ML062920034: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/27/2006
| issue date = 10/27/2006
| title = 2006/10/27-Summary of Telephone Conference Call on September 25, 2006, Between the U.S. Nuclear Regulatory Commission & Entergy Nuclear Operations, Inc.,Concerning Information Pertaining to Vermont Yankee Nuclear Power Station License Renew
| title = 2006/10/27-Summary of Telephone Conference Call on September 25, 2006, Between the U.S. Nuclear Regulatory Commission & Entergy Nuclear Operations, Inc.,Concerning Information Pertaining to Vermont Yankee Nuclear Power Station License Renew
| author name = Rowley J G
| author name = Rowley J
| author affiliation = NRC/NRR/ADRO/DLR
| author affiliation = NRC/NRR/ADRO/DLR
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:October 27, 2006LICENSEE:Entergy Nuclear Operations, Inc.FACILITY:Vermont Yankee Nuclear Power Station
{{#Wiki_filter:October 27, 2006 LICENSEE:       Entergy Nuclear Operations, Inc.
FACILITY:       Vermont Yankee Nuclear Power Station


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 25, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONThe U.S. Nuclear Regulatory Commission staff (the staff) and representatives of EntergyNuclear Operations, Inc., (ENO) held a telephone conference call on September 25, 2006, to discuss and clarify the staff's requests for additional information (RAIs) concerning the Vermont Yankee Nuclear Station (VYNPS) license renewal application (LRA). The conference call was useful in clarifying the staff's questions.Enclosure 1 provides a listing of the conference call participants. Enclosure 2 contains a listingof the issues discussed with the applicant, including a brief discussion of the items' status.The applicant had an opportunity to comment on this summary./RA/Jonathan Rowley, Project ManagerLicense Renewal Branch B Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-271
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 25, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., (ENO) held a telephone conference call on September 25, 2006, to discuss and clarify the staffs requests for additional information (RAIs) concerning the Vermont Yankee Nuclear Station (VYNPS) license renewal application (LRA). The conference call was useful in clarifying the staffs questions. provides a listing of the conference call participants. Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief discussion of the items status.
The applicant had an opportunity to comment on this summary.
                                                      /RA/
Jonathan Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271


==Enclosures:==
==Enclosures:==
As statedcc w/encls:  See next page


ML062920034OFFICEPM:RLRBLA:RLRBBC:RLRBNAMEJRowleyI. King              JZimmerman DATE10/25/0610/27/0610/27/06 Vermont Yankee Nuclear Power Station cc:
As stated cc w/encls: See next page
Regional Administrator, Region IU. S. Nuclear Regulatory Commission


475 Allendale Road King of Prussia, PA  19406-1415Mr. David R. LewisPillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W.
ML062920034 OFFICE      PM:RLRB                LA:RLRB                  BC:RLRB NAME        JRowley                I. King                 JZimmerman DATE        10/25/06                10/27/06                10/27/06
Washington, DC  20037-1128Mr. David O'Brien, CommissionerVermont Department of Public Service 112 State Street Montpelier, VT  05620-2601Mr. James Volz, ChairmanPublic Service Board State of Vermont 112  State Street Montpelier, VT  05620-2701Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT  05354-0116Operating Experience CoordinatorVermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT  05354G. Dana Bisbee, Esq.Deputy Attorney General 33 Capitol Street Concord, NH  03301-6937Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA  02108Ms. Carla A. White, RRPT, CHPRadiological Health Vermont Department of Health P.O. Box 70, Drawer #43 108 Cherry Street Burlington, VT 05402-0070Mr. James M. DeVincentisManager, Licensing Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500Resident InspectorVermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354Director, Massachusetts Emergency   Management Agency ATTN: James Muckerheide 400 Worcester Rd.
 
