NLS2006056, Revision to Cooper Safeguards Plan: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:H Nebraska Public Power District Always there when you need us NLS2006056 June 22, 2006 U.S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:H Nebraska Public Power District Always there when you need us NLS2006056 June 22, 2006 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-000 1
Document Control Desk Washington, D.C. 20555-000 1  


==Subject:==
==Subject:==
Revision to the Cooper Nuclear Station Safeguards Plan Cooper Nuclear Station, NRC Docket 50-298, DPR-46 The purpose of this letter is to transmit revised pages of the Cooper Nuclear Station Safeguards Plan in accordance with the provisions of 10 CFR 50.54(p).
Revision to the Cooper Nuclear Station Safeguards Plan Cooper Nuclear Station, NRC Docket 50-298, DPR-46 The purpose of this letter is to transmit revised pages of the Cooper Nuclear Station Safeguards Plan in accordance with the provisions of 10 CFR 50.54(p). Attachment A provides a summary of the changes, none of which represent a reduction of effectiveness. Attachment B is the filing instructions for the revised pages. This plan change does not include any pages that are Safeguards.
Attachment A provides a summary of the changes, none of which represent a reduction of effectiveness.
Attachment B is the filing instructions for the revised pages. This plan change does not include any pages that are Safeguards.
If you have any questions regarding this submittal, please contact Jerry Bcbb, Security Manager, at 402-825-5244.
If you have any questions regarding this submittal, please contact Jerry Bcbb, Security Manager, at 402-825-5244.
Sincerely, Pauiýlming Licensing Manager/cb Attachments/Enclosure cc: Regional Administrator with attachments/enclosure USNRC -Region IV NPG Distribution w/o attachments/enclosure CNS Records w/o attachments/enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone:
Sincerely, Pauiýlming Licensing Manager
(402) 825-3811 / Fax: (402) 825-5211 www.nppd.com NLS2006056 Attachment A Page 1 of I NEBRASKA PUBLIC POWER DISTRICT SAFEGUARDS PLAN COOPER NUCLEAR STATION June 16, 2006 Revision These changes implement the EOF relocation.
/cb Attachments/Enclosure cc:       Regional Administrator with attachments/enclosure USNRC - Region IV NPG Distribution w/o attachments/enclosure CNS Records w/o attachments/enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
TABLE OF CHANGES PAGE DESCRIPTION/REASON FOR CHANGE List of Effective Updated pages 1, 2, page 35.Pages 35 Changed due to relocation of EOF on 6/16/2006.
 
NLS2006056 Attachment B Page 1 of 1 FILING INSTRUCTIONS CNS SAFEGUARDS PLAN June 16, 2006 Changes implementing the relocation of the EOF on June 16, 2006.REMOVE INSERT List of Effective Pages dated 5/10/06 List of Effective Pages dated 6/16/06 Page 35 dated 9/30/05 Page 35 dated 6/16/06 I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© Correspondence Number: NLS2006056 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document.
NLS2006056 Attachment A Page 1 of I NEBRASKA PUBLIC POWER DISTRICT SAFEGUARDS PLAN COOPER NUCLEAR STATION June 16, 2006 Revision These changes implement the EOF relocation.
Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments.
TABLE OF CHANGES PAGE                         DESCRIPTION/REASON FOR CHANGE List of Effective   Updated pages 1, 2, page 35.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
Pages 35                   Changed due to relocation of EOF on 6/16/2006.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None I t I +I +I +PROCEDURE 0.42 REVISION 19 PAGE 20 OF 27 NLS2006056 Enclosure Page 1 of 4 ENCLOSURE Revised Pages of the Cooper Nuclear Station Safeguards Plan List of Effective Pages CNS Safeguards Plan Paie ii III°, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Effective DatE 10/12/05 10/12/05 10/12/05 5/10/06 10/29/04 2/20/05 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 2/20/05 9/30/05 9/30/05 9/30/05 10/29/04 10/29/04 10/29/04 10/12/05 10/12/05 10/12/05 10/12/05 10/12/05 10/12/05 10/29/04 6/16/06 10/29/04 10/29/04 10/29/04 10/29/04 9/30/05 10/29/04 10/29/04 10/29/04 Page B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-13 B-14 B-15 Effective Date 10/29/04 10/29/04 10/29/04 2/20/05 2/20/05 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 2/20/05 2/20/05 2/20/05 2/20/05 C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 C-9 C-10 C-Il C-12 C-13 C-14 C-15 C-16 C-17 C-18 C-19 C-20 C-21 C-22 C-23 C-24 C-25 C-26 C-27 C-28 C-29 C-30 C-31 C-32 C-33 C-34 5/10/06 2/20/05 5/10/06 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29104 10/29/04 10/29/04 10/29/04 10/29/04 5/10/06 2/20/05 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 10/29/04 2/20/05 10/29/04 A-1 A-2 A-3 A-4 A-5 A-6 A-7 B-1 1 06/16/06 I List of Effective Pages CNS Safeguards Plan Page C-35 C-36 C-37 C-38 C-39 C-40 C-41 C-42 C-43 Effective Date 10/29/04 10/29/04 9/30/05 2/9/06 2/9/06 2/9/06 9/30/05 2/9/06 9130/05 Page Effective Date 2 06/16/06 1}}
 
