|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 12/27/2006 | | | issue date = 12/27/2006 |
| | title = Withdrawal of Amendment Extension of Technical Specification 3.8.3.1, Onsite Power Distribution | | | title = Withdrawal of Amendment Extension of Technical Specification 3.8.3.1, Onsite Power Distribution |
| | author name = Miller G E | | | author name = Miller G |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 | | | author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 |
| | addressee name = Peschel J M, St.Pierre G | | | addressee name = Peschel J, St.Pierre G |
| | addressee affiliation = Florida Power & Light Energy Seabrook, LLC | | | addressee affiliation = Florida Power & Light Energy Seabrook, LLC |
| | docket = 05000443 | | | docket = 05000443 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:December 27, 2006Mr. Gene St. Pierre, Site Vice Presidentc/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874 | | {{#Wiki_filter:December 27, 2006 Mr. Gene St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEABROOK STATION, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT RE: EXTENSION OF TECHNICAL SPECIFICATION 3.8.3.1, "ONSITE POWER DISCTIBUTION" (TAC NO. MC9165) | | SEABROOK STATION, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT RE: |
| | EXTENSION OF TECHNICAL SPECIFICATION 3.8.3.1, ONSITE POWER DISCTIBUTION (TAC NO. MC9165) |
|
| |
|
| ==Dear Mr. St. Pierre:== | | ==Dear Mr. St. Pierre:== |
|
| |
|
| By letter dated December 6, 2005, as supplemented by letters dated March 30, 2006, andOctober 1, 2006, FPL Energy Seabrook, LLC (FPLE) applied for an amendment to the Seabrook Station, Unit No. 1 Facility Operating License No. NPF-86. The proposed change would have modified Technical Specification (TS) 3.8.3.1, "Onsite Power Distribution," to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours to 7 days. | | By letter dated December 6, 2005, as supplemented by letters dated March 30, 2006, and October 1, 2006, FPL Energy Seabrook, LLC (FPLE) applied for an amendment to the Seabrook Station, Unit No. 1 Facility Operating License No. NPF-86. The proposed change would have modified Technical Specification (TS) 3.8.3.1, Onsite Power Distribution, to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours to 7 days. |
| As part of the Nuclear Regulatory Commission (NRC or the Commission) staff's review, an independent analysis of the proposed change was performed. While the NRC staff's analysis indicated that the proposed change may be acceptable, differences were identified during performance of the confirmatory analysis that would require further NRC and FPLE staff communication to resolve. Subsequently, by letter dated December 20, 2006, FPLE withdrew the amendment request to allow these questions to be addressed, and incorporated in a revised license amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/ G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443 | | As part of the Nuclear Regulatory Commission (NRC or the Commission) staffs review, an independent analysis of the proposed change was performed. While the NRC staffs analysis indicated that the proposed change may be acceptable, differences were identified during performance of the confirmatory analysis that would require further NRC and FPLE staff communication to resolve. Subsequently, by letter dated December 20, 2006, FPLE withdrew the amendment request to allow these questions to be addressed, and incorporated in a revised license amendment request. |
| | The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. |
| | Sincerely, |
| | /RA/ |
| | G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Notice of Withdrawalcc w/encl: See next page Seabrook Station, Unit No. 1 cc:
| |
| Mr. J. A. StallSenior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Peter BrannAssistant Attorney General State House, Station #6 Augusta, ME 04333Resident InspectorU.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874Town of Exeter10 Front Street Exeter, NH 03823Regional Administrator, Region IU.S. Nuclear Regulatory Commission
| |
|
| |
|
| 475 Allendale Road King of Prussia, PA 19406Office of the Attorney GeneralOne Ashburton Place, 20th Floor Boston, MA 02108Board of SelectmenTown of Amesbury Town Hall Amesbury, MA 01913Mr. Robert PooleFederal Emergency Management Agency Region I J.W. McCormack P.O. &
| | Notice of Withdrawal cc w/encl: See next page |
| Courthouse Building, Room 401 Boston, MA 02109Mr. Tom CrimminsPolestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019Ms. Cristine McComb, DirectorATTN: John Giarrusso Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399Ms. Kelly Ayotte, Attorney GeneralMr. Orvil Fitch, Deputy Attorney General 33 Capitol Street Concord, NH 03301Mr. Christopher M. Pope, DirectorHomeland Security & Emergency Mgmt.
