ML081090519: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:10 CFR 54.21 Contents of application--technical information.
{{#Wiki_filter:10 CFR 54.21 Contents of application--technical information.                                           U   D RE-UTORY lint#* rI F-ntergy (Pilgrim Nuclear Power Station V6         4&                                                                                     D     t 50-293-LR _OMMcI Elifft No.0 Indlex SiteMapIFA I Facilty Imb IReading Rm INew IKlpeIiG~osse I ContalctUs                     OFFEREbr AW K=~f~fý                       aq~_
U D RE-UTORY lint#* rI F-ntergy (Pilgrim Nuclear Power Station V6 4& D t 50-293-LR
IIq AimTMM                 FEi       I VI .     ..
_OMMcI Elifft No.0 Indlex SiteMapIFA I Facilty Imb IReading Rm INew IKlpeIiG~osse I ContalctUs OFFEREbr AW K=~f~fý aq~_IIq AimTMM FEi I VI ...Ab~tN~- -- ucear -~Niil Radloact~vi
Ab~tN~-     --         ucear     -       ~Niil                   Radloact~vi
-~Rdactrs -- Materials'Wst Home > Electronic Reading Room > Document Collections  
                          -             ~Rdactrs           --     Materials'Wst Home > Electronic Reading Room > Document Collections > NRC Regulations (10 CFR) > Part Index > § 54.21 Contents of application-technical information.                                                                                                         DOCKETED USNRC
> NRC Regulations (10 CFR) > Part Index > § 54.21 Contents of application-technical information.
    § 54.21 Contents of application--technical information.                                                                 April 15, 2008 (10:00am)
DOCKETED USNRC§ 54.21 Contents of application--technical information.
Each application must contain the following information:                                                               OFFICE OF SECRETARY RULEMAKINGS AND (a) An integrated plant assessment (IPA). The IPA must--                                                               ADJUDICATIONS STAFF (1) For those systems, structures, and components within the scope of this part, as delineated in § 54.4, identify and list those structures and components subject to an aging management review. Structures and components subject to an aging management review shall encompass those structures and components--
April 15, 2008 (10:00am)Each application must contain the following information:
(i) That perform an intended function, as described in § 54.4, without moving parts or without a change in configuration or properties. These structures and components include, but are not limited to, the reactor vessel, the reactor coolant system pressure boundary, steam generators, the pressurizer, piping, pump casings, valve bodies, the core shroud, component supports, pressure retaining boundaries, heat exchangers, ventilation ducts, the containment, the containment liner, electrical and mechanical penetrations, equipment hatches, seismic Category I structures, electrical cables and connections, cable trays, and electrical cabinets, excluding, but not limited to, pumps (except casing), valves (except body), motors, diesel generators, air compressors, snubbers, the control rod drive, ventilation dampers, pressure transmitters, pressure indicators, water level indicators, switchgears, cooling fans, transistors, batteries, breakers, relays, switches, power inverters, circuit boards, battery chargers, and power supplies; and (ii) That are not subject to replacement based on a qualified life or specified time period.
OFFICE OF SECRETARY RULEMAKINGS AND (a) An integrated plant assessment (IPA). The IPA must-- ADJUDICATIONS STAFF (1) For those systems, structures, and components within the scope of this part, as delineated in § 54.4, identify and list those structures and components subject to an aging management review. Structures and components subject to an aging management review shall encompass those structures and components--(i) That perform an intended function, as described in § 54.4, without moving parts or without a change in configuration or properties.
(2) Describe and justify the methods used in paragraph (a)(1) of this section.
These structures and components include, but are not limited to, the reactor vessel, the reactor coolant system pressure boundary, steam generators, the pressurizer, piping, pump casings, valve bodies, the core shroud, component supports, pressure retaining boundaries, heat exchangers, ventilation ducts, the containment, the containment liner, electrical and mechanical penetrations, equipment hatches, seismic Category I structures, electrical cables and connections, cable trays, and electrical cabinets, excluding, but not limited to, pumps (except casing), valves (except body), motors, diesel generators, air compressors, snubbers, the control rod drive, ventilation dampers, pressure transmitters, pressure indicators, water level indicators, switchgears, cooling fans, transistors, batteries, breakers, relays, switches, power inverters, circuit boards, battery chargers, and power supplies; and (ii) That are not subject to replacement based on a qualified life or specified time period.(2) Describe and justify the methods used in paragraph (a)(1) of this section.(3) For each structure and component identified in paragraph (a)(1) of this section, demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the CLB for the period of extended operation.(b) CLB changes during NRC review of the application.
(3) For each structure and component identified in paragraph (a)(1) of this section, demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the CLB for the period of extended operation.
Each year following submittal of the license renewal application and at least 3 months before scheduled completion of the NRC review, an amendment to the renewal application must be submitted that identifies any change to the CLB of the facility that materially affects the contents of the licenserenewal application, including the FSAR supplement.(c) An evaluation of time-limited aging analyses.(1) A list of time-limited aging analyses, as defined in § 54.3, must be provided.
(b) CLB changes during NRC review of the application. Each year following submittal of the license renewal application and at least 3 months before scheduled completion of the NRC review, an amendment to the renewal application must be submitted that identifies any change to the CLB of the facility that materially affects the contents of the licenserenewal application, including the FSAR supplement.
The applicant shall demonstrate that--(i) The analyses remain valid for the period of extended operation;(ii) The analyses have been projected to the end of the period of extended operation; or (iii) The effeects of aging on the intended function(s) will be adequately managed for the period of extended operation.
(c) An evaluation of time-limited aging analyses.
(2) A list must be provided of plant-specific exemptions granted pursuant to 10 CFR 50.12 and in effect that are based on time-limited aging analyses as defined in § 54.3. The applicant shall provide an evaluation that justifies the continuation of these exemptions for the period of extended operation.(d) An FSAR supplement.
(1) A list of time-limited aging analyses, as defined in § 54.3, must be provided. The applicant shall demonstrate that--
The FSAR supplement for the facility must contain a summary description of the programs and activities for managing the effects of aging and the evaluation of time-limited aging analyses for the period of extended operation determined by paragraphs (a) and (c) of this section, respectively.
(i) The analyses remain valid for the period of extended operation; (ii) The analyses have been projected to the end of the period of extended operation; or (iii) The effeects of aging on the intended function(s) will be adequately managed for the period of extended operation.
Privacy Policy I Site Disclaimer Wednesday, February 27, 2008 ZscL5f}}
(2) A list must be provided of plant-specific exemptions granted pursuant to 10 CFR 50.12 and in effect that are based on time-limited aging analyses as defined in § 54.3. The applicant shall provide an evaluation that justifies the continuation of these exemptions for the period of extended operation.
(d) An FSAR supplement. The FSAR supplement for the facility must contain a summary description of the programs and activities for managing the effects of aging and the evaluation of time-limited aging analyses for the period of extended operation determined by paragraphs (a) and (c) of this section, respectively.
Privacy Policy I Site Disclaimer Wednesday, February27, 2008 ZscL5f}}

