an RCP will parameter will trend outside of operating limits and require the RCP to be tripped. This is a modified bank JPM. KA 003 A2.02 (3.7/3.9)
I. The applicants will initiate RCS boration during a cooldown outside the control room. This is a bank JPM.
E. The task is to place Steam Dumps in the Steam Pressure Mode. The alternate path of this task will be that an input failure results in the steam dumps failing open and causing an RCS cooldown, requiring the applicant to close the valves. This is a bank JPM that was performed on the 2004 NRC exam. KA 041 A4.08 (3.0/3.1)
KA 004 G2.1.30 (3.9/3.4)
F. The task is to place the Containment H2 Analyzer in service from the control room. This is a bank JPM that was performed on the 2004 NRC exam. KA 028 A4.03 (3.1/3.3)
J. The applicants will locally close valves that should close on Containment Isolation phase B. This is a bank JPM that was performed on the 2004 NRC exam.
G. The applicant will start and parallel a diesel generator to an energized emergency bus. This is a bank JPM. KA 064 A4.01 (4.0/4.3)
KA 103 A2.03 (3.5/3.8)
H. The applicant will reinitiate a containment mini-purge that was stopped earlier. This task is ONLY performed by RO applicants. This is a bank JPM. KA 029 A2.03 (2.7/3.1)
K. The applicants will align the Fire Water system to supply the CST. This is a bank JPM.
I. The applicants will initiate RCS boration during a cooldown outside the control room. This is a bank JPM. KA 004 G2.1.30 (3.9/3.4)
KA 086 G2.1.30 (3.9/3.4)
J. The applicants will locally close valves that should close on Containment Isolation phase B. This is a bank JPM that was performed on the 2004 NRC exam. KA 103 A2.03 (3.5/3.8)
NUREG-1021, Revision 9}}
K. The applicants will align the Fire Water system to supply the CST. This is a bank JPM. KA 086 G2.1.30 (3.9/3.4)}}

Latest revision as of 17:51, 23 November 2019

08-2005-Draft Admin Outline
ML061560079
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/22/2005
From: Gody A
Operations Branch IV
To: Naslund C
Union Electric Co
References
50-483/05-301, ES-301, ES-301-1, NUREG-1021, Rev 9 50-483/05-301
Download: ML061560079 (8)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Callaway Date of Examination: 8/22/2005 Examination Level (circle one): RO Operating Test Number: NRC Administrative Topic Type Describe activity to be performed (see Note) Code*

JPM: Perform a Shutdown Margin Calculation.

Conduct of Operations N,R,S K/A: 2.1.32 (3.4)

Ability to explain and apply all system limits and precautions JPM: Calculate blended makeup volume and flow to Conduct of Operations N,R the RWST.

K/A: 2.1.25 (2.8)

Ability to obtain and interpret station reference materials such as graphs, nomographs, and tables which contain performance data.

JPM: Determine Tagging Boundaries for Equipment Control N, R Containment Spray Pump.

K/A: 2.2.13 (3.6)

Knowledge of tagging and clearance procedures JPM: Determine Stay Time.

Radiation Control M, R K/A: 2.3.2 (2.5)

Knowledge of facility ALARA program Emergency Plan NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room (D)irect from bank ( 3 for ROs; for SROs & RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams ( 1; randomly selected)

(S)imulator Class(R)oom NUREG-1021, Revision 9

ES-301 Administrative Topics Outline Form ES-301-1 TASK

SUMMARY

A1a: Conduct of Operations:

Perform a Shutdown Margin Calculation. The task will require the RO and SRO applicants to perform a Shutdown Margin Calculation for Mode 3 conditions with all rods in. The JPM will be a new JPM A1b: Conduct of Operations:

Calculate blended makeup volume and flow for a makeup to the RWST. The task will require the applicant to determine volume of boric acid required based upon boric acid storage tank concentration, and makeup flow controller settings based upon desired makeup flow. This is a new JPM.

A2: Equipment Control:

Determine Boundaries for Containment Spray Pump. The RO applicants will be required to determine the isolation boundaries for a Containment Spray Pump that will be removed from service. This is a new JPM.

A3 Radiation Control:

Determine Stay Time. Given several Radiation Work Permits to choose from, survey maps of an area where work is required, and alarming dosimetry, the RO and SRO applicants will be required to determine their allowed stay time prior to reaching the dosimetry alarm setpoint.

This task is modified from a task performed on the 2003 NRC examination NUREG-1021, Revision 9

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Callaway Date of Examination: 8/22/2005 Examination Level (circle one): SRO Operating Test Number: NRC Administrative Topic Type Describe activity to be performed (see Note) Code*

JPM: Perform A Shutdown Margin Calculation.

Conduct of Operations N,R,S K/A: 2.1.32 (3.8)

Ability to explain and apply all system limits and precautions JPM: Calculate blended makeup volume and flow to Conduct of Operations N,R the RWST.

K/A: 2.1.25 (3.1)

Ability to obtain and interpret station reference materials such as graphs, nomographs, and tables which contain performance data.

JPM: Review a Tagging Order for approval.

Equipment Control N,R K/A: 2.2.13 (3.8)

Knowledge of tagging and clearance procedures JPM: Determine Stay Time.