| | |
| New Hampshire Department of Safety Bureau of Emergency Management 33 Hazen Drive Concord, NH 03301Mr. M. S. Ross, Managing AttorneyFlorida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Rajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420James M. PeschelRegulatory Programs Manager FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874Ms. Marjan MashhadiSenior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004 Seabrook Station, Unit No. 1 cc: | | Seabrook Station, Unit No. 1 cc: |
| Mr. Mark E. WarnerVice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 7590-01-PUNITED STATES NUCLEAR REGULATORY COMMISSIONFPL ENERGY SEABROOK, LLCDOCKET NO. 50-443NOTICE OF WITHDRAWAL OF APPLICATION FORAMENDMENT TO FACILITY OPERATING LICENSEThe U.S. Nuclear Regulatory Commission (NRC or the Commission) has granted therequest of FPL Energy Seabrook, LLC (the licensee) to withdraw its December 6, 2005, application (as supplemented by letters dated March 30, 2006, and October 1, 2006) for a proposed amendment to Facility Operating License No. NPF-86 for Seabrook Station, Unit No. 1, located in Rockingham County. The proposed amendment would have modified Technical Specification (TS) 3.8.3.1,"Onsite Power Distribution," to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours to 7 days. The Commission had previously issued a Notice of Consideration of Issuance ofAmendment published in the FEDERAL REGISTER on January 17, 2006 (71 FR 2592). | | Mr. J. A. Stall Ms. Cristine McComb, Director Senior Vice President, Nuclear and ATTN: John Giarrusso Chief Nuclear Officer Massachusetts Emergency Management Agency Florida Power & Light Company 400 Worcester Road P.O. Box 14000 Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Ms. Kelly Ayotte, Attorney General Mr. Peter Brann Mr. Orvil Fitch, Deputy Attorney General Assistant Attorney General 33 Capitol Street State House, Station #6 Concord, NH 03301 Augusta, ME 04333 Mr. Christopher M. Pope, Director Resident Inspector Homeland Security & Emergency Mgmt. |
| However, by letter dated September 26, 2006, the licensee withdrew the proposed change.For further details with respect to this action, see the application for amendment datedDecember 6, 2005 (as supplemented by letters dated March 30, 2006, and October 1, 2006), | | U.S. Nuclear Regulatory Commission New Hampshire Department of Safety Seabrook Nuclear Power Station Bureau of Emergency Management P.O. Box 1149 33 Hazen Drive Seabrook, NH 03874 Concord, NH 03301 Town of Exeter Mr. M. S. Ross, Managing Attorney 10 Front Street Florida Power & Light Company Exeter, NH 03823 P.O. Box 14000 Juno Beach, FL 33408-0420 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Rajiv S. Kundalkar 475 Allendale Road Vice President - Nuclear Engineering King of Prussia, PA 19406 Florida Power & Light Company P.O. Box 14000 Office of the Attorney General Juno Beach, FL 33408-0420 One Ashburton Place, 20th Floor Boston, MA 02108 James M. Peschel Regulatory Programs Manager Board of Selectmen FPL Energy Seabrook, LLC Town of Amesbury PO Box 300 Town Hall Seabrook, NH 03874 Amesbury, MA 01913 Ms. Marjan Mashhadi Mr. Robert Poole Senior Attorney Federal Emergency Management Agency Florida Power & Light Company Region I 801 Pennsylvania Ave., NW Suite 220 J.W. McCormack P.O. & Washington, DC 20004 Courthouse Building, Room 401 Boston, MA 02109 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 |
| and the licensee's letter dated December 20, 2006, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly-available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or whoencounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by email to pdr@nrc.gov | | |
| . Dated at Rockville, Maryland, this 27th day of December, 2006FOR THE NUCLEAR REGULATORY COMMISSION/RA/ G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation December 27, 2006Mr. Gene St. Pierre, Site Vice Presidentc/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
| | Seabrook Station, Unit No. 1 cc: |
| | Mr. Mark E. Warner Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 |
| | |