Framingham, MA 01702-5399Jonathan M. Block, Esq.Main Street P.O. Box 566 Putney, VT 05346-0566Mr. John F. McCannDirector, Licensing Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station cc:
440 Hamilton Avenue White Plains, NY 10601Mr. Gary J. TaylorChief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Vermont Yankee Nuclear Power Station   cc:
Regional Administrator, Region I        Ms. Carla A. White, RRPT, CHP U. S. Nuclear Regulatory Commission    Radiological Health 475 Allendale Road                      Vermont Department of Health King of Prussia, PA 19406-1415          P.O. Box 70, Drawer #43 108 Cherry Street Mr. David R. Lewis                      Burlington, VT 05402-0070 Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W.                    Mr. James M. DeVincentis Washington, DC 20037-1128              Manager, Licensing Vermont Yankee Nuclear Power Station Mr. David OBrien, Commissioner        P.O. Box 0500 Vermont Department of Public Service    185 Old Ferry Road 112 State Street                        Brattleboro, VT 05302-0500 Montpelier, VT 05620-2601 Resident Inspector Mr. James Volz, Chairman                Vermont Yankee Nuclear Power Station Public Service Board                    U. S. Nuclear Regulatory Commission State of Vermont                        P.O. Box 176 112 State Street                        Vernon, VT 05354 Montpelier, VT 05620-2701 Director, Massachusetts Emergency Chairman, Board of Selectmen            Management Agency Town of Vernon                          ATTN: James Muckerheide P.O. Box 116                            400 Worcester Rd.
Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
Vernon, VT 05354-0116                  Framingham, MA 01702-5399 Operating Experience Coordinator        Jonathan M. Block, Esq.
440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station    Main Street 320 Governor Hunt Road                  P.O. Box 566 Vernon, VT 05354                        Putney, VT 05346-0566 G. Dana Bisbee, Esq.                    Mr. John F. McCann Deputy Attorney General                Director, Licensing 33 Capitol Street                      Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwartzVice President, Operations Support Entergy Nuclear Operations, Inc.
Concord, NH 03301-6937                  440 Hamilton Avenue White Plains, NY 10601 Chief, Safety Unit Office of the Attorney General          Mr. Gary J. Taylor One Ashburton Place, 19th Floor        Chief Executive Officer Boston, MA 02108                        Entergy Operations 1340 Echelon Parkway Jackson, MS 39213
440 Hamilton Avenue White Plains, NY 10601Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.
 
440 Hamilton Avenue White Plains, NY 10601Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station cc:
440 Hamilton Avenue White Plains, NY 10601Mr. Theodore SullivanSite Vice President Entergy Nuclear Operations, Inc.
Mr. John T. Herron Sr. VP and Chief Operating Officer       Ms. Stacey M. Lousteau Entergy Nuclear Operations, Inc.         Treasury Department 440 Hamilton Avenue                     Entergy Services, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT  05302-0500Mr. James H. Sniezek5486 Nithsdale Drive Salisbury, MD  21801Mr. Garrett D. Edwards814 Waverly Road Kennett Square, PA  19348Ms. Stacey M. LousteauTreasury Department Entergy Services, Inc.
White Plains, NY 10601                  639 Loyola Avenue New Orleans, LA 70113 Mr. Oscar Limpias Vice President, Engineering             Mr. Norman L. Rademacher Entergy Nuclear Operations, Inc.         Director, NSA 440 Hamilton Avenue                     Vermont Yankee Nuclear Power Station White Plains, NY 10601                  P.O. Box 0500 185 Old Ferry Road Mr. Christopher Schwartz                Brattleboro, VT 05302-0500 Vice President, Operations Support Entergy Nuclear Operations, Inc.         Mr. Raymond Shadis 440 Hamilton Avenue                     New England Coalition White Plains, NY 10601                  Post Office Box 98 Edgecomb, ME 04556 Mr. Michael J. Colomb Director of Oversight                   Mr. James P. Matteau Entergy Nuclear Operations, Inc.         Executive Director 440 Hamilton Avenue                     Windham Regional Commission White Plains, NY 10601                  139 Main Street, Suite 505 Brattleboro, VT 05301 Mr. Travis C. McCullough Assistant General Counsel               Mr. William K. Sherman Entergy Nuclear Operations, Inc.         Vermont Department of Public Service 440 Hamilton Avenue                     112 State Street White Plains, NY 10601                  Drawer 20 Montpelier, VT 05620-2601 Mr. Theodore Sullivan Site Vice President                     Mr. Michael D. Lyster Entergy Nuclear Operations, Inc.         5931 Barclay Lane Vermont Yankee Nuclear Power Station     Naples, FL 34110-7306 P.O. Box 0500 185 Old Ferry Road                       Ms. Charlene D. Faison Brattleboro, VT 05302-0500              Manager, Licensing 440 Hamilton Avenue Mr. James H. Sniezek                    White Plains, NY 10601 5486 Nithsdale Drive Salisbury, MD 21801                      Mr. James Ross Nuclear Energy Institute Mr. Garrett D. Edwards                  1776 I Street, NW, Suite 400 814 Waverly Road                        Washington, DC 20006-3708 Kennett Square, PA 19348
639 Loyola Avenue New Orleans, LA  70113Mr. Norman L. RademacherDirector, NSA Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500Mr. Raymond ShadisNew England Coalition Post Office Box 98 Edgecomb, ME  04556Mr. James P. MatteauExecutive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT  05301Mr. William K. ShermanVermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT  05620-2601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL  34110-7306Ms. Charlene D. FaisonManager, Licensing 440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Vermont Yankee Nuclear Power Station     cc:
 