Revision as of 18:39, 14 November 2019

2008/02/27-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 3, 10 CFR 54.21, Contents of Application - Technical Information
ML081090519
Person / Time
Site: Pilgrim
Issue date: 02/27/2008
From:
NRC/SECY
To:
SECY RAS
References
50-293-LR, ASLBP 06-848-02-LR, Pilgrim-Intervenor-16, RAS J-46
Download: ML081090519 (1)


Text

10 CFR 54.21 Contents of application--technical information. U D RE-UTORY lint#* rI F-ntergy (Pilgrim Nuclear Power Station V6 4& D t 50-293-LR _OMMcI Elifft No.0 Indlex SiteMapIFA I Facilty Imb IReading Rm INew IKlpeIiG~osse I ContalctUs OFFEREbr AW K=~f~fý aq~_

IIq AimTMM FEi I VI . ..

Ab~tN~- -- ucear - ~Niil Radloact~vi

- ~Rdactrs -- Materials'Wst Home > Electronic Reading Room > Document Collections > NRC Regulations (10 CFR) > Part Index > § 54.21 Contents of application-technical information. DOCKETED USNRC

§ 54.21 Contents of application--technical information. April 15, 2008 (10:00am)

Each application must contain the following information: OFFICE OF SECRETARY RULEMAKINGS AND (a) An integrated plant assessment (IPA). The IPA must-- ADJUDICATIONS STAFF (1) For those systems, structures, and components within the scope of this part, as delineated in § 54.4, identify and list those structures and components subject to an aging management review. Structures and components subject to an aging management review shall encompass those structures and components--

(i) That perform an intended function, as described in § 54.4, without moving parts or without a change in configuration or properties. These structures and components include, but are not limited to, the reactor vessel, the reactor coolant system pressure boundary, steam generators, the pressurizer, piping, pump casings, valve bodies, the core shroud, component supports, pressure retaining boundaries, heat exchangers, ventilation ducts, the containment, the containment liner, electrical and mechanical penetrations, equipment hatches, seismic Category I structures, electrical cables and connections, cable trays, and electrical cabinets, excluding, but not limited to, pumps (except casing), valves (except body), motors, diesel generators, air compressors, snubbers, the control rod drive, ventilation dampers, pressure transmitters, pressure indicators, water level indicators, switchgears, cooling fans, transistors, batteries, breakers, relays, switches, power inverters, circuit boards, battery chargers, and power supplies; and (ii) That are not subject to replacement based on a qualified life or specified time period.

(2) Describe and justify the methods used in paragraph (a)(1) of this section.

(3) For each structure and component identified in paragraph (a)(1) of this section, demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the CLB for the period of extended operation.

(b) CLB changes during NRC review of the application. Each year following submittal of the license renewal application and at least 3 months before scheduled completion of the NRC review, an amendment to the renewal application must be submitted that identifies any change to the CLB of the facility that materially affects the contents of the licenserenewal application, including the FSAR supplement.

(c) An evaluation of time-limited aging analyses.

(1) A list of time-limited aging analyses, as defined in § 54.3, must be provided. The applicant shall demonstrate that--

(i) The analyses remain valid for the period of extended operation; (ii) The analyses have been projected to the end of the period of extended operation; or (iii) The effeects of aging on the intended function(s) will be adequately managed for the period of extended operation.

(2) A list must be provided of plant-specific exemptions granted pursuant to 10 CFR 50.12 and in effect that are based on time-limited aging analyses as defined in § 54.3. The applicant shall provide an evaluation that justifies the continuation of these exemptions for the period of extended operation.

(d) An FSAR supplement. The FSAR supplement for the facility must contain a summary description of the programs and activities for managing the effects of aging and the evaluation of time-limited aging analyses for the period of extended operation determined by paragraphs (a) and (c) of this section, respectively.

Privacy Policy I Site Disclaimer Wednesday, February27, 2008 ZscL5f