| | 7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FPL ENERGY SEABROOK, LLC DOCKET NO. 50-443 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (NRC or the Commission) has granted the request of FPL Energy Seabrook, LLC (the licensee) to withdraw its December 6, 2005, application (as supplemented by letters dated March 30, 2006, and October 1, 2006) for a proposed amendment to Facility Operating License No. NPF-86 for Seabrook Station, Unit No. 1, located in Rockingham County. |
| | The proposed amendment would have modified Technical Specification (TS) 3.8.3.1, Onsite Power Distribution, to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours to 7 days. |
| | The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on January 17, 2006 (71 FR 2592). |
| | However, by letter dated September 26, 2006, the licensee withdrew the proposed change. |
| | For further details with respect to this action, see the application for amendment dated December 6, 2005 (as supplemented by letters dated March 30, 2006, and October 1, 2006), |
| | and the licensee's letter dated December 20, 2006, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly-available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, |
| | |
| | http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by email to pdr@nrc.gov. |
| | Dated at Rockville, Maryland, this 27th day of December, 2006 FOR THE NUCLEAR REGULATORY COMMISSION |
| | /RA/ |
| | G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation |
| | |
| | December 27, 2006 Mr. Gene St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEABROOK STATION, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT RE: EXTENSION OF TECHNICAL SPECIFICATION 3.8.3.1, "ONSITE POWER DISCTIBUTION" (TAC NO. MC9165) | | SEABROOK STATION, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT RE: |
| | EXTENSION OF TECHNICAL SPECIFICATION 3.8.3.1, ONSITE POWER DISCTIBUTION (TAC NO. MC9165) |
|
| |
|
| ==Dear Mr. St. Pierre:== | | ==Dear Mr. St. Pierre:== |
|
| |
|
| By letter dated December 6, 2005, as supplemented by letters dated March 30, 2006, andOctober 1, 2006, FPL Energy Seabrook, LLC (FPLE) applied for an amendment to the Seabrook Station, Unit No. 1 Facility Operating License No. NPF-86. The proposed change would have modified Technical Specification (TS) 3.8.3.1, "Onsite Power Distribution," to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours to 7 days. | | By letter dated December 6, 2005, as supplemented by letters dated March 30, 2006, and October 1, 2006, FPL Energy Seabrook, LLC (FPLE) applied for an amendment to the Seabrook Station, Unit No. 1 Facility Operating License No. NPF-86. The proposed change would have modified Technical Specification (TS) 3.8.3.1, Onsite Power Distribution, to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours to 7 days. |
| As part of the Nuclear Regulatory Commission (NRC or the Commission) staff's review, an independent analysis of the proposed change was performed. While the NRC staff's analysis indicated that the proposed change may be acceptable, differences were identified during performance of the confirmatory analysis that would require further NRC and FPLE staff communication to resolve. Subsequently, by letter dated December 20, 2006, FPLE withdrew the amendment request to allow these questions to be addressed, and incorporated in a revised license amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/ G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443Distribution | | As part of the Nuclear Regulatory Commission (NRC or the Commission) staffs review, an independent analysis of the proposed change was performed. While the NRC staffs analysis indicated that the proposed change may be acceptable, differences were identified during performance of the confirmatory analysis that would require further NRC and FPLE staff communication to resolve. Subsequently, by letter dated December 20, 2006, FPLE withdrew the amendment request to allow these questions to be addressed, and incorporated in a revised license amendment request. |
| :PUBLICRidsNrrLACRaynorJChung PDI-2 R/FRidsOgcRpMMcConnell RidsNrrDlpmLpdI-2RidsAcrsAcnwMailCenterGWilson RidsNrrPMGMillerRidsRgn1MailCenterGMorris RISNrrDorlDprLMrowca Accession Number: ML063560237NRR106OFFICELPL1-2/PMLPL1-2/LALPL1-2/BCNAMEGEMillerCRaynorHChernoffDATE12/27/0612/27/0612/26/06OFFICIAL RECORD COPY}}
| | The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. |