Diane Curran, Esq.Harmon, Curran, Spielberg &
Vermont Yankee Nuclear Power Station cc:
Eisenberg, L.L.P 1726 M Street, NW, Suite 600 Washington, DC   20036 Note to Entergy Nuclear Operations, Inc., from Jonathan Rowley dated October 27, 2006
Diane Curran, Esq.
Harmon, Curran, Spielberg &
Eisenberg, L.L.P 1726 M Street, NW, Suite 600 Washington, DC 20036
 
Note to Entergy Nuclear Operations, Inc., from Jonathan Rowley dated October 27, 2006


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 25, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONHARD COPYDLR R/FJRowleyE-MAIL: JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 25, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION HARD COPY DLR R/F JRowley E-MAIL:
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva
JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes
--------------
JRowley RLaufer JShea CAnderson, RI RPowell, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MYoung RidsOpaMail
 
LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 25, 2006 Participants                    Affiliations Jonathan Rowley                U.S. Nuclear Regulatory Commission (NRC)
Lambros Lois                    NRC Ganesh Cheruvenki              NRC Naeem Iqbal                    NRC Andy Taylor                    Entergy Nuclear Operations, Inc. (ENO)
Lori Potts                      ENO Dave King                      ENO Ron Finnin                      ENO Larry Luckins                  ENO Enclosure 1
 
VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 25, 2006 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on September 25, 2006, to discuss and clarify the staffs requests for additional information (RAIs) and other issues concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA). The following issues were discussed during the telephone conference call:
RAI 2.3.3.8-1 License renewal application (LRA) drawing LRA-G-191163-SH-01-0, Fire Protection System Inner Loop, shows the yard fire hydrants as out of scope (i.e., not colored in purple). Verify whether the yard fire hydrants are in scope of license renewal in accordance with Title 10 Code of Federal Regulations Part 54.4(a) (10 CFR 54.4(a)) and subject to an aging management review (AMR) in accordance with 10 CFR 54.21(a)(1). If they are excluded from the scope of license renewal and not subject to an AMR, please provide justification for the exclusion.
Discussion: The staff found the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI incomplete. The staff reiterated its position that yard fire hydrants require an AMR and asked for additional information. The applicant will provide a supplemental response to this concern in a future letter to the NRC.
RAI B.1.2-1 The applicant states that the Control Rod Drive (CRD) return line nozzle has been capped at VYNPS. The staff requests that the applicant provide the following information regarding the cap and the weld.
(1)    Describe the configuration, location and material of construction of the capped nozzle.
This should include the existing base material for the nozzle, piping (if piping remnants exist) and cap material, and any welds.
(2)    Describe how the aging effects for this weld and the cap are managed in accordance with the guidelines of BWRVIP-75, BWR Vessel and Internals Project (BWRVIP),
Technical Basis for Revisions to Generic Letter 88-01 Inspection Schedule.
(3)    Discuss whether the event at Pilgrim (leaking weld at capped nozzle, September 30, 2003) is applicable to VYNPS. The staff issued Information Notice 2004-08, Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds, dated April 22, 2004, which states that the cracking occurred in an Alloy 182 weld that was previously repaired extensively. Discuss experience with previous leakage at the VYNPS capped nozzle, if any. Include in your discussion the past inspection techniques applied, the results obtained, and mitigative strategies imposed.
Enclosure 2


RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes
Provide information as to how the plant-specific experience related to this aging effect impacts the attributes specified in AMP B.1.2, BWR CRD Return line Nozzles.
Discussion: The staff required clarification of the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI. The applicant clarified that BWRVIP-75 would be followed at VYNPS in the period of extended operation.
RAI B.1.2-2 Section 4 of the Generic Aging Lessens Learned Report (GALL) AMP XI.M6, BWR Control Rod Drive (CRD) Return Line Nozzle, recommends that the aging degradation in the CRD return line nozzles should be monitored per the inspection recommendations specified in NUREG-0619, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking.
Section 8.2(2) of NUREG-0619 recommends that ultrasonic testing (UT) should be performed on the welded connection joining the rerouted CRD return line to the system which then returns the flow to the reactor vessel during each refueling outage.
In a letter dated January 15, 1982, the applicant made a commitment to the staff indicating that it will perform UT examination of the CRD to the reactor water cleanup (RWCU) weld joint as discussed in NUREG-0619 for three consecutive refuel outages. The applicant further stated that upon the completion of these inspections, the inspection frquency will be reassessed based on the inspection results. In AMP B.1.2, BWR CRD Return Line Nozzle, the applicant stated that it inspected the CRD return line to the RWCU weld joint using UT methods for three consecutive refuel outages and found no indications. Since no indications were found, the applicant intends to take exception to GALL AMP XI.M6, in which the applicant proposes not to inspect the aforementioned weld joint during the extended period of operation. The staff determined that the following information regarding the subject weld is required to complete its review.
(1)      The applicant should provide technical justification for not performing the UT examination of the subject weld as recommended by the GALL AMP XI.M6 and NUREG-0619 during the extended period of operation.
(2)      The applicant should confirm that the CRD return lines that are connected to RWCU piping system that fall under the jurisdiction of the ASME Code, Section XI boundary will be inspected per the ASME Section XI Code.
Discussion: The staff required clarification of the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI. The applicant provided the necessary clarification.
RAI 4.2-1 In Section 4.2.1 of the VYNPS LRA it is stated that ...the reactor fluence ....has been projected to the end of the period of extended operation. In Sections 4.2.1 and 4.2.2 of the LRA there is no discussion of how this extrapolation was performed. Vermont Yankee has been approved for operation at an extended power uprate. In general, power uprates are based on revised axial power profiles with higher axial peaks at a lower axial location. Therefore, extrapolation of the existing axial profile may not provide an accurate projection.


