ML072180024: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML072180024 | | number = ML072180024 | ||
| issue date = 08/09/2007 | | issue date = 08/09/2007 | ||
| title = | | title = Revised Pages of Renewed Facility Operating License No. DPR-20 | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1 | | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE NO.DPR- | {{#Wiki_filter:REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE NO.DPR-20 DOCKET NO. 50-255 PALISADES NUCLEAR PLANT Insert the following page in the Facility Operating License No. DPR-20. The revised page is identified by the date of the letter issuing the page and contains marginal line indicating the areas of change. | ||
: 2. Assessment of mutual aid fire fighting assets | REMOVE INSERT | ||
: 3. Designated staging areas for equipment and materials | ------ Page 5a | ||
: 4. Command and control | |||
: 5. Training of response | 5a (6) Develop and maintain strategies for addressing large fires and explosions and that include the following key areas: | ||
: 2. Communications | : a. Fire fighting response strategy with the following elements: | ||
: 3. Minimizing fire spread | : 1. Pre-defined coordinated fire response strategy and guidance | ||
: 4. Procedures for implementing integrated fire response strategy | : 2. Assessment of mutual aid fire fighting assets | ||
: 5. Identification of readily-available pre-staged equipment | : 3. Designated staging areas for equipment and materials | ||
: 6. Training on integrated fire response strategy | : 4. Command and control | ||
: 7. Spent fuel pool mitigation | : 5. Training of response personnel | ||
: 2. Dose to onsite | : b. Operations to mitigate fuel damage considering the following: | ||
: 1. Protection and use of personnel assets | |||
: 2. Communications | |||
: 3. Minimizing fire spread | |||
: 4. Procedures for implementing integrated fire response strategy | |||
: 5. Identification of readily-available pre-staged equipment | |||
: 6. Training on integrated fire response strategy | |||
: 7. Spent fuel pool mitigation measures | |||
: c. Actions to minimize release to include consideration of: | |||
: 1. Water spray scrubbing | |||
: 2. Dose to onsite responders Revised by letter dated August 9, 2007}} |
Latest revision as of 04:53, 23 November 2019
ML072180024 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 08/09/2007 |
From: | NRC/NRR/ADRO/DORL/LPLIII-1 |
To: | |
Chawla M, NRR/DORL/LPL3-1, 301-415-8371 | |
Shared Package | |
ML0722000259 | List: |
References | |
Download: ML072180024 (2) | |
Text
REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE NO.DPR-20 DOCKET NO. 50-255 PALISADES NUCLEAR PLANT Insert the following page in the Facility Operating License No. DPR-20. The revised page is identified by the date of the letter issuing the page and contains marginal line indicating the areas of change.
REMOVE INSERT
Page 5a
5a (6) Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
- a. Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel
- b. Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures
- c. Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders Revised by letter dated August 9, 2007