| {{#Wiki_filter:December 23, 2008 | | {{#Wiki_filter:December 23, 2008 Mr. David J. Bannister Vice President and CNO Omaha Public Power District Fort Calhoun Station 444 South 16th St. Mall Fort Calhoun, NE 68102-2247 |
| | |
| Mr. David J. Bannister Vice President and CNO Omaha Public Power District Fort Calhoun Station 444 South 16 th St. Mall Fort Calhoun, NE 68102-2247 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| FORT CALHOUN STATION, UNIT NO.1 - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT (TAC NO. MD8049) | | FORT CALHOUN STATION, UNIT NO.1 - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT (TAC NO. MD8049) |
|
| |
|
| ==Dear Mr. Bannister:== | | ==Dear Mr. Bannister:== |
|
| |
|
| Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption dated February 4, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080360106), as supplemented by letter dated October 13, 2008 (ADAMS Accession No. ML082980018) for the Fort Calhoun Station, Unit No. 1. The proposed action would provide an exemption from the provisions of Section III.G.1.b of Appendix R to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, for the 72-hour requirement to provide repair procedures and materials for cold shutdown capability for redundant cold shutdown components. | | Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption dated February 4, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080360106), as supplemented by letter dated October 13, 2008 (ADAMS Accession No. ML082980018) for the Fort Calhoun Station, Unit No. 1. The proposed action would provide an exemption from the provisions of Section III.G.1.b of Appendix R to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, for the 72-hour requirement to provide repair procedures and materials for cold shutdown capability for redundant cold shutdown components. |
| The assessment is being forwarded to the Office of the Federal Register for publication. | | The assessment is being forwarded to the Office of the Federal Register for publication. |
| | | Sincerely, |
| Sincerely, /RA/ | | /RA/ |
| Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 | | Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Environmental Assessment cc w/encl: Distribution via Listserv
| |
|
| |
|
| ML082980018) for the Fort Calhoun Station, Unit No. 1. The proposed action would provide an exemption from the provisions of Section III.G.1.b of Appendix R to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, for the 72-hour requirement to provide repair procedures and materials for cold shutdown capability for redundant cold shutdown components.
| | Environmental Assessment cc w/encl: Distribution via Listserv |
|
| |
|
| | ML082980018) for the Fort Calhoun Station, Unit No. 1. The proposed action would provide an exemption from the provisions of Section III.G.1.b of Appendix R to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, for the 72-hour requirement to provide repair procedures and materials for cold shutdown capability for redundant cold shutdown components. |
| The assessment is being forwarded to the Office of the Federal Register for publication. | | The assessment is being forwarded to the Office of the Federal Register for publication. |
| Sincerely, | | Sincerely, |
| /RA/ Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
| | /RA/ |
| | Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Environmental Assessment cc w/encl: Distribution via Listserv DISTRIBUTION | | |
| : PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDlrRerb Resource RidsNrrDorlLpl4 Resource RidsNrrPMFortCalhoun Resource RidsNrrLAJBurkhardt Resource RidsOgcRp Resource RidsRgn4MailCenter Resource ADAMS Accession Nos.: PKG: ML083330025 Letter: ML083330026 EA FRN: ML083330036 OFFICE DORL/LPL4/GE DORL/LPL4/PM DORL/LPL4/LA DLR/RERB/BC OGC DORL/LPL4/BC DORL/LPL4/PM NAME LWilkins AWang JBurkhardt BPham EWilliamson MMarkley Flyon for AWang DATE 12/1/08 12/3/08 12/1/08 12/8/08 12/18/08 12/22/08 12/23/08}}
| | Environmental Assessment cc w/encl: Distribution via Listserv DISTRIBUTION: |
| | PUBLIC RidsNrrPMFortCalhoun Resource LPLIV Reading RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDlrRerb Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource ADAMS Accession Nos.: PKG: ML083330025 Letter: ML083330026 EA FRN: ML083330036 OFFICE DORL/LPL4/GE DORL/LPL4/PM DORL/LPL4/LA DLR/RERB/BC OGC DORL/LPL4/BC DORL/LPL4/PM NAME LWilkins AWang JBurkhardt BPham EWilliamson MMarkley Flyon for AWang DATE 12/1/08 12/3/08 12/1/08 12/8/08 12/18/08 12/22/08 12/23/08}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML0833602642008-09-17017 September 2008 E-mail Request for Additional Information Re Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.1.b for Fire Area 31 Project stage: RAI LIC-08-0109, Response to Request for Additional Information Concerning Exemption from Requirements of 10 CFR 50, Appendix R, Section Iii.G.B. for Fire Area 312008-10-13013 October 2008 Response to Request for Additional Information Concerning Exemption from Requirements of 10 CFR 50, Appendix R, Section Iii.G.B. for Fire Area 31 Project stage: Response to RAI ML0833300362008-12-23023 December 2008 Environmental Assessment and Finding of No Significant Impact, Re Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.1.b for Fire Area 31 Project stage: Approval ML0833300262008-12-23023 December 2008 Environmental Assessment and Finding of No Significant Impact Project stage: Other ML0900504382009-02-0606 February 2009 Transmittal Letter, Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.1.b for Fire Area 31 Project stage: Approval ML0900504422009-02-0606 February 2009 Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.1.b for Fire Area 31 Project stage: Approval NRC-2008-0670, Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.1.b for Fire Area 312009-02-0606 February 2009 Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.1.b for Fire Area 31 Project stage: Approval 2008-12-23
[Table View] |
|
---|
Category:Letter
MONTHYEARML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-07-08
[Table view] |
Text
December 23, 2008 Mr. David J. Bannister Vice President and CNO Omaha Public Power District Fort Calhoun Station 444 South 16th St. Mall Fort Calhoun, NE 68102-2247
SUBJECT:
FORT CALHOUN STATION, UNIT NO.1 - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT (TAC NO. MD8049)
Dear Mr. Bannister:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption dated February 4, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080360106), as supplemented by letter dated October 13, 2008 (ADAMS Accession No. ML082980018) for the Fort Calhoun Station, Unit No. 1. The proposed action would provide an exemption from the provisions of Section III.G.1.b of Appendix R to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, for the 72-hour requirement to provide repair procedures and materials for cold shutdown capability for redundant cold shutdown components.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosure:
Environmental Assessment cc w/encl: Distribution via Listserv
ML082980018) for the Fort Calhoun Station, Unit No. 1. The proposed action would provide an exemption from the provisions of Section III.G.1.b of Appendix R to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, for the 72-hour requirement to provide repair procedures and materials for cold shutdown capability for redundant cold shutdown components.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosure:
Environmental Assessment cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMFortCalhoun Resource LPLIV Reading RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDlrRerb Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource ADAMS Accession Nos.: PKG: ML083330025 Letter: ML083330026 EA FRN: ML083330036 OFFICE DORL/LPL4/GE DORL/LPL4/PM DORL/LPL4/LA DLR/RERB/BC OGC DORL/LPL4/BC DORL/LPL4/PM NAME LWilkins AWang JBurkhardt BPham EWilliamson MMarkley Flyon for AWang DATE 12/1/08 12/3/08 12/1/08 12/8/08 12/18/08 12/22/08 12/23/08