--------------
In view of the above, please respond to the following:
JRowley RLaufer JShea CAnderson, RI RPowell, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MYoung RidsOpaMail  LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALLTO DISCUSS THE VERMONT YANKEE NUCLEAR POWER STATIONLICENSE RENEWAL APPLICATIONSeptember 25, 2006Participants                                      AffiliationsJonathan RowleyU.S. Nuclear Regulatory Commission (NRC)Lambros LoisNRC Ganesh CheruvenkiNRC Naeem IqbalNRC Andy TaylorEntergy Nuclear Operations, Inc. (ENO)
(1)     Compare the axial power profiles (at the peak power azimuthal location) and confirm that the extrapolation remains valid.
Lori PottsENO Dave KingENO Ron FinninENO Larry LuckinsENO  VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONSeptember 25, 2006The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of EntergyNuclear Operations, Inc., held a telephone conference call on September 25, 2006, to discuss and clarify the staff's requests for additional information (RAIs) and other issues concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA). The following issues were discussed during the telephone conference call:RAI 2.3.3.8-1License renewal application (LRA) drawing LRA-G-191163-SH-01-0, "Fire Protection SystemInner Loop," shows the yard fire hydrants as out of scope (i.e., not colored in purple). Verify whether the yard fire hydrants are in scope of license renewal in accordance with Title 10 Codeof Federal Regulations Part 54.4(a) (10 CFR 54.4(a)) and subject to an aging managementreview (AMR) in accordance with 10 CFR 54.21(a)(1). If they are excluded from the scope of license renewal and not subject to an AMR, please provide justification for the exclusion.Discussion:  The staff found the applicant's response in their September 20, 2006, letter(License Renewal Application, Amendment 14) to this RAI incomplete. The staff reiterated itsposition that yard fire hydrants require an AMR and asked for additional information. The applicant will provide a supplemental response to this concern in a future letter to the NRC.RAI B.1.2-1The applicant states that the Control Rod Drive (CRD) return line nozzle has been capped atVYNPS. The staff requests that the applicant provide the following information regarding the cap and the weld.(1)Describe the configuration, location and material of construction of the capped nozzle. This should include the existing base material for the nozzle, piping (if piping remnants exist) and cap material, and any welds. (2)Describe how the aging effects for this weld and the cap are managed in accordancewith the guidelines of BWRVIP-75, "BWR Vessel and Internals Project (BWRVIP),
(2)     Confirm that the projected operating plan will support the assumed axial power profile to the end of the period of extended operation.
Technical Basis for Revisions to Generic Letter 88-01 Inspection Schedule." (3)Discuss whether the event at Pilgrim (leaking weld at capped nozzle, September 30, 2003)is applicable to VYNPS. The staff issued Information Notice 2004-08, "Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds," dated April 22, 2004, which states that the cracking occurred in an Alloy 182 weld that was previously repaired extensively. Discuss experience with previous leakage at the VYNPS capped nozzle, if any. Include in your discussion the past inspection techniques applied, the results obtained, and mitigative strategies imposed. Provide information as to how the plant-specific experience related to this aging effectimpacts the attributes specified in AMP B.1.2, "BWR CRD Return line Nozzles."Discussion:  The staff required clarification of the applicant's response in their September 20,2006, letter (License Renewal Application, Amendment 14) to this RAI. The applicant clarifiedthat BWRVIP-75 would be followed at VYNPS in the period of extended operation.RAI B.1.2-2Section 4 of the Generic Aging Lessens Learned Report (GALL) AMP XI.M6, "BWR ControlRod Drive (CRD) Return Line Nozzle," recommends that the aging degradation in the CRD return line nozzles should be monitored per the inspection recommendations specified in NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking."
Discussion: The staff found the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI incomplete. The staff requested clarification on whether the applicant had accounted for the shift in axial power profile due to the power uprate when performing the extrapolation. The applicant agreed to provide the staff the GE-NE-0000-2342-R1-NP report mentioned in the response. The staff will review the report to verify the values provided in the response.
Section 8.2(2) of NUREG-0619 recommends that ultrasonic testing (UT) should be performed on the welded connection joining the rerouted CRD return line to the system which then returns the flow to the reactor vessel during each refueling outage. In a letter dated January 15, 1982, the applicant made a commitment to the staff indicating thatit will perform UT examination of the CRD to the reactor water cleanup (RWCU) weld joint as discussed in NUREG-0619 for three consecutive refuel outages. The applicant further stated that upon the completion of these inspections, the inspection frquency will be reassessed based on the inspection results. In AMP B.1.2, "BWR CRD Return Line Nozzle," the applicant stated that it inspected the CRD return line to the RWCU weld joint using UT methods for three consecutive refuel outages and found no indications. Since no indications were found, the applicant intends to take exception to GALL AMP XI.M6, in which the applicant proposes not to inspect the aforementioned weld joint during the extended period of operation. The staff determined that the following information regarding the subject weld is required to complete its review.(1) The applicant should provide technical justification for not performing the UTexamination of the subject weld as recommended by the GALL AMP XI.M6 and NUREG-0619 during the extended period of operation.  (2) The applicant should confirm that the CRD return lines that are connected to RWCUpiping system that fall under the jurisdiction of the ASME Code, Section XI boundary will be inspected per the ASME Section XI Code.Discussion:  The staff required clarification of the applicant's response in their September 20,2006, letter (License Renewal Application, Amendment 14) to this RAI. The applicant providedthe necessary clarification.RAI 4.2-1In Section 4.2.1 of the VYNPS LRA it is stated that "...the reactor fl uence ....has been projectedto the end of the period of extended operation."  In Sections 4.2.1 and 4.2.2 of the LRA there is no discussion of how this extrapolation was performed. Vermont Yankee has been approved for operation at an extended power uprate. In general, power uprates are based on revised axial power profiles with higher axial peaks at a lower axial location. Therefore, extrapolation of the existing axial profile may not provide an accurate projection. In view of the above, please respond to the following:(1)Compare the axial power profiles (at the peak power azimuthal location) and confirmthat the extrapolation remains valid.(2)Confirm that the projected operating plan will support the assumed axial power profile tothe end of the period of extended operation.Discussion: The staff found the applicant's response in their September 20, 2006, letter(License Renewal Application, Amendment 14) to this RAI incomplete. The staff requestedclarification on whether the applicant had accounted for the shift in axial power profile due to the power uprate when performing the extrapolation. The applicant agreed to provide the staff the GE-NE-0000-2342-R1-NP report mentioned in the response. The staff will review the report to verify the values provided in the response.}}
                                                }}

