ML090570047: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML090570047
| number = ML090570047
| issue date = 02/13/2009
| issue date = 02/13/2009
| title = Millstone, Units 2 & 3, Submittal of Technical Specifications 2008 Annual Report
| title = Submittal of Technical Specifications 2008 Annual Report
| author name = Griffin R T
| author name = Griffin R
| author affiliation = Dominion
| author affiliation = Dominion
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:4 Dominion Dominion Nuclear Connecticut, Inc.Millstone Power Station Rope Ferry Road, Waterford, CT 06385 FEB 1 3 2009 Attention:
{{#Wiki_filter:Dominion Nuclear Connecticut, Inc.
Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No.NSS&L/MLC Docket Nos.License Nos.09-100 RO 50-336 50-423 DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT.
Millstone Power Station                                             4      Dominion Rope Ferry Road, Waterford, CT 06385 FEB 1 3 2009 Attention: Document Control Desk                                 Serial No.      09-100 U.S. Nuclear Regulatory Commission                               NSS&L/MLC      RO Washington, DC 20555-0001                                       Docket Nos. 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT. INC.
INC.MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS 2008 ANNUAL REPORT In accordance with the referenced Technical Specifications (TS) reporting requirements for Millstone Power Station Unit 2 (MPS2) and Millstone Power Station Unit 3 (MPS3), Dominion Nuclear Connecticut, Inc. (DNC) hereby submits the following information for the period January 1, 2008 through December 31, 2008.* MPS2 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.5c)." MPS3 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.2b).
MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS 2008 ANNUAL REPORT In accordance with the referenced Technical Specifications (TS) reporting requirements for Millstone Power Station Unit 2 (MPS2) and Millstone Power Station Unit 3 (MPS3), Dominion Nuclear Connecticut, Inc. (DNC) hereby submits the following information for the period January 1, 2008 through December 31, 2008.
If you have any further questions, please contact Mr. William D. Bartron at (860) 444-4301.Sincerely, R. T. Griffin Director, Nuc e ar Station Safety and Licensing 41u) ý Serial No. 09-100 TS 2008 Annual Report Page 2 of 2 Attachments:
* MPS2 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.5c).
None Commitments made in this letter: None.cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ms. C. J. Sanders NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8B3 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station}}
        "   MPS3 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.2b).
If you have any further questions, please contact Mr. William D. Bartron at (860) 444-4301.
Sincerely, R. T. Griffin Director, Nuc ear Station Safety and Licensing 41u)ý
 
Serial No. 09-100 TS 2008 Annual Report Page 2 of 2 Attachments: None Commitments made in this letter: None.
cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ms. C. J. Sanders NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8B3 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station}}

Latest revision as of 09:40, 14 November 2019

Submittal of Technical Specifications 2008 Annual Report
ML090570047
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/13/2009
From: Griffin R
Dominion
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML090570047 (2)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station 4 Dominion Rope Ferry Road, Waterford, CT 06385 FEB 1 3 2009 Attention: Document Control Desk Serial No.09-100 U.S. Nuclear Regulatory Commission NSS&L/MLC RO Washington, DC 20555-0001 Docket Nos. 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS 2008 ANNUAL REPORT In accordance with the referenced Technical Specifications (TS) reporting requirements for Millstone Power Station Unit 2 (MPS2) and Millstone Power Station Unit 3 (MPS3), Dominion Nuclear Connecticut, Inc. (DNC) hereby submits the following information for the period January 1, 2008 through December 31, 2008.

  • MPS2 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.5c).

" MPS3 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.2b).

If you have any further questions, please contact Mr. William D. Bartron at (860) 444-4301.

Sincerely, R. T. Griffin Director, Nuc ear Station Safety and Licensing 41u)ý

Serial No.09-100 TS 2008 Annual Report Page 2 of 2 Attachments: None Commitments made in this letter: None.

cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ms. C. J. Sanders NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8B3 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station