| | Sincerely, |
| | /RA/ |
| | G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 Distribution: |
| | PUBLIC RidsNrrLACRaynor JChung PDI-2 R/F RidsOgcRp MMcConnell RidsNrrDlpmLpdI-2 RidsAcrsAcnwMailCenter GWilson RidsNrrPMGMiller RidsRgn1MailCenter GMorris RISNrrDorlDpr LMrowca Accession Number: ML063560237 NRR106 OFFICE LPL1-2/PM LPL1-2/LA LPL1-2/BC NAME GEMiller CRaynor HChernoff DATE 12/27/06 12/27/06 12/26/06 OFFICIAL RECORD COPY}} |
Letter Sequence Withdrawal |
---|
|
|
MONTHYEARML0602403382006-02-16016 February 2006 Request for Additional Information Regarding License Amendment Request to Increase Technical Specification 3.8.3.1 Project stage: RAI ML0616702182006-06-21021 June 2006 Facsimile Transmission, Draft Request for Additional Information (RAI) to Be Discussed in an Upcoming Conference Call Project stage: Draft RAI ML0635602372006-12-27027 December 2006 Withdrawal of Amendment Extension of Technical Specification 3.8.3.1, Onsite Power Distribution Project stage: Withdrawal 2006-02-16
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML19282C6142019-10-22022 October 2019 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML19282B8322019-10-22022 October 2019 Cover Letter with Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opp. for a Hearing ML19238A3692019-09-0303 September 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 09/10/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 NRC-2019-0075, Federal Register Notice - License Amendment; Issuance (CAC No. MF8260; EPID L-2016-LLA-0007)2019-03-12012 March 2019 Federal Register Notice - License Amendment; Issuance (CAC No. MF8260; EPID L-2016-LLA-0007) ML18204A2422019-03-12012 March 2019 Federal Register Notice - License Amendment; Issuance (CAC No. MF8260; EPID L-2016-LLA-0007) ML18345A2322019-03-12012 March 2019 Federal Register Notice - Issuance of Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit 1 ML19015A1832019-03-11011 March 2019 Notice of Issuance of License Amendment to Facility Operating License No. NPF-86 (CAC No. MF8260; EPID L-2016-LLA-0007) ML17031A3652017-02-15015 February 2017 Order Prohibiting Involvement in NRC-Licensed Activities and Notice of Violation (NRC Office of Investigations Report No. 1-2015-029) (IA-16-075) ML17003A2422017-01-24024 January 2017 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: February 7, ML16271A0922016-09-28028 September 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016 ML16131A7952016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 20162016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML15096A1432015-07-28028 July 2015 Exemption from Specific Requirements of 10 CFR Part 50, Appendix G, and 10 CFR 50.60 NRC-2015-0184, Exemption2015-07-28028 July 2015 Exemption ML15092A5192015-07-28028 July 2015 Exemption ML15204A2792015-07-27027 July 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 4, 2015 ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 ML15120A2272015-05-0101 May 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML14233A2082014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 NRC-2014-0193, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 20142014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 NRC-2014-0008, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures fo2014-01-22022 January 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Add ML14007A2192014-01-22022 January 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Add ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML12152A3162012-06-12012 June 2012 Biweekly Sholly Report - Federal Register Notice - Fr Publication June 12, 2012 ML12158A2612012-06-0606 June 2012 Federal Register Notice Regarding the ACRS Plant License Renewal (Seabrook) Subcommittee Meeting, July 10, 2012 ML12109A4272012-05-31031 May 2012 Notice of Intent to Prepare a Supplement to Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station ML12109A4022012-05-31031 May 2012 Notice of Intent to Prepare a Supplement to Draft Supplement 46 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Seabrook Station NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11349A0052011-12-15015 December 2011 Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 