Latest revision as of 14:01, 23 November 2019

2006/10/27-Summary of Telephone Conference Call on September 25, 2006, Between the U.S. Nuclear Regulatory Commission & Entergy Nuclear Operations, Inc.,Concerning Information Pertaining to Vermont Yankee Nuclear Power Station License Renew
ML062920034
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/27/2006
From: Rowley J
NRC/NRR/ADRO/DLR
To:
Entergy Nuclear Operations
Rowley J, NRR/DLR/RLRB, 415-4053
References
%dam200612
Download: ML062920034 (10)


Text

October 27, 2006 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Vermont Yankee Nuclear Power Station

SUBJECT:

SUMMARY

OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 25, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., (ENO) held a telephone conference call on September 25, 2006, to discuss and clarify the staffs requests for additional information (RAIs) concerning the Vermont Yankee Nuclear Station (VYNPS) license renewal application (LRA). The conference call was useful in clarifying the staffs questions. provides a listing of the conference call participants. Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief discussion of the items status.

The applicant had an opportunity to comment on this summary.

/RA/

Jonathan Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

As stated cc w/encls: See next page

ML062920034 OFFICE PM:RLRB LA:RLRB BC:RLRB NAME JRowley I. King JZimmerman DATE 10/25/06 10/27/06 10/27/06

Vermont Yankee Nuclear Power Station cc:

Regional Administrator, Region I Ms. Carla A. White, RRPT, CHP U. S. Nuclear Regulatory Commission Radiological Health 475 Allendale Road Vermont Department of Health King of Prussia, PA 19406-1415 P.O. Box 70, Drawer #43 108 Cherry Street Mr. David R. Lewis Burlington, VT 05402-0070 Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W. Mr. James M. DeVincentis Washington, DC 20037-1128 Manager, Licensing Vermont Yankee Nuclear Power Station Mr. David OBrien, Commissioner P.O. Box 0500 Vermont Department of Public Service 185 Old Ferry Road 112 State Street Brattleboro, VT 05302-0500 Montpelier, VT 05620-2601 Resident Inspector Mr. James Volz, Chairman Vermont Yankee Nuclear Power Station Public Service Board U. S. Nuclear Regulatory Commission State of Vermont P.O. Box 176 112 State Street Vernon, VT 05354 Montpelier, VT 05620-2701 Director, Massachusetts Emergency Chairman, Board of Selectmen Management Agency Town of Vernon ATTN: James Muckerheide P.O. Box 116 400 Worcester Rd.

Vernon, VT 05354-0116 Framingham, MA 01702-5399 Operating Experience Coordinator Jonathan M. Block, Esq.

Vermont Yankee Nuclear Power Station Main Street 320 Governor Hunt Road P.O. Box 566 Vernon, VT 05354 Putney, VT 05346-0566 G. Dana Bisbee, Esq. Mr. John F. McCann Deputy Attorney General Director, Licensing 33 Capitol Street Entergy Nuclear Operations, Inc.