Radiation Control M,R K/A: 2.3.2 (2.9)

Knowledge of facility ALARA program JPM: Upgrade Emergency Classification and make Emergency Plan N,R,S initial Protective Action Recommendation K/A: 2.4.44 (4.0)

Knowledge of emergency plan protective action recommendations NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room (D)irect from bank ( 3 for ROs; for SROs & RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams ( 1; randomly selected)

(S)imulator Class(R)oom NUREG-1021, Revision 9

ES-301 Administrative Topics Outline Form ES-301-1 NUREG-1021, Revision 9

ES-301 Administrative Topics Outline Form ES-301-1 TASK

SUMMARY

A1a: Conduct of Operations:

Perform a Shutdown Margin Calculation. The task will require the RO and SRO applicants to perform a Shutdown Margin Calculation for Mode 3 conditions with all rods in. The JPM will be a new JPM A1b: Conduct of Operations:

Calculate blended makeup volume and flow for a makeup to the RWST. The task will require the applicant to determine volume of boric acid required based upon boric acid storage tank concentration, and makeup flow controller settings based upon desired makeup flow. This is a new JPM.

A2: Equipment Control:

Review a Tagging Order for approval. The SRO applicants will review a tagging order that contains critical errors. The applicants will be required to determine the errors that exist and recommend correction prior to tagging order approval. This is a new JPM.

A3 Radiation Control:

Determine Stay Time. Given several Radiation Work Permits to choose from, survey maps of an area where work is required, and alarming dosimetry, the RO and SRO applicants will be required to determine their allowed stay time prior to reaching the dosimetry alarm setpoint.

This task is modified from a task performed on the 2003 NRC examination A4: Emergency Plan:

Upgrade Emergency Classification and make initial PAR. The SRO applicants will be given plant conditions requiring escalation of an emergency classification to a General Area Emergency. The applicants will then make an initial Protective Action Recommendation based upon the existing conditions. This is a new JPM.

NUREG-1021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Callaway Date of Examination: 8/22/2005 Exam Level (circle one): RO / SRO(I) Operating Test No.: NRC Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

Type Code* Safety System / JPM Title Function 001 Rod Control S1. N,S,A 1 Raise reactor power and block source range high flux trips 006 ECCS S2. N,S,A 2 Isolate SI Accumulators during Post-LOCA cooldown 010 PPCS S3. N,S,A 3 Respond to a Spray Valve failure 003 RCP S4. M,S,A,L 4P Start an RCP 041 Steam Dump S5. D,S,A,P 4S Place Main Steam Dumps in Steam Pressure Mode 103 Containment S6. D,S,P 5 Place Containment H2 Analyzer in service 064 EDG S7. D,S 6 Parallel a DG to an energized bus 029 Containment Purge S8. D,S 8 Reinitiate Containment Purge (Performed by ROs Only)

In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 004 CVCS P1. D,E 1 Borate RCS during cooldown outside the control room 103 Containment P2. D,R,E,P 5 Locally close valves for CIS-B 086 Fire Protection P3. D,E 8 Perform Fire Water System makeup to CST NUREG-1021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator NUREG-1021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Task Summary A. Task is to raise reactor power during a reactor startup, and block the Source Range High Flux trips when P-6 is energized. After Source Range High Flux trips are blocked, the alternate path of this task requires the applicant to trip the reactor due to a rod control failure (Continuous Rod Withdrawal). This is a new JPM.

KA 001 A2.11 (4.4/4.7)

B. During a Post-LOCA cooldown in ES-1.2, the applicants will be required to isoloate the SI Accumulators.

The alternate path of this task is that one accumulator isolation valve will not close, requiring the applicant to vent the component. This is a new JPM.

KA A4.02 (4.0/3.8)

C. The applicant will be performing action in ES-0.1 to stabilize plant parameters. The alternate path of this task is to determine that RCS pressure is not responding as required, correctly identify a partially failed open Main Spray valve, trip associated RCPs, and energize pressurizer heaters. This is a new JPM.

KA 010 A2.02 (3.9/3.9)

D. The applicant will be required to start an RCP. The alternate path of this task is that an RCP will parameter will trend outside of operating limits and require the RCP to be tripped. This is a modified bank JPM.

KA 003 A2.02 (3.7/3.9)

E. The task is to place Steam Dumps in the Steam Pressure Mode. The alternate path of this task will be that an input failure results in the steam dumps failing open and causing an RCS cooldown, requiring the applicant to close the valves. This is a bank JPM that was performed on the 2004 NRC exam.

KA 041 A4.08 (3.0/3.1)

F. The task is to place the Containment H2 Analyzer in service from the control room. This is a bank JPM that was performed on the 2004 NRC exam.

KA 028 A4.03 (3.1/3.3)

G. The applicant will start and parallel a diesel generator to an energized emergency bus. This is a bank JPM.

KA 064 A4.01 (4.0/4.3)

H. The applicant will reinitiate a containment mini-purge that was stopped earlier. This task is ONLY performed by RO applicants. This is a bank JPM.

KA 029 A2.03 (2.7/3.1)

I. The applicants will initiate RCS boration during a cooldown outside the control room. This is a bank JPM.

KA 004 G2.1.30 (3.9/3.4)

J. The applicants will locally close valves that should close on Containment Isolation phase B. This is a bank JPM that was performed on the 2004 NRC exam.

KA 103 A2.03 (3.5/3.8)

K. The applicants will align the Fire Water system to supply the CST. This is a bank JPM.

KA 086 G2.1.30 (3.9/3.4)

NUREG-1021, Revision 9