NRC-2011-0290, Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 20112011-12-15015 December 2011 Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 ML11237A0072011-08-25025 August 2011 FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/112011-08-25025 August 2011 FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 ML11131A0052011-08-0101 August 2011 NRC Nextera Energy Seabrook, LLC Notice of Availability of Draft Supplement 46 to the GEIS for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Seabrook Station,Unit 1 Docket No. 50-443 (NRC-2010-0206) ML1111802212011-05-0202 May 2011 Withdrawal of License Amendment Request 10-06 ML1103502482011-03-0101 March 2011 License Amendment, Issuance of Amendment, the Proposed Amendment Would Modify Technical Specification 6.7.6.k, Steam Generator, and Technical Specification 6.8.1.7, Steam Generator Tube Inspection Report. ML1103502522011-02-23023 February 2011 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, Opportunity for a Hearing, and Order Imposing Procedures for Document Access.. NRC-2011-0044, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, Opportunity for a Hearing, and Order Imposing Procedures for Document Access..2011-02-23023 February 2011 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, Opportunity for a Hearing, and Order Imposing Procedures for Document Access.. ML1019000132010-07-20020 July 2010 08/19/2010-Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Seabrook Station License Renewal Application Review ML1016904492010-07-13013 July 2010 Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. NPF-086 for an Additional 20-year Period ML1016804272010-07-13013 July 2010 Notice of Intent to Prepare an Environmental Impact Statement and Conduct the Scoping Process for License Renewal for Seabrook Station - FRN ML1013300492010-06-10010 June 2010 Notice of Receipt and Availability for Seabrook Station License Renewal Application (FRN) ML0911306172009-04-24024 April 2009 Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML0905800142009-02-26026 February 2009 Sholly Report for Fr Publication Date March 10th 2009 ML0807100432008-03-12012 March 2008 Individual Federal Register Notice-Seabrook Station, Unit No. 1-Individual Notice of Consideration of Issuance of Amendment Concerning the Revision of Nuclear Instrumentation Surveillance Requirement 2020-07-15
[Table view] Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] |
Text
December 27, 2006 Mr. Gene St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT RE:
EXTENSION OF TECHNICAL SPECIFICATION 3.8.3.1, ONSITE POWER DISCTIBUTION (TAC NO. MC9165)
Dear Mr. St. Pierre:
By letter dated December 6, 2005, as supplemented by letters dated March 30, 2006, and October 1, 2006, FPL Energy Seabrook, LLC (FPLE) applied for an amendment to the Seabrook Station, Unit No. 1 Facility Operating License No. NPF-86. The proposed change would have modified Technical Specification (TS) 3.8.3.1, Onsite Power Distribution, to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
As part of the Nuclear Regulatory Commission (NRC or the Commission) staffs review, an independent analysis of the proposed change was performed. While the NRC staffs analysis indicated that the proposed change may be acceptable, differences were identified during performance of the confirmatory analysis that would require further NRC and FPLE staff communication to resolve. Subsequently, by letter dated December 20, 2006, FPLE withdrew the amendment request to allow these questions to be addressed, and incorporated in a revised license amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Notice of Withdrawal cc w/encl: See next page
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall Ms. Cristine McComb, Director Senior Vice President, Nuclear and ATTN: John Giarrusso Chief Nuclear Officer Massachusetts Emergency Management Agency Florida Power & Light Company 400 Worcester Road P.O. Box 14000 Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Ms. Kelly Ayotte, Attorney General Mr. Peter Brann Mr. Orvil Fitch, Deputy Attorney General Assistant Attorney General 33 Capitol Street State House, Station #6 Concord, NH 03301 Augusta, ME 04333 Mr. Christopher M. Pope, Director Resident Inspector Homeland Security & Emergency Mgmt.