Concord, NH 03301-6937 440 Hamilton Avenue White Plains, NY 10601 Chief, Safety Unit Office of the Attorney General Mr. Gary J. Taylor One Ashburton Place, 19th Floor Chief Executive Officer Boston, MA 02108 Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Vermont Yankee Nuclear Power Station cc:

Mr. John T. Herron Sr. VP and Chief Operating Officer Ms. Stacey M. Lousteau Entergy Nuclear Operations, Inc. Treasury Department 440 Hamilton Avenue Entergy Services, Inc.

White Plains, NY 10601 639 Loyola Avenue New Orleans, LA 70113 Mr. Oscar Limpias Vice President, Engineering Mr. Norman L. Rademacher Entergy Nuclear Operations, Inc. Director, NSA 440 Hamilton Avenue Vermont Yankee Nuclear Power Station White Plains, NY 10601 P.O. Box 0500 185 Old Ferry Road Mr. Christopher Schwartz Brattleboro, VT 05302-0500 Vice President, Operations Support Entergy Nuclear Operations, Inc. Mr. Raymond Shadis 440 Hamilton Avenue New England Coalition White Plains, NY 10601 Post Office Box 98 Edgecomb, ME 04556 Mr. Michael J. Colomb Director of Oversight Mr. James P. Matteau Entergy Nuclear Operations, Inc. Executive Director 440 Hamilton Avenue Windham Regional Commission White Plains, NY 10601 139 Main Street, Suite 505 Brattleboro, VT 05301 Mr. Travis C. McCullough Assistant General Counsel Mr. William K. Sherman Entergy Nuclear Operations, Inc. Vermont Department of Public Service 440 Hamilton Avenue 112 State Street White Plains, NY 10601 Drawer 20 Montpelier, VT 05620-2601 Mr. Theodore Sullivan Site Vice President Mr. Michael D. Lyster Entergy Nuclear Operations, Inc. 5931 Barclay Lane Vermont Yankee Nuclear Power Station Naples, FL 34110-7306 P.O. Box 0500 185 Old Ferry Road Ms. Charlene D. Faison Brattleboro, VT 05302-0500 Manager, Licensing 440 Hamilton Avenue Mr. James H. Sniezek White Plains, NY 10601 5486 Nithsdale Drive Salisbury, MD 21801 Mr. James Ross Nuclear Energy Institute Mr. Garrett D. Edwards 1776 I Street, NW, Suite 400 814 Waverly Road Washington, DC 20006-3708 Kennett Square, PA 19348

Vermont Yankee Nuclear Power Station cc:

Diane Curran, Esq.

Harmon, Curran, Spielberg &

Eisenberg, L.L.P 1726 M Street, NW, Suite 600 Washington, DC 20036

Note to Entergy Nuclear Operations, Inc., from Jonathan Rowley dated October 27, 2006

SUBJECT:

SUMMARY

OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 25, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION HARD COPY DLR R/F JRowley E-MAIL:

JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes


JRowley RLaufer JShea CAnderson, RI RPowell, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MYoung RidsOpaMail

LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 25, 2006 Participants Affiliations Jonathan Rowley U.S. Nuclear Regulatory Commission (NRC)

Lambros Lois NRC Ganesh Cheruvenki NRC Naeem Iqbal NRC Andy Taylor Entergy Nuclear Operations, Inc. (ENO)

Lori Potts ENO Dave King ENO Ron Finnin ENO Larry Luckins ENO Enclosure 1

VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 25, 2006 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on September 25, 2006, to discuss and clarify the staffs requests for additional information (RAIs) and other issues concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA). The following issues were discussed during the telephone conference call:

RAI 2.3.3.8-1 License renewal application (LRA) drawing LRA-G-191163-SH-01-0, Fire Protection System Inner Loop, shows the yard fire hydrants as out of scope (i.e., not colored in purple). Verify whether the yard fire hydrants are in scope of license renewal in accordance with Title 10 Code of Federal Regulations Part 54.4(a) (10 CFR 54.4(a)) and subject to an aging management review (AMR) in accordance with 10 CFR 54.21(a)(1). If they are excluded from the scope of license renewal and not subject to an AMR, please provide justification for the exclusion.

Discussion: The staff found the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI incomplete. The staff reiterated its position that yard fire hydrants require an AMR and asked for additional information. The applicant will provide a supplemental response to this concern in a future letter to the NRC.

