| {{#Wiki_filter:ENCLOSURE 1REVISED PAGES OF FACILITY OPERATING LICENSE NO. NPF-58DOCKET NO. 50-440PERRY NUCLEAR POWER PLANT, UNIT NO. 1Replace the following page of the Facility Operating License with the attached revised pages. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change. REMOVE INSERTLicense NPF-58License NPF-58Page 5Page 5-----Page 5a shall comply with the antitrust conditions delineated in Appendix C to this license;Appendix C is hereby incorporated into this license.b.FENOC shall comply with the antitrust conditions delineated in Appendix C tothis license as if named therein. FENOC shall not market or broker power or energy from the Perry Nuclear Power Plant, Unit No. 1. The Owners are responsible and accountable for the actions of FENOC to the extent that said actions affect the marketing or brokering of power or energy from the Perry Nuclear Power Plant, Unit No. 1, and in any way, contravene the antitrust condition contained in the license.(4) Deleted (5) Deleted (6) Fire Protection (Section 9.5, SER, SSER #1, 2, 3, 4, 7, and 8)FENOC shall comply with the following requirements of the fire protection program:FENOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, as amended, for the Perry Nuclear Power Plant and as approved in the Safety Evaluation Report (NUREG-0887) dated May 1982 and Supplement Nos. 1 through 10 thereto, subject to the following provisions:a.FENOC may make changes to the approved fire protection program without priorapproval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.(7) Deleted (8) Deleted (9) Deleted (10) Deleted (11) Mitigation Strategy License Condition llThe licensee shall develop and maintain strategies for addressing large fires and lexplosions and that include the follow key areas: | | {{#Wiki_filter:ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT NO. 1 Replace the following page of the Facility Operating License with the attached revised pages. |
| l l(a)Fire fighting response strategy with the following elements: | | The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change. |
| l1.Predefined coordinated fire response strategy and guidance l2.Assessment of mutual aid fire fighting assets l3.Designated staging areas for equipment and materials l
| | REMOVE INSERT License NPF-58 License NPF-58 Page 5 Page 5 |
| l lAmendment No. 137 Revised by letter dated July 11, 2007 | | ----- Page 5a |
| - 5a -l4.Command and control l5.Training of response personnel ll(b)Operations to mitigate fuel damage considering the following: | | |
| l1.Protection and use of personnel assets l2.Communications l3.Minimizing fire spread l4.Procedures for implementing integrated fire response strategy l5.Identification of readily-available pre-staged equipment l6.Training on integrated fire response strategy l7.Spent fuel pool mitigation measures l
| | shall comply with the antitrust conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license. |
| l(c)Actions to minimize release to include consideration of:
| | : b. FENOC shall comply with the antitrust conditions delineated in Appendix C to this license as if named therein. FENOC shall not market or broker power or energy from the Perry Nuclear Power Plant, Unit No. 1. The Owners are responsible and accountable for the actions of FENOC to the extent that said actions affect the marketing or brokering of power or energy from the Perry Nuclear Power Plant, Unit No. 1, and in any way, contravene the antitrust condition contained in the license. |
| l1.Water spray scrubbing l2.Dose to onsite responders l
| | (4) Deleted (5) Deleted (6) Fire Protection (Section 9.5, SER, SSER #1, 2, 3, 4, 7, and 8) |
| l Revised by letter dated July 11, 2007}}
| | FENOC shall comply with the following requirements of the fire protection program: |
| | FENOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, as amended, for the Perry Nuclear Power Plant and as approved in the Safety Evaluation Report (NUREG-0887) dated May 1982 and Supplement Nos. 1 through 10 thereto, subject to the following provisions: |
| | : a. FENOC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. |
| | (7) Deleted (8) Deleted (9) Deleted (10) Deleted (11) Mitigation Strategy License Condition l l |
| | The licensee shall develop and maintain strategies for addressing large fires and l explosions and that include the follow key areas: l l |
| | (a) Fire fighting response strategy with the following elements: l |
| | : 1. Predefined coordinated fire response strategy and guidance l |
| | : 2. Assessment of mutual aid fire fighting assets l |
| | : 3. Designated staging areas for equipment and materials l l |
| | l Amendment No. 137 Revised by letter dated July 11, 2007 |
| | |
| | - 5a - l |
| | : 4. Command and control l |
| | : 5. Training of response personnel l l |
| | (b) Operations to mitigate fuel damage considering the following: l |
| | : 1. Protection and use of personnel assets l |
| | : 2. Communications l |
| | : 3. Minimizing fire spread l |
| | : 4. Procedures for implementing integrated fire response strategy l |
| | : 5. Identification of readily-available pre-staged equipment l |
| | : 6. Training on integrated fire response strategy l |
| | : 7. Spent fuel pool mitigation measures l l |
| | (c) Actions to minimize release to include consideration of: l |