NLS2006056 Attachment B Page 1 of 1 FILING INSTRUCTIONS CNS SAFEGUARDS PLAN June 16, 2006 Changes implementing the relocation of the EOF on June 16, 2006.
REMOVE                                           INSERT List of Effective Pages dated 5/10/06           List of Effective Pages dated 6/16/06 Page 35 dated 9/30/05                           Page 35 dated 6/16/06
 
I   ATTACHMENT 3           LIST OF REGULATORY COMMITMENTS© Correspondence Number: NLS2006056 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT       COMMITTED DATE COMMITMENT                         NUMBER             OR OUTAGE None I                 t I                 +
I                 +
I                 +
PROCEDURE 0.42                       REVISION 19           PAGE 20 OF 27
 
NLS2006056 Enclosure Page 1 of 4 ENCLOSURE Revised Pages of the Cooper Nuclear Station Safeguards Plan
 
List of Effective Pages CNS Safeguards Plan Paie Effective DatE         Page  Effective Date ii      10/12/05             B-2        10/29/04 10/12/05             B-3        10/29/04 III°,  10/12/05            B-4        10/29/04 B-5          2/20/05 1        5/10/06            B-6          2/20/05 2      10/29/04             B-7        10/29/04 3        2/20/05            B-8        10/29/04 4      10/29/04             B-9        10/29/04 5      10/29/04             B-10       10/29/04 6      10/29/04             B-11        10/29/04 7      10/29/04             B-12        2/20/05 8      10/29/04             B-13        2/20/05 9      10/29/04             B-14        2/20/05 10      10/29/04            B-15        2/20/05 11      10/29/04 12      10/29/04             C-1          5/10/06 13      10/29/04             C-2          2/20/05 14      10/29/04            C-3          5/10/06 15      10/29/04            C-4        10/29/04 16     10/29/04             C-5        10/29/04 17      10/29/04             C-6        10/29/04 18      10/29/04             C-7        10/29/04 19      10/29/04             C-8         10/29/04 20      10/29/04             C-9        10/29/04 21        2/20/05           C-10        10/29/04 22        9/30/05            C-Il        10/29104 23        9/30/05           C-12        10/29/04 24        9/30/05            C-13        10/29/04 25      10/29/04             C-14        10/29/04 26      10/29/04             C-15        10/29/04 27      10/29/04            C-16        5/10/06 28      10/12/05             C-17         2/20/05 29      10/12/05            C-18        10/29/04 30      10/12/05            C-19        10/29/04 31      10/12/05            C-20        10/29/04 32      10/12/05            C-21        10/29/04 33      10/12/05            C-22        10/29/04 34      10/29/04             C-23        10/29/04 35        6/16/06           C-24        10/29/04 C-25        10/29/04 A-1    10/29/04             C-26        10/29/04 A-2    10/29/04             C-27        10/29/04 A-3    10/29/04             C-28        10/29/04 A-4    10/29/04             C-29        10/29/04 A-5      9/30/05            C-30        10/29/04 A-6    10/29/04             C-31        10/29/04 A-7    10/29/04             C-32        10/29/04 C-33        2/20/05 B-1    10/29/04             C-34        10/29/04 1                 06/16/06 I
 
List of Effective Pages CNS Safeguards Plan Page Effective Date        Page  Effective Date C-35     10/29/04 C-36      10/29/04 C-37        9/30/05 C-38        2/9/06 C-39        2/9/06 C-40        2/9/06 C-41        9/30/05 C-42        2/9/06 C-43        9130/05 2               06/16/06 1}}

Latest revision as of 16:34, 23 November 2019

Revision to Cooper Safeguards Plan
ML061870500
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/22/2006
From: Fleming P
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2006056
Download: ML061870500 (7)


Text

H Nebraska Public Power District Always there when you need us NLS2006056 June 22, 2006 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-000 1

Subject:

Revision to the Cooper Nuclear Station Safeguards Plan Cooper Nuclear Station, NRC Docket 50-298, DPR-46 The purpose of this letter is to transmit revised pages of the Cooper Nuclear Station Safeguards Plan in accordance with the provisions of 10 CFR 50.54(p). Attachment A provides a summary of the changes, none of which represent a reduction of effectiveness. Attachment B is the filing instructions for the revised pages. This plan change does not include any pages that are Safeguards.

