Line 2: |
Line 2: |
| | number = ML062970389 | | | number = ML062970389 |
| | issue date = 10/24/2006 | | | issue date = 10/24/2006 |
| | title = Ltr 10/24/06 RPV Head Lifts at D. C. Cook Nuclear Power Plant | | | title = RPV Head Lifts at D. C. Cook Nuclear Power Plant |
| | author name = Pederson C | | | author name = Pederson C |
| | author affiliation = NRC/RGN-III/DRS | | | author affiliation = NRC/RGN-III/DRS |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:October 24, 2006Mr. Mano K. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 | | {{#Wiki_filter:October 24, 2006 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REACTOR PRESSURE VESSEL (RPV) HEAD LIFTS AT D.C. COOKNUCLEAR POWER PLANT | | REACTOR PRESSURE VESSEL (RPV) HEAD LIFTS AT D.C. COOK NUCLEAR POWER PLANT |
|
| |
|
| ==Dear Mr. Nazar:== | | ==Dear Mr. Nazar:== |
|
| |
|
| This refers to D.C. Cook Letter AEP:NRC:6514, dated September 22, 2006, and oursubsequent acknowledgment letter (ML062650461) to you of the same date regarding RPV head lifts (over the RPV) following NRC staff concerns raised regarding the D.C. Cook RPV head drop analysis. In your letter, you indicated that you would perform a more detailed, rigorous quantitative analysis to provide additional safety assurance, and that you would discuss those results with NRC staff prior to subsequent lifts of the RPV head over the RPV with fuel in the vessel during the current refuel outage.This letter documents our review of that analysis and subsequent clarifications and discussions,culminating in our discussion with your staff on October 23, 2006. During that discussion, we communicated our conclusion that your detailed analysis and commitments including a limitation on lift height, flooding of the reactor cavity, and various administrative controls described in your September 22, 2006 letter, sufficiently addressed our safety concerns for the remaining planned head lift for the current refuel outage.We request that you immediately notify me at (630) 829-9700 if your understanding differs fromthat set forth above or if, for any reason, you intend to change, deviate from, or not complete any of the actions documented in your September 22, 2006 letter, as modified or bounded by your current head drop analysis, prior to the change or deviation.However, please note that additional interaction is necessary to completely resolve the issue forthe longer term. Specifically, our inspection of this issue exited with an unresolved item that remains under evaluation with respect to the plant's licensing and design bases.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will bemade available electronically for public inspection in the NRC Public Document Room or from M. Nazar-2-the Publically Available Records (PARS) component of NRC's document system (ADAMS),accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).Sincerely,/RA/Cynthia D. Pederson, Director Division of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74 cc:M. Peifer, Site Vice PresidentL. Weber, Plant Manager S. Simpson, Regulatory Affairs Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - | | This refers to D.C. Cook Letter AEP:NRC:6514, dated September 22, 2006, and our subsequent acknowledgment letter (ML062650461) to you of the same date regarding RPV head lifts (over the RPV) following NRC staff concerns raised regarding the D.C. Cook RPV head drop analysis. In your letter, you indicated that you would perform a more detailed, rigorous quantitative analysis to provide additional safety assurance, and that you would discuss those results with NRC staff prior to subsequent lifts of the RPV head over the RPV with fuel in the vessel during the current refuel outage. |
| Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan M. Nazar-2-the Publically Available Records (PARS) component of NRC's document system (ADAMS),accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).Sincerely,/RA/Cynthia D. Pederson, Director Division of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74 cc:M. Peifer, Site Vice PresidentL. Weber, Plant Manager S. Simpson, Regulatory Affairs Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - | | This letter documents our review of that analysis and subsequent clarifications and discussions, culminating in our discussion with your staff on October 23, 2006. During that discussion, we communicated our conclusion that your detailed analysis and commitments including a limitation on lift height, flooding of the reactor cavity, and various administrative controls described in your September 22, 2006 letter, sufficiently addressed our safety concerns for the remaining planned head lift for the current refuel outage. |
| Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of MichiganDISTRIBUTION | | We request that you immediately notify me at (630) 829-9700 if your understanding differs from that set forth above or if, for any reason, you intend to change, deviate from, or not complete any of the actions documented in your September 22, 2006 letter, as modified or bounded by your current head drop analysis, prior to the change or deviation. |
| :TEB PST RidsNrrDirsIrib GEG KGO BJK1 CAA1 CDP1 DRPIII DRSIII PLB1 TXN JAG KAM MEM2 PST TJM1 ROPreports@nrc.gov DOCUMENT NAME:C:\FileNet\ML062970389.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy withattach/encl "N" = No copyOFFICERIIIRIIINRRRIIINAMEMholmbergfor DHills:jbCLipaMholmberg forTMcGintyCPedersonDATE10/23/0610/23/0610/23/0610/23/06OFFICIAL RECORD COPY}}