U.S. Nuclear Regulatory Commission New Hampshire Department of Safety Seabrook Nuclear Power Station Bureau of Emergency Management P.O. Box 1149 33 Hazen Drive Seabrook, NH 03874 Concord, NH 03301 Town of Exeter Mr. M. S. Ross, Managing Attorney 10 Front Street Florida Power & Light Company Exeter, NH 03823 P.O. Box 14000 Juno Beach, FL 33408-0420 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Rajiv S. Kundalkar 475 Allendale Road Vice President - Nuclear Engineering King of Prussia, PA 19406 Florida Power & Light Company P.O. Box 14000 Office of the Attorney General Juno Beach, FL 33408-0420 One Ashburton Place, 20th Floor Boston, MA 02108 James M. Peschel Regulatory Programs Manager Board of Selectmen FPL Energy Seabrook, LLC Town of Amesbury PO Box 300 Town Hall Seabrook, NH 03874 Amesbury, MA 01913 Ms. Marjan Mashhadi Mr. Robert Poole Senior Attorney Federal Emergency Management Agency Florida Power & Light Company Region I 801 Pennsylvania Ave., NW Suite 220 J.W. McCormack P.O. & Washington, DC 20004 Courthouse Building, Room 401 Boston, MA 02109 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019
Seabrook Station, Unit No. 1 cc:
Mr. Mark E. Warner Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FPL ENERGY SEABROOK, LLC DOCKET NO. 50-443 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (NRC or the Commission) has granted the request of FPL Energy Seabrook, LLC (the licensee) to withdraw its December 6, 2005, application (as supplemented by letters dated March 30, 2006, and October 1, 2006) for a proposed amendment to Facility Operating License No. NPF-86 for Seabrook Station, Unit No. 1, located in Rockingham County.
The proposed amendment would have modified Technical Specification (TS) 3.8.3.1, Onsite Power Distribution, to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on January 17, 2006 (71 FR 2592).
However, by letter dated September 26, 2006, the licensee withdrew the proposed change.
For further details with respect to this action, see the application for amendment dated December 6, 2005 (as supplemented by letters dated March 30, 2006, and October 1, 2006),
and the licensee's letter dated December 20, 2006, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly-available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site,
http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 27th day of December, 2006 FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
December 27, 2006 Mr. Gene St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT RE:
EXTENSION OF TECHNICAL SPECIFICATION 3.8.3.1, ONSITE POWER DISCTIBUTION (TAC NO. MC9165)
Dear Mr. St. Pierre:
By letter dated December 6, 2005, as supplemented by letters dated March 30, 2006, and October 1, 2006, FPL Energy Seabrook, LLC (FPLE) applied for an amendment to the Seabrook Station, Unit No. 1 Facility Operating License No. NPF-86. The proposed change would have modified Technical Specification (TS) 3.8.3.1, Onsite Power Distribution, to extend the allowed outage time for vital instrument bus inverters 1E and 1F from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
As part of the Nuclear Regulatory Commission (NRC or the Commission) staffs review, an independent analysis of the proposed change was performed. While the NRC staffs analysis indicated that the proposed change may be acceptable, differences were identified during performance of the confirmatory analysis that would require further NRC and FPLE staff communication to resolve. Subsequently, by letter dated December 20, 2006, FPLE withdrew the amendment request to allow these questions to be addressed, and incorporated in a revised license amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 Distribution:
PUBLIC RidsNrrLACRaynor JChung PDI-2 R/F RidsOgcRp MMcConnell RidsNrrDlpmLpdI-2 RidsAcrsAcnwMailCenter GWilson RidsNrrPMGMiller RidsRgn1MailCenter GMorris RISNrrDorlDpr LMrowca Accession Number: ML063560237 NRR106 OFFICE LPL1-2/PM LPL1-2/LA LPL1-2/BC NAME GEMiller CRaynor HChernoff DATE 12/27/06 12/27/06 12/26/06 OFFICIAL RECORD COPY