| | : 1. Water spray scrubbing l |
| | : 2. Dose to onsite responders l l |
| | Revised by letter dated July 11, 2007}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML0719200062007-07-11011 July 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4499) Project stage: Other ML0719200172007-07-11011 July 2007 Unit, 1, Revised Pages of Facility Operating License No. NPF-58 Project stage: Other 2007-07-11
[Table View] |
Similar Documents at Perry |
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24057A0782024-03-0101 March 2024 Amendments to Indemnity Agreements - Enclosure 2 ML24057A0772024-03-0101 March 2024 Conforming License Amendments - Enclosure 1 ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18214A6672018-08-22022 August 2018 FENOC Fleet - Perry Nuclear Power Plant, Unit No. 1 - Correction to the Issuance of Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules (CAC No. MG0136; EPID L-2017-LLA-0259) ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17163A3542017-06-29029 June 2017 Issuance of Amendment Concerning Adoption of Tstf-501, Revision 1, Relocation of Diesel Fuel and Lube Oil Volume Values to Licensee Control (CAC No. MF8693) (L-16-236) ML17139C3722017-06-19019 June 2017 Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17033A0142017-02-16016 February 2017 Issuance of Amendment Concerning Revision to Technical Specifications to Permit Installation of Upper Containment Pool Gate During Modes 1, 2, and 3 (CAC No. MF7476) (L-16-083) ML16158A3312016-09-14014 September 2016 Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan ML16130A5362016-05-31031 May 2016 Issuance of Conforming Amendment Related to the Direct License Transfer of the Facility Operating License NPF-58 ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) ML15075A1392015-03-30030 March 2015 Issuance of Amendment Concerning Full Implementation of Alternative Source Term (TAC No. MF3197) (L-13-306) L-14-325, Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)2015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML15075A0912015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML14205A6192014-08-29029 August 2014 Amendments to Indemnity Agreements (TAC MF0701, MF0702, MF0703, and MF0704) ML13136A1432013-05-16016 May 2013 Nucelar Power Plant, Unit 1 - Re-Issuance of Amendment Regarding Adoption of TSTF-275 and TSTF-300 ML13051B1442013-05-0606 May 2013 Issuance of Amendment Regarding Adoption of TSTF-275, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-Up, and TSTF-300 ML13017A4312013-04-18018 April 2013 Issuance of Amendment Revise Technical Specification 3.10.1, Inservice Leak, and Hydrostatic Testing Operation ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC 2024-03-01
[Table view] |
Text
ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT NO. 1 Replace the following page of the Facility Operating License with the attached revised pages.
The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.
REMOVE INSERT License NPF-58 License NPF-58 Page 5 Page 5
Page 5a
shall comply with the antitrust conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license.
- b. FENOC shall comply with the antitrust conditions delineated in Appendix C to this license as if named therein. FENOC shall not market or broker power or energy from the Perry Nuclear Power Plant, Unit No. 1. The Owners are responsible and accountable for the actions of FENOC to the extent that said actions affect the marketing or brokering of power or energy from the Perry Nuclear Power Plant, Unit No. 1, and in any way, contravene the antitrust condition contained in the license.
(4) Deleted (5) Deleted (6) Fire Protection (Section 9.5, SER, SSER #1, 2, 3, 4, 7, and 8)
FENOC shall comply with the following requirements of the fire protection program:
FENOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, as amended, for the Perry Nuclear Power Plant and as approved in the Safety Evaluation Report (NUREG-0887) dated May 1982 and Supplement Nos. 1 through 10 thereto, subject to the following provisions:
- a. FENOC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(7) Deleted (8) Deleted (9) Deleted (10) Deleted (11) Mitigation Strategy License Condition l l
The licensee shall develop and maintain strategies for addressing large fires and l explosions and that include the follow key areas: l l
(a) Fire fighting response strategy with the following elements: l
- 1. Predefined coordinated fire response strategy and guidance l
- 2. Assessment of mutual aid fire fighting assets l
- 3. Designated staging areas for equipment and materials l l
l Amendment No. 137 Revised by letter dated July 11, 2007
- 5a - l
- 4. Command and control l
- 5. Training of response personnel l l
(b) Operations to mitigate fuel damage considering the following: l
- 1. Protection and use of personnel assets l
- 2. Communications l
- 3. Minimizing fire spread l
- 4. Procedures for implementing integrated fire response strategy l
- 5. Identification of readily-available pre-staged equipment l
- 6. Training on integrated fire response strategy l
- 7. Spent fuel pool mitigation measures l l
(c) Actions to minimize release to include consideration of: l
- 1. Water spray scrubbing l
- 2. Dose to onsite responders l l
Revised by letter dated July 11, 2007