RAI B.1.2-1 The applicant states that the Control Rod Drive (CRD) return line nozzle has been capped at VYNPS. The staff requests that the applicant provide the following information regarding the cap and the weld.

(1) Describe the configuration, location and material of construction of the capped nozzle.

This should include the existing base material for the nozzle, piping (if piping remnants exist) and cap material, and any welds.

(2) Describe how the aging effects for this weld and the cap are managed in accordance with the guidelines of BWRVIP-75, BWR Vessel and Internals Project (BWRVIP),

Technical Basis for Revisions to Generic Letter 88-01 Inspection Schedule.

(3) Discuss whether the event at Pilgrim (leaking weld at capped nozzle, September 30, 2003) is applicable to VYNPS. The staff issued Information Notice 2004-08, Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds, dated April 22, 2004, which states that the cracking occurred in an Alloy 182 weld that was previously repaired extensively. Discuss experience with previous leakage at the VYNPS capped nozzle, if any. Include in your discussion the past inspection techniques applied, the results obtained, and mitigative strategies imposed.

Enclosure 2

Provide information as to how the plant-specific experience related to this aging effect impacts the attributes specified in AMP B.1.2, BWR CRD Return line Nozzles.

Discussion: The staff required clarification of the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI. The applicant clarified that BWRVIP-75 would be followed at VYNPS in the period of extended operation.

RAI B.1.2-2 Section 4 of the Generic Aging Lessens Learned Report (GALL) AMP XI.M6, BWR Control Rod Drive (CRD) Return Line Nozzle, recommends that the aging degradation in the CRD return line nozzles should be monitored per the inspection recommendations specified in NUREG-0619, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking.

Section 8.2(2) of NUREG-0619 recommends that ultrasonic testing (UT) should be performed on the welded connection joining the rerouted CRD return line to the system which then returns the flow to the reactor vessel during each refueling outage.

In a letter dated January 15, 1982, the applicant made a commitment to the staff indicating that it will perform UT examination of the CRD to the reactor water cleanup (RWCU) weld joint as discussed in NUREG-0619 for three consecutive refuel outages. The applicant further stated that upon the completion of these inspections, the inspection frquency will be reassessed based on the inspection results. In AMP B.1.2, BWR CRD Return Line Nozzle, the applicant stated that it inspected the CRD return line to the RWCU weld joint using UT methods for three consecutive refuel outages and found no indications. Since no indications were found, the applicant intends to take exception to GALL AMP XI.M6, in which the applicant proposes not to inspect the aforementioned weld joint during the extended period of operation. The staff determined that the following information regarding the subject weld is required to complete its review.

(1) The applicant should provide technical justification for not performing the UT examination of the subject weld as recommended by the GALL AMP XI.M6 and NUREG-0619 during the extended period of operation.

(2) The applicant should confirm that the CRD return lines that are connected to RWCU piping system that fall under the jurisdiction of the ASME Code,Section XI boundary will be inspected per the ASME Section XI Code.

Discussion: The staff required clarification of the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI. The applicant provided the necessary clarification.

RAI 4.2-1 In Section 4.2.1 of the VYNPS LRA it is stated that ...the reactor fluence ....has been projected to the end of the period of extended operation. In Sections 4.2.1 and 4.2.2 of the LRA there is no discussion of how this extrapolation was performed. Vermont Yankee has been approved for operation at an extended power uprate. In general, power uprates are based on revised axial power profiles with higher axial peaks at a lower axial location. Therefore, extrapolation of the existing axial profile may not provide an accurate projection.

In view of the above, please respond to the following:

(1) Compare the axial power profiles (at the peak power azimuthal location) and confirm that the extrapolation remains valid.

(2) Confirm that the projected operating plan will support the assumed axial power profile to the end of the period of extended operation.

Discussion: The staff found the applicants response in their September 20, 2006, letter (License Renewal Application, Amendment 14) to this RAI incomplete. The staff requested clarification on whether the applicant had accounted for the shift in axial power profile due to the power uprate when performing the extrapolation. The applicant agreed to provide the staff the GE-NE-0000-2342-R1-NP report mentioned in the response. The staff will review the report to verify the values provided in the response.