| | However, please note that additional interaction is necessary to completely resolve the issue for the longer term. Specifically, our inspection of this issue exited with an unresolved item that remains under evaluation with respect to the plants licensing and design bases. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from |
| | |
| | M. Nazar the Publically Available Records (PARS) component of NRCs document system (ADAMS), |
| | accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Sincerely, |
| | /RA/ |
| | Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: M. Peifer, Site Vice President L. Weber, Plant Manager S. Simpson, Regulatory Affairs Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - |
| | Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan |
| | |
| | M. Nazar the Publically Available Records (PARS) component of NRCs document system (ADAMS), |
| | accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Sincerely, |
| | /RA/ |
| | Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: M. Peifer, Site Vice President L. Weber, Plant Manager S. Simpson, Regulatory Affairs Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - |
| | Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan DISTRIBUTION: |
| | TEB PST RidsNrrDirsIrib GEG KGO BJK1 CAA1 CDP1 DRPIII DRSIII PLB1 TXN JAG KAM MEM2 PST TJM1 ROPreports@nrc.gov DOCUMENT NAME:C:\FileNet\ML062970389.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NRR RIII NAME Mholmberg CLipa Mholmberg for CPederson for DHills:jb TMcGinty DATE 10/23/06 10/23/06 10/23/06 10/23/06 OFFICIAL RECORD COPY}} |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-62, Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask2024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance ML24073A2342024-03-0606 March 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System IR 05000315/20230062024-02-28028 February 2024 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023006 and 05000316/2023006) AEP-NRC-2024-11, Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation2024-02-27027 February 2024 Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation AEP-NRC-2024-10, Form OAR-1, Owners Activity Report2024-02-0707 February 2024 Form OAR-1, Owners Activity Report ML24037A0522024-02-0707 February 2024 NRC Response to DC Cook Triennial Evaluated Force-on-Force Cycle Schedule Change Request IR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 2024-09-05
[Table view] |
Text
October 24, 2006 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
REACTOR PRESSURE VESSEL (RPV) HEAD LIFTS AT D.C. COOK NUCLEAR POWER PLANT
Dear Mr. Nazar:
This refers to D.C. Cook Letter AEP:NRC:6514, dated September 22, 2006, and our subsequent acknowledgment letter (ML062650461) to you of the same date regarding RPV head lifts (over the RPV) following NRC staff concerns raised regarding the D.C. Cook RPV head drop analysis. In your letter, you indicated that you would perform a more detailed, rigorous quantitative analysis to provide additional safety assurance, and that you would discuss those results with NRC staff prior to subsequent lifts of the RPV head over the RPV with fuel in the vessel during the current refuel outage.
This letter documents our review of that analysis and subsequent clarifications and discussions, culminating in our discussion with your staff on October 23, 2006. During that discussion, we communicated our conclusion that your detailed analysis and commitments including a limitation on lift height, flooding of the reactor cavity, and various administrative controls described in your September 22, 2006 letter, sufficiently addressed our safety concerns for the remaining planned head lift for the current refuel outage.
We request that you immediately notify me at (630) 829-9700 if your understanding differs from that set forth above or if, for any reason, you intend to change, deviate from, or not complete any of the actions documented in your September 22, 2006 letter, as modified or bounded by your current head drop analysis, prior to the change or deviation.
However, please note that additional interaction is necessary to completely resolve the issue for the longer term. Specifically, our inspection of this issue exited with an unresolved item that remains under evaluation with respect to the plants licensing and design bases.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from
M. Nazar the Publically Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: M. Peifer, Site Vice President L. Weber, Plant Manager S. Simpson, Regulatory Affairs Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan
M. Nazar the Publically Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: M. Peifer, Site Vice President L. Weber, Plant Manager S. Simpson, Regulatory Affairs Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan DISTRIBUTION:
TEB PST RidsNrrDirsIrib GEG KGO BJK1 CAA1 CDP1 DRPIII DRSIII PLB1 TXN JAG KAM MEM2 PST TJM1 ROPreports@nrc.gov DOCUMENT NAME:C:\FileNet\ML062970389.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NRR RIII NAME Mholmberg CLipa Mholmberg for CPederson for DHills:jb TMcGinty DATE 10/23/06 10/23/06 10/23/06 10/23/06 OFFICIAL RECORD COPY