If you have any questions regarding this submittal, please contact Jerry Bcbb, Security Manager, at 402-825-5244.

Sincerely, Pauiýlming Licensing Manager

/cb Attachments/Enclosure cc: Regional Administrator with attachments/enclosure USNRC - Region IV NPG Distribution w/o attachments/enclosure CNS Records w/o attachments/enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

NLS2006056 Attachment A Page 1 of I NEBRASKA PUBLIC POWER DISTRICT SAFEGUARDS PLAN COOPER NUCLEAR STATION June 16, 2006 Revision These changes implement the EOF relocation.

TABLE OF CHANGES PAGE DESCRIPTION/REASON FOR CHANGE List of Effective Updated pages 1, 2, page 35.

Pages 35 Changed due to relocation of EOF on 6/16/2006.

NLS2006056 Attachment B Page 1 of 1 FILING INSTRUCTIONS CNS SAFEGUARDS PLAN June 16, 2006 Changes implementing the relocation of the EOF on June 16, 2006.

REMOVE INSERT List of Effective Pages dated 5/10/06 List of Effective Pages dated 6/16/06 Page 35 dated 9/30/05 Page 35 dated 6/16/06

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© Correspondence Number: NLS2006056 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None I t I +

I +

I +

PROCEDURE 0.42 REVISION 19 PAGE 20 OF 27

NLS2006056 Enclosure Page 1 of 4 ENCLOSURE Revised Pages of the Cooper Nuclear Station Safeguards Plan

List of Effective Pages CNS Safeguards Plan Paie Effective DatE Page Effective Date ii 10/12/05 B-2 10/29/04 10/12/05 B-3 10/29/04 III°, 10/12/05 B-4 10/29/04 B-5 2/20/05 1 5/10/06 B-6 2/20/05 2 10/29/04 B-7 10/29/04 3 2/20/05 B-8 10/29/04 4 10/29/04 B-9 10/29/04 5 10/29/04 B-10 10/29/04 6 10/29/04 B-11 10/29/04 7 10/29/04 B-12 2/20/05 8 10/29/04 B-13 2/20/05 9 10/29/04 B-14 2/20/05 10 10/29/04 B-15 2/20/05 11 10/29/04 12 10/29/04 C-1 5/10/06 13 10/29/04 C-2 2/20/05 14 10/29/04 C-3 5/10/06 15 10/29/04 C-4 10/29/04 16 10/29/04 C-5 10/29/04 17 10/29/04 C-6 10/29/04 18 10/29/04 C-7 10/29/04 19 10/29/04 C-8 10/29/04 20 10/29/04 C-9 10/29/04 21 2/20/05 C-10 10/29/04 22 9/30/05 C-Il 10/29104 23 9/30/05 C-12 10/29/04 24 9/30/05 C-13 10/29/04 25 10/29/04 C-14 10/29/04 26 10/29/04 C-15 10/29/04 27 10/29/04 C-16 5/10/06 28 10/12/05 C-17 2/20/05 29 10/12/05 C-18 10/29/04 30 10/12/05 C-19 10/29/04 31 10/12/05 C-20 10/29/04 32 10/12/05 C-21 10/29/04 33 10/12/05 C-22 10/29/04 34 10/29/04 C-23 10/29/04 35 6/16/06 C-24 10/29/04 C-25 10/29/04 A-1 10/29/04 C-26 10/29/04 A-2 10/29/04 C-27 10/29/04 A-3 10/29/04 C-28 10/29/04 A-4 10/29/04 C-29 10/29/04 A-5 9/30/05 C-30 10/29/04 A-6 10/29/04 C-31 10/29/04 A-7 10/29/04 C-32 10/29/04 C-33 2/20/05 B-1 10/29/04 C-34 10/29/04 1 06/16/06 I

List of Effective Pages CNS Safeguards Plan Page Effective Date Page Effective Date C-35 10/29/04 C-36 10/29/04 C-37 9/30/05 C-38 2/9/06 C-39 2/9/06 C-40 2/9/06 C-41 9/30/05 C-42 2/9/06 C-43 9130/05 